Pekerjaan Penguatan Sistem Diseminasi Informasi Dan Peringatan Dini Ancaman Tsunami Kepada Masyarakat Tahun 2025

Basic Information
Type: Public Tender
Tender Code: 10021923000
Date: 26 March 2025
Year: 2025
KLPD: Badan Nasional Penanggulangan Bencana
Work Unit: Badan Nasional Penanggulangan Bencana
Procurement Type: Pengadaan Barang
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 24,000,000,000
Estimated Value (Nilai HPS): Rp 23,690,093,000
Winner (Pemenang): PT Kinerja Lintas Nusantara
NPWP: 316537257034000
RUP Code: 58704627
Work Location: Tegalkamulyan, Karangkandri - Cilacap (Kab.)|Katapiang, Ulakan - Padang Pariaman (Kab.)|Labean, Ponggerang, Sioyong, Siboang, Tonggolobibi - Dongala (Kab.)|Lere, Sulae, Talise - Palu (Kota)|Penyaringan, Yeh Kuning, Pengambengan, Karangwuni - Jembrana (Kab.)|Karangwuni - Kulon Progo (Kab.)|Pelabuhanratu, Loji - Sukabumi (Kab.)|Kembang, Sidoharjo - Pacitan (Kab.)|Selong Blanak, Sengkol, Mertak - Lombok Tengah (Kab.)|Sokong, Jenggala, Gondang, Segara Katon - Lombok Utara (Kab.)|Bintaro, Tanjung Karang, Jempong Baru - Mataram (Kota)|Kubangsari, Mekarsari, Lebakgede, Gerem - Cilegon (Kota)|Kambang Barat, Amping Parak - Pesisir Selatan (Kab.)|Beringin Raya, Berkas - Bengkulu (Kota)|Rangai Tri Tunggal, Tarahan, Kalianda, Banding, Way Muli, Sukaraja - Lampung Selatan (Kab.)|Cikiruhwetan, Panimbangjaya, Caringin, Cigondang, Carita - Pandeglang (Kab.)|Muara ,Sukajadi, Siturege, Pondokpanjang, Sawarna, Bayah Barat - Lebak (Kab.)|Bulakan, Karang Suraga, Anyar, Sumuranja, Salira, Argawana - Serang (Kab.)
Participants: 38
Applicants
Reason
0316537257034000Rp 23,511,718,270-
Ayooklik Airmas Perkasa
07*3**6****44**0--
PT Javandra Nikara Teknik
03*7**1****12**0--
0029801917404000--
0746986215444000--
PT Pelita Putra Pratama
09*4**7****08**0Rp 23,130,000,000tidak melampirkan : 1. pajak 3 tahun terakhir 2. tidak menyetujui Pernyataan Pakta Integritas 3.Tidak menyetujui Surat Pernyataan Peserta 4. Tidak menyampaikan financial capability 5. tidak menyampaikan dokumen yang dipersyaratkan dalam dokumen pemilihan 6. tidak menyampaikan layanan purna jual 7. tidak memiliki pengalaman pekerjaan sesuai dengan yang dipersyaratkan dalam dokumen pemilihan
0720556976027000Rp 22,562,955,9001. VHF antenna : Frequency yang diminta capable on VHF 137 - 149,9 MHz, yang ditawarkan sesuai brosur : Frequency Range: 136-144 MHz 2. Splitzen type Lightning rod : tidak melampirkan brosur, tidak sesuai dengan RFB ITB 37.1 point A.3 Documentary Evidence: The Bidder shall furnish documentary evidence to demonstrate that the goods it offers meet the following usage requirement namely catalog of product, brochure, pictures, equipment. 3. Audio Speaker Set (8 units) : penawaran yang disampikan lebih dari 1 barang, dan salah satunya tidak memenuhi spek yang diminta sesuai brosur yang di tawarkan. Yang diminta Frequency Response : 150 Hz - 8.000 Hz (min), yang disampikan pada brosur produk TOA Frequency Response : 150 Hz - 6.000 Hz (min) 4. Monitoring Camera System, yang diminta Camera type IP Rating: IP67, yang tersampaikan sesuai brosur IP Rating: IP66, brosur kamera modul tidak disampaikan 5. Activation Fee + Airtime :tidak melampirkan brosur, tidak sesuai dengan RFB ITB 37.1 point A.3 Documentary Evidence: The Bidder shall furnish documentary evidence to demonstrate that the goods it offers meet the following usage requirement namely catalog of product, brochure, pictures, equipment.
CV Pinguin Data Solusindo
08*9**3****26**0Rp 23,129,007,652-
PT Putra Arga Binangun
00*7**0****24**0--
Haq Lombok Seruni
02*0**6****11**0--
0854283876432000--
0025619719101000--
0016286619008000--
0020346052542000--
0427170899422000--
0906122403009000--
PT Royal Inti Mahiro
07*6**9****09**0--
PT Bryan Bimantara Lestari
09*5**0****15**0--
0026488718411000--
0312111511016001--
0021896170037000--
0016785727013000--
0030312441027000--
0905499190067000--
Yakin Malara Sejahtera
06*7**3****35**0--
0765814231407000--
0746622968107000--
PT Merapi Tani Instrumen
07*9**9****43**0--
0016989923027000--
PT Mazmur Karya Jaya
04*3**4****23**0--
PT Tiga Kaya Raya
02*8**0****04**0--
0905106936015000--
0013025424025000--
PT Telekomunikasi Selular
00*7**3****93**0--
PT Peppas Karya Bersama
02*5**6****17**0--
0849409644012000--
0801013798028000--
0317080711424000--
Attachment
II. SCOPE OF WORK                                                       
                                                                        
