NAMA PEKERJAAN : PEMASANGAN BATU KALI JALAN MASUK REKTORAT
LOKASI : KAMPUS REULEUT KECAMATAN MUARA BATU KABUPATEN ACEH UTARA
TAHUN ANGGARAN : 2025
NO. URAIAN PEKERJAAN
I. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah Menggunakan Alat Berat
2 Urugan Tanah dibawah Pasangan Batu
3 Urugan Pasir Bawah Lantai, t = 5 cm
II. PEKERJAAN BETON DAN BETON BERTULANG
1 Pondasi Uk. 80 x 80
- Beton Mutu f'c = 15 Mpa (K 175)
- Besi Beton Polos
2 Kolom Pedestal Uk. 30 x 30 cm
- Beton Mutu f'c = 15 Mpa (K 175)
- Besi Beton Polos
- Bekisting Kolom Pedestal
3 Sloof Uk. 30 x 20 cm
- Beton Mutu f'c = 15 Mpa (K 175)
- Besi Beton Polos
- Bekisting Sloof
4 Kolom Uk. 30 x 30 cm
- Beton Mutu f'c = 15 Mpa (K 175)
- Besi Beton Polos
- Bekisting Kolom
5 Balok Uk. 30 x 20
- Beton Mutu f'c = 15 Mpa (K 175)
- Besi Beton Polos
- Bekisting Balok
III. PEKERJAAN PASANGAN
1 Pasangan Batu Kali 1:4
2 Penanaman Rumput
3 Finishing Siar Pasangan Batu Kali
4 Acian Sloof, Kolom dan Balok
5 Pipa PVC Dia. 4" Type AW (Pipa Air Hujan)
6 Pipa PVC Dia. 3/4" Type AW