,Land Development Kampus Sidotopo Untidar

Basic Information
Type: Public Tender
Tender Code: 10473769000
Date: 14 October 2025
Year: 2025
KLPD: Kementerian Pendidikan Tinggi, Sains, dan Teknologi
Work Unit: Universitas Tidar
Procurement Type: Jasa Konsultansi Badan Usaha Non Konstruksi
Method: Pengadaan Langsung
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 400,000,000
Estimated Value (Nilai HPS): Rp 393,012,000
Winner (Pemenang): CV Rizky Bintang Jaya
NPWP: 01*7**6****19**0
RUP Code: 59470692
Work Location: Jalan Kapten Suparman No 39 Potrobangsan Magelang Jawa Tengah - Magelang (Kota)
Participants: 1
Attachment
Bill of Quantity                             
                                                                               
Pekerjaan : Land Development Kampus Sidotopo Untidar                           
Lokasi : Universitas Tidar Kampus Sidotopo                                     
Tahun : 2025                                                                   
                                                                               
                                                       Harga Satuan Jumlah Harga
 No.              Uraian Pekerjaan         Volume Sat.                         
                                                         (Rp)       (Rp)       
 A PEKERJAAN PERSIAPAN                                                         
  1 Pembersihan Lokasi Sebelum dan Sesudah Pekerjaan 1,00 Ls             -     
  2 Pengukuran                               3 88,61 m²                  -     
  3 Langsir material ke lokasi Kantin         1 ,00 Ls                   -     
                                                     Sub Total A        -      
 B PEKERJAAN LANDSCAPE ZONA A                                                  
 B.1 Pekerjaan Tanah dan Bongkaran                                             
  1 Galian Pondasi                            1 3,57 m3                  -     
  2 Urugan Tanah Kembali                      5 ,53 m3                   -     
  3 Urugan Tanah Peninggian Pail Bangunan     3 4,14 m3                  -     
  4 Urugan Tanah Mendatangkan                 6 5,75 m3                  -     
  5 Urugan tanah subur                        1 7,17 m3                  -     
  6 Urugan Pasir Bawah Pondasi                5 ,22 m3                   -     
  7 Bongkar dinding beton eksisting           1 ,00 Ls                   -     
  8 Angkut material sisabongkaran keluar area pekerjaan 1 ,00 Ls         -     
 B.2 Pekerjaan Pasangan                                                        
  1 Pas. Pondasi Batu Kali 1pc : 6ps          1 7,22 m3                  -     
  2 Pas. Talud Pondasi Batu Kali 1pc : 6ps    6 1,03 m3                  -     
  3 Balok Sloof Praktis                       5 4,90 m'                  -     
  4 Pipa suling-suling                        2 9,90 m1                  -     
  5 Pas. Bata Taman                           9 ,71 m2                   -     
  6 Plesteran                                 1 2,94 m2                  -     
  7 Acian                                     1 2,94 m2                  -     
 B.3 Pekerjaan Penutup Lantai dan Dinding & Groundcover                        
  1 Pas. Paving Blok type Holland tebal 6 cm (A) 1 69,23 m2              -     
  2 Pas. Paving Blok type Holland tebal 8 cm (B) 7 7,21 m2               -     
  3 Pas. Kanstin                              9 5,72 m1                  -     
  4 Cor Lantai Beton Ramp t: 10cm                                              
   a. Pembesian Wiremesh M6-150               4 7,82 kg                  -     
   b. Bekisting                               2 ,60 m2                   -     
   c. Beton                                   1 ,56 m3                   -     
 B.4 Pekerjaan Air Bersih (Air dingin)                                         
  1 Pompa Transfer                            1 ,00 unit                 -     
  2 Pompa Booster (Roof Tank)                 1 ,00 set                  -     
  3 Tanki Air Atas (Roof tank) , Lokasi Atap  1 ,00 unit                 -     
  4 Instalasi Power Pompa Transfer (kabel NYY 4x6 mm + BC 6 mm) 8 ,84 m' -     
  5 Instalasi Power Pompa Booster Roof Tank (kabel NYY 4x6 mm + BC 6 mm) 1 2,00 m' -
  6 Pipa PVC AW dia. 1 inch dari Pompa Transfer naik ke Tanki Air 1 1,78 m1 -  
  7 Gate Valve dia. 1"                        1 ,00 bh                   -     
  8 Sumur bor air bersih min. 25m             1 ,00 ls                   -     
  9 Material bantu                            1 ,00 lot                  -     
