Rehabilitasi Drainase Pasar Ayam

Basic Information
Type: Public Tender
Tender Code: 10340440000
Date: 21 August 2025
Year: 2025
KLPD: Kab. Aceh Barat
Work Unit: Dinas Pekerjaan Umum Dan Penataan Ruang
Procurement Type: Pekerjaan Konstruksi
Method: Pengadaan Langsung
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 172,980,000
Estimated Value (Nilai HPS): Rp 172,974,800
Winner (Pemenang): CV Na Jaya Bersama
NPWP: 10*0**0****77**7
RUP Code: 59814843
Work Location: Kec. Johan Pahlawan - Aceh Barat (Kab.)
Participants: 1
Attachment
REKAPITULASI                                             
                                                                                              
                                                                                              
                                                                                              
PEKERJAAN         : REHABILITASI SALURAN DRAINASE PASAR AYAM                                  
                                                                                              
LOKASI            : KEC. JOHAN PAHLAWAN                                                       
KABUPATEN         : KABUPATEN ACEH BARAT                                                      
SUMBER DANA       : DAU                                                                       
TAHUN ANGGARAN    : 2025                                                                      
                                                                                              
                                                                                              
                                                                                              
  NO                  URAIAN PEKERJAAN                          JUMLAH HARGA (Rp)             
                                                                                              
                                                                                              
                                                                                              
                                                                                              
  I    PEKERJAAN PERSIAPAN                                                            -       
                                                                                              
                                                                                              
                                                                                              
  II   PEKERJAAN SALURAN DRAINASE                                                     -       
                                                                                              
                                                                                              
                                                                                              
  III  PEKERJAAN BOX                                                                  -       
                                                                                              
                                                                                              
                                                                                              
                                                                                              
       JUMLAH                                                                         -       
                                                                                              
       PPN 11%                                                                        -       
                                                                                              
       JUMLAH TOTAL                                                                   -       
                                                                                              
       DIBULATKAN                                                                     -       
                                                                                              
                                                                                              
          Terbilang : …........................................................               
                                                                                              
                                                                                              
                                                                                              
                                                             …............,….....................2025
                                                                     Penawar,                 
                                                                                              
                                                                 PT/CV…...................... 
                                                                                              
                                                                                              
                                                                                              
                                                                                              
                                                                                              
                                                                                              
                                                                                              
                                                                   (Nama Jelas)               
                                                                     Jabatan                  
                                               DAFTAR  KUANTITAS  DAN  HARGA                                                    
                                                                                                                                
                                                                                                                                
                                                                                                                                
                                                                                                                                
                                                                                                                                
      PEKERJAAN      : REHABILITASI SALURAN DRAINASE PASAR AYAM                                                                 
      LOKASI         : KEC. JOHAN PAHLAWAN                                                                                      
      SUMBER DANA    : DAU                                                                                                      
                                                                                                                                
      TAHUN ANGGARAN : 2025                                                                                                     
                                                                                                                                
                                                                                                                                
                                                                                          HARGA SATUAN                          
      NO.                    URAIAN PEKERJAAN                  VOLUME   SAT.   ANALISA                 JUMLAH HARGA (Rp)        
                                                                                              (Rp)                              
        I  PEKERJAAN PERSIAPAN                                                                                                  
       1   Pengukuran dan Pemasangan Bouwplank                     1 ,00 Ls     Taksir             -                -           
                                                                                                                                
       2   Perlengkapan K3                                          -                                                           
           - Helm Pelindung                                        5 ,00 Bh     Taksir             -                -           
                                                                                                                                
           - Masker                                                5 ,00 Bh     Taksir             -                -           
           - Sarung Tangan                                         5 ,00 Bh     Taksir             -                -           
                                                                                                                                
           - Sepatu Boat                                           5 ,00 Bh     Taksir             -                -           
           - Rompi/Jaket                                           5 ,00 Bh     Taksir             -                -           
                                                                                                                                
           - Peralatan P3K                                         1 ,00 Pkt    Taksir             -                -           
           - Papan Peringatan Proyek                               4 ,00 Unit   Taksir             -                -           
       3   Pemasangan Papan Nama Proyek                            1 ,00 Ls     Taksir             -                -           
                                                                                                                                
       4   Dokumentasi dan Pelaporan                               1 ,00 Ls     Taksir             -                -           
                                                                                                                    -           
                                                                                                                                
