Pembangunan Drainase Lingkungan Kawasan Dusun Gawoeng Gp. Ie Itam Tunong Kec. Woyla

Basic Information
Type: Public Tender
Tender Code: 10241508000
Date: 7 July 2025
Year: 2025
KLPD: Kab. Aceh Barat
Work Unit: Dinas Pekerjaan Umum Dan Penataan Ruang
Procurement Type: Pekerjaan Konstruksi
Method: Pengadaan Langsung
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 185,000,000
Estimated Value (Nilai HPS): Rp 184,964,000
Winner (Pemenang): CV Pelita Hati Engineering
NPWP: 033430661101000
RUP Code: 59815108
Work Location: kec. woyla - Aceh Barat (Kab.)
Participants: 1
Attachment
REKAPITULASI                                             
                                                                                          
                                                                                          
                                                                                          
PEKERJAAN          PEMBANGUNAN DRAINASE LINGKUNGAN KAWASAN DUSUN GAWOENG GP. IE ITAM      
                  :                                                                       
                   TUNONG KEC. WOYLA                                                      
LOKASI            : GP. IE ITAM TUNONG KEC. WOYLA                                         
KABUPATEN         : ACEH BARAT                                                            
SUMBER DANA       : DTU                                                                   
TAHUN ANGGARAN    : 2025                                                                  
                                                                                          
                                                                                          
                                                                                          
  NO              URAIAN PEKERJAAN                     JUMLAH HARGA (Rp)                  
                                                                                          
                                                                                          
                                                                                          
                                                                                          
   I   PEKERJAAN PERSIAPAN                                                   -            
                                                                                          
                                                                                          
                                                                                          
   II  PEKERJAAN SALURAN DRAINASE                                            -            
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
       JUMLAH                                                                -            
                                                                                          
       PPN 11%                                                               -            
                                                                                          
       JUMLAH TOTAL                                                          -            
                                                                                          
       DIBULATKAN                                                            -            
                                                                                          
           Terbilang : …................................................                  
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                      ….........,….................2025   
                                                            Penawar,                      
                                                        PT/CV….....................       
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                                                          
                                                          (Nama Jelas)                    
                                                            Jabatan                       
                                                DAFTAR  KUANTITAS  DAN  HARGA                                                    
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
        PEKERJAAN      : PEMBANGUNAN DRAINASE LINGKUNGAN KAWASAN DUSUN GAWOENG GP. IE ITAM TUNONG KEC. WOYLA                     
        LOKASI         : GP. IE ITAM TUNONG KEC. WOYLA                                                                           
        SUMBER DANA    : DTU                                                                                                     
                                                                                                                                 
        TAHUN ANGGARAN : 2025                                                                                                    
                                                                                                                                 
                                                                                                                                 
        NO.                URAIAN PEKERJAAN              VOLUME   SAT.     ANALISA     HARGA SATUAN (Rp) JUMLAH HARGA (Rp)       
                                                                                                                                 
                                                                                                                                 
         I   PEKERJAAN PERSIAPAN                                                                                                 
         1   Pengukuran dan Pemasangan Bouwplank             1 ,00 Ls       Taksir                 -                -            
                                                                                                                                 
         2   Perlengkapan K3                                  -                                                                  
             - Helm Pelindung                                5 ,00 Bh       Taksir                 -                -            
                                                                                                                                 
             - Masker                                        5 ,00 Bh       Taksir                 -                -            
             - Sarung Tangan                                 5 ,00 Bh       Taksir                 -                -            
                                                                                                                                 
             - Sepatu Boat                                   5 ,00 Bh       Taksir                 -                -            
             - Rompi/Jaket                                   5 ,00 Bh       Taksir                 -                -            
                                                                                                                                 
             - Peralatan P3K                                 1 ,00 Pkt      Taksir                 -                -            
             - Papan Peringatan Proyek                       1 ,00 Unit     Taksir                 -                -            
         3   Pemasangan Papan Nama Proyek                    1 ,00 Ls       Taksir                 -                -            
                                                                                                                                 
         4   Dokumentasi dan Pelaporan                       1 ,00 Ls       Taksir                 -                -            
                                                                                                                    -            
                                                                                                                                 
