| 0754720423617000 | Rp 123,376,000 | 71.1 | |
CV Cpm Konsulindo | 0755272747612000 | Rp 132,693,000 | 75.53 |
CV Elemen Tiga Tiga | 0313993909614000 | - | - |
| 0759298920627000 | - | - | |
| 0024136822602000 | - | - | |
PT Concept Design Architect | 07*3**4****27**0 | - | - |
| 0719688103528000 | - | - | |
| 0711862706602000 | - | - | |
| 0660888587614000 | - | - | |
| 0024783003656000 | - | - | |
CV Cremona Consultant | 03*5**0****25**0 | - | - |
| 0316258540429000 | - | - |
| Authority | |||
|---|---|---|---|
| 17 March 2017 | Pengawasan Konstruksi (10 Di) | Pemerintah Daerah Provinsi Jawa Tengah | Rp 600,000,000 |
| 21 December 2017 | Sid Pembangunan Tambak Garam Kab.Rembang | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 550,000,000 |
| 13 May 2017 | Konsultan Pengawasan Jembatan (Paket 1) | Pemerintah Daerah Kabupaten Sampang | Rp 168,275,000 |
| 10 August 2018 | Konsultan Pengawas Jembatan (Paket 1) | Kab. Sampang | Rp 159,500,000 |
| 16 March 2018 | Kajian Pemetaan Daerah Irigasi Uptd Besuk | Kab. Probolinggo | Rp 158,430,000 |
| 8 June 2018 | Pengawasan Pembangunan Dam Golondoro (Baru) Ds. Kedungpandan Kec. Jabon | Kab. Sidoarjo | Rp 100,000,000 |
| 20 August 2016 | Konsultan Pengawasan Jalan Paket 9 | Kementerian Desa Pembangunan Daerah Tertinggal dan Transmigrasi RI | Rp 100,000,000 |
| 22 July 2016 | Konsultan Pengawasan Jalan (Jasmas) Paket 4 | Kementerian Desa Pembangunan Daerah Tertinggal dan Transmigrasi RI | Rp 98,000,000 |
| 20 July 2016 | Konsultan Pengawasan Jalan Paket 10 | Kementerian Desa Pembangunan Daerah Tertinggal dan Transmigrasi RI | Rp 98,000,000 |
| 29 July 2016 | Konsultan Pengawasan Jalan (Jasmas) Paket 6 | Kementerian Desa Pembangunan Daerah Tertinggal dan Transmigrasi RI | Rp 98,000,000 |