Rehab Selasar Dan Penataan Halaman Pgsd

Basic Information
Type: Public Tender
Tender Code: 15981025
Date: 5 September 2023
Year: 2023
KLPD: Kementerian Pendidikan dan Kebudayaan
Work Unit: Universitas Palangkaraya
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 500,000,000
Estimated Value (Nilai HPS): Rp 500,000,000
Winner (Pemenang): CV Bukit Raya Perdana
NPWP: 029784436711000
RUP Code: 43926354
Work Location: Kampus Tunjung Nyaho Jalan Yos Sudarso - Palangka Raya (Kota)
Participants: 18
Applicants
0029784436711000Rp 497,470,325
0749697389711000-
CV Chezii Jaya Mandiri
06*5**9****11**0-
0028234748731000-
0737515072711000-
0947350740731000-
0530543263003000-
0739497964732000-
0625196514711000-
0014244917731000-
CV Efod Design Consultant
07*5**9****17**0-
0026140533731000-
0390065530711000-
0413682998922000-
Chanel
00*8**4****21**0-
Batara Sakti, CV
0032784563701000-
0961923158629000-
0423432251529000-
Attachment
DAFTAR KUANTITAS DAN HARGA                         
                                                                            
   SATUAN KERJA : UNIVERSITAS PALANGKA RAYA                                 
   PEKERJAAN  : REHAB SELASAR DAN PENATAAN HALAMAN PGSD                     
   LOKASI     : KAMPUS UPR TUNJUNG NYAHO JALAN YOS SUDARSO PALANGKA RAYA    
   TAHUN ANGGARAN : 2023                                                    
                                             VOL.   HARGA       JUMLAH      
     NO           ITEM PEKERJAAN     ANALISA              PPN 11%           
                                           PEKERJAAN SATUAN     HARGA       
                                                                            
