| 17 May 2013 | Pekerjaan Pengadaan Rubber Boat (Rb) 4,7 M Kantor Pusat Badan Sar Nasional (Lelang Tidak Mengikat/Dipa/Dpa Belum Disahkan) | Badan Nasional Pencarian Dan Pertolongan | Rp 6,240,000,000 |
| 30 May 2013 | Pekerjaan Pembangunan Gedung Operasional Pos Sar Amurang (Lelang Tidak Mengikat) | Badan Nasional Pencarian Dan Pertolongan | Rp 2,800,000,000 |
| 17 July 2013 | Pekerjaan Pengadaan Rubber Boat (Rb) 4,7 M Kantor Pusat Badan Sar Nasional | Badan Nasional Pencarian Dan Pertolongan | Rp 7,500,000,000 |
| 17 February 2014 | Pekerjaan Pengadaan Deep Water Remote Operational Vehicle Badan Sar Nasional (Lelang Tidak Mengikat) | Badan Nasional Pencarian Dan Pertolongan | Rp 10,500,000,000 |
| 11 March 2014 | Pengadaan Rubber Boat (Rb) 4,8 M Kantor Pusat Badan Sar Nasional | Badan Nasional Pencarian Dan Pertolongan | Rp 6,750,000,000 |
| 2 June 2014 | Pekerjaan Pengembangan Gedung Pos Sar Amurang Badan Sar Nasional | Badan Nasional Pencarian Dan Pertolongan | Rp 4,815,000,000 |
| 23 December 2014 | Pekerjaan Pengadaan Rigid Inflatable Boat (Rib) 9.5 Meter Kantor Pusat Badan Sar Nasional | Badan SAR Nasional | Rp 70,000,000,000 |
| 12 February 2016 | Pekerjaan Pengadaan Rigid Inflatable Boat (Rib) 9.5 Meter Kantor Pusat Badan Sar Nasional | Badan Nasional Pencarian Dan Pertolongan | Rp 17,500,000,000 |
| 15 April 2014 | Pembangunan Sarana Prasarana Loka Pendidikan Dan Pelatihan Penerbang Banyuwangi Tahap II | Badan Peng. SDM Perhubungan | Rp 9,769,270,000 |
| 23 May 2014 | Pekerjaan Overlay Runway (1400X30), Turning Area 750 M2, Apron Dan Taxiway 7500 M2 Tebal Rata-Rata 7,5 Cm Termasuk Marking | Ditjen Phb Laut | Rp 16,950,000,000 |