       II  PEKERJAAN SALURAN DRAINASE                                                                                           
                                                                                                                                
       1   Galian Tanah                                           4 4,13 M³   U.3.4.1.a.1(c)       -                -           
       2   Galian Sedimen Saluran                                 3 0,22 M³   U.3.4.1.a.1(c)       -                -           
                                                                                                                                
       3   Pembongkaran Beton lama                                 2 ,74 M³    A.2.03.2J.1         -                -           
       4   Pembuangan Sisa Galian                                 3 2,96 M³   U.3.6.a.11 (a)       -                -           
                                                                                                                                
           Beton Mutu fc' 15 Mpa, slump (100±25) mm, agregat maksimal 19                                                        
       5                                                          4 1,75 M³    U.4.1.b (c)         -                -           
           mm secara manual                                                                                                     
       6   Pembesian                                            1 .727,53 Kg  U.4.6.a.1 (a)        -                -           
       7   Bekisting                                             2 02,05 M²   A.1.03.2b.1          -                -           
       8   Pipa Ø 4 Inch                                          2 0,00 M'     Taksir             -                -           
                                                                                                                                
                                                                                                                    -           
       III PEKERJAAN BOX                                                                                                        
                                                                                                                                
       1   Galian Tanah                                            9 ,94 M³   U.3.4.1.a.1(c)       -                -           
           Beton Mutu fc' 20 Mpa, slump (100±25) mm, agregat maksimal 19                                                        
       2                                                           2 ,27 M³    U.4.1.d. c          -                -           
           mm secara manual                                                                                                     
       3   Pembesian                                             1 79,77 Kg    U.4.6.a.1 (a)       -                -           
       4   Bekisting                                               7 ,10 M²    A.1.03.2b.1         -                -           
                                                                                                                    -           
                                                 ANALISA HARGA SATUAN                                                    
                                                                                                                         
                       Satuan pembayaran         :  M³                                                                   
                                                                                                                         
                       Jenis Pekerjaan           :  Galian Tanah Biasa sedalam ≤ 1m                                      
                       ANALISA                   :  U.3.4.1.a.1(c)                                                       
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                            1 Pekerja                  O/H       0,7500        -              -                          
                                                                                                                         
                            2 Mandor                   O/H       0,0380        -              -                          
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                                                                                                                         
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                       Satuan pembayaran         :  M³                                                                   
                       Jenis Pekerjaan           :  Membuat 1 m3 Beton Mutu fc' 15 Mpa, slump (100±25) mm,               
                                                    agregat maksimal 19 mm secara manual                                 
                       Analisa                   :  U.4.1.b (c)                                                          
                                                                                                                         
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                            1 Pekerja                  O/H      1 ,6500        -              -                          
                            2 Tukang                   O/H      0 ,2750        -              -                          
                            3 Kepala tukang            O/H      0 ,0280        -              -                          
                                                                                                                         
                            4 Mandor                   O/H      0 ,0090        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                            1 Semen                    Kg      306,0000        -              -                          
                            2 Pasir Beton              Kg      832,0000        -              -                          
                            3 Kerikil                  Kg     1.009,0000       -              -                          
                                                                                                                         
                            4 Air                     Liter    2 02,0000       -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                            1 Molen Kapasitas 0,3 m3  Hari       0,2500        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                                                                                                                         
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                       Satuan pembayaran         :  M³                                                                   
                                                                                                                         
                                                    Membuat 1 m3 Beton Mutu fc' 20 Mpa, slump (100±25) mm,               
                       Jenis Pekerjaan           :  agregat maksimal 19 mm secara manual                                 
                       Analisa                   :  U.4.1.d. c                                                           
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                                                                                                                         
                            1 Pekerja                  O/H      1 ,6500        -              -                          
                            2 Tukang                   O/H      0 ,2750        -              -                          
                            3 Kepala tukang            O/H      0 ,0280        -              -                          
                            4 Mandor                   O/H      0 ,0090        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                            1 Semen                    Kg      348,0000        -              -                          
                                                                                                                         
                            2 Pasir Beton              Kg      790,0000        -              -                          
                            3 Kerikil                  Kg     1.009,0000       -              -                          
                            4 Air                     Liter    2 02,0000       -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                            1 Molen Kapasitas 0,3 m3  Hari       0,2500        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                                                                                                                         
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                                                                                                                         
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                                                                                         
                                                                                                                         
                       Satuan pembayaran         :  Kg                                                                   
                                                    Penulangan 1 kg baja tulangan polos (BjTP) atau baja tulangan        
                                                                                                                         