     I. PEKERJAAN PENDAHULUAN                                               
      01. Pek. Pembersihan Lokasi    LUMPSUM 1 ,00 KEG Rp - Rp - Rp -       
      02. Pek. Papan nama proyek     LUMPSUM 1 ,00 BUAH Rp - Rp - Rp -      
      03. Pek. Pengadaan SMKK        LUMPSUM 1 ,00 KEG Rp - Rp - Rp -       
      04. Pek. Pemasangan Bouwplank  LUMPSUM 1 ,00 KEG Rp - Rp - Rp -       
      05. Pek. Bongkaran Bangunan lama dan Pembuangan bongkaran LUMPSUM 1 ,00 KEG Rp - Rp - Rp -
                                                  JUMLAH I     Rp   -       
     II. PEKERJAAN TANAH                                                    
      01. Pek. Galian Pondasi Setempat A.2.3.1.1. 10,98 M3 Rp - Rp - Rp -   
      02. Pek. Galian Halaman        A.2.3.1.1. 15,96 M3 Rp - Rp - Rp -     
      03. Pek. Urugan bekas Galian   A.2.3.1.9. 8 ,08 M3 Rp - Rp - Rp -     
      04. Pek. Urugan Tanah Peninggian Lantai A.2.3.1.11. 16,70 M3 Rp - Rp - Rp -
      05. Pek. Urugan Tanah Isian Bangku dan Pot A.2.3.1.11. 2 ,84 M3 Rp - Rp - Rp -
                                                   JUMLAH II   Rp   -       
     III. PEKERJAAN STRUKTUR SELASAR                                        
      01. Pek. Cor Beton Tumbuk Lantai Kerja f' c=7,4 Mpa (K-100) A.A.4.1.1.4. 1 ,37 M3 Rp - Rp - Rp -
      02. Pek. Pondasi Plat Beton f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 1 ,51 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 12 mm A.4.1.1.17 182,00 KG Rp - Rp - Rp -
        - Bekisting Pondasi 2 x pakai A.4.1.1.20 2 ,52 M2 Rp - Rp - Rp -    
      03. Pek. Kolom Pondasi f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,50 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 12 mm A.4.1.1.17 94,48 KG Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 8 mm A.4.1.1.17 146,12 KG Rp - Rp - Rp -
        - Bekisting Kolom Pondasi 2x pakai A.4.1.1.22 9 ,72 M2 Rp - Rp - Rp -
      04. Pek. Sloof Uk. 15 x 50 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 6 ,48 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 12 mm A.4.1.1.17 727,59 KG Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 8 mm A.4.1.1.17 336,54 KG Rp - Rp - Rp -
        - Bekisting Sloof 15 x 50 2x pakai A.4.1.1.21 21,61 M2 Rp - Rp - Rp -
      05. Pek. Cor Lantai Beton f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 6 ,07 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Wiremesh M6 A.4.1.1.19.b 382,36 KG Rp - Rp - Rp -
      06. Pek. Kolom Utama Uk. 20 x 20 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 2 ,69 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 12 mm A.4.1.1.17 358,04 KG Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 8 mm A.4.1.1.17 123,87 KG Rp - Rp - Rp -
        - Bekisting Kolom 2x pakai   A.4.1.1.22 13,44 M2 Rp - Rp - Rp -     
      07. Pek. Ringbalk Uk. 20 x 20 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 3 ,46 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 12 mm A.4.1.1.17 363,80 KG Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 8 mm A.4.1.1.17 196,32 KG Rp - Rp - Rp -
        - Bekisting Ringbalk 20 x 20 2x pakai A.4.1.1.21 20,48 M2 Rp - Rp - Rp -
                                                   JUMLAH III  Rp   -       
     IV. PEKERJAAN ATAP SELASAR                                             
      01. Pas. Kuda-Kuda Baja Ringan + Reng LS. A. 01 138,40 M2 Rp - Rp - Rp -
      02. Pas. Atap Metal            A.4.5.2.32 138,40 M2 Rp - Rp - Rp -    
      03. Pas. Nok Atap Metal        A.4.5.2.36 34,60 M' Rp - Rp - Rp -     
      04. Pas. Listplank             A.4.6.1.21.b 139,70 M' Rp - Rp - Rp -  
                                                   JUMLAH IV   Rp   -       
     V. PEKERJAAN FINISHING SELASAR                                         
      01. Pek. Acian                 A.4.4.2.27 205,70 M2 Rp - Rp - Rp -    
      02. Pek. Pengecatan            A.4.7.1.10 108,82 M2 Rp - Rp - Rp -    
                                                   JUMLAH V    Rp   -       
                                             VOL.   HARGA       JUMLAH      
     NO           ITEM PEKERJAAN     ANALISA              PPN 11%           
                                           PEKERJAAN SATUAN     HARGA       
     VI. PEKERJAAN STRUKTUR HALAMAN                                         
      01. Pek. Cor Beton Tumbuk Lantai Kerja f' c=7,4 Mpa (K-100) A.A.4.1.1.4. 3 ,33 M3 Rp - Rp - Rp -
      02. Pek. Plat Beton f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 9 ,86 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 470,08 Kg Rp - Rp - Rp -
        - Bekisting Plat             A.4.1.1.24 8 ,39 M2 Rp - Rp - Rp -     
      03. Pek. Sloof Uk. 15 x 15 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,91 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 83,93 Kg Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 6 mm A.4.1.1.17 40,85 Kg Rp - Rp - Rp -
        - Bekisting Sloof 15 x 15 2x pakai A.4.1.1.21 3 ,02 M2 Rp - Rp - Rp -
      04. Pek. Kolom Uk. 15 x 15 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,06 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 5 ,06 Kg Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 6 mm A.4.1.1.17 2 ,66 Kg Rp - Rp - Rp -
        - Bekisting Kolom 2x pakai   A.4.1.1.22 0 ,84 M2 Rp - Rp - Rp -     
      05. Pek. Sloof Paving Block 1 Uk. 15 x 25 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 4 ,59 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 197,22 Kg Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 6 mm A.4.1.1.17 129,60 Kg Rp - Rp - Rp -
        - Bekisting Sloof 15 x 25 2x pakai A.4.1.1.21 15,30 M2 Rp - Rp - Rp -
      06. Pek. Sloof Paving Block 2 Uk. 15 x 35 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,67 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 25,15 Kg Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 6 mm A.4.1.1.17 16,78 Kg Rp - Rp - Rp -
        - Bekisting Sloof 15 x 35 2x pakai A.4.1.1.21 2 ,23 M2 Rp - Rp - Rp -
      07. Pek. Stepping Area Uk. 30 x 35 cm f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 3 ,20 M3 Rp - Rp - Rp -
        - Pembesian Tul. Utama Besi Polos Dia. 8 mm A.4.1.1.17 94,99 Kg Rp - Rp - Rp -
        - Pembesian Tul. Cincin Besi Polos Dia. 6 mm A.4.1.1.17 41,96 Kg Rp - Rp - Rp -
        - Bekisting Sloof 30 x 35 2x pakai A.4.1.1.21 5 ,33 M2 Rp - Rp - Rp -
      08. Pek. Lantai Saluran Beton f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,82 M3 Rp - Rp - Rp -
                                                   JUMLAH VI   Rp   -       
     VII. PEKERJAAN DINDING                                                 
      01. Pas. Dinding Bata Merah 1/2 Batu A.4.4.1.9 12,07 M2 Rp - Rp - Rp -
      02. Pas. Dinding Bata Merah 1/2 Batu Saluran Air A.4.4.1.9 65,52 M2 Rp - Rp - Rp -
                                                   JUMLAH VII  Rp   -       
     VIII. PEKERJAAN FINISHING                                              
      01. Pek. Finishing Dinding dan Kolom                                  
        - Pek. Plesteran Dinding camp. 1 Pc : 4 Psr A.4.4.2.4 81,21 M2 Rp - Rp - Rp -
        - Pek. Acian                 A.4.4.2.27 90,44 M2 Rp - Rp - Rp -     
        - Pek. Pengecatan            A.4.7.1.10 90,44 M2 Rp - Rp - Rp -     
                                                   JUMLAH VIII Rp   -       
     IX. PEKERJAAN ATAP                                                     
      01. Pas. Rangka Atap besi Hollow + Atap Polycarbonat LS. B. 06 54,08 M2 Rp - Rp - Rp -
                                                   JUMLAH IX   Rp   -       
     X. PEKERJAAN PAVING BLOCK                                              
      01. Pas. Paving Block 1        A.4.4.1.20 3 ,57 M2 Rp - Rp - Rp -     
      02. Pas. Paving Block 2        A.4.4.1.20 30,44 M2 Rp - Rp - Rp -     
      03. Pas. Paving Block 3        A.4.4.1.20 9 ,80 M2 Rp - Rp - Rp -     
                                                   JUMLAH X    Rp   -       
     XI. PEKERJAAN LANDSCAPING                                              
      01. Pek. Tanah Subur           A.2.3.1.11b. 8 ,00 M3 Rp - Rp - Rp -   
      02. Pek. Penanaman Adam Hawa    LS. B. 01 150,00 PBK Rp - Rp - Rp -   
      03. Pek. Penanaman Pohon Dollar LS. B. 02 1 ,00 PHN Rp - Rp - Rp -    
      04. Pek. Penanaman Kembang Kertas LS. B. 03 83,00 PBK Rp - Rp - Rp -  
                                                   JUMLAH XI   Rp   -       
     XII. PEKERJAAN PERBAIKAN TAMAN                                         
      01. Pek. Acian                 A.4.4.2.27 35,25 M2 Rp - Rp - Rp -     
      02. Pek. Pengecatan            A.4.7.1.10 35,25 M2 Rp - Rp - Rp -     
      03. Pek. Cor beton f' c=14,5 Mpa (K-175) A.A.4.1.1.5. 0 ,95 M3 Rp - Rp - Rp -
      04. - Pembesian Tul. Utama Besi Wiremesh M6 A.4.1.1.19.b 69,52 Kg Rp - Rp - Rp -
                                                   JUMLAH XII  Rp   -       
                               REKAPITULASI                                 
                                                                            
