| Reason | ||||
|---|---|---|---|---|
| 0802189951822000 | Rp 121,000,000 | 67.77 | - | |
CV Darma Anugerah Konsultan | 0208116341801000 | - | - | - |
CV Adicipta Nusatama | 0014761266822001 | Rp 120,340,000 | 62.48 | nilai teknis tidak memenuhi passing rate (65) |
CV Draftech Engineer | 0719638165822000 | - | - | - |
| 0032688483444000 | Rp 119,500,000 | 57 | nilai teknis tidak memenuhi passing rate (65) | |
| 0025350794822000 | - | - | - | |
| 0811296599822000 | - | - | - | |
| 0031292907801000 | - | - | - | |
| 0033125303822000 | - | - | - | |
CV Marimoi Engineering Consultant | 0017871781942000 | - | - | - |
CV Archicivil Konsultan | 0022278295822000 | - | - | - |
| 0016664930822000 | - | - | - | |
| 0744484494609000 | - | - | - | |
PT Karya Mulia Abadi | 00*6**4****22**0 | - | - | - |
| 0314461807501000 | - | - | - | |
| 0015373822821000 | - | - | - | |
CV Arcadia Grida Pradana | 0025348012822000 | - | - | - |
PT Era Bangun Elektrik | 07*5**3****22**0 | - | - | - |
| 0028852887801000 | - | - | - | |
CV Jaya Mulia Design | 0745537225514000 | - | - | - |
| 0033058645822000 | - | - | - | |
| 0026805622822000 | - | - | - | |
PT Andika Persada Raya | 0210783676429000 | - | - | - |
| 0827093451805000 | - | - | - | |
| 0211291059401000 | - | - | - | |
| 0022275945822000 | - | - | - | |
| 0032632119822000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 18 December 2018 | Perencanaan Konstruksi Pembangunan Dit Lantas Polda Gorontalo T.A 2019 | Kepolisian Negara Republik Indonesia | Rp 885,300,000 |
| 17 March 2022 | Pengawasan Jalan Provinsi (Dak) | Provinsi Gorontalo | Rp 423,000,000 |
| 22 March 2022 | Pengawasan Rekonstruksi/ Peningkatan Kapasitas Struktur Jalan Ollot - Goyo (Dak) | Kab. Bolaang Mongondow Utara | Rp 368,060,000 |
| 2 February 2018 | Pengawasan Peningkatan Jalan Dulomo 1 Cs (Dak Penugasan) | Kab. Pohuwato | Rp 339,400,000 |
| 11 February 2022 | Pengawasan Penataan Drainase Kota Gorontalo (Pen) | Kota Gorontalo | Rp 300,985,632 |
| 16 March 2022 | Pengawasan Jembatan By-Pass I | Kab. Gorontalo Utara | Rp 300,000,000 |
| 21 February 2022 | Pengawasan Rekonstruksi Jalan Ruas Taluduyunu 3 | Kab. Pohuwato | Rp 300,000,000 |
| 30 March 2022 | Ded Gedung Perawatan (Pen) | Kab. Gorontalo Utara | Rp 280,000,000 |
| 13 May 2022 | Perencanaan Konstruksi Bangunan Wilker Bintauna | Kementerian Kesehatan | Rp 255,750,000 |
| 11 May 2022 | Jasa Konsultan Pengawas Kegiatan Kontraktual Dana Alokasi Khusus (Dak) | Kab. Boalemo | Rp 250,000,000 |