2.1 Scope of Work                                                       
                                                                        
    The work of Strengthening the Dissemination System of Tsunami Information and Early
Warning to The Community is mainly only for tsunami disasters triggered by earthquakes. The
scope of this activity includes (minimum technical specifications and minimum quantities as
                                                                        
attached):                                                              
  1. Procurement Siren Control Unit (Controller)                        
                                                                        
     Should have the ability as following:                              
      a. The controller uses LAN and GSM networks as the main communication mode
        and/or VHF radio network and/or Short Burst Data (SBD) satellite as a backup
        communication mode.                                             
                                                                        
      b. Controllers can activate one or all the Siren Units located in one district and/or
        province for controllers stationed there.                       
      c. The controller provides a mechanism/interface connected to one digital/analogue
        input port to activate the Existing Siren Unit (previously built).
                                                                        
      d. The controller is capable/adaptive of activating other new Siren Units if there are
        additional Siren Units (which use internet and VHF-based communications).
      e. The controller provides an LCD display/panel to display information on each
        controller unit:                                                
          ●  District/City/Province of Controller location.             
          ●  Controller activity status.                                
                                                                        
          ●  Device status and communication lines.                     
          ●  Power supply device status.                                
      f. The controller provides a microphone unit for conveying warning/advice sounds
        via the outdoor speaker in the Siren Unit.                      
                                                                        
                                                                        
  2. Procurement Siren Unit (Siren)                                     
     Should have the ability as following:                              
      a. Siren uses the GSM network as the primary communication mode and the Short
                                                                        
        Burst Data (SBD) satellite and VHF radio network (for some locations) as a backup
        communication mode.                                             
      b. The siren is capable/adaptive to the addition of additional communication lines via
        the VHF radio network (for locations that have not been facilitated).
                                                                        
      c. The siren can be activated in several ways, namely:            
          ●  Remotely using the Control Unit at Pusdalops (EOC).        
          ●  Remotely using a registered HT device (for sirens equipped with
             VHF communication).                                        
                                                                        
          ●  Remotely use the menu on the Dashboard/Web as determined by BNPB.
          ●  Locally/manually using the activation button placed on the Siren.
      d. Siren has the following dissemination modes:                   
          ●  Rotary Lamp.                                               
          ●  Horn.                                                      
                                                                        