         II  PEKERJAAN SALURAN DRAINASE                                                                                          
                                                                                                                                 
         1   Galian Tanah                                  1 20,16 M3     U.3.4.1.a.1(c)           -                -            
         2   Beton Mutu fc' 15 Mpa                          7 7,03 M3      U.4.1.b (c)             -                -            
                                                                                                                                 
         3   Pembesian                                     3 37,39 Kg     U.4.6.a.1 (a)            -                -            
         4   Bekisting                                     1 88,00 M2     A.1.03.2b.1              -                -            
                                                                                                                                 
                                                                                                                    -            
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                            #REF!                                
                                                                                                                                 
                                                                                                                                 
                                                                                            #REF!                                
                                                                                            #REF!                                
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                                                                 
                                                                                            #REF!                                
                                                       ANALISA HARGA SATUAN                                                        
                                                                                                                                   
                                                                                                                                   
                             Satuan pembayaran        :   M³                                                                       
                             Jenis Pekerjaan          :   Galian Tanah Biasa sedalam ≤ 1m                                          
                             ANALISA                  :   U.3.4.1.a.1(c)                                                           
                                                                                                                                   
                                                                             HARGA SATUAN JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                                                                                                                   
                                  1 Pekerja                 O/H        0,7500        -              -                              
                                  2 Mandor                  O/H        0,0380        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah                   -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah                   -                              
                                                                                                                                   
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                                                                                                                                   
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                             Satuan pembayaran        :   M³                                                                       
                             Jenis Pekerjaan          :   Membuat 1 m3 Beton Mutu fc' 15 Mpa, slump (100±25) mm,                   
                                                          agregat maksimal 19 mm secara manual                                     
                             Analisa                  :   U.4.1.b (c)                                                              
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                                                                                                                                   
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                  1 Pekerja                 O/H       1 ,6500        -              -                              
                                  2 Tukang                  O/H       0 ,2750        -              -                              
                                  3 Kepala tukang           O/H       0 ,0280        -              -                              
                                  4 Mandor                  O/H       0 ,0090        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                                                                                                                   
                                  1 Semen                    Kg      306,0000        -              -                              
                                  2 Pasir Beton              Kg      832,0000        -              -                              
                                  3 Kerikil                  Kg     1.009,0000       -              -                              
                                  4 Air                     Liter    2 02,0000       -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                  1 Molen Kapasitas 0,3 m3  Hari       0,2500        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                                                                                                                                   
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                             Satuan pembayaran        :   M³                                                                       
                                                                                                                                   
                                                          Membuat 1 m3 Beton Mutu fc' 20 Mpa, slump (100±25) mm,                   
                             Jenis Pekerjaan          :   agregat maksimal 19 mm secara manual                                     
                             Analisa                  :   U.4.1.d. c                                                               
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                                                                                                                                   
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                  1 Pekerja                 O/H       1 ,6500        -              -                              
                                  2 Tukang                  O/H       0 ,2750        -              -                              
                                  3 Kepala tukang           O/H       0 ,0280        -              -                              
                                  4 Mandor                  O/H       0 ,0090        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                                                                                                                   
                                  1 Semen                    Kg      348,0000        -              -                              
                                  2 Pasir Beton              Kg      790,0000        -              -                              
                                  3 Kerikil                  Kg     1.009,0000       -              -                              
                                  4 Air                     Liter    2 02,0000       -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                  1 Molen Kapasitas 0,3 m3  Hari       0,2500        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                                                                                                                                   
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                             Satuan pembayaran        :   Kg                                                                       
                                                          Penulangan 1 kg baja tulangan polos (BjTP) atau baja tulangan            
                             Jenis Pekerjaan          :   sirip/ulir (BjTS)                                                        
                             Analisa                  :   U.4.6.a.1 (a)                                                            
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                                   Pembesian 100 Kg Besi Polos                                                                     
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                  1 Pekerja                 O/H       0 ,0070        -              -                              
                                  2 Tukang                  O/H       0 ,0070        -              -                              
                                  3 Kepala tukang           O/H       0 ,0007        -              -                              
                                  4 Mandor                  O/H       0 ,0007        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                                                                                                                   
                                  1 BjTP atau BjTS           Kg        1,0200        -              -                              
                                  2 Kawat bendrat            Kg        0,0150        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                                                                                                                                   
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                           2                                                                       
                             Satuan pembayaran        :   M                                                                        
                             Jenis Pekerjaan          :   1 m2 Bekisting biasa lantai beton dengan multiflex 12 mm                 
                                                          atau 18 mm (TP)                                                          
                             Analisa                  :   A.1.03.2b.1                                                              
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                  1 Pekerja                 O/H       0 ,2000        -              -                              
                                                                                                                                   