   SATUAN KERJA : UNIVERSITAS PALANGKA RAYA                                 
   PEKERJAAN  : REHAB SELASAR DAN PENATAAN HALAMAN PGSD                     
   LOKASI     : KAMPUS UPR TUNJUNG NYAHO JALAN YOS SUDARSO PALANGKA RAYA    
   TAHUN ANGGARAN : 2023                                                    
     NO           ITEM PEKERJAAN                                JUMLAH      
     I. PEKERJAAN PENDAHULUAN                                  Rp   -       
     II. PEKERJAAN TANAH                                       Rp   -       
     III. PEKERJAAN STRUKTUR SELASAR                           Rp   -       
     IV. PEKERJAAN ATAP SELASAR                                Rp   -       
     V. PEKERJAAN FINISHING SELASAR                            Rp   -       
                                                                            
     VI. PEKERJAAN STRUKTUR HALAMAN                            Rp   -       
     VII. PEKERJAAN DINDING                                    Rp   -       
     VIII. PEKERJAAN FINISHING                                 Rp   -       
     IX. PEKERJAAN ATAP                                        Rp   -       
     X. PEKERJAAN PAVING BLOCK                                 Rp   -       
     XI. PEKERJAAN LANDSCAPING                                 Rp   -       
     XII. PEKERJAAN PERBAIKAN TAMAN                            Rp   -       
                                                                            
   JUMLAH                                                      Rp   -       
   JUMLAH YANG DIBULATKAN                                      Rp   -       
   TERBILANG  :                                                             
                                                                            
                                                                            
                                               Palangka Raya, 2023          
                                                                            
                                                                            
                                                    Penawar,                
                                                  (Nama Perusahaan)         
                                                                            
                                                                            
                                                                            
                                                                            
                                                    (Nama)                  
                                                    (Jabatan)               
                        TABEL ANALISA HARGA SATUAN                          
                                                                            
                                                                            
 I. PEKERJAAN TANAH                                                         
   A.2.3.1.11b. PENGURUGAN 1 M³ DENGAN TANAH SUBUR                          
                                                                            
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Mandor            Oh    0,010 Rp  -  Rp       -                  
           Pekerja           Oh    0,300 Rp  -  Rp       -                  
           Tanah Subur       Oh    1,200 Rp  -  Rp       - Rp       -       
           JUMLAH                               Rp       - Rp       -       
                                                                            
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
II. HARGA SATUAN PEKERJAAN BETON                                            
   A.A.4.1.1.4. PEMBUATAN 1M3 LANTAI KERJA BETON MUTU f' c=7,4 Mpa (K-100), SLUMP (3-6) CM, w/c=0,87
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    1,200 Rp  -  Rp       -                  
                                                                            
           Tukang Batu       OH    0,200 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,020 Rp  -  Rp       -                  
           Mandor            OH    0,060 Rp  -  Rp       -                  
           Semen Portland    Kg   230,000 Rp -            Rp        -       
           Pasir Beton       Kg   893,000 Rp -            Rp        -       
           Kerikil (Maks. 30mm) Kg 1.027,000 Rp -         Rp        -       
                                                                            
           Air               Liter 200,000 Rp -           Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
   A.A.4.1.1.5. PEMBUATAN 1M3 BETON MUTU f' c=14,5 Mpa (K-175), SLUMP (12**2) CM, w/c=0,66
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    1,650 Rp  -  Rp       -                  
                                                                            
           Tukang Batu       OH    0,275 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,028 Rp  -  Rp       -                  
           Mandor            OH    0,083 Rp  -  Rp       -                  
           Semen Portland    Kg   326,000 Rp -            Rp        -       
           Pasir Beton       Kg   760,000 Rp -            Rp        -       
                                                                            
           Kerikil (Maks. 30mm) Kg 1.029,000 Rp -         Rp        -       
           Air               Liter 215,000 Rp -           Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
                                                                            
           HARGA SATUAN                         Rp                   -      
   A.4.1.1.17 PEMBESIAN 1 KG DENGAN BESI POLOS ATAU BESI ULIR               
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,070 Rp  -  Rp       -                  
           Tukang Besi       OH    0,070 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,007 Rp  -  Rp       -                  
                                                                            
           Mandor            OH    0,004 Rp  -  Rp       -                  
           Besi beton (polos/Ulir) kg 10,500 Rp -         Rp        -       
           Kawat beton       kg    0,150 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
                                                                            
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
   A.4.1.1.19.b PEMASANGAN 1 KG JARING KAWAT BAJA (WIREMESH-DIA. 6MM)       
                                                                            
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,025 Rp  -  Rp       -                  
           Tukang Besi       OH    0,050 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,050 Rp  -  Rp       -                  
           Mandor            OH    0,001 Rp  -  Rp       -                  
                                                                            
           Wiremesh-M6       kg   10,200 Rp  -            Rp        -       
           Kawat beton       kg    0,050 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
                                                                            
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
   A.4.1.1.20 PEMASANGAN 1 M2 BEKISTING UNTUK PONDASI                       
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
                                                                            
           Pekerja           OH    0,520 Rp  -  Rp       -                  
           Tukang Kayu       OH    0,260 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,026 Rp  -  Rp       -                  
           Mandor            OH    0,026 Rp  -  Rp       -                  
           Kayu Kelas III    M3    0,040                  Rp        -       
                                                                            
           Paku 5-10         KG    0,300                  Rp        -       
           Minyak Bekisting LITER  0,100                  Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
                                                                            
           HARGA SATUAN                         Rp                   -      
   A.4.1.1.21 PEMASANGAN 1 M2 BEKISTING UNTUK SLOOF                         
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,520 Rp  -  Rp       -                  
           Tukang Kayu       OH    0,260 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,026 Rp  -  Rp       -                  
                                                                            
