PW02: PENGAWASAN TEKNIS PEMBANGUNAN
JALAN TOL SEMARANG – DEMAK PAKET 1C
TIMELINE D A N P R O G R E S
Pembangunan Jalan Tol Semarang - Demak Seksi 1
TIME LINE KEGIATAN
TENDER KONTRAK
APR‘27
MAR‘21 JUL ‘21 DES‘21 JAN ‘22 JAN ‘23 FEB‘26
PRAKUALIFIKASI TAHAP PEMILIHAN
LOANAGREEMENT EFEKTIF MASAKONSTRUKSI
2027
(MAR‘21 – JUL ’21) (JUL ‘21– DES‘21) (FEB‘22 – DES ’22) (JAN ‘23 – FEB’26)
TTD KONTRAK TANGGAL MULAI KERJA
24 & 27 JAN ‘22 (TMK/CoW) JAN’ 23 (1A& 1C) RENCANA ADDENDUM
PHO PERUBAHAN
FEB’ 23 (1B)
Progress/d 08 Juli 2024 WAKTU
PELAKSANAAN
LAHAN SIAP PROGRES
SEGMEN MASA PELAKSANAAN KONTRAK ADDENDUM PERUBAHAN
KONSTRUKSI (%) KONSTRUKSI
WAKTU PELAKSANAAN
(%)
Seksi 1
1 A : 97,26 % 1 A : 67,35% 1A : Januari 2023 – April 2025 Januari 2023 – 31 Juli 2026
(Sta - 0+250 – Sta 10+394) 1 B : 77,70% 1 B : 44,45% 1B : Februari 2023 – Februari 2026 Februari 2023 – 26 April 2027
Kaligawe – Sayung
1 C : 87,89 % 1 C : 28,55% 1C : Januari 2023 – Juni 2025 Januari 2023 – 27 September 2026
SEKSI 1 85,42% 45,62%
TIMELINE KEGIATAN PENGAWASAN TEKNIS PEMBANGUNAN JALAN TOL SEMARANG-DEMAK PAKET 1C
Paket Fisik Konstruksi 1C
RENCANA AWAL PHO 1C
TTD KONTRAK TANGGAL MULAI KERJA 1A
23 JUNI‘25
27 JAN ‘22 (TMK/CoW) JAN’ 23 RENCANA PHO 1C
LOANAGREEMENT
PERUBAHAN WAKTU PELAKSANAAN
PAKET 1A
(FEB‘22 – DES ’22)
27 SEPTEMBER‘26
ADD 07
PAKET 1C
Paket Pengawasan PW02 untuk 1C nilai pagu Rp. 20.835.924.000,00
JUL‘22 JAN‘23
SELESAI MASA
MOBILISASI MOBILISASI
PENGAWASAN
CORE TEAM 1C FIELD TEAM 1C
31 JULI 2025
AGUSTUS‘25
SELESAI MASA
PENGAWASAN
Usulan Paket Lanjutan Pengawasan PW02 untuk 1C
11 OKTOBER 2026
TIMELINE KEGIATAN PENGAWASAN TEKNIS PEMBANGUNAN JALAN TOL SEMARANG - EMAK PAKET
STRUKTUR ORGANISASI KONSULTAN PENGAWASAN LANJUTAN PAKET 1C
LINGKUP PEKERJAAN TOLL ROAD DEVELOPMENT OF SEMARANG – DEMAK 1C
YODYA – HILMY, KSO SINOHYDRO – ADHI, JO
PETA ALIRAN SUNGAI
SKEMA ALIRAN AIR
Rumah Pompa
Sriwulan
Rumah Pompa
Terboyo
Inlet Channel
• Debit aliran S. Tenggang dan S. Sringin masuk ke Kolam Retensi Terboyo dan dibuang ke laut
melalui muara S. Babon menggunakan Pompa Terboyo.
• Debit aliran K. Sriwulan, K. Menyong dan K. Kaidin masuk ke Kolam Retensi Sriwulan dan
dibuang ke laut melalui muara S. Babon menggunakan Pompa Sriwulan.