                                  2 Tukang                  O/H       0 ,1000        -              -                              
                                  3 Kepala tukang           O/H       0 ,0100        -              -                              
                                  4 Mandor                  O/H       0 ,0200        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                  1 Multiflex 12 mm         Lembar     0,2030        -              -                              
                                  2 Kaso 5/7                 M³        0,0080        -              -                              
                                  3 Paku 5 cm dan 7 cm       Kg        0,2200        -              -                              
                                                                                                                                   
                                  4 Minyak Bekisting         Ltr       0,2000        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                                                                                                                                   
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                                                                                                                                   
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                                                                                                   
                                                                                                                                   
                             Satuan pembayaran        :   M3                                                                       
                             Jenis Pekerjaan          :   Bongkar 1 m3 beton dengan Jack Hammer Drill 2,5 KW+Genset 5 KW           
                                                                                                                                   
                             Analisa                  :   A.2.03.2J.1                                                              
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                  1 Pekerja                 O/H       0 ,1800        -              -                              
                                  3 Mandor                  O/H       0 ,0180        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                  1 Cuka Bibit              Liter      1,2000        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                                                                                                                   
                                  1 Jack Hammer + Genset    hari       0,0600        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                           3                                                                       
                             Satuan pembayaran        :   M                                                                        
                             Jenis Pekerjaan          :   Mengangkut 1 m3 tanah lepas, jarak angkut > 500 s.d 600 m                
                             Analisa                  :   U.3.6.a.11 (a)                                                           
                                                                                                                                   
                                                                            HARGA SATUAN  JUMLAH HARGA                             
                              NO       URAIAN PEKERJAAN    SATUAN  KUANTITAS                                                       
                                                                                (Rp)          (Rp.)                                
                              A.   TENAGA KERJA                                                                                    
                                                                                                                                   
                                                                                                                                   
                                  1 Pekerja                 O/H       1 ,3777        -              -                              
                                  2 Mandor                  O/H       0 ,0688        -              -                              
                                                                          Jumlah                    -                              
                                                                                                                                   
                              B.   BAHAN                                                                                           
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                                                                                                                                   
                              C.   PERALATAN                                                                                       
                                                                                                                                   
                                  1 Mobil Angkut Timbunan  Sewa-Hari   0,0625        -              -                              
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                          Jumlah                    -                              
                              D. Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)             -                              
                              E. Overhead dan Profit ( 15% x D)                                     -                              
                                                                                                                                   
                              F. Harga Satuan Pekerjaan (D+E)                                       -                              
                                                      ANALISA HARGA SATUAN                                                         
                                                                                                                                   
                                                                                                                                   
                              Satuan pembayaran     :    M³                                                                        
                              Jenis Pekerjaan       :    Pengurugan 1 m3 dengan tanah timbun                                       
                              ANALISA               :    A.2.3.1.15.                                                               
                                                                                                                                   
                                                                              HARGA SATUAN JUMLAH HARGA                            
                                NO      URAIAN PEKERJAAN   SATUAN    KUANTITAS                                                     
                                                                                 (Rp)       (Rp.)                                  
                                A.         TENAGA KERJA                                                                            
                                                                                                                                   
                                                                                                                                   
                                          1 Pekerja          O/H         0,1000      -          -                                  
                                          2 Mandor           O/H         0,0100      -          -                                  
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah               -                                  
                                                                                                                                   
                                B.         BAHAN                                                                                   
                                                                                                                                   
                                          1 Tanah Timbun     M3          1,2000      -          -                                  
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah               -                                  
                                                                                                                                   
                                C.         PERALATAN                                                                               
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah               -                                  
                                                                                                                                   