           Mandor            OH    0,026 Rp  -  Rp       -                  
           Kayu Kelas III    M3    0,045 Rp  -            Rp        -       
           Paku 5-10         KG    0,300 Rp  -            Rp        -       
           Minyak Bekisting LITER  0,100 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
                                                                            
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
   A.4.1.1.22 PEMASANGAN 1 M2 BEKISTING UNTUK KOLOM                         
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,660 Rp  -  Rp       -                  
           Tukang Kayu       OH    0,330 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,033 Rp  -  Rp       -                  
                                                                            
           Mandor            OH    0,033 Rp  -  Rp       -                  
           Kayu Kelas III    M3    0,040 Rp  -            Rp        -       
           Balok Kayu Kelas III M3 0,015 Rp  -            Rp        -       
           Paku 5-12         KG    0,400 Rp  -            Rp        -       
           Minyak Bekisting LITER  0,200 Rp  -            Rp        -       
                                                                            
           Playwood tebal 9 mm LEMBAR 0,350 Rp -          Rp        -       
           Dolken Kayu Dia.(8-10)cm, P=4 m BATANG 2,000 Rp - Rp     -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
                                                                            
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
   A.4.1.1.24 PEMASANGAN 1 M2 BEKISTING UNTUK LANTAI                        
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
                                                                            
           Pekerja           OH    0,660 Rp  -  Rp       -                  
           Tukang Kayu       OH    0,330 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,033 Rp  -  Rp       -                  
           Mandor            OH    0,033 Rp  -  Rp       -                  
           Kayu Kelas III    M3    0,040 Rp  -            Rp        -       
                                                                            
           Balok Kayu Kelas III M3 0,015 Rp  -            Rp        -       
           Paku 5-12         KG    0,400 Rp  -            Rp        -       
           Minyak Bekisting LITER  0,200 Rp  -            Rp        -       
           Playwood tebal 9 mm LEMBAR 0,350 Rp -          Rp        -       
           Dolken Kayu Dia.(8-10)cm, P=4 m BATANG 6,000 Rp - Rp     -       
                                                                            
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
V. HARGA SATUAN PEKERJAAN DINDING                                           
                                                                            
   A.4.4.1.9 PEMASANGAN 1 M2 DINDING BATA MERAH (5X11X22) CM TEBAL 1/2 BATU CAMP 1 SP:4PP
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,300 Rp  -  Rp       -                  
           Tukang Batu       OH    0,100 Rp  -  Rp       -                  
                                                                            
           Kepala Tukang     OH    0,010 Rp  -  Rp       -                  
           Mandor            OH    0,015 Rp  -  Rp       -                  
           Bata merah        bh   70,000 Rp  -            Rp        -       
           Semen portlan     KG   11,500 Rp  -            Rp        -       
                                                                            
           Pasir Pasang      m3    0,043 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
                                                                            
           HARGA SATUAN                         Rp                   -      
                                                                            
VI. HARGA SATUAN PEKERJAAN PLESTERAN                                        
   A.4.4.2.4 PEMASANGAN 1 M2 PLESTERAN 1SP:4PP TEBAL 15 MM                  
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
                                                                            
           Pekerja           OH    0,300 Rp  -  Rp       -                  
           Tukang Batu       OH    0,150 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,015 Rp  -  Rp       -                  
           Mandor            OH    0,015 Rp  -  Rp       -                  
           1. PC             Kg    6,240 Rp  -            Rp        -       
                                                                            
           2. PP             m3    0,024 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
                                                                            
           HARGA SATUAN                         Rp                   -      
                                                                            
   A.4.4.2.27 PEMASANGAN 1 M2 ACIAN                                         
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,200 Rp  -  Rp       -                  
                                                                            
           Tukang Batu       OH    0,100 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,010 Rp  -  Rp       -                  
           Mandor            OH    0,010 Rp  -  Rp       -                  
           Semen portlan     KG    3,250 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
                                                                            
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
VIII. HARGA SATUAN PEKERJAAN KAYU                                           
   A.4.6.1.21.b PEMASANGAN 1 M' KALSIPLANK UKURAN 1X30 CM                   
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,100 Rp  -  Rp       -                  
                                                                            
           Tukang kayu       OH    0,200 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,020 Rp  -  Rp       -                  
           Mandor            OH    0,005 Rp  -  Rp       -                  
           Papan plank kalsiboard m 1,050 Rp -            Rp        -       
           skrup             bh    6,000 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
                                                                            
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
IX. HARGA SATUAN PEKERJAAN PENGECATAN                                       
   A.4.7.1.10 PENGECATAN 1 M2 TEMBOK BARU (1 LAPIS PLAMUR, 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,020 Rp  -  Rp       -                  
                                                                            
           Tukang Cat        OH    0,063 Rp  -  Rp       -                  
           Kepala Tukang     OH    0,006 Rp  -  Rp       -                  
           Mandor            OH    0,003 Rp  -  Rp       -                  
           Plamuur           Kg    0,100 Rp  -            Rp        -       
           Cat dasar'        Kg    0,100 Rp  -            Rp        -       
           Cat penutup       Kg    0,260 Rp  -            Rp        -       
                                                                            
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
X. HARGA SATUAN PEKERJAAN ATAP                                              
   A.4.5.2.32 PEMASANGAN 1 M'2 GENTENG METAL                                
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,200 Rp  -  Rp       -                  
                                                                            
           Tukang kayu       OH    0,100 Rp  -  Rp       -                  
           Kepala tukang kayu OH   0,010 Rp  -  Rp       -                  
           Mandor            OH    0,001 Rp  -  Rp       -                  
           genteng metal     bh    1,020 Rp  -            Rp        -       
           Paku biasa 1/2"-1" Kg   0,200 Rp  -            Rp        -       
                                                                            
