Pembangunan Poskesdes Gpg. Padang Hilir Kec. Susoh (Doka)

Basic Information
Type: Public Tender
Tender Code: 3279625
Date: 4 March 2024
Year: 2024
KLPD: Kab. Aceh Barat Daya
Work Unit: Dinas Kesehatan
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 490,000,000
Estimated Value (Nilai HPS): Rp 489,897,252
Winner (Pemenang): CV Simpati
NPWP: 021501200106000
RUP Code: 46599403
Work Location: Kec. Susoh - Aceh Barat Daya (Kab.)
Participants: 8
Applicants
0021501200106000Rp 484,033,340
0027760818106000-
0025031063101000-
0032734063101000-
PT Halvia Mandiri Group
09*5**0****01**0-
CV Rest Area Pasid
05*0**1****01**0-
CV Ganesha Karya
09*8**8****01**0-
0032483547101000-
Attachment
URAIAN SINGKAT PEKERJAAN                             
                                                                            
                                                                            
1 Nama Paket Pekerjaan : Pembagunan Poskesdes Gpg. Padang Hilir Kec. Susoh (DOKA)
2 Nilai Total HPS  : Rp. 490.000.000,-                                      
                     (Empat ratus sembilan puluh juta rupiah)               
3 Sumber Dana      : Dana Otonomi Khusus Aceh (DOKA) Kabupaten Aceh Barat Daya
4 Tahun Anggaran   : 2024                                                   
5 Lingkup Pekerjaan  Pembagunan Poskesdes Gpg. Padang Hilir Kec. Susoh (DOKA) Direncanakan
                   : dengan volume 1 Unit Gedung Poskesdes.                 
                     Rincian lingkup pelaksanaan konstruksi tersebut adalah :
                     A. Bersama Konsultan membantu KPA/PPK dalam proses pembangunan fisik.
                     B. Lingkup pekerjaan Kontraktor Pelaksana dalam kegiatan ini adalah:
                      1.  Memeriksa dan mempelajari dokumen untuk pelaksanaan konstruksi yang
                          akan dijadikan dasar dalam pekerjaan di lapangan; 
                      2.  Menyusun program kerja yang meliputi jadwal waktu pelaksanaan,
                          jadwal pengadaan bahan, jadwal penggunaan tenaga kerja, dan jadwal
                          penggunaan peralatan;                             
                      3.  Melaksanakan persiapan di lapangan sesuai dengan pedoman
                          pelaksanaan;                                      
                      4.  Melaksanakan pekerjaan konstruksi fisik di lapangan sesuai dengan
                          dokumen pelaksanaan;                              
                      5.  Mengoptimalkan pemakaian bahan sesuai dengan ketentuan yang
                          tercantum dalam Spesifikasi Teknis dan harus mengutamakan
                          penggunaan bahan dan peralatan produksi dalam negeri, mengoptimalkan
                          peralatan dan metode pelaksanaan, serta ketepatan waktu dan biaya
                          pekerjaan konstruksi;                             
                      6.  Mengoptimalkan pelaksanaan pekerjaan konstruksi dari segi kualitas,
                          kuantitas, dan laju pencapaian volume/realisasi fisik;
                      7.  Mengumpulkan data dan informasi di lapangan untuk memecahkan
                          persoalan yang terjadi selama pelaksanaan konstruksi;
                      8.  Melaksanakan pelaporan pelaksanaan konstruksi fisik, melalui rapat-rapat
                          lapangan, laporan harian, laporan mingguan, laporan bulanan, laporan
                          kemajuan pekerjaan, laporan persoalan yang timbul atau dihadapi, dan
                          surat-menyurat;                                   
                      9.  Menyusun gambar pelaksanaan (shop drawing) untuk pekerjaan-
                          pekerjaan yang memerlukannya. Shop drawing diajukan kepada
                          Konsultan Pengawas dan Pejabat Pembuat Komitmen (PPK);
                      10. Membuat gambar yang sesuai dengan pelaksanaan di lapangan (as built
                          drawings) yang selesai sebelum serah terima pertama, setelah disetujui
                          oleh Konsultan Pengawas dan Pejabat pembuat Komitmen (PPK);
                      11. Melakukan perbaikan terhadap cacat/kerusakan pada masa
                          pemeliharaan, dan menyusun laporan akhir pekerjaan konstruksi;
                      12. Menyusun berita acara persetujuan kemajuan pekerjaan, berita acara
                          pemeliharaan pekerjaan, dan serah terima pertama dan kedua
                          pelaksanaan konstruksi sebagai kelengkapan untuk pembayaran angsuran
                          pekerjaan konstruksi;                             
                      13. Bersama-sama penyedia jasa Konstruksi dan Konsultan Pengawas
                          menyusun petunjuk pemeliharaan bangunan gedung;   
                      14. Bangunan Gedung yang di kerjakan/dibangun merupakan sarana
                          pendukung Kegiatan Kesehatan Masyarakat;          
                      15. Lingkup pekerjaan :                               
                          I. PEKERJAAN PERSIAPAN                            
                          1. Pengukuran dan Pemasangan Bowplank             
                          2. Biaya Pelaksanaan K3                           
                          3. Foto Visual & Administrasi                     
                          4. Papan Nama Kegiatan                            
                          II. PEKERJAAN BANGUNAN POKESDES                   
                          A. PEKERJAAN TANAH                                
                          1. Galian Tanah Pondasi                           
                          2. Urugan Bekas Galian                            
                          3. Timbunan Tanah                                 
                          4. Urugan Pasir Bawah Lantai                      
                          5. Urugan Pasir Bawah Pondasi                     
                          B. PEKERJAAN PASANGAN                             
                          1. Pas. Batu Kosong                               
                          2. Pas. Pondasi Batu Kali 1 : 4                   
                          3. Pasangan 1/2 Bata 1: 2                         
