GAMBAR RENCANA
PEMERINTAH KABUPATEN BALANGAN
DINAS PEKERJAAN UMUM, PENATAAN RUANG,
PERENCANAAN PENINGKATAN SARANA DAN
PERUMAHAN RAKYAT DAN KAWASAN
PEKERJAAN : PRASARANA AIR BERSIH DESA PUTAT BASIUN KEC.
PERMUKIMAN
AWAYAN
KEGIATAN PENGELOLAAN DAN PENGEMBANGAN SISTEM
PENYEDIAAN AIR MINUM (SPAM) DI DAERAH KABUPATEN/KOTA LOKASI : DESA PUTAT BASIUN KEC. AWAYAN
KABUPATEN BALANGAN TAHUN ANGGARAN 2025
GAMBAR RENCANA
CV. NUSANTARA REKA CONSULTANT
>= 20 cm
Tanah dasar
Pipa HDPE SNI OD 63 mm SDR 17 PN 10
Tanah dasar
Pipa HDPE SNI OD 63 mm SDR 17 PN 10
mC
04
=>
mC
04
=>
NO NAMA JMLH
1 CLAMP SADLE HDPE 2" x 1/2" 1 bh
2 bh
2 SOCK DRAT LUAR HDPE 1/2 "
3 PIPA HDPE PN. 16 DIA. 1/2 " 15 m
4 KNIE GI 1/2 " 3 bh
3 bh
5 PIPA GI 1/2" (SENAI + POTONG 20 CM)
6 ELBOW GI 1/2" 1 bh 9
7 8 4
1 bh
7 STOP KRAN KUNINGAN 1/2"
1 bh
8 WATER METER ITRON + COUPLING DIA. 1/2"
1 bh
9 KRAN AIR 1/2"
10 TEE (GI) 1/2" 1 bh 5
11
1 bh
11 BOX METER KUNING
1 bh
12 BATA RINGAN
1 bh
13 DOP ( END CAP) GALVANIS 1/2"
10
6
5
Muka Tanah 5
3
4
12
4
13
2
2
1
Tutup Meter Air
A
P
B
D
2025
Pondasi Tutup Meter Air
Bata Ringan (600 x 200 x 75 mm)
DETAIL Tutup Meter Air
Penampang Sumur Bor Detail Sumur Bor
kedalaman 120 m kapasitas 1lt/detik kedalaman 120 m kapasitas 1lt/detik