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
   A.4.5.2.36 PEMASANGAN 1 M' NOK GENTENG METAL                             
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,250 Rp  -  Rp       -                  
           Tukang kayu       OH    0,150 Rp  -  Rp       -                  
           Kepala tukang kayu OH   0,015 Rp  -  Rp       -                  
                                                                            
           Mandor            OH    0,013 Rp  -  Rp       -                  
           Nok genteng metal bh    1,100 Rp  -            Rp        -       
           Paku biasa 1/2"-1" Kg   0,050 Rp  -                              
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
                                                                            
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
   LS. A. 01 PEMASANGAN 1 M2 KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
                                                                            
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           Pekerja           OH    0,200 Rp  -  Rp       -                  
           tukang besi       OH    0,450 Rp  -  Rp       -                  
           kepala tukang     OH    0,010 Rp  -  Rp       -                  
           Mandor            OH    0,050 Rp  -  Rp       -                  
                                                                            
           C-75              m     3,720 Rp  -            Rp        -       
           baut (screw driver) bh 38,000 Rp  -            Rp        -       
           Dynabolt          bh    1,600 Rp  -            Rp        -       
           reng              m     3,000 Rp  -            Rp        -       
           talang jurai      m     0,124 Rp  -            Rp        -       
                                                                            
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
                                                                            
XI. HARGA SATUAN PEKERJAAN ATAP RANGKA BESI                                 
   LS. B. 06 PEMASANGAN 1 M2 ATAP POLYCARBONAT                              
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
                                                                            
           pekerja + bahan   Ls    1,000 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
XII. HARGA SATUAN PEKERJAAN TANAMAN                                         
   LS. B. 01 PEKERJAAN PENANAMAN 1 POLIBACK ADAM HAWA                       
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           pekerja + bahan   Ls    1,000 Rp  -            Rp        -       
                                                                            
           JUMLAH                               Rp       - Rp       -       
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                                                                            
                                                                            
   LS. B. 03 PEKERJAAN PENANAMAN 1 POLIBACK KEMBANG KERTAS                  
                 ITEM        SAT. KOEFISIEN HARGA JUMLAH UPAH JUMLAH BAHAN  
           pekerja + bahan   Ls    1,000 Rp  -            Rp        -       
           JUMLAH                               Rp       - Rp       -       
                                                                            
           JUMLAH UPAH + BAHAN                  Rp                   -      
           BIAYA UMUM (OVERHEAD)                Rp                   -      
           BIAYA KEUNTUNGAN (PROFIT)            Rp                   -      
           HARGA SATUAN                         Rp                   -      
                       HARGA DASAR UPAH DAN BAHAN                           
                                                                            
                                                                            
                                                                            
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
   A UPAH                                                                   
    01. Mandor                                      OH                      
                                                                            
    02. Kepala tukang batu                          OH                      
    03. Kepala tukang besi                          OH                      
                                                                            
    04. Kepala tukang kayu                          OH                      
    05. Kepala tukang cat                           OH                      
    06. Tukang batu                                 OH                      
                                                                            
    07. Tukang besi                                 OH                      
    08. Tukang kayu                                 OH                      
    09. Tukang cat                                  OH                      
                                                                            
    10. Laden tukang batu                           OH                      
    11. Laden tukang besi                           OH                      
    12. Laden tukang kayu                           OH                      
                                                                            
    13. Laden tukang cat                            OH                      
    14. Tukang Gali                                 OH                      
                                                                            
    15. Tukang Listrik                              OH                      
                                                                            
  B  BAHAN                                                                  
                                                                            
     BAHAN BETON                                                            
    01. Pasir urug                                  M3                      
    02. Pasir pasang                                M3                      
                                                                            
    03. Pasir beton                                 M3                      
    04. Tanah urug biasa/Granit                     M3                      
                                                                            
    05. Tanah urug pilihan/Tanah Kuning             M3                      
    06. Tanah Subur                                 M3                      
    07. Kerikil sungai                              M3                      
                                                                            
    08. Batu Belah/ Batu Gunung 10/15               M3                      
    09. Batu Belah/ Batu Gunung 5/7                 M3                      
    10. Batu pecah 1-2 cm (Split)                   M3                      
                                                                            
    11. Batu pecah 2-3 cm                           M3                      
    12. Batu pecah 3-5 cm                           M3                      
                                                                            
    13. Batu pecah 5-7 cm                           M3                      
    14. Batu Koral Sikat Hitam                      M2                      
    15. Batu Koral Sikat Warna                      M2                      
                                                                            
    16. Batu Alam Palimanan                         M2                      
    17. Batu Alam Candi Polos                       M2                      
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
    18. Batu Alam Andesit Alur                      M2                      
                                                                            
    19. Batu Alam Andesit Polos Bakar               M2                      
    20. Batu Alam Andesit Bintik BaKar              M2                      
    21. Semen PC (isi 40 Kg/Zak)    Gresik          Zak                     
                                                                            
    22. Semen PC (isi 50 Kg/Zak)                    Zak                     
    23. Semen putih (40 Kg/Zak)     Tiga Roda       Zak                     
    24. Semen Warna 1 Bks = 1 Kg    Tiga Roda       Kg                      
                                                                            
    25. Kawat beton/ bendrat        RRT             Kg                      
    26. Besi beton polos                            Kg                      
    27. Besi ulir 10                                Kg                      
                                                                            
    28. Besi ulir 12                                Kg                      
    29. Besi ulir 16                                Kg                      
                                                                            
    27. Minyak begesting                            Liter                   
    28. Wiremesh 150x150, besi ø 4,5 mm, uk. 2,1x5,4 m Lembar               
    29. Wiremesh 150x150, besi ø 5,7 mm, uk. 2,1x5,4 m roll                 
                                                                            
    30. Wiremesh 150x150, besi ø 8 mm, uk. 2,1x5,4 m Lembar                 
    31. Wiremesh 150x150, besi ø 10 mm, uk. 2,1x5,4 m Lembar                
    32. Beton Readymix K-175 (Tanpa Pompa+slang)    M3                      
                                                                            