                                D.  Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)      -                                  
                                E.  Overhead dan Profit ( 15% x D)                              -                                  
                                F.  Harga Satuan Pekerjaan (D+E)                                -                                  
                                                                                                                                   
                                                                                                                                   
                                                          3                                                                        
                              Satuan pembayaran     :    M                                                                         
                              Jenis Pekerjaan       :    Menggunakan Molen, untuk ketinggian > 0 s.d. 1 m'                         
                              Analisa               :    P.01.a.1).(b)                                                             
                                                                                                                                   
                                                                                                                                   
                                                                              HARGA SATUAN JUMLAH HARGA                            
                                NO      URAIAN PEKERJAAN   SATUAN    KUANTITAS                                                     
                                                                                 (Rp)       (Rp.)                                  
                                A.         TENAGA KERJA                                                                            
                                                                                                                                   
                                          1 Pekerja          O/H         1,0000      -          -                                  
                                          2 Tukang batu      O/H         0 ,5000     -          -                                  
                                          3 Mandor           O/H         0 ,1000     -          -                                  
                                                                           Jumlah               -                                  
                                                                                                                                   
                                B.         BAHAN                                                                                   
                                                                                                                                   
                                          1  Batu Kali       m3          0,7000      -          -                                  
                                          2  Pasir Pasang    m3          0,4400      -          -                                  
                                          3  Portland Cement Kg         252,0000     -          -                                  
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah               -                                  
                                                                                                                                   
                                C.         PERALATAN                                                                               
                                                                                                                                   
                                          1 MoCboil nAcnrgekteu tM Tiixmebrunan Sewa-Hari 0,0625 - -                               
                                                                                                                                   
                                                                                                                                   
                                                                                                                                   
                                                                           Jumlah               -                                  
                                                                                                                                   
                                D.  Jumlah Harga Tenaga Kerja, Bahan dan peralatan (A+B+C)      -                                  
                                E.  Overhead dan Profit ( 15% x D)                              -                                  
                                F.  Harga Satuan Pekerjaan (D+E)                                -                                  
                                               DAFTAR HARGA SATUAN UPAH                                                 
                                                                                                                        
                                                                                                                        
                                                                                                                        
                    NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                     
                                                                                                                        
                                                                                                                        
                     I.  U P A H                                                                                        
                                                                                                                        
                     1   Pekerja                             Hari/Orang            -                                    
                                                                                                                        
                     2   Tukang                              Hari/Orang            -                                    
                                                                                                                        
                     3   Kepala Tukang                       Hari/Orang            -                                    
                                                                                                                        
                     4   Mandor                              Hari/Orang            -                                    
                                                                                                                        
                       5 Operator Terlatih                   Hari/Orang            -                                    
                                                                                                                        
                       6 Operator Terlatih                     Jam                 -                                    
                                                                                                                        
                                                                                                                        
                       7 Pembantu Operator                   Hari/Orang            -                                    
                                                                                                                        
                       8 Pembantu Operator                     Jam                 -                                    
                                                                                                                        
                                                                                                                        
                                              DAFTAR HARGA  SATUAN BAHAN                                                
                                                                                                                        
                                                                                                                        
                                                                                                                        
                    NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                     
                                                                                                                        
                     II. B A H A N                                                                                      
                     1   Batu Kali (Koral)                     M³                  -                                    
                     2   Kayu Kelas : I                        M³                  -                                    
                                                                                                                        
                     3   Kayu Kelas : II (sejenis kayu keras)  M³                  -                                    
                     4   Multiflex 12 mm                       Lbr                 -                                    
                     5   Kayu Kelas : III (sejenis kayu keras) M³                  -                                    
                                                                                                                        
                     6   Papan Kayu 3/20 (kayu Kelas III)      Lbr                 -                                    
                     7   Kerikil Sungai                        M³                  -      BJ Kerikil                    
                                                                                                                        
                     8   Kerikil Sungai                        Kg                  -          1.350,00                  
                     9   Papan Kayu Klas I                     M3                  -                                    
                     10  Papan Kayu Klas II                    M3                  -                                    
                                                                                                                        
