Penyusunan Studi Kelayakan Dan Detail Engineering Design (Ded) Pltmh Tahap II Di Sumatera Barat IV

Seleksi Ulang
Basic Information
Type: Public Tender
Tender Code: 6176109
Status: Seleksi Ulang
Date: 22 December 2016
Year: 2017
KLPD: Kementerian Energi Dan Sumber Daya Mineral
Work Unit: Direktorat Jenderal Energi Baru Terbarukan Dan Konservasi Energi
Procurement Type: Jasa Konsultansi Badan Usaha
Method: Seleksi Umum - Prakualifikasi Dua File - Kualitas dan Biaya
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 350,000,000
Estimated Value (Nilai HPS): Rp 290,437,000
Winner (Pemenang): CV Sapta Buana Jaya
NPWP: 732431317061000
Work Location: Kecamatan Kinali, Desa Jorong Enam Koto Utara - Pasaman Barat (Kab.)
Participants: 35
Applicants
Administrative Score (SA)Reason
CV Sapta Buana Jaya
0732431317061000Rp 256,375,00079.1485.4-
0013207808015000Rp 275,000,00065.173.53-
0029712759101000---- Tidak menyampaikan Surat Keterangan Domisili Perusahaan (SKDP) - Tidak menyampaikan surat keterangan memiliki kemampuan menyediakan fasilitas/peralatan/perlengkapan untuk melaksanakan pekerjaan ini
0014218218424000---- Tidak menyampaikan surat keterangan memiliki kemampuan menyediakan fasilitas/peralatan/perlengkapan untuk melaksanakan pekerjaan ini - Tidak menyampaikan surat bermaterai untuk tidak menuntut ganti rugi
0017676156423000---Tidak dapat membuktikan kepemilikan tenaga ahli tetap sebanyak 5 orang dengan kualifikasi S1 Teknik sipil/mekanikal/elektrikal/instrumen dengan pengalaman bekerja tetap di perusahaan selama minimal 1 tahun, yang dibuktikan dengan surat referensi tenaga ahli, ijazah asli dan/atau fotokopi legalisir dan SPT Tahunan pribadi 1 tahun terakhir
0015712250002000---- Tidak ada SBU Jasa Perencana dan Pengawas Konstruksi sub klasifikasi Jasa Desain Rekayasa untuk pekerjaan teknik sipil air (Kode: RE 103 - Tidak menyampaikan pengalaman pada pekerjaan studi kelayakan (FS) dan /atau DED Pembangkit Listrik
PT Arci Pratama Konsultan
0026433961804000----
PT Dap Consultants
0021880505009000----
0011180353322000----
PT Pasya Mitra Utama
0026236869061000----
0025413436013000----
0722837234013000----
0021606967013000----
0033185869013000----
0316100940013000----
0722869930013000----
0013616222017000----
0316258540429000----
PT Sumber Lestari Sampurna
0032006371015000----
CV Studi Teknik
0018900175518000----
0318210259201000----
0021927017071000----
0701515033002000----
PT Mangisi Makmur Sentosa
0013944564011000----
0211107990429000----
0011191475424000----
0032688483444000----
0738156629064000----
0751033028101000----
CV Adi Jaya Teknik
0016887275201000----
0016779563428000----
0015314974423000----
CV Cendrawasih Multi Guna
00*3**5****13**0----
Kawan Joymor
03*5**3****07**0----
0016887457201000----
Tenders also won by CV Sapta Buana Jaya
Authority
7 March 2018Pengawasan Pemasangan Lampu Tenaga Surya Hemat Energi (Ltshe) Di Papua III Dan Papua IVKementerian Energi Dan Sumber Daya MineralRp 2,484,678,000
22 December 2016Penyusunan Studi Kelayakan Potensi, Basic Engineering Design Pembangunan Plts Di Wilayah TransmigrasiKementerian Energi Dan Sumber Daya MineralRp 1,500,000,000
15 November 2016Penyusunan Studi Kelayakan Dan Ded Plts Terpusat Lokasi Prioritas Perbatasan Di Provinsi Aceh Dan RiauKementerian Energi Dan Sumber Daya MineralRp 974,147,000
22 December 2016Penyusunan Studi Kelayakan Dan Ded Plts Terpusat Lokasi Prioritas Perbatasan Di Provinsi Nusa Tenggara Timur IKementerian Energi Dan Sumber Daya MineralRp 795,309,000
1 September 2015Penyusunan Studi Kelayakan Dan Ded Pembangkit Listrik Tenaga Surya (Plts) Terpusat Maluku Utara, Papua Dan Papua BaratRp 648,711,000
27 June 2019Penyusun Ded Plts Terpusat Pada 8 LokasiPemerintah Daerah Provinsi Kalimantan TimurRp 520,618,000
20 July 2018Sambungan Rumah Untuk Keluarga Kurang Mampu Di Kabupaten WonogiriProvinsi Jawa TengahRp 520,000,000
30 September 2015Implementasi Tungku Hemat Energi Di WonogiriKementerian Energi Dan Sumber Daya MineralRp 500,000,000
1 September 2015Penyusunan Studi Perencanaan Pembangunan Plts Rooftop Di Bandara Hasanuddin MakasarRp 492,614,000
1 September 2015Penyusunan Studi Perencanaan Pembangunan Plts Rooftop Di Bandara Kualanamu MedanRp 492,076,000