    33. Beton Readymix K-200 (Tanpa Pompa+slang)    M3                      
    34. Beton Readymix K-225 (Tanpa Pompa+slang)    M3                      
                                                                            
    35. Beton Readymix K-250 (Tanpa Pompa+slang)    M3                      
    36. Beton Readymix K-275 (Tanpa Pompa+slang)    M3                      
    37. Plastik Cor (50 m/ bungkus)                 Roll                    
                                                                            
    38. Plastik Cor                                 M'                      
    38. tutup buis beton 100 cm (tebal 10 cm)       bh                      
    39. buis beton 100 cm x 50 cm (tebal 10 cm)     bh                      
                                                                            
                                                                            
     BAHAN DINDING                                                          
    40. Batu bata 9x20x3,5 (Produksi Lokal)        Buah                     
                                                                            
    41. Bataco                                     Buah                     
    42. Beton kerawang (ukuran kecil)               Biji                    
                                                                            
    43. Aspal Ac Pen 60/70 - 80/100                 Kg                      
    44. Kawat Harmonika t=1 m (1 rol = 25 meter)    M'                      
    45. Bata/Beton Ringan tebal 7,5 cm             Buah                     
                                                                            
    46. Bata/Beton Ringan tebal 10 cm              Buah                     
    47. Mortar siap pakai                           Kg                      
    48. Paving Stone/conblock Hitam Segi Empat, Tinggi 8 cm Buah            
                                                                            
                                                                            
     BAHAN BESI                                                             
                                                                            
    49. Besi beugel/ Baut (Kuda-kuda)               Bh                      
    50. Besi Strip                                  Kg                      
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
    51. Besi profil                                 Kg                      
                                                                            
    51. Pipa galvanis 1/2                           m                       
    52. Pipa galvanis 3/4                           m                       
    53. Pipa galvanis 1                             m                       
                                                                            
    54. Pipa galvanis 1 1/2                         m                       
    55. Pipa galvanis 2                             m                       
    56. Pipa galvanis 4                             m                       
                                                                            
    57. hollow galvanis 4x4x1                       m                       
    58. braket siku                                 m                       
    59. profil alumunium kusen                      m                       
                                                                            
                                                                            
     BAHAN KAYU                                                             
                                                                            
    60. Balok kayu klas I 5/10 (Ulin)               M3                      
    61. Balok kayu klas I 10/10 (Ulin)              M3                      
    62. Balok kayu klas I 6/12 (Ulin)               M3                      
                                                                            
    63. Papan kayu klas I (Ulin)                    M3                      
    64. Balok kayu klas II (banuas)                 M3                      
    65. Balok kayu klas II (lanan)                  M3                      
                                                                            
    66. Papan kayu klas II (banuas)                 M3                      
    67. Papan kayu klas II (lanan)                  M3                      
                                                                            
    68. Balok kayu klas III                         M3                      
    69. Papan kayu klas III                         M3                      
    70. Papan kayu bouwplank                        M3                      
                                                                            
    71. Papan kayu begesting                        M3                      
    72. Reng 3x5 kayu kls II                       Batang                   
    73. Kayu bulat/Galam dia. 6-10 cm P.4M         Batang                   
                                                                            
    74. Kayu bulat/knopel dia. 8-10 cm P.4M        Batang                   
                                                                            
     BAHAN ATAP                                                             
                                                                            
    75. Seng gelombang BJLS 20 (80 X 180 cm)       Lembar                   
    76. Seng plat BJLS 20 (lebar 40 cm)             M'                      
                                                                            
    77. Seng gelombang 3"x6"                       Lembar                   
    78. Genteng peletong                            bh                      
    79. Genteng kodok                               bh                      
                                                                            
    80. Genteng bubung                              bh                      
    81. Rooflight 90x180                           Lembar                   
    82. Asbes gel 92x250                           Lembar                   
                                                                            
    83. Asbes gel 92x225                           Lembar                   
    84. Asbes gel 92x200                           Lembar                   
                                                                            
    85. Asbes gel 92x180                           Lembar                   
    86. Asbes gel 105x300                          Lembar                   
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
    87. Asbes gel 105x270                          Lembar                   
                                                                            
    88. Asbes gel 105x240                          Lembar                   
    89. Asbes gel 105x210                          Lembar                   
    90. Asbes gel 105x150                          Lembar                   
                                                                            
    76. Genteng Zincalume Colour tbl.0,25, 1,62 Lbr/m2 Sakura Roof Merpati Lembar
    77. Genteng Zincalume Colour tbl.0,25, 1,62 Lbr/m2 Sakura Roof Merpati M2
    78. Atap metal zincalume spandek tbl 0,3 mm - Lbr. 72 cm Spandek M      
                                                                            
    79. Atap metal zincalume spandek tbl 0,3 mm - (106 X 600) Spandek LEMBAR
    80. Atap Metal Zincalume Soka tbl.0,22mm (1,2 m2/lbr) Soka Lembar       
    81. Genteng beton                               bh                      
                                                                            
    82. Genteng aspal                               bh                      
    83. Sirap kayu                                  bh                      
                                                                            
    84. Bubungan Genteng Metal bentuk C, p=75 cm Sakura Buah                
    85. Nok paten 92 cm                            Lembar                   
    86. Nok rata 92 cm                             Lembar                   
                                                                            
    87. Nok genteng beton                           bh                      
    88. Nok genteng aspal                           bh                      
    81. Nok genteng metal           Sakura          bh                      
                                                                            
    82. Nok spandek                 Sakura          m                       
    83. Plastic aerator                             bh                      
                                                                            
    84. Papan Plank Kalsiboard                     Lembar                   
    85. Papan Plank Kalsiboard                      m                       
    86. Reng Baja Ringan                           Batang                   
                                                                            
