| 4 July 2024 | Paket Konsolidasi Pembangunan Paving Blok RT.02 RW. 04 Lorong Mekar Sari Kel. Kadia, Jl. Sao-Sao Lr. Teknologi 1 Kel. Bende (Pasar Buah), Jl. Balaikota 3 RT.02 RW. 03 Kel. Pondambea Danjl. Wayong Poros P2id Lorong Anugrah RT. 04 RW. 02 Kel. Pondambea | Kota Kendari | Rp 760,000,000 |
| 17 July 2024 | Konsolidasi Paving Blok Jl. Bangau RW.07 Kelurahan Kambu, Kecamatan Kambu, Paving Blok Kelurahan Kambu | Kota Kendari | Rp 380,000,000 |
| 2 September 2025 | Paving Blok Lrg. Bukit Jaya I RT.04 RW.02 Kel. Tobuuha | Kota Kendari | Rp 142,500,000 |
| 2 September 2025 | Paving Blok RT.14 RW.04 Kel. Mandonga Kec. Mandonga | Kota Kendari | Rp 95,000,000 |
| 2 October 2025 | Drainase RT.01 RW.01 Kel. Padaleu | Kota Kendari | Rp 190,000,000 |
| 7 October 2025 | Drainase Lrg. Masjid Orange Kel. Anawai | Kota Kendari | Rp 95,000,000 |
| 14 November 2025 | Drainase Jl. Lakada Kel. Mataiwoi Kec. Wua-Wua | Kota Kendari | Rp 47,500,000 |
| 21 March 2018 | Penataan Kawasan Unsultra | Provinsi Sulawesi Tenggara | Rp 450,000,000 |
| 21 March 2018 | Penataan Kaw. Benteng Sorawolio Kota Baubau | Provinsi Sulawesi Tenggara | Rp 815,200,000 |
| 25 April 2019 | Pembangunan Drainase Kompleks Perkantoran Bumipraja Anduonohu Lanjutan | Pemerintah Daerah Provinsi Sulawesi Tenggara | Rp 475,600,000 |