YODYA – HILMY, KSO SINOHYDRO – ADHI, JO
LINGKUP PEKERJAAN
LINGKUP PEKERJAAN
A. Pekerjaan Kolam Retensi Terboyo
Pek. Galian Galian Tanah Lumpur dengan CSD kedalaman ± 3 m
Pek. Tanggul Common Borrow Material, Drainase Pasir Horisontal, PVD (L=18.3 m), PHD & Sheetpile CCSP
(L= 18 m)
B. Pekerjaan Kolam Retensi Sriwulan
Pek. Galian Galian Tanah Lumpur dengan CSD kedalaman ± 3 m
Pek. Tanggul Common Borrow Material, Drainase Pasir Horisontal, PVD (L=18.3 m), PHD & Sheetpile CCSP
(L= 18 m)
C. Pekerjaan Saluran Pembawa Sriwulan (1500 m)
Pek. Galian Galian Tanah Lumpur dengan CSD kedalaman ± 2 m
Pek. Tanggul Common Borrow Material, Drainase Pasir Horisontal, PVD (L=18.3 m), PHD & Sheetpile CCSP
(L= 18 m)
D. Pekerjaan Rumah Pompa Terboyo
Pek. Pompa 6 unit (Axial vertical) kap. 5 m3/dt , 2 unit (submersible) kap. 500 lt/dt
Struktur Bawah Tiang Bor Sekan, Ground Anchor, Deep Soil Mixing & CSP ∅ 1000
E. Pekerjaan Rumah Pompa Sriwulan
Pek. Pompa 4 unit (Axial vertical) kap. 5 m3/dt , 2 unit (submersible) kap. 500 lt/dt
Struktur Bawah Matras Bambu, PVD & PHD, Tiang Bor Sekan, Ground Anchor, Deep Soil Mixing & CSP ∅
1000
YODYA – HILMY, KSO SINOHYDRO – ADHI, JO
DATA TEKNIS DESAIN
TANGGUL
Panjang Tanggul
Terboyo 6,550 Km
:
Sriwulan 2,100 Km
Saluran Inlet 1,500 Km
Tipe Jalan : Jalan Inspeksi
4,5 m
Lebar Jalan :
Railing Ø 4”
Struktur Jalan : - Agregat Kelas B T=20 cm
Kemiringan Tanggul : 1 : 5
- Bracketed Rip Rap
Slope Protection :
- Vetiver Grass System
- Timbunan (HSD & Common
Borrow) PENANGANAN TANAH
Struktur Tanggul : - Corrugated Concrete Sheet Pile
1 : Geotextile Woven, T = 200 kN/m
(CCSP) Type W-325 B ; L=18
m) 2 : Horizontal Sand Drain (HSD) Up to El. +1.300
Elevasi 3 : Prefabricated Vertical Drain (PVD) L=18.3 m
Top Tanggul Elv. + 1.000 & Elv. + 2.600
: Prefabricated Horizontal Drain (PHD)
Top Caping Beam Elv. - 2.150 4 :
Spacing : Longitudinal = 2.0m ; Transversal = 6.0m
Bottom Kolam Retesi Elv. - 4.150
5 : Common Borrow Material (CBM) H = 1.2 m
- Concrete Panel
Pagar ROW : - Barbed Wire Konsolidasi Tanggul Terboyo : 120 Hari
6 :
- BRC Konsolidasi Tanggul Sriwulan : 120 Hari
YODYA – HILMY, KSO SINOHYDRO – ADHI, JO
DATA TEKNIS DESAIN
RUMAH POMPA
Terboyo dan Sriwulan
Rumah Pompa :
(2 buah)
Spesifikasi
Pompa Drainase
Utama Vertical Axial Flow 5000 Ltr/dtk
Terboyo : 6 Unit (5 Operasi & 1 Cadangan)
Sriwulan Vertical Axial Flow 5000 Ltr/dtk
4 Unit (3 Operasi & 1 Cadangan)
Spesifikasi
Submersible Axial Flow 500 Ltr/dtk
Pompa Lumpur
2 Unit
Terboyo :
PENANGANAN TANAH (SRIWULAN)
Submersible Axial Flow 500 Ltr/dtk
Sriwulan
2 Unit
Bamboo Mattress 11 Layers
Concrete Spun Pile Ø 1000, L=54m
1 : Clustered 7 Bamboos Piles, L=8m
Tiang Bor Sekan Primer Ø 880, L=25m
Geotube 2.1m x 1.2m x 21m
Tiang Bor Sekan Sekunder Ø 1200, L=47m
Struktur Pondasi :
Deep Soil Mixing Ø700 Spacing 700, L=5m
2 : Geotextile Woven, T = 200 kN/m
Ground Anchor D=15cm
(Strand 4-Ø1/2” @1.5 m) 3 : Horizontal Sand Drain (HSD) Elv. +1.300
- Interlocking Concrete Paving, t=80mm
4 : Prefabricated Vertical Drain (PVD) L= 42.3m
Struktur - Sand 50mm
:
Kawasan - Agregat Kelas A, t=200mm
Prefabricated Horizontal Drain (PHD)
- Selected Borrow Material, t=400mm 5 :
Spacing : Longitudinal = 2.0m ; Transversal = 6.0m
Konsolidasi
Fasilitas Rumah Mushola
: Stage I – H = 3.0m (55 Hari)
Pompa Rumah Operator 6 :
Stage II – H = 1.7m (55 Hari)
Stage III – H = 2.8m (150 Hari)
YODYA – HILMY, KSO SINOHYDRO – ADHI, JO
DATA TEKNIS DESAIN
KOLAM RETENSI
Terboyo dan Sriwulan
Kolam Retensi :
(2 buah)
Elevasi Dasar : -4.150
Volume
Perkiraan
Galian Lumpur
Terboyo 5.358.700 M3
:
Total = 6.298.197 M3
Sriwulan 939.497 M3
Jumlah Aliran
Inllet / Sungai
S. Tenggang, S. Sringin
Terboyo
:
K. Sriwulan. K. Menyong,
Sriwulan
K. Kaidin
KAPASITAS KOLAM RETENSI
Jumlah SUTT : 10 Buah
KOLAM ELV. NORMAL ELV. BANJIR
URAIAN
RETENSI (LWL) -2,150 (HWL) -0,500
Luas Tampungan 168,85 Ha 209,36 Ha
Terboyo
Volume
3.313.600 M3 6.717.470 M3
Tampungan
Luas Tampungan 28 Ha 32 Ha
Sriwulan
Volume
560.000 M3 1.100.000 M3