          ●  Outdoor Speaker.                                           
      e. The siren can emitting/transmit warning sounds (admonitions) from the controller
        to the speaker. The siren can emitting/sound a warning sound stored on the
                                                                        
        storage/memory media.                                           
      f. The siren device provides a display to give information on each siren unit:
          ●  Siren location in the village.                             
          ●  Siren activity status.                                     
          ●  Device status and communication lines.                     
                                                                        
          ●  Power supply device status.                                
                                                                        
  3. Procurement Monitoring Device for Equipment Condition              
                                                                        
     a. Equipment Monitoring                                            
        This device monitors the Control Unit, and Siren Unit. Has the following abilities:
                                                                        
       1) Send periodically to the Dashboard/Web determined by BNPB regarding the
          current conditions of the parameters:                         
           ●  Quality of sound produced by speakers.                    
           ●  Voltage, current, charging/discharge conditions and power supply device
              status. This will enable the system to provide timely warnings on battery
                                                                        
              health and related issues that will be useful for O&M     
           ●  Condition of opening and closing the panels/boxes of all devices,
              including the power supply panel/box.                     
           ●  Temperature and Humidity inside the panel/box.            
                                                                        
           ●  GSM, VHF and SBD communication status with the Siren Control Unit.
       2) Send a warning status if one of the parameters above is problematic/abnormal.
     b. Security Monitoring                                             
        This device monitors security conditions in the Siren Unit. Has the following
        abilities:                                                      
                                                                        
       1) Send the latest pictures/photos and short videos to the relevant Dashboard/Web,
          as determined by BNPB, if there are indications of vandalism/theft attempts on
          Siren devices.                                                
       2) Send the latest images/photos and short videos to the relevant Dashboard/Web,
                                                                        
          as determined by BNPB if there is a request from the Dashboard/Web.
     The monitoring process is carried out by integrating device monitoring into a web-
                                                                        
     based dashboard application determined by BNPB, which is a website portal that has
     control and monitoring features for sirens in all locations, including the function of
     security monitoring devices, which are differentiated by user accounts at the BNPB,
     Provincial BPBD and District/city BPBD levels according to the functions and duties
     of each agency.                                                    
                                                                        
                                                                        
  4. Procurement Tower Infrastructure                                   
     a. The tower construction used is the rectangular SST type with 4 legs, made of steel
                                                                        
        following the specified technical specifications.               
     b. To support siren units.                                         
  5. Procurement for supporting elements and activities                 
      a. Providing technical guidance and socialization regarding the introduction, use and
                                                                        
        maintenance of equipment to BPBD personnel, the Disaster Preparedness Team
        and, the Disaster Preparedness Group, and representatives of village/sub-
        district/local community facilities.                            
      b. Procurement of Equipment Use & Maintenance Manual documents translate into
        Bahasa for all construction sites.                              
                                                                        
For siren and controller equipment, prioritizes using products that meet the Indonesian National
Standards (SNI) accompanied by proof of equipment test results following SNI. Apart from
                                                                        
that, the implementer of this work must fulfill data-information needs and collaborate with the
Supervisory Consultant appointed by BNPB.                               
                                                                        
2.2 Output Products                                                     
                                                                        
    The product output resulting from procurement work is the construction and functioning
of instrumentation to strengthen the Tsunami information dissemination and early warning
                                                                        
system, which can be used to disseminate information on Tsunami early warning information.
    The work results of the Goods/Service Supplier or implementer must comply with the
quantity and quality specified in the contract and function well. The process and results of work
implementation are reported periodically and accompanied by documentation of photographs
                                                                        
of the implementation process.                                          
    The Executor or Supplier of Goods/Services is responsible for all work results during the
trial period and carrying out maintenance within a minimum of 24 (twenty-four) months or
                                                                        
according to the time specified in the contract. Apart from maintaining the work results, the
implementer is also responsible for the electronic equipment or instruments installed, which
must receive a product guarantee of at least 3 years. The maintenance period is valid from when
the Final Handover (BAST) is signed.                                    
                                                                        
