| Reason | |||
|---|---|---|---|
| 0015268386619000 | Rp 1,476,446,701 | - | |
CV Mandawe | 00*8**1****15**0 | - | - |
| 0030767057941000 | Rp 1 | Calon penyedia tidak secara lengkap mengupload dokumen | |
| 0935996850941000 | - | - | |
| 0905215570009000 | - | - | |
| 0732690672941000 | - | - | |
| 0761762541943000 | - | - | |
| 0906785621941000 | - | - | |
CV Alam Pusaka Abadi | 02*9**3****41**0 | - | - |
| 0025717588941000 | - | - | |
| 0026369702941000 | - | - | |
CV Zahra Aulia Perkasa | 00*6**7****29**0 | - | - |
| 0821713815941000 | - | - | |
CV Zulfar Pratama Jaya | 01*9**4****16**0 | - | - |
| 0033169533824000 | - | - | |
PT Pelita Putra Pratama | 09*4**7****08**0 | - | - |
Verindo Perkasa | 06*8**2****47**0 | - | - |
NO JENIS PEKERJAAN VOLUME SATUAN
I PEKERJAAN PERSIAPAN
1 Direksi keet + gudang material 1,00 ls
2 Pagar seng proyek depan 15,00 m’
3 Pembersihan lahan/lapangan 300,00 m2
4 Uitzet + bouwplank 70,00 m’
5 Mobilisiai alat/material 1,00 ls
II PEKERJAAN PONDASI
1 Galian tanah u/ pondasi batu kali 188,16 m3
2 Pondasi Batu Kali Tengah (30/80, t:80) 38,00 m3
3 Pondasi Batu Kali Tepi (30/80, t:80) 25,00 m3
4 Urugan sirtu dalam bangunan (tebal : 15cm) 31,45 m3
5 Perataan dan pemadatan 120,00 m2
6 Rabat lt. dasar t=3cm 209,64 m2
III PEKERJAAN BETON
1 Sloof struktur
10,93 m3
Sloof S1 (20/25) ; Tul. Pokok 6D12, Beugel 8-15
2 Kolom struktur lt. I
K1 (13/30) ; Tul. Pokok 4D12, Beugel 8-20 3,51 m3
K2 (13/40) ; Tul. Pokok 6D12, Beugel 8-15 1,93 m3
3 Kolom praktis (12/12) lt. I ; Tul. Pokok 4D8, Beugel 6-15 2,66 m3
4 Balok struktur lt. I
B1 (12/30) ; Tul. Pokok 4D12, Beugel 8-20 2,38 m3
B2 (12/40) ; Tul. Pokok 5D12, Beugel 8-15 0,70 m3
5 Ringbalk (12/20) lt. I ; Tul. Pokok 4D8, Beugel 6-15 3,24 m3
6 Cor meja dapur (Lihat gambar denah dapur) : Tul 8-150 0,20 m3
7 Pelat lantai atap tebal 10 cm (Dak atap) : Tul 10-200 12,77 m3
8 Pelat Kanopi Jendela tebal 8 cm : Tul 8-150 0.29 m3
IV PEKERJAAN DINDING
1 Pasangan bata lt. I (Luas ring balok 3,80 m1) 324,95 m2
2 Plesteran dinding 649,91 m2
3 Acian 624,55 m2
4 Benangan kusen, sudut dinding, kolom dll 449,48 m’
5 Benangan listplank, ban2an tampak depan 112,61 m’
6 Benangan plint lantai 77,40 m’
V PEKERJAAN LANTAI
1 Pasang granite tile 60x60 lantai utama lt. I 86,01 m2
2 Pasang granite tile 60x60 doff teras depan 6,84 m2
NO JENIS PEKERJAAN VOLUME SATUAN
3 Pasang granite tile 60x60 doff teras belakang 14,66 m2
4 Pasang granite tile 60x120 tangga 30,00 m2
5 Pasang keramik rustic 40x40 carport 31,00 m2
6 Pasang keramik 40x40 lantai service/dapur kotor 7,00 m2
7 Pasang keramik 40x40 lantai km/wc pembantu 2,00 m2
8 Pasang keramik 60x60 lantai km/wc service lt. I 2,00 m2
9 Pasang keramik 60x60 lantai km/wc utama lt. I 3,00 m2
10 Pasang keramik 30x60 dinding pantri 5,00 m2
11 Pasang granite tile 60x120 meja pantri 2,50 m2
12 Pasang keramik 25x40 meja dan dinding dapur kotor 7,51 m2
13 Pasang keramik 25x40 dinding km/wc pembantu 7,72 m2
14 Pasang keramik 30x60 dinding km/wc service lt. I 11,37 m2
15 Pasang keramik 30x60 dinding km/wc utama lt. I 13,89 m2
16 Pasang keramik façade depan 25,35 m2
VI PEKERJAAN ATAP, GORDING, IKATAN ANGIN DLL
1 Rangka atap zincalume 46,78 m2
2 Pasang atap spandex 46,78 m2
3 Wuwung atap spandex 19,47 m’