  10 Testing commissioning                    1 ,00 lot                  -     
   - LANTAI 1                                                                  
  1 Kran Kitchensink                          1 ,00 bh                   -     
  2 Pipa PVC AW dia 1"                        1 8,65 m1                  -     
  3 Pipa PVC AW dia 3/4"                      2 8,40 m1                  -     
  4 Gate Valve dia. 1"                        1 ,00 bh                   -     
  5 Tandon Air 2000 L                         1 ,00 bh                   -     
                                                       Harga Satuan Jumlah Harga
 No.              Uraian Pekerjaan         Volume Sat.                         
                                                         (Rp)       (Rp)       
 B.5 Pekerjaan Air Kotor dan Vent                                              
  1 Pas. Kitchensink                          4 ,00 bh                   -     
  2 Pipa Air Bekas PVC kelas AW :                                              
   - dia. 3"                                  6 2,15 m1                  -     
  3 Sumur Peresapan dia:80cm                  1 ,00 unit                 -     
  4 Bak Kontrol 60x60cm Include Tutup         1 ,00 unit                 -     
  5 Bak Grease Trap 125x80 cm                 1 ,00 unit                 -     
  6 Fitting + Supporting                      1 ,00 ls                   -     
 B.6 Pekerjaan Air Hujan                                                       
  1 Pipa PVC kelas AW dia. 4"                 9 ,00 m1                   -     
  2 Roof Drain                                3 ,00 bh                   -     
  3 Acessoris Pipa                            1 ,00 lot                  -     
                                                     Sub Total B        -      
 C PEKERJAAN LANDSCAPE ZONA B                                                  
 C.1 Pekerjaan Tanah dan Urugan                                                
  1 Urugan Tanah Mendatangkan                 1 4,15 m3                  -     
  2 Urugan tanah subur                        2 0,80 m3                  -     
  3 Urugan Pasir Bawah Pondasi                3 ,38 m3                   -     
  4 Urugan Pasir Bawah Ramp Beton             3 ,71 m3                   -     
  5 Urugan Sirtu                              3 1,75 m3                  -     
 C.2 Pekerjaan Pasangan                                                        
  1 Pas. Pondasi Batu Kali 1pc : 8ps          1 8,06 m3                  -     
  2 Pas. Bata Rollag Pedestrian               9 ,75 m2                   -     
  3 Plesteran                                 1 3,40 m2                  -     
  4 Acian                                     1 3,40 m2                  -     
 C.3 Pekerjaan Penutup Lantai dan Dinding & Groundcover                        
  1 Pas. Paving Blok type Holland tebal 6 cm (A) 6 2,79 m2               -     
  2 Pas. Paving Blok type Holland tebal 8 cm (B) 7 9,38 m2               -     
  3 Pas. Kanstin                             1 00,84 m1                  -     
  4 Cor Lantai Beton Ramp t: 20cm                                              
   a. Pembesian                             2 .761,73 kg                 -     
   b. Bekisting                               2 ,75 m2                   -     
   c. Beton                                   1 0,58 m3                  -     
  5 Saluran air hujan U-Ditch 400x400 cm      6 ,45 m1                   -     
  6 Tutup beton saluran air hujan             3 ,75 m1                   -     
                                                     Sub Total C        -      
                                                      JUMLAH TOTAL (A)  -      
                                                          PPN 11% (B)   -      
                                                         JUMLAH A + B   -      
                                                         PEMBULATAN     -      
                                Terbilang : Nol Rupiah                         
                                                     Kota, tgl_bln_thn         
                                                     Badan Usaha               
                                                                               
                                                                               
                                                                               
                                                     Penanggung Jawab          
                                                     Jabatan