                     11  Papan Kayu Klas III                   M3                  -                                    
                     12  Pasir Beton                           M³                         BJ Pasir                      
                                                                                   -                                    
                     13  Pasir Beton                           Kg                             1.400,00                  
                                                                                   -                                    
                     14  Pasir Pasang                          M³                                                       
                                                                                   -                                    
                     15  Pasir Urug                            M³                                                       
                                                                                   -                                    
                     16  Sirtu                                 M³                                                       
                                                                                   -                                    
                     17  Tanah Timbun                          M³                                                       
                                                                                   -                                    
                     18  Bensin                                Liter                                                    
                                                                                   -                                    
                     19  Besi Beton ( U 24 )                   Kg                                                       
                                                                                   -                                    
                     20  Besi Ulir ( D 32 )                    Kg                                                       
                                                                                   -                                    
                     21  Cat Kayu                              Kg                                                       
                                                                                   -                                    
                     22  Kawat Beton                           Kg                                                       
                                                                                   -                                    
                     24  Minyak Pelumas (Pertamina)            Liter                                                    
                                                                                   -                                    
                     25  Minyak Bekisting                      Liter                                                    
                                                                                   -                                    
                     26  Paku                                  Kg                                                       
                                                                                   -                                    
                     27  Semen PC ( 40 Kg )                    Zak                                                      
                                                                                   -                                    
                     28  Semen PC ( 40 Kg )                    Kg                                                       
                                                                                   -                                    
                     29  Solar ( Industri )                    Liter                                                    
                                                                                   -                                    
                     30  Pelumas Mesin                         Liter                                                    
                                                                                   -                                    
                     31  Wire Mesh Uk. 2,10 x 5,40 m, Ø 6 mm   Kg                                                       
                                                                                   -                                    
                     32  Dolken Kayu Galam, Ø (8-10) cm, pjg 4 m Batang                                                 
                                                                                   -                                    
                     33  Pipa Ø 4 Inch                          m                                                       
                                                                                   -                                    
                     34  Elbow Ø 4 Inch                        Bh                                                       
                                                                                   -                                    
                     35  BBM non subsidi                       Liter                                                    
                                                                                   -                                    
                     36  Air                                   Liter               -                                    
                                             DAFTAR HARGA SATUAN PERALATAN                                              
                                                                                                                        
                                                                                                                        
                                                                                                                        
                    NO.                URAIAN                SATUAN    HARGA SATUAN (Rp) KETERANGAN                     
                                                                                                                        
                                                                                                                        
                     1   Concrete Mixer                        Hari                -                                    
                     2   Jack Hammer + Genset                  Hari                -
Tenders also won by CV Pelita Hati Engineering
Authority
19 May 2014Pengadaan Buku Perpustakaan Gampong Wilayah Tengah Untuk 8 Kabupaten (54 Gampong X 1.000 Eks)LPSE Provinsi AcehRp 1,269,000,000
15 May 2018Pengadaan Bantuan Paket PersalinanKota Banda AcehRp 1,200,000,000
28 May 2019Bantuan Barang Pasca PersalinanPemerintah Daerah Kota Banda AcehRp 1,200,000,000
28 April 2015Pembangunan Pagar Kantor Ppmg SimeulueArsip Nasional Republik IndonesiaRp 798,450,000
4 May 2016Pembangunan Lab. Komputer Sman 1 Pulau Banyak Barat Kab. Aceh SingkilLPSE Provinsi AcehRp 600,000,000
13 May 2014Pengadaan Perangkat Pengolah Data Dan InformasiPendidikan Anak Usia Dini dan Pendidikan MasyarakatRp 541,700,000
2 October 2015Pengadaan Buku Koleksi Perpustakaan SmpLpse Aceh TimurRp 525,000,000
24 July 2021Pengaspalan Jalan Akses Masuk Rumah Susun Bagi Asn Di Lingk. Puslatbang Khan Lan Kab. Aceh BesarAcehRp 455,000,000
19 October 2025Pembangunan Gedung Laboratorium MesinKementerian Pendidikan Tinggi, Sains, dan TeknologiRp 400,000,000
23 October 2015Pengadaan Peralatan Pendidikan Jasman, Olah Ragai Dan Kesehatan (Pjok) SmpLpse Aceh TimurRp 340,000,000