Bangunan Gedung Kantor

Basic Information
Type: Public Tender
Tender Code: 10605189000
Date: 19 November 2025
Year: 2025
KLPD: Provinsi Papua Barat Daya
Work Unit: Dinas Kependudukan Dan Pencatatan Sipil Dan Pemberdayaan Masyarakat Dan Kampung
Procurement Type: Pekerjaan Konstruksi
Method: Pengadaan Langsung
Contract Type: Lumsum
Financial Information
Value (Nilai Pagu): Rp 1,387,426,052
Estimated Value (Nilai HPS): Rp 999,259,863
RUP Code: 61733052
Work Location: Kabupaten Maybrat - Maybrat (Kab.)
Participants: 1
Attachment
BILL   OF   QUANTITY                                
                                                                        
                                                                        
                           ( B  O  Q  )                                 
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                               PAKET:                                   
                                                                        
      PEMBANGUNAN  DAN BANTUAN PERLENGKAPAN SANGGAR TTG                 
                                                                        
                        BAGI MASYARAKAT DI KAMPUNG                      
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                                                                        
                         OTONOMI KHUSUS (OTSUS)                         
                          TAHUN ANGGARAN 2025                           
            PEMERINTAH   PROVINSI  PAPUA  BARAT  DAYA                   
                                                                        
            DINAS KEPENDUDUKAN     DAN  CATATAN   SIPIL                 
              Alamat : Jalan Dr, Sam Ratulangi Kampung Baru Kota Sorong 
                                                                        
                       BILL OF QUANTITY                                 
                           ( B O Q )                                    
      PEMBANGUNAN  DAN BANTUAN PERLENGKAPAN SANGGAR TTG                 
                                                                        