                                                                        
2.3 Management for Social and Environmental Impact                      
                                                                        
    Management of social and environmental impacts, work on strengthening information
dissemination and tsunami early warning systems must safeguard and manage the impacts that
occur following the provisions stipulated in the program framework (Environmental and Social
Management Framework/ESMF IDRIP). Service/Goods Suppliers undertake efforts to manage
                                                                        
environmental and social risks relevant to the scope of work and mitigation effort, as follows:
1. Potential risk of work accidents during travel and implementation in the field. Prevention
   efforts should be made through Work Regulations by applicable Work Safety, Health and
                                                                        
   Safety (K3) Regulations. Regarding the risk of accidents during work implementation,
   project implementers are specifically required to comply with the following protocol;
      a. provide life, accident and health insurance policies for workers who travel to
        target areas;                                                   
                                                                        
      b. minimize travel at night;                                      
      c. If it can’t be avoided to travel at night using land and water transportation, the
        organizers should request an escort from the police.            
      d. Potential risks of gender-based violence and sexual violence (GBV/SEA).
        Prevention efforts include implementing a code of ethics in work contracts as a
                                                                        
        condition for implementation;                                   
2. Potential involvement of indigenous groups must assess the presence of indigenous
   communities at the activity location and, if necessary, plan their participation in
   consultations or implementation of work carried out by the culture and language of
   indigenous groups.                                                   
                                                                        
    Goods/Service Suppliers carry out socialization/simulation activities, provide equipment
and safety equipment for workers and the environment, arrange permits if necessary and report
                                                                        
on the implementation of social, environmental and K3L management.      
    The land designated for tsunami sirens is owned by various entities, both government and
                                                                        
private. The Early Warning Directorate has secured agreements to utilize this land for siren
placement. Specific siren locations within each village can be found here, and a general
sociocultural overview of the siren installation areas is available here. Based on an overlay with
the forestry map (Decree of the Minister of Forestry of the Republic of Indonesia Number:
SK.465/Menhut-II/2011), all siren locations are located within areas designated for non-forest
                                                                        
use (APL).                                                              
    Additionally, considering the physical dimensions and functions of the equipment, and
                                                                        
in accordance with Regulation of the Minister of Environment and Forestry of the Republic of
Indonesia Number 4 of 2021 concerning the List of Businesses and/or Activities that are
Required to Have an Environmental Impact Analysis (AMDAL), Environmental Management
Efforts and Environmental Monitoring Efforts (UKL/UPL) or a Statement Letter of
                                                                        
Commitment to Environmental Management and Monitoring (SPPL), it can be concluded that
environmental approval from relevant government agencies is not mandatory. However, prior
to construction, a permit from the landowner for the placement of equipment/land use is still
required, and supplier is required to carry out the supply and installation of the equipment in
                                                                        
accordance with the Occupational, Health and Safety (OHS) principles for both project workers
and host communities.                                                   
    Prior to the installation of the tower, the contractor/supplier will be responsible to conduct
                                                                        
socialization meetings with the village communities, explaining the installation process,
potential risks, and safety of the project. The contractor may invite representatives from local
environmental agencies (DLHK) and local disaster management agencies (BPBD) as speakers,
and ensure participations from communities, volunteers (relawan bencana), chief of village,
                                                                        
and representatives from local figures, and Destana facilitators.       
    Prior to implementation of the activities, the supplier/contractor is required to refine and
                                                                        
finalize the Contractors’ Environmental and Social Management Plan (CESMP) for approval
by the Project Manager (PPK) in compliance with the requirements specified in the ESCOPs.
The ESCOPs for this activity can be found here. The contractors must commit to fully
implementing their CESMP. The CESMP and mitigation plans should be updated promptly
                                                                        
and redisclosed as appropriate to address new issues.                   
                                                                        