4 Listplank woodplank + rangka hollow 26,52 m’
5 Rangka plafond 4/6 dari hollow + gypsum 9mm 135,52 m2
6 List gypsum 10-15cm minimalis 148,55 m’
VII PEKERJAAN PINTU DAN JENDELA
1 Kusen aluminium 103,18 m’
2 Daun pintu ganda/kupu-kupu + slot + handle 1,00 bh
3 Daun pintu panil 8,00 bh
4 Daun pintu PVC + kunci dan engsel 3,00 bh
5 Daun jendela casement aluminium 14,00 bh
6 Daun jendela bovenlicht 21,00 bh
7 Kaca polos 5 mm 41,98 m2
8 Engsel pintu 4" 10,00 ps
9 Pintu + Rel geser + handle + kunci + tutup 1,00 set
10 Engsel jendela 3" 11,00 ps
11 Casement jendela 11,00 ps
12 Rambuncis jendela 11,00 bh
VIII PEKERJAAN SANITAIR
1 Instalasi air bersih 3/4" 34,86 m’
2 Instalasi air hujan, air kotor dan kotoran (V) 3" 79,24 m’
3 Instalasi kotoran 4" 10,98 m’
NO JENIS PEKERJAAN VOLUME SATUAN
4 Instalasi air kotor induk 5" 31,00 m’
5 Instalasi air panas rifeng 8,10 ls
6 Pasang klosed duduk + jet shower 2,00 set
7 Pasang klosed jongkok 1,00 bh
8 Pasang wastafel + siphon + kran + flexible + meja 2,00 set
9 Pasang shower set + kran panas dingin 2,00 bh
10 Kitchen sink 1 lubang u/ pantri 1,00 ls
11 Kitchen sink 1 lubang u/ dapur kotor 1,00 ls
12 Kran sink 1,00 ls
13 Floordrain 4,00 bh
14 Kran dinding 6,00 bh
15 Septictank kap. 2m3 1,00 ls
16 Resapan septictank 1,00 ls
IX PEKERJAAN PENGECATAN
1 Cat tembok interior 320,35 m2
2 Cat tembok exterior 303,02 m2
3 Cat dak atap 111,00 m2
4 Cat plafond 135,52 m2
Melamine pintu panil 9,00 bh
X PEKERJAAN RALLING, PAGAR, DAN LAINNYA
1 Pintu pagar depan besi hollow finishing cat (tinggi 2 m) 6,40 m2
2 Pasang tembok pagar depan + besi hollow 14,40 m2
3 Pasang roster pagar 8,10 m2
4 Canopy Depan (6x3.21 m)
- Rangka Utama Hollow 60x60mm, Reng 40x60mm 19,25 m2
5 Canopy Belakang (3.53x6.4 m)
- Rangka Utama Hollow 60x60mm, Reng 40x60mm 22,58 m2
XI PEKERJAAN INSTALASI LISTRIK
1 Penambahan daya 5500 Watt 1,00 ls
2 Pasang instalasi lampu 40,00 ttk
3 Pasang instalasi stop kontak 22,00 ttk
4 Pasang instalasi stop kontak AC 4,00 ttk
5 Box MCB + Kabel power 1,00 bh
6 Pasang Arde Penangkal petir 1,00 ls
7 Pasang EVTS 500vaSp 1,00 bh| Authority | |||
|---|---|---|---|
| 30 June 2022 | Perbaikan Flat Dewaruci Aal Ta 2022 | Kementerian Pertahanan | Rp 3,177,345,000 |
| 24 May 2022 | Pengaspalan Dan Pembuatan Parit Jalan Rumdis Owa Tni Al | Kementerian Pertahanan | Rp 1,941,552,000 |
| 28 December 2020 | Pembangunan Gedung Balai Pengobatan Makassar | Kementerian Pertahanan | Rp 1,776,020,000 |
| 12 September 2020 | Perbaikan Sedang Mess Perwira Dan Mess Bintara Kowal Lantamal VI Makassar | Kementerian Pertahanan | Rp 1,299,017,000 |
| 23 September 2021 | Perbaikan Turap Plengsengan Lanal Maumere | Kementerian Pertahanan | Rp 938,000,000 |
| 22 September 2021 | Perbaikan Balai Prajurit Lanal Maumere | Kementerian Pertahanan | Rp 849,000,000 |
| 20 May 2021 | Pengadaan Kapor Dan Kapsat (Paket 3.F Topi Pdl Tni Al Okinawa Non Marinir Wiltim) Ta 2021 - Disbekal | Kementerian Pertahanan | Rp 692,250,000 |
| 8 June 2021 | Pengadaan Peralatan Kantor Dan Pengolahan Data Inspektorat Koarmada II | Kementerian Pertahanan | Rp 621,841,000 |
| 29 March 2021 | Pengadaan Meubelair Mess Fatahillah Lantamal VI Mks | Kementerian Pertahanan | Rp 297,810,000 |