                  BAGI MASYARAKAT DI KAMPUNG                            
                                  Sat. Volume Harga satuan Jumlah       
No.           Uraian Pekerjaan                                          
                                              ( Rp. )  ( Rp. )          
 A PEKERJAAN PEMBANGUNAN SANGGAR                                        
   PEKERJAAN PERSIAPAN                                                  
  1 Pembuatan 1 m2 kantor sementara/rumah jaga/gudang semen M2 12.00 2 ,902,800.00 3 4,833,600.00
   dan peralatan lantai plesteran, dinding setengah tembok              
  2 Keselamatan dan Kesehatan Kerja LS  1.00 1 0,000,000.00 1 0,000,000.00
  3 Papan Nama Proyek              LS   1.00   5 00,000.00 5 00,000.00  
  4 Pembersihan dan pengupasan permukaan tanah (striping) s.d. M2 450.00 2 4,500.00 1 1,025,000.00
   tanaman ∅ 2 cm (m2)                                                  
  5 Pembuatan 1 m' bouwplank       M1  46.00   1 08,900.00 5 ,009,400.00
   PEKERJAAN GALIAN TANAH                                               
  1 Penggalian 1 m3 cadas atau tanah keras sedalam > 1 s.d. 2 m M3 219.99 3 79,300.00 8 3,443,049.46
   untuk volume > 200 m3                                                
   PEKERJAAN TIMBUNAN DAN PEMADATAN                                     
  1 1 m3 urukan pasir uruk untuk volume s.d 200 m3 tanpa M3 18.00 5 18,700.00 9 ,336,600.00
   pemadatan secara manual                                              
  2 1 m3 timbunan dan pemadatan sirtu M3 24.00 4 78,400.00 1 1,481,600.00
   PEKERJAAN PONDASI                                                    
  1 Pemasangan 1 m3 batu kosong (anstamping) untuk pondasi M3 6.86 1 ,362,300.00 9 ,345,378.00
   gedung                                                               
  2 Pemasangan 1 m3 pondasi batu belah mortar tipe S 12,5 Mpa M3 34.30 2 ,241,900.00 7 6,897,170.00
   (setara 1SP : 3PP), cara manual                                      
   PEKERJAAN BETON                                                      
  1 Pembuatan 1 kg penulangan kolom, balok, ring balok, dan sloof Kg 1 ,688.73 1 8,200.00 3 0,734,960.74
   untuk BjTP atau BjTS dia. < 12 mm, cara manual                       
  2 Pemasangan 1 m2 bekisting untuk sloof (3 kali pakai) M2 58.80 2 76,900.00 1 6,281,720.00
  3 Pemasangan 1 m2 bekisting untuk kolom (3 kali pakai) M2 57.60 3 61,400.00 2 0,816,640.00
  4 Pemasangan 1 m2 bekisting untuk balok (3 kali pakai) M2 39.20 3 64,600.00 1 4,292,320.00
  5 Pembuatan 1 m3 beton mutu rendah f'c 15 MPa, slump (100 ± M3 17.52 2 ,268,400.00 3 9,742,368.00
   25) mm, agregat maks 19 mm secara semi mekanis                       
  6 Pembuatan 1 m3 beton mutu sedang f'c 20 MPa, slump (100 ± M3 13.07 2 ,336,100.00 3 0,537,499.20
   25) mm, agregat maks 19 mm secara semi mekanis                       
  7 Pemadatan 1 m3 beton menggunakan penusuk besi beton M3 13.07 5 4,500.00 7 12,424.00
  8 Menyirami 1 m2 permukaan beton menggunakan media karung M2 120.00 2 2,100.00 2 ,652,000.00
   goni selama 4 hari                                                   
  9 Pembuatan 1 m' kolom praktis beton bertulang (11x11) M1 21.00 1 50,400.00 3 ,158,400.00
 1 0 Pembuatan 1 m' balok praktis beton bertulang (10x15) M1 9.50 2 11,400.00 2 ,008,300.00
   PEKERJAAN RANGKA ATAP                                                
  1 Pemasangan 1 m3 konstruksi kuda-kuda ekspose, kayu kelas I M3 3.39 1 5,979,500.00 5 4,214,129.04
  2 Pemasangan 1 m3 konstruksi gording, kayu kelas I M3 1.49 1 0,289,200.00 1 5,279,462.00
  3 Pemasangan 1 m3 konstruksi kaso kayu kelas I M3 0.29 1 0,289,200.00 2 ,976,665.56
   PEKERJAAN PASANGAN DINDING                                           
  1 Pemasangan 1 m2 dinding bata merah tebal 1 batu dengan mortar M2 233.09 6 99,600.00 1 63,069,764.00
   tipe S,fc’ 12,5 MPa (Setara Campuran 1SP : 3PP)                      
   PEKERJAAN PENUTUP ATAP                                               
  1 Pemasangan 1 m2 atap seng gelombang BJLS 0.3 panjang 6 Inch M2 157.80 1 44,700.00 2 2,833,660.00
  2 Pemasangan 1 m' bubung atap seng gelombang M1 15.00 8 5,000.00 1 ,275,000.00
  3 Pemasangan 1 m' talang datar/jurai seng BJLS 28 lebar 90 cm M1 30.00 2 56,100.00 7 ,683,000.00
  4 Pemasangan 1 m' lisplank uk. 3x20 cm, kayu kelas I atau II M1 51.00 1 27,100.00 6 ,482,100.00
   PEKERJAAN PLESTERAN DAN ACIAN                                        
  1 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm UNIT 48.98 1 10,700.00 5 ,422,086.00
  2 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm UNIT 368.22 1 07,800.00 3 9,694,116.00
  3 Pemasangan 1 m2 acian         UNIT 417.20  8 1,900.00 3 4,168,680.00
   PEKERJAAN PLAFOND                                                    
