Uraian Singkat Pekerjaan Perbaikan Pompa Kebon Raya No. 3 adalah:
Perbaikan Pompa Kebon Raya No. 3
A Transportasi, Mobilisasi dan Demobilisasi (dengan Pick Up)
B Pengangkatan dan Pemasangan Kembali Pompa; 500 lps
Pembongkaran dan Perakitan Kembali Komponen Pompa (Dismantling
C
and Assembly); 500 lps
D Balancing Shaft Impeller Assy, Standar ISO 1940 G2.5; 500 lps
E Perbaikan Shaft dan Housing Bearing, Standar API 610; 500 lps
Rewinding Elektro Motor 380 - 440 V Class H; 4 Pole (1500 Rpm); 39,4
F
kW
G Painting Anti Korosit; 500 lps
H Rewiring Panel
I Comissioning Test
J Bahan
1 Kabel Power 4 x 4 mm2; Titanex H07RN-F 213
2 Spiral Hose Aluminium
3 Skun Kabel Ø 6 mm
4 Mechanical Seal Lower
5 Mechanical Seal Upper
6 O-Ring 4 x Øi 342 x Øo 350 mm; Viton
7 O-Ring 4 x Øi 40 x Øo 48 mm; Viton
8 O-Ring 4 x Øi 258 x Øo 266 mm; Viton
9 O-Ring 3 x Øi 332 x Øo 335 mm; Viton
10 O-Ring 5 x Øi 315 x Øo 325 mm; Viton
11 O-Ring 2 x Øi 341 x Øo 345 mm; Viton
12 Bearing FAG 7214-B-XL-JP
13 Bearing FAG NU307-E-XL-TVP2
14 Snapring 1,99 x Øi 51,88 x Øo 61,23 mm
15 MCCB 160A 3P Schneider EZC250F3160
16 MCB 10A 1P Schneider iC60N C10A
17 Contactor Schneider LC1D50AM7
18 Thermal Overload Schneider LRD365
19 Timer Omron H3CR-A8 220V + Socket
20 Rail MCB
21 Phase Failure Relay Schneider RM17TG20
22 Pilot Lamp 220V; Fort
23 Skun Kabel Ø 25 mm
24 Skun Kabel SVS 1,25 - 3,5 (@100 Pcs)
25 Kabel NYAF 1,5 mm (@100 m)
26 Push Button; Fort
27 Selector Switch On-Off
28 Ampere Meter Digital; Fort FT-96A
29 Volt Meter Digital; Fort FT-96
30 Volt Selector Switch; Fort
31 CT 100/5A; Fort
32 Spiral Wrapping Band KS-8 (@10 M)
33 Kabel Duct 70 x 100
34 Hour Meter Digital HM-D48
35 Kabel NYAF 25 mm; Supreme
36 Terminal Block 4P 150A
37 Terminal Block 4P 100A