                       Jenis Pekerjaan           :  sirip/ulir (BjTS)                                                    
                       Analisa                   :  U.4.6.a.1 (a)                                                        
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                             Pembesian 100 Kg Besi Polos                                                                 
                        A.   TENAGA KERJA                                                                                
                            1 Pekerja                  O/H      0 ,0070        -              -                          
                                                                                                                         
                            2 Tukang                   O/H      0 ,0070        -              -                          
                            3 Kepala tukang            O/H      0 ,0007        -              -                          
                            4 Mandor                   O/H      0 ,0007        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                            1 BjTP atau BjTS           Kg        1,0200        -              -                          
                            2 Kawat bendrat            Kg        0,0150        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                                                                                                                         
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                     2                                                                   
                       Satuan pembayaran         :  M                                                                    
                       Jenis Pekerjaan           :  1 m2 Bekisting biasa lantai beton dengan multiflex 12 mm             
                                                    atau 18 mm (TP)                                                      
                       Analisa                   :  A.1.03.2b.1                                                          
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                            1 Pekerja                  O/H      0 ,2000        -              -                          
                            2 Tukang                   O/H      0 ,1000        -              -                          
                            3 Kepala tukang            O/H      0 ,0100        -              -                          
                                                                                                                         
                            4 Mandor                   O/H      0 ,0200        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                            1 Multiflex 12 mm         Lembar     0,2030        -              -                          
                            2 Kaso 5/7                 M³        0,0080        -              -                          
                            3 Paku 5 cm dan 7 cm       Kg        0,2200        -              -                          
                            4 Minyak Bekisting         Ltr       0,2000        -              -                          
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                                                                                                                         
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                       Satuan pembayaran         :  M3                                                                   
                       Jenis Pekerjaan           :  Bongkar 1 m3 beton dengan Jack Hammer Drill 2,5 KW+Genset 5 KW       
                       Analisa                   :  A.2.03.2J.1                                                          
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                                                                                                                         
                            1 Pekerja                  O/H      0 ,1800        -              -                          
                            3 Mandor                   O/H      0 ,0180        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                            1 Cuka Bibit               Liter     1,2000        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                            1 Jack Hammer + Genset     hari      0,0600        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                     3                                                                   
                       Satuan pembayaran         :  M                                                                    
                       Jenis Pekerjaan           :  Mengangkut 1 m3 tanah lepas, jarak angkut > 500 s.d 600 m            
                       Analisa                   :  U.3.6.a.11 (a)                                                       
                                                                                                                         
                                                                       HARGA SATUAN JUMLAH HARGA                         
                        NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                   
                                                                           (Rp)         (Rp.)                            
                        A.   TENAGA KERJA                                                                                
                                                                                                                         
                            1 Pekerja                  O/H      1 ,3777        -              -                          
                                                                                                                         
                            2 Mandor                   O/H      0 ,0688        -              -                          
                                                                     Jumlah                   -                          
                                                                                                                         
                        B.   BAHAN                                                                                       
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        C.   PERALATAN                                                                                   
                                                                                                                         
                            1 Mobil Angkut Timbunan  Sewa-Hari   0,0625        -              -                          
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                     Jumlah                   -                          
                                                                                                                         
                        D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                          
                        E. Overhead dan Profit ( 15% x D)                                     -                          
                        F. Harga Satuan Pekerjaan (D+E)                                       -                          
                                                ANALISA HARGA SATUAN                                                     
                                                                                                                         
                   Satuan pembayaran     :    M³                                                                         
                   Jenis Pekerjaan       :    Pengurugan 1 m3 dengan tanah timbun                                        
                                                                                                                         
                   ANALISA               :    A.2.3.1.15.                                                                
                                                                                                                         
                                                                             HARGA SATUAN JUMLAH HARGA                   
                     NO      URAIAN PEKERJAAN         SATUAN        KUANTITAS                                            
                                                                                (Rp)       (Rp.)                         
                     A.         TENAGA KERJA                                                                             
                                                                                                                         
                               1 Pekerja               O/H              0,1000      -          -                         
                               2 Mandor                O/H              0,0100      -          -                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                          Jumlah               -                         
                                                                                                                         
                     B.         BAHAN                                                                                    
                                                                                                                         
                               1 Tanah Timbun          M3               1,2000      -          -                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                          Jumlah               -                         
                                                                                                                         