  1                                M2  175.20  9 7,000.00 1 6,994,400.00
   Pemasangan 1 m2 plafon kayu lapis tebal 3 mm, 4 mm, dan 6 mm         
  3 Pemasangan 1 m2 rangka plafon kayu kelas II atau III, modul M2 175.20 2 52,600.00 4 4,255,520.00
   60x60 cm                                                             
   PEKERJAAN PENUTUP LANTAI DAN DINDING                                 
  1 Pemasangan 1 m2 lantai keramik unpolish uk. 40x40 cm (1SP : M2 85.20 2 55,900.00 2 1,802,680.00
   2PP)                                                                 
  2 Pemasangan 1 m2 lantai keramik polish uk. 40x40 cm (1SP : 2PP) M2 114.00 2 68,400.00 3 0,597,600.00
  4 Pemasangan 1 m2 dinding keramik uk. 20x20 cm (1SP : 2PP) M2 24.00 3 25,500.00 7 ,812,000.00
   PEKERJAAN PINTU DAN JENDELA                                          
  1 Pembuatan 1 m2 daun pintu panel, kayu kelas I atau II M2 12.18 1 ,300,800.00 1 5,843,744.00
  2 Pembuatan dan pemasangan 1 m’ kusen pintu dan kusen jendela, M2 25.02 1 90,800.00 4 ,773,816.00
   kayu kelas I uk. 5x10 cm                                             
  3 Pemasangan 1 buah kunci tanam  BH   6.00   5 40,900.00 3 ,245,400.00
  4 Pemasangan 1 buah engsel pintu BH   6.00   2 09,900.00 1 ,259,400.00
  5 Pemasangan 1 buah spring knip untuk jendela BH 12.00 7 3,800.00 8 85,600.00
  6 Pemasangan 1 buah kait angin   BH  12.00   1 98,400.00 2 ,380,800.00
  7 Pemasangan 1 buah grendel      BH   3.00   6 6,200.00 1 98,600.00   
  8 Pemasangan 1 buah grendel tanam BH  2.00   2 45,900.00 4 91,800.00  
   PEKERJAAN KACA                                                       
  1 Pemasangan 1 m2 kaca polos tebal 5 mm M2 9.00 5 53,000.00 4 ,977,000.00
   PEKERJAAN PENGECATAN DAN PELITURAN                                   
  1 Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat M2 43.44 1 00,200.00 4 ,352,688.00
   dasar, 2 lapis cat penutup)                                          
  3 Pengecatan 1 m2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 M2 417.20 9 8,700.00 4 1,177,640.00
   lapis cat penutup), interior                                         
  4 Pengecatan 1 m2 plafon (1 lapis cat dasar dan 2 lapis cat penutup) M2 175.20 7 7,400.00 1 3,560,480.00
   PEKERJAAN SANITAIR                                                   
  1 Pemasangan 1 buah closet jongkok BH 2.00  1 ,220,900.00 2 ,441,800.00
  2 Pemasangan 1 buah floor drain stainless steel BH 2.00 1 63,700.00 3 27,400.00
  3 Pemasangan 1 buah kran diameter ½" atau 3/4" BH 3 .00 3 04,400.00 9 13,200.00
   PEKERJAAN SISTEM AIR MINUM                                           
  1 Pemasangan 1 unit tangki toren kap. 2,2 m3 UNIT 1.00 6 ,751,200.00 6 ,751,200.00
   PEKERJAAN PERPIPAAN GEDUNG                                           
  1 Pemasangan 1 m' pipa PVC, dia. 1/2" (15 mm) M1 4 .00 3 3,700.00 1 34,800.00
  2 Pemasangan 1 m' pipa PVC, dia. 3/4" (20 mm) M1 6.00 4 9,300.00 2 95,800.00
  3 Pemasangan 1 m' pipa PVC, dia. 1" (25 mm) M1 12.00 5 9,800.00 7 17,600.00
   PEKERJAAN JARINGAN LISTRIK                                           
  1 Pemasangan 1 m' kabel NYY 2 x 1,5 mm² M1 8.00 3 3,600.00 2 68,800.00
  2 Pemasangan 1 m' kabel NYM 2 x 1,5 mm² M1 30.80 4 5,300.00 1 ,395,240.00
  3 Pemasangan 1 m' kabel NYM 2 x 2,5 mm² M1 45.00 6 1,900.00 2 ,785,500.00
   PEKERJAAN AKHIR                                                      
  1 Pembersihan Akhir              Ls   1.00  3 ,000,000.00 3 ,000,000.00
                                               Jumlah A 1 ,000,000,000.00
 B PEKERJAAN PERENCANAAN DAN PENGAWASAN                                 
  1 Perencanaan                    Ls   1.00 60,000,000.00 6 0,000,000.00
   Pengawasan                      Ls   1.00 9 0,000,000.00 9 0,000,000.00
                                               Jumlah B 1 50,000,000.00 
 C PEKERJAAN PERENCANAAN DAN PENGAWASAN                                 
   Pengadaan Perlengkapan Sanggar TTG Ls 1.00 1 03,071,893.69 1 03,071,893.69
                                               Jumlah C 1 03,071,893.69 
                                         JUMLAH A + B + C 1 ,253,071,893.69
 Terbilang :                                   PPN 11 % 1 37,837,908.31 
                                           JUMLAH + PPN 1 ,390,909,802.00
   Satu Milyard Tiga Ratus Sembilan Puluh Juta Sembilan Ratus Ribu Rupiah
                                            DIBULATKAN 1 ,390,900,000.00
              Disetujui Oleh :              Dibuat Oleh :               
         DINAS DUKCAPIL PAPUA BARAT DAYA DINAS DUKCAPIL PAPUA BARAT DAYA
          PEJABAT PEMBUAT KOMITMEN    PEJABAT PELAKSANA TEKNIS KEGIATAN 
                                                                        