2.4 Reporting                                                           
    The progress of the implementation of this work is reported periodically, weekly,
monthly and in final reports. The report submitted will contain the following matters:
                                                                        
                                                                        
   a. Preliminary Report                                                
       ● Phase plans and strategies, as well as work implementation schedule;
                                                                        
       ● The amount of material to be procured and the labour employed; 
   b. Progress Report (Phases 1, 2, and 3)                              
       ● Recapitulation of work progress in the relevant month and progress to that
         progress;                                                      
       ● Quantity of materials procured and labour employed;            
                                                                        
       ● Documentation and photos of the implementation process and progress;
       ● Obstacles dan constraints experienced.                         
       ● Progress in the absorption of term funds that have been received by service/goods
         suppliers;                                                     
       ● The following planning implementation plan.                    
                                                                        
   c. Final report                                                      
       ● Progress in the implementation of all physical and financial work according to
          the contract;                                                 
       ● Minutes of changes to work if there are changes to the contract;
                                                                        
       ● Minutes of work completion, documentation, and photographs of work results.
   d. Report on the implementation of social, environmental and K3L impact
       management.                                                      
       ● Monitoring the implementation of social, environmental and K3L impact
          management                                                    
                                                                        
                                                                        
2.5 Schedule                                                            
    The implementation of this work will be completed within 5 (five) months or 150 (one
                                                                        
hundred and fifty days) calendar, single years from signing the contract. Furthermore, after the
contract is completed, the Service/Goods Supplier carries out a maintenance period according
to the contract. The planned schedule for implementing this work is described in Table 6.
                                                                        
                    Table 6. Work Implementation Schedule               
                                                                        
                                           Month                        
 No      Description   Duration                                         
                                 0   1    2    3   4    5               
  1  Preparation                                                        
  2  Procurement Process                                                
  3  Contract Implementation:                                           
                        5 Month                                         
     - All Location                                                     
  4  Technical Training 3 Month                                         
  5  Final Hand Over/ FHO
Tenders also won by PT Kinerja Lintas Nusantara
Authority
27 December 2021Pengadaan Surveillance Car With Tactical Next G Message Dissemination Wilayah Kalimantan Sulawesi Baintelkam Polri Ta 2022Kepolisian Negara Republik IndonesiaRp 130,725,799,000
22 January 2020Peralatan Pendeteksi Dan Navigasi Kapal PolisiKepolisian Negara Republik IndonesiaRp 111,982,088,000
5 March 2019Pengadaan 3 Set Peralatan Pendeteksi Dan Navigasi Kapal Polisi T.A.2019Kepolisian Negara Republik IndonesiaRp 97,246,179,000
29 December 2020Peralatan Pendeteksi Dan Navigasi Kapal PolisiKepolisian Negara Republik IndonesiaRp 61,600,000,000
3 April 2017Pengadaan Rompi Anti Peluru Level III A Dan Level IV A Biro Sarpras Polda Metro Jaya T.A. 2017Kepolisian Negara Republik IndonesiaRp 53,000,000,000
16 February 2018Pengadaan Peralatan Pendeteksi Dan Navigasi Kapal PolisiKepolisian Negara Republik IndonesiaRp 51,095,000,000
28 December 2021Peralatan Pendeteksi Dan Navigasi Kapal PolisiKepolisian Negara Republik IndonesiaRp 50,000,060,000
29 November 2023Pengadaan Tali Dalmas T.A 2024Kepolisian Negara Republik IndonesiaRp 50,000,000,000
1 December 2022Pengadaan Tali DalmasKepolisian Negara Republik IndonesiaRp 50,000,000,000
1 February 2023Pengadaan 3 (Tiga) Set Peralatan Pendeteksi Dan Navigasi Kapal Polisi Sumber Anggaran Apbn Ta.2023Kepolisian Negara Republik IndonesiaRp 49,998,348,000