| Reason | ||||
|---|---|---|---|---|
CV Biro Polyteknik Exakta Consultant | 0014935241811000 | Rp 190,000,000 | 74.54 | - |
Kaison Konsultan | 00*6**0****11**0 | - | - | - |
Buton Cipta Nusa Consultant | 0020852950811000 | - | - | - |
| 0030219216811000 | - | - | - | |
| 0033474271811000 | Rp 199,200,000 | 45.25 | Nilai skor teknis tidak mencapai passing grade | |
| 0012272464812000 | Rp 185,000,000 | 22 | Nilai skor teknis tidak mencapai passing grade | |
| 0014936298811000 | - | - | - | |
| 0026790782811000 | - | - | - | |
| 0023349293811000 | - | - | - | |
CV Sultra Multimedia Info Global | 00*0**3****11**0 | - | - | - |
CV Bintang Surya Pratama | 0026786509811000 | - | - | - |
| Authority | |||
|---|---|---|---|
| 11 February 2015 | Detail Engineering Design (Ded) Pelabuhan Laut Di Kendari | Bank Pembangunan Daerah Sultra | Rp 425,000,000 |
| 18 September 2014 | Detail Engineering Design (Ded) Pelabuhan Laut Paria Kab. Bombana | Rp 425,000,000 | |
| 8 March 2017 | Rip/Masterplan Pelabuhan Laut Waodeburi/Lelamo Kab. Buton Utara | Provinsi Sulawesi Tenggara | Rp 400,000,000 |
| 13 February 2017 | Pengawasan Pekerjaan Sisi Darat 1 Paket' | Kementerian Perhubungan | Rp 380,300,000 |
| 28 March 2016 | Feasibility Study Pelabuhan Batuawu | Rp 350,000,000 | |
| 5 October 2015 | Fisibility Study (Fs) Pelabuhan Laut Batu Awu | Bank Pembangunan Daerah Sultra | Rp 350,000,000 |
| 8 April 2017 | Fisibility Study (Fs) Pelabuhan Penyeberangan Kadatua Kab. Buton Selatan | Provinsi Sulawesi Tenggara | Rp 350,000,000 |
| 18 September 2014 | Desain Gedung Terminal Vip Bandara Haluoleo Kendari | Rp 325,000,000 | |
| 21 February 2018 | Pengawasan Sisi Udara | Kementerian Perhubungan | Rp 290,218,000 |
| 2 April 2013 | Pengawasan Pembangunan Terminal Tahap I 1 (Satu) Paket | Ditjen Phb Udara | Rp 202,439,000 |