    87. Reng Baja Ringan                            M'                      
    88. Rangka Baja Ringan C        Spyro          Batang                   
    89. Rangka Baja Ringan C                        M'                      
                                                                            
    90. Baut (Screw driver)                        Buah                     
    90. Multi Sirap                                 M2                      
    91. Talang PVC segi empat                       btg                     
                                                                            
    92. Waterproof                                  Kg                      
    93. Atap galvalum                               m2                      
                                                                            
    94. tiang galvanis 3"                           m'                      
    95. Atap Polycarbonat tbl 4 mm (2,1 x 11,8 m)   Roll                    
                                                                            
                                                                            
     BAHAN PLAFOND                                                          
    96. Kayu Lapis Triplek 4 mm, 120x240mm plywood Lembar                   
    97. Kayu Lapis Triplek 6 mm, 120x240mm plywood Lembar                   
                                                                            
    98. Kayu Lapis Triplek 9 mm, 120x240mm plywood Lembar                   
    99. Kayu Lapis Triplek 4 mm, 80x200mm          Lembar                   
                                                                            
   100. Formica                                    Lembar                   
   101. Kayu Lapis Teakwood                        Lembar                   
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
   102. Kayu Moulding Papan lap-lapan Alau         Batang                   
                                                                            
   103. List Kayu profil (moulding) 5 cm            M'                      
   104. Lem Putih                                   Kg                      
   105. Playwood 9mm                               Lembar                   
                                                                            
   106. Gypsum 9 mm 120x240 (Papan Plafond) jayaboarad Lbr                  
   107. List Profil Gypsum uk. Sedang (10cm) sp     M'                      
   108. Dempul Gypsum @ 20 kg       sp              Zak                     
                                                                            
   109. Dempul Gypsum @ 20 kg                       Kg                      
   110. Kayu Lapis Triplek 9 mm, 120x240 cm         Lbr                     
   111. Papan Plafond Kalsiboard 3,5 mm (120x240) nusaboard Lembar          
                                                                            
   112. Papan Plafond Kalsiboard 9 mm (120x240) nusaboard Lembar            
   113. Paku Kalsiboard                             Kg                      
                                                                            
   114. Rangka Plafond Baja Ringan 40x40x0,3 mm    Batang                   
   115. Dynabolt                                   Buah                     
                                                                            
                                                                            
     BAHAN PAKU DAN SKRUP                                                   
   116. Paku besi (ukuran besar/sedang, 4-12 cm)    Kg                      
   117. Paku besi (ukuran kecil/paku reng/paku sirap) Kg                    
                                                                            
   118. Paku payung/ paku seng                      Kg                      
   119. Paku ulin                                   Kg                      
                                                                            
   120. Paku asbes                                  Kg                      
   121. Paku anti karat (Paku genteng Metal)        Kg                      
   122. Paku Skrup                                  Bh                      
                                                                            
   123. Paku pancing 6x23                           Kg                      
   123. Paku biasa 1/2"-1"                          Kg                      
   124. Paku biasa 2"-5"                            Kg                      
                                                                            
                                                                            
     BAHAN CAT                                                              
                                                                            
   125. Cat Menie Kayu              indian          Kg                      
   126. Cat manie besi                              Kg                      
   127. Cat kayu/ cat besi (Avian)                  Kg                      
                                                                            
   128. Cat kayu dasar (Indian)                     Kg                      
   129. Cat Tembok 5 Kg/peil (Interior Danabrite)   Peil                    
   130. Cat Tembok (Interior Danabrite)             Kg                      
                                                                            
   131. Cat Eksterior 20 Kg/Peil (Eksterior Duluxweathershell) Peil         
   132. Cat Eksterior (Eksterior Duluxweathershell) Kg                      
   133. Cat Alkali (2,5 liter)      Dana Paint     Kaleng                   
                                                                            
   134. Plamur tembok isi 5 Kg      Avitex          Peil                    
   135. Plamur tembok isi 5 Kg      Avitex          Kg                      
                                                                            
   136. Plamur Kayu (Nippon Paint)                  Kg                      
   137. Dempul Kayu                 Pedang          Kg                      
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
   138. Minyak cat                                  Liter                   
                                                                            
   139. Kuas                                        bh                      
   140. Residu/Ter Kayu                             Liter                   
   141. Solar tidak bersubsidi                      Liter                   
                                                                            
   142. Olie                                        Liter                   
   143. Soda api                                    Kg                      
   144. Sabun                                       Kg                      
                                                                            
   145. Politur                                     Liter                   
   146. Vernis                                      Liter                   
   147. Wallpapper                                  M2                      
                                                                            
   148. Lem kuning                                  Kg                      
   149. Ampelas                                     Lbr                     
                                                                            
                                                                            
     BAHAN PINTU JENDELA                                                    
   150. Kaca bening 8 mm                            M2                      
                                                                            
   151. Kaca bening 5 mm                            M2                      
   152. Kaca ryben 5 mm                             M2                      
   153. Kaca ryben 8 mm                             M2                      
                                                                            
   154. Kaca bening 3 mm                            M2                      
   155. Kaca ryben 3 mm                             M2                      
                                                                            
   156. Kunci pintu tanam lengkap                   Set                     
   157. Kunci pintu tanam kecil lengkap (standart)  Set                     
   158. kunci slot                                  Set                     
                                                                            
   158. Engsel lokal 4" untuk pintu                Pasang                   
   159. Engsel lokal 3" untuk jendela              Pasang                   
   160. Grendel 3" (Imperial)                      Buah                     
                                                                            
   161. Expagnolet besar (penuh)                   Buah                     
   161. Hak angin 8" stainless steel               Buah                     
   162. Handle Jendela                             Buah                     
                                                                            
   163. Handle Pintu                               Pasang                   
   164. Engsel Jendela Untuk Aluminium             Buah                     
                                                                            
   165. Engsel Pintu untuk Aluminium               Buah                     
   166. Handle Aluminium                           Buah                     
   167. Kunci Gambok (Majesty)                     Buah                     
                                                                            