                                                                        
                                                                        
           NIKOLAS ASMURUF, SE.,M.AP.    TONCE WAY, S.HUT.,M.AP.        
           NIP. 19690717 200012 1 006    NIP. 19840410 201201 1 001     
                      DAFTAR HARGA SATUAN PEKERJAAN (DHSP)              
                           BIDANG CIPTA KARYA                           
                      Berdasarkan Permen PUPR No.8 Tahun 2023           
 NO                URAIAN PEKERJAAN          SATUAN HARGA SATUAN        
 A PEKERJAAN PERSIAPAN                                                  
 1 Pembuatan 1 m2 kantor sementara/rumah jaga/gudang semen dan peralatan lantai plesteran, dinding setengah temmbo2k Rp 2 ,902,800.00
 2 Pembersihan dan pengupasan permukaan tanah (striping) s.d. tanaman ∅ 2 cm (m2) m2 Rp 2 4,500.00
 3 Pembuatan 1 m' bouwplank                   m' Rp 1 08,900.00         
 B PEKERJAAN GALIAN TANAH                                               
 1 Penggalian 1 m3 cadas atau tanah keras sedalam > 1 s.d. 2 m untuk volume > 200 m3 m3 Rp 3 79,300.00
 C PEKERJAAN TIMBUNAN DAN PEMADATAN                                     
 1 1 m3 urukan pasir uruk untuk volume s.d 200 m3 tanpa pemadatan secara manual m3 Rp 5 18,700.00
 2 1 m3 timbunan dan pemadatan sirtu          m3 Rp 4 78,400.00         
 E PEKERJAAN PONDASI                                                    
 1 Pemasangan 1 m3 batu kosong (anstamping) untuk pondasi gedung m3 Rp 1 ,362,300.00
 2 Pemasangan 1 m3 pondasi batu belah mortar tipe S 12,5 Mpa (setara 1SP : 3PP), cara manual m3 Rp 2 ,241,900.00
 F PEKERJAAN BETON                                                      
 3 Pembuatan 1 kg penulangan kolom, balok, ring balok, dan sloof untuk BjTP atau BjTS dia. < 12 mm, cara kg Rp 1 8,200.00
 15 Pemasangan 1 m2 bekisting untuk sloof (3 kali pakai) m2 Rp 2 76,900.00
 16 Pemasangan 1 m2 bekisting untuk kolom (3 kali pakai) m2 Rp 3 61,400.00
 17 Pemasangan 1 m2 bekisting untuk balok (3 kali pakai) m2 Rp 3 64,600.00
 31 Pembuatan 1 m3 beton mutu rendah f'c 15 MPa, slump (100 ± 25) mm, agregat maks 19 mm secara semi mekanism3 Rp 2 ,268,400.00
 33 Pembuatan 1 m3 beton mutu sedang f'c 20 MPa, slump (100 ± 25) mm, agregat maks 19 mm secara semi mekanism3 Rp 2 ,336,100.00
 48 Pemadatan 1 m3 beton menggunakan penusuk besi beton m3 Rp 5 4,500.00
 52 Menyirami 1 m2 permukaan beton menggunakan media karung goni selama 4 hari m2 Rp 2 2,100.00
 53 Pembuatan 1 m' kolom praktis beton bertulang (11x11) m' Rp 1 50,400.00
 54 Pembuatan 1 m' balok praktis beton bertulang (10x15) m' Rp 2 11,400.00
 G PEKERJAAN RANGKA ATAP                                                
 4 Pemasangan 1 m3 konstruksi kuda-kuda ekspose, kayu kelas I m3 Rp 1 5,979,500.00
 5 Pemasangan 1 m3 konstruksi gording, kayu kelas I m3 Rp 1 0,289,200.00
 H PEKERJAAN PASANGAN DINDING                                           
 2 Pemasangan 1 m2 dinding bata merah tebal 1 batu dengan mortar tipe S,fc’ 12,5 MPa (Setara Campuran m2
                                                 Rp 6 99,600.00         
   1SP : 3PP)                                                           
 I PEKERJAAN PENUTUP ATAP                                               
 32 Pemasangan 1 m2 atap seng gelombang BJLS 0.3 panjang 6 Inch m2 Rp 1 44,700.00
