| Reason | |||
|---|---|---|---|
| 0026243691063000 | Rp 782,254,000 | - | |
| 0315867028005000 | Rp 785,400,000 | - | |
| 0660634445403000 | Rp 793,500,007 | - Masa berlaku SIUP telah habis sebelum batas akhir Upload Dokumen Penawaran - Tidak memiliki pengalaman Penyediaan barang pada divisi Pengadaan Alat Uji Laboratorium Teknik paling kurang 1 satu pekerjaan dalam kurun waktu 1 satu tahun terakhir baik di lingkungan pemerintah maupun swasta, termasuk pengalaman subkontrak | |
| 0768278798421000 | Rp 615,615,000 | Tidak memenuhi Spesifikasi Teknis : Alat Marshal Test - Daya Alat : approx 375W - memiliki Geared screwjack and motor drive - pada spesifikasi alat memiliki precise speed - memiliki electronic data acquisition and control system performing marshall CBR, Unconfined Compression, Direct and Residual Shear, One Diemsional Consolidationand Unconsolidated Ucrained tests with remote access - Pada data logger sistem yang diindinkan never lose data from powe failures-2 gigabytes of non-volatile memory Alat CBR Controls - Diminta max vertical clearance: minimal 800 mm - Platen diameter: min 130 mm - Diminta rapid platen adjusment | |
| 0803530856834000 | - | - | |
| 0031662752804000 | Rp 746,097,000 | - Tidak memiliki pengalaman Penyediaan barang pada divisi Pengadaan Alat Uji Laboratorium Teknik paling kurang 1 satu pekerjaan dalam kurun waktu 1 satu tahun terakhir baik di lingkungan pemerintah maupun swasta, termasuk pengalaman subkontrak - Tidak memenuhi spesifikasi teknis : Alat Marshal Test - Daya Alat : approx 375W - memiliki Geared screwjack and motor drive - pada spesifikasi alat memiliki precise speed - memiliki electronic data acquisition and control system performing marshall CBR, Unconfined Compression, Direct and Residual Shear, One Diemsional Consolidationand Unconsolidated Ucrained tests with remote access - Pada data logger sistem yang diindinkan never lose data from powe failures-2 gigabytes of non-volatile memory Alat CBR Controls - Diminta max vertical clearance: minimal 800 mm - Platen diameter: min 130 mm - Diminta rapid platen adjusment | |
| 0026783555831000 | Rp 726,660,000 | - Tidak memiliki pengalaman Penyediaan barang pada divisi Pengadaan Alat Uji Laboratorium Teknik paling kurang 1 satu pekerjaan dalam kurun waktu 1 satu tahun terakhir baik di lingkungan pemerintah maupun swasta, termasuk pengalaman subkontrak - Tidak memenuhi spesifikasi teknis : Alat Marshal Test - Daya Alat : approx 375W - memiliki Geared screwjack and motor drive - pada spesifikasi alat memiliki precise speed - memiliki electronic data acquisition and control system performing marshall CBR, Unconfined Compression, Direct and Residual Shear, One Diemsional Consolidationand Unconsolidated Ucrained tests with remote access - Pada data logger sistem yang diindinkan never lose data from powe failures-2 gigabytes of non-volatile memory Alat CBR Controls - Diminta max vertical clearance: minimal 800 mm - Platen diameter: min 130 mm - Diminta rapid platen adjusment | |
CV Poisongarudaengineer | 0802442038831000 | - | - |
| 0836887943831000 | - | - | |
CV Cahaya Sejahtera | 0810580548609000 | - | - |
CV Nur Fadilah | 0019752011831000 | - | - |
CV Tribina Lestari | 0025730482831000 | - | - |
| 0708242938422000 | - | - | |
CV Agung Karya Bakti | 00*9**4****21**0 | - | - |
| 0719075814831000 | - | - | |
| 0750912388831000 | - | - | |
| 0027945435831000 | - | - | |
| 0031989627008000 | - | - | |
| 0015314487615000 | - | - | |
| 0901924746015000 | - | - | |
| 0806806873831000 | - | - | |
| 0019909803652000 | - | - | |
CV Lima Pandawa | 0710158338832000 | - | - |
| 0810043356429000 | - | - | |
| 0019082155831000 | - | - | |
CV Darma Karya | 00*8**1****31**0 | - | - |
| 0026805572822000 | - | - | |
CV Indo Pritun | 0031980469831000 | - | - |
CV Bonto Dalle | 00*8**0****07**0 | - | - |
| 0663816858831000 | - | - | |
| 0667148555831000 | - | - | |
| 0316602069214000 | - | - | |
| 0849670211831000 | - | - | |
| 0020283255003000 | - | - | |
| 0315692772418000 | - | - | |
| 0029214756833000 | - | - | |
| 0749663381803000 | - | - | |
| 0751250721801000 | - | - | |
CV Sinar Ivana | 08*6**8****21**0 | - | - |
| 0749954939013000 | - | - | |
CV Arti Morithond | 0025730243831000 | - | - |
| 0749589792039000 | - | - | |
| 0834232332005000 | - | - | |
| 0856906953831000 | - | - | |
| 0753127034831000 | - | - | |
CV Anugrah Utama | 07*2**0****26**0 | - | - |
| 0755552312043000 | - | - |
| Authority | |||
|---|---|---|---|
| 29 September 2022 | Pengadaan Peralatan Laboratorium | Kab. Kutai Timur | Rp 4,555,229,665 |
| 5 November 2021 | Pengadaan Peralatan Pengujian Produk Tekstil Untuk Keperluan Medis | Kementerian Perindustrian | Rp 2,809,900,000 |
| 17 January 2018 | Pengadaan Alat Laboratorium | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 1,990,336,000 |
| 3 May 2019 | Pengadaan Alat Laboratorium Buatan | Pemerintah Daerah Provinsi Kalimantan Tengah | Rp 1,704,690,000 |
| 27 April 2022 | Pengadaan Sarana Dan Prasarana Laboratorium ( Belanja Modal Alat Laboratorium Lain ) | Provinsi DKI Jakarta | Rp 1,411,064,367 |
| 16 February 2022 | Belanja Modal Alat Laboratorium Bahan Bangunan Konstruksi | Provinsi Jawa Tengah | Rp 1,410,220,000 |
| 4 June 2018 | Pengadaan Alat Laboratorium Bpjn III | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 1,165,143,000 |
| 5 January 2018 | Pengadaan Alat Laboratorium Bpjn III | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 1,165,143,000 |
| 20 August 2019 | Belanja Modal Pengadaan Alat Pendukung Pengujian Laboratorium | Pemerintah Daerah Provinsi Jawa Timur | Rp 1,096,600,000 |
| 3 September 2018 | Pengadaan Peralatan Laboratorium Dan Alat Survey Bpjn Xv | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 1,053,800,000 |