                     C.         PERALATAN                                                                                
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                                                                         
                                                                          Jumlah               -                         
                     D.   Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)               -                         
                     E.   Overhead dan Profit ( 15% x D)                                       -                         
                                                                                                                         
                     F.   Harga Satuan Pekerjaan (D+E)                                         -                         
                                            DAFTAR HARGA SATUAN UPAH                                               
                                                                                                                   
                                                                                                                   
                                                                                                                   
                 NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                   
                                                                                                                   
                  I.  U P A H                                                                                      
                                                                                                                   
                  1   Pekerja                             Hari/Orang            -                                  
                                                                                                                   
                  2   Tukang                              Hari/Orang            -                                  
                                                                                                                   
                  3   Kepala Tukang                       Hari/Orang            -                                  
                                                                                                                   
                  4   Mandor                              Hari/Orang            -                                  
                                                                                                                   
                                                                                                                   
                    5 Operator Terlatih                   Hari/Orang            -                                  
                                                                                                                   
                    6 Operator Terlatih                     Jam                 -                                  
                                                                                                                   
                    7 Pembantu Operator                   Hari/Orang            -                                  
                                                                                                                   
                    8 Pembantu Operator                     Jam                 -                                  
                                                                                                                   
                                                                                                                   
                                           DAFTAR HARGA SATUAN  BAHAN                                              
                                                                                                                   
                                                                                                                   
                                                                                                                   
                 NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                   
                                                                                                                   
                  II. B A H A N                                                                                    
                  1   Batu Kali (Koral)                     M³                  -                                  
                  2   Kayu Kelas : I                        M³                  -                                  
                                                                                                                   
                  3   Kayu Kelas : II (sejenis kayu keras)  M³                  -                                  
                  4   Multiflex 12 mm                       Lbr                 -                                  
                  5   Kayu Kelas : III (sejenis kayu keras) M³                  -                                  
                                                                                                                   
                  6   Papan Kayu 3/20 (kayu Kelas III)      Lbr                 -                                  
                  7   Kerikil Sungai                        M³                  -      BJ Kerikil                  
                                                                                                                   
                  8   Kerikil Sungai                        Kg                  -          1.350,00                
                  9   Papan Kayu Klas I                     M3                  -                                  
                  10  Papan Kayu Klas II                    M3                  -                                  
                  11  Papan Kayu Klas III                   M3                  -                                  
                                                                                                                   
                  12  Pasir Beton                           M³                  -      BJ Pasir                    
                  13  Pasir Beton                           Kg                  -          1.400,00                
                                                                                                                   
                  14  Pasir Pasang                          M³                  -                                  
                  15  Pasir Urug                            M³                  -                                  
                  16  Sirtu                                 M³                  -                                  
                                                                                                                   
                  17  Tanah Timbun                          M³                  -                                  
                  18  Bensin                                Liter               -                                  
                  19  Besi Beton ( U 24 )                   Kg                  -                                  
                                                                                                                   
                  20  Besi Ulir ( D 32 )                    Kg                  -                                  
                  21  Cat Kayu                              Kg                  -                                  
                                                                                                                   
                  22  Kawat Beton                           Kg                  -                                  
                  24  Minyak Pelumas (Pertamina)            Liter               -                                  
                  25  Minyak Bekisting                      Liter               -                                  
                                                                                                                   
                  26  Paku                                  Kg                  -                                  
                  27  Semen PC ( 40 Kg )                    Zak                 -                                  
                  28  Semen PC ( 40 Kg )                    Kg                  -                                  
                                                                                                                   
                  29  Solar ( Industri )                    Liter               -                                  
                  30  Pelumas Mesin                         Liter               -                                  
                  31  Wire Mesh Uk. 2,10 x 5,40 m, Ø 6 mm   Kg                  -                                  
                                                                                                                   
                  32  Dolken Kayu Galam, Ø (8-10) cm, pjg 4 m Batang            -                                  
                  33  Pipa Ø 4 Inch                         m                   -                                  
                                                                                                                   
                  34  Elbow Ø 4 Inch                        Bh                  -                                  
                  35  BBM non subsidi                       Liter               -                                  
                  36  Air                                   Liter               -                                  
                                         DAFTAR HARGA  SATUAN PERALATAN                                            
                                                                                                                   
                                                                                                                   
                                                                                                                   
                 NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                   
                                                                                                                   
                                                                                                                   
                  1   Concrete Mixer                        Hari                -                                  
                  2   Jack Hammer + Genset                  Hari                -