 41 Pemasangan 1 m' bubung atap seng gelombang m' Rp 8 5,000.00         
 50 Pemasangan 1 m' talang datar/jurai seng BJLS 28 lebar 90 cm m' Rp 2 56,100.00
 52 Pemasangan 1 m' lisplank uk. 3x20 cm, kayu kelas I atau II m' Rp 1 27,100.00
 J PEKERJAAN PLESTERAN DAN ACIAN                                        
 2 Pemasangan 1 m2 plesteran 1SP : 2PP tebal 15 mm m2 Rp 1 10,700.00    
 3 Pemasangan 1 m2 plesteran 1SP : 3PP tebal 15 mm m2 Rp 1 07,800.00    
 8 Pemasangan 1 m2 acian                      m2 Rp 8 1,900.00          
 K PEKERJAAN PLAFON                                                     
 7 Pemasangan 1 m2 plafon kayu lapis tebal 3 mm, 4 mm, dan 6 mm m2 Rp 9 7,000.00
 13 Pemasangan 1 m2 rangka plafon kayu kelas II atau III, modul 60x60 cm m2 Rp 2 52,600.00
 L PEKERJAAN PENUTUP LANTAI DAN DINDING                                 
 50 Pemasangan 1 m2 lantai keramik unpolish uk. 40x40 cm (1SP : 2PP) m2 Rp 2 55,900.00
 51 Pemasangan 1 m2 lantai keramik polish uk. 40x40 cm (1SP : 2PP) m2 Rp 2 68,400.00
 72 Pemasangan 1 m2 dinding keramik uk. 20x20 cm (1SP : 2PP) m2 Rp 3 25,500.00
 M PEKERJAAN PINTU DAN JENDELA                                          
 11 Pembuatan 1 m2 daun pintu panel, kayu kelas I atau II m2 Rp 1 ,300,800.00
 21 Pembuatan dan pemasangan 1 m’ kusen pintu dan kusen jendela, kayu kelas I uk. 5x10 cm m' Rp 1 90,800.00
 27 Pemasangan 1 buah kunci tanam            buah Rp 5 40,900.00        
 30 Pemasangan 1 buah engsel pintu           buah Rp 2 09,900.00        
 34 Pemasangan 1 buah spring knip untuk jendela buah Rp 7 3,800.00      
 35 Pemasangan 1 buah kait angin             buah Rp 1 98,400.00        
 45 Pemasangan 1 buah grendel                buah Rp 6 6,200.00         
 46 Pemasangan 1 buah grendel tanam          buah Rp 2 45,900.00        
 N PEKERJAAN KACA                                                       
 3 Pemasangan 1 m2 kaca polos tebal 5 mm      m2 Rp 5 53,000.00         
 Q PEKERJAAN PENGECATAN DAN PELITURAN                                   
 4 Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 Rp 1 00,200.00
 10 Pengecatan 1 m2 tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup), interior m2 Rp 9 8,700.00
 22 Pengecatan 1 m2 plafon (1 lapis cat dasar dan 2 lapis cat penutup) m2 Rp 7 7,400.00
 S PEKERJAAN SANITAIR                                                   
 2 Pemasangan 1 buah closet jongkok          buah Rp 1 ,220,900.00      
 15 Pemasangan 1 buah floor drain stainless steel buah Rp 1 63,700.00   
 16 Pemasangan 1 buah kran diameter ½" atau 3/4" buah Rp 3 04,400.00    
 T PEKERJAAN SISTEM AIR MINUM                                           
 9 Pemasangan 1 unit tangki toren kap. 2,2 m3 unit Rp 6 ,751,200.00     
 W PEKERJAAN PERPIPAAN GEDUNG                                           
 1 Pemasangan 1 m' pipa PVC, dia. 1/2" (15 mm) m' Rp 3 3,700.00         
 2 Pemasangan 1 m' pipa PVC, dia. 3/4" (20 mm) m' Rp 4 9,300.00         
 3 Pemasangan 1 m' pipa PVC, dia. 1" (25 mm)  m' Rp 5 9,800.00          
 X PEKERJAAN JARINGAN LISTRIK                                           
 18 Pemasangan 1 m' kabel NYY 2 x 1,5 mm²     m' Rp 3 3,600.00          
 57 Pemasangan 1 m' kabel NYM 2 x 1,5 mm²     m' Rp 4 5,300.00          
 58 Pemasangan 1 m' kabel NYM 2 x 2,5 mm²     m'                        
                                                 Rp 6 1,900.00          
 KET