                          4. Plesteran 1 :2                                 
                          5. Pasangan 1/2 Bata 1: 4                         
                          6. Plesteran 1 : 4                                
                          C. PEKERJAAN BETON                                
                          1. Tapak Pondasi                                  
                          2. Kolom Pondasi Tapak                            
                          3. Sloof 20/25                                    
                          4. Kolom 20/20                                    
                          5. Kolom 13/13                                    
                          6. Balok Lateu 13/15                              
                          7. Ringbalk 13/20                                 
                          8. Plat Kanopi t = 7 cm                           
                          9. Rabat Beton Lantai                             
                          D. PEKERJAAN LANTAI                               
                          1. Keramik Lantai 40x40 Cm                        
                          2. Keramik Lantai 25x25 Cm (Unpolished)           
                          3. Keramik Dinding 25/40                          
                          E PEKERJAAN KUSEN PINTU, DAN JENDELA              
                          1. Kosen + Daun Pintu dan Jendela dan Ventilasi Type I
                            Kosen + Daun Pintu dan Ventilasi Type II Panel uPVC Tebal 5 Cm +
                          2.                                                
                            Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
                            Kosen + Daun Pintu Type III Panel uPVC Tebal 5 Cm + Kaca Polos 5
                          3.                                                
                            mm + Ongkos+ Accesoris Lengkap Terpasang        
                            Kosen + Daun Jendela dan Ventilasi Type I Panel uPVC Tebal 5 Cm +
                          4.                                                
                            Kaca Polos 5 mm + Ongkos+ Accesoris Lengkap Terpasang
                            Kosen + Daun Ventilasi Type I Panel uPVC Tebal 5 Cm + Kaca Polos 5
                          5.                                                
                            mm + Ongkos+ Accesoris Lengkap Terpasang        
                          F. PEKERJAAN ATAP DAN PLAFOND                     
                          1. Rangka Atap Baja Ringan                        
                          2. Atap Seng Spandex 0,30                         
                          3. Rabung Atap                                    
                          4. Talang Patahan                                 
                          5. Papan Listplank                                
                          6. Plafond PVC + Rangka (Terpasang)               
                          G. PEKERJAAN INSTALASI LISTRIK                    
                          1. Pemasukan Arus Listrik 6 Ampere                
                            Instalasi Titik Lampu dgn Kabel NYM 2,5 mm + Pipa Pvc +
                          2.                                                
                            Accessories (Terpasang)                         
                            Instalasi Titik Api Stop Kontak dgn Kabel NYM 2,5 mm + Pipa Pvc +
                          3.                                                
                            Accessories (Terpasang)                         
                          4. Lampu LED 12 Watt Tipe Tempel (Setara Hanoch)  
                          5. Lampu HE 28 Watt (Setara Philips)              
                          6. Mangkok Listrik + Penutup                      
                          7. Saklar                                         
                          8. Stop Kontak                                    
                          9. MCB Terpasang                                  
                          H. PEKERJAAN SANITASI                             
                          1. Instalasi Air Bersih Pipa (Lengkap Terpasang)  
                          2. Instalasi Air Kotor (Lengkap Terpasang)        
                          3. Pengambilan Air+ Pipa Tanam+ Bahan + Aksesories (Terpasang)
                          4. Mesin Pompa Air + Rangka Besi Pengaman         
                          5. Kran Air 3/4"                                  
                          6. Klosed Jongkok                                 
                          7. Bak Air PVC                                    
                          8. Floor Drain (Stainless)                        
                          9. Septictank + Resapan                           
                          I. PEKERJAAN PENGECATAN DAN LAIN-LAIN             
                          1. Cat Tembok                                     
                          2. Cat kayu
Tenders also won by CV Simpati
Authority
26 May 2022Pemeliharaan Berkala Jalan Blangpidie - Cot ManeAcehRp 5,700,000,000
29 June 2021Pembangunan Tanggul Pengaman Sungai Gp. Padang Baru Kec. Susoh (Did)Kab. Aceh Barat DayaRp 4,149,018,769
13 June 2019Lanjutan Pembangunan Tanggul Pengaman Krueng SusohKab. Aceh Barat DayaRp 4,000,000,000
4 May 2023Pembangunan Bangunan Perkuatan Tebing Sungai Dan Normalisasi Sungai Krueng Ujong Tanoh Kab. Aceh Barat DayaAcehRp 3,385,686,924
21 June 2024Peningkatan Jalan Suak Nibong (135) Kec. Tangan-Tangan (Dak)Kab. Aceh Barat DayaRp 2,619,000,000
8 May 2024Lanjutan Peningkatan Jalan Bendung Mata Ie - Kila (268) Kec. Blangpidie (Doka)Kab. Aceh Barat DayaRp 2,472,533,974
15 February 2021Rehabilitasi Jaringan Irigasi D.I Panton Teungku ( Dak )Kab. Aceh Barat DayaRp 2,178,350,000
9 April 2019Pembangunan/Peningkatan Jalan Produksi Perkebunan Rakyat Kecamatan Kuala Batee (Doka)Kab. Aceh Barat DayaRp 1,764,720,000
26 March 2020Pembangunan Jalan Produksi Perkebunan Arah Pegunungan Kec. Manggeng (Doka)Kab. Aceh Barat DayaRp 1,656,351,000
30 July 2019Pembangunan Rumah Sehat Sederhana Paket 1 (Otsus)Pemerintah Daerah Kabupaten Nagan RayaRp 1,416,100,000