   168. Kusen Aluminium                             M'                      
   168. Sealant                                    Tube                     
   169. Teralis besi                                M2                      
                                                                            
                                                                            
     BAHAN TOILET                                                           
                                                                            
   169. Closet duduk putih lengkap (Toto)           Set                     
   170. Closet jongkok putih (Toto)                Buah                     
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
   171. Bak mandi Fibre 70x70 Sudut                Buah                     
                                                                            
   172. Wastafel lengkap + cermin putih            Buah                     
   173. Wastafel lengkap tanpa cermin              Buah                     
   174. Kran air stainless                         Buah                     
                                                                            
   175. Drain floor                                Buah                     
   176. Seal tape                                  Buah                     
   177. Pompa Air Lengkap 200w (Panasonic)          Unit                    
                                                                            
   178. Sumur pompa tangan lengkap terpasang       Buah                     
   179. Pipa PVC AW Ø 1/2 " Panjang 4 M            Batang                   
   180. Pipa PVC AW Ø 3/4 " Panjang 4 M            Batang                   
                                                                            
   181. Pipa PVC AW Ø 1 " Panjang 4 M              Batang                   
   182. Pipa PVC AW Ø 1 1/4" Panjang 4 M           Batang                   
                                                                            
   183. Pipa PVC AW Ø 1 1/2 " Panjang 4 M          Batang                   
   184. Pipa PVC AW Ø 2 " Panjang 4 M              Batang                   
   185. Pipa PVC AW Ø 3 " Panjang 4 M              Batang                   
                                                                            
   186. Pipa PVC AW Ø 4 " Panjang 4 M              Batang                   
   187. Stop kran                                  Buah                     
   188. bio septic tank BF-03                       Unit                    
                                                                            
   189. Urinoir                                    Buah                     
   190. Bak Cuci Piring Stainless                  Buah                     
                                                                            
   191. Bathkip Fibre 36x75x170 cm                 Buah                     
   192. Shower Mandi Stainless                     Buah                     
   193. Shower Kloset Stainless                    Buah                     
                                                                            
   194. Kran Double                                Buah                     
   195. Floor drain stainless                      Buah                     
                                                                            
                                                                            
     BAHAN LANTAI                                                           
   187. Keramik 10/20 & 20/20 Anti slip corak/ warna Asia Tile Dos          
   188. Keramik 10/20 & 20/20 polos Setara Mulia/Arwana Dos                 
                                                                            
   189. Keramik 20/25 corak/ warna  Setara Mulia    Dos                     
   190. Keramik 30/30 polos         Setara Mulia/Arwana Dos                 
                                                                            
   191. Keramik 30/30 corak/ warna  Setara Mulia/Arwana Dos                 
   192. Keramik 40/40 (polished)    Essenza         Dos                     
   193. Keramik 40/40 (kasar)       Essenza         Dos                     
                                                                            
   194. Keramik 40/40 (corak)       Roman           Dos                     
   195. Keramik Granito 60/60 (polished) Garuda     Dos                     
   196. Keramik Granito 60/60 (kasar) Essenza       Dos                     
                                                                            
                                                                            
     BAHAN LISTRIK                                                          
                                                                            
   197. Titik nyala Lampu + instalasi (konstruksi kayu) Titik               
   198. Titik nyala Lampu + instalasi (konstruksi beton) Titik              
   NO          NAMA/JENIS BAHAN                   SATUAN HARGA KETERANGAN   
   199. Stop kontak + instalasi (Konstruksi kayu)   Titik                   
                                                                            
   200. Stop kontak + instalasi (Konstruksi beton)  Titik                   
   201. Saklar Double               Broco          Buah                     
   202. Saklar Tunggal              Broco          Buah                     
                                                                            
   203. Lampu pijar 15 w            Philip         Buah                     
   204. Lampu SL 23 watt            Philip         Buah                     
   205. MCB 3 Ph 32 A               Schneider      Buah                     
                                                                            
   206. Fitting Plafond             Broco          Buah                     
   207. Stop Kontak                 Masko          Buah                     
   208. Kabel NYA                   Merah           M'                      
                                                                            
   209. Pipa Listrik                Pralon         Batang                   
   210. T Dos                       Clipton        Buah                     
                                                                            
   211. Isolator                    National       Buah                     
   212. Lass Doop                                  Buah
Tenders also won by CV Bukit Raya Perdana
Authority
19 February 2020Pengeboran Air Tanah Untuk Air Baku Pada Daerah Rawan Kering Di Kab. Pulang PisauKementerian Pekerjaan Umum dan Perumahan RakyatRp 4,281,000,000
25 July 2025Pembangunan Aula Kecamatan Manuhing RayaKab. Gunung MasRp 2,500,000,000
24 May 2017- Pembangunan Gedung Kantor (Lanjutan)Kementerian Agraria dan Tata Ruang/BPNRp 2,287,000,000
9 September 2022Pembangunan Jaringan Irigasi Dir Hambuyung (Lanjutan)Kab. Gunung MasRp 1,710,653,983
18 June 2018Pembangunan Sekolah Alquran Jamiatul Qabail (Lanjutan)Kota PalangkarayaRp 1,500,000,000
21 September 2015Pembangunan Kantor Kecamatan Tanah SiangMurung RayaRp 1,344,817,000
13 June 2019Belanja Modal Pembangunan Pasar Rakyat Di Kecamatan Miri ManasaPemerintah Daerah Kabupaten Gunung MasRp 1,196,460,000
9 August 2017Pembangunan/Peningkatan Gereja Tumbang LahangLPSE Kabupaten KatinganRp 1,115,000,000
4 August 2020Pengembangan Jaringan Perpipaan Di Kelurahan TewahKab. Gunung MasRp 1,050,000,000
14 July 2017Belanja Modal Pengadaan Bangunan Gedung KantorPemerintah Daerah Kota Palangka RayaRp 1,050,000,000