| Reason | |||
|---|---|---|---|
| 0943859876832000 | Rp 290,846,294 | - | |
| 0416667376832000 | Rp 292,289,160 | Tidak hadir pembuktian | |
| 0748957008832000 | Rp 297,695,582 | - | |
| 0532140837832000 | Rp 306,176,367 | - | |
CV Rekayasa Construksi | 0025184482832000 | Rp 299,625,674 | - |
CV Usaha Bersama Kita | 00*5**7****32**0 | - | - |
CV Ken Rizky Jaya | 09*4**6****32**0 | - | - |
| 0748536828832000 | - | - | |
| 0810493833832000 | - | - | |
| 0626295372822000 | - | - | |
CV Montolutusan Banggai Berkarya | 04*1**8****32**0 | - | - |
| 0966538647832000 | - | - | |
| 0314614769005000 | - | - | |
| 0750460222832000 | - | - | |
| 0415558170832000 | - | - | |
| 0748996188832000 | - | - | |
| 0025349077822000 | - | - | |
| 0749429197832000 | - | - | |
| 0028606317832000 | - | - |
REKAPITULASI
SKPD : DINAS PENDIDIKAN, PEMUDA DAN OLAHRAGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA
LOKASI : SD INPRES DODUNG
TAHUN ANGGARAN : 2023
NO. URAIAN PEKERJAAN JUMLAH HARGA
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH DAN PASIR
III PEKERJAAN PONDASI
IV PEKERJAAN STRUKTUR BETON
V PEKERJAAN LANTAI DAN DINDING
VI PEKERJAAN ATAP DAN PLAFOND
VII PEKERJAAN KUSEN DAN PENGGANTUNG
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN INSTALASI LISTRIK
X PEKERJAAN SANITASI
XI PEKERJAAN PERABOT MEBEL
XII PEKERJAAN AKHIR
A. JUMLAH Rp -
B. PPN (11% X A) Rp -
C. TOTAL (A + B) Rp -
D. DIBULATKAN Rp -
Terbilang :
Banggai, 2023
Dibuat Oleh :
PT/CV……………………………
. ……………………………………
Direktur
Rekapitulasi 1
RENCANA ANGGARAN BIAYA
SKPD : DINAS PENDIDIKAN, PEMUDA DAN OLAHRAGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA
LOKASI : SD INPRES DODUNG
TAHUN ANGGARAN : 2023
HARGA J U M L A H
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek Ls 1 ,00 Rp -
2 Pengukuran dan Pemasangan Bouwplank M' 1 4,40 Rp -
3 Mobilisasi dan Demobilisasi Ls 1 ,00 Rp -
4 Rencana Kesehatan dan Keselamatan Kerja (K3) Ls 1 ,00 Rp -
JUMLAH (I) Rp -
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah biasa <1 m, Pondasi M³ 2 1,63 Rp -
2 Pek. Pengurugan tanah kembali M³ 4 ,79 Rp -
3 Pek. Pengurugan tanah bawah lantai M³ 6 4,85 Rp -
4 Pek. Pemadatan tanah M³ 6 4,85 Rp -
5 Pek. Pengurugan pasir bawah pondasi M³ 2 ,40 Rp -
6 Pek. Pengurugan pasir bawah lantai M³ 7 ,27 Rp -
JUMLAH (II) Rp -
III PEKERJAAN PONDASI
1 Pek. Pasangan batu kosong (aanstamping) M³ 7 ,19 Rp -
2 Pek. Pasangan pondasi batu belah CP. 1:5 M³ 2 9,29 Rp -
3 Pek. Pasangan pondasi Rollage Bata (Tangga) CP. 1 : 3 M² 6 ,68 Rp -
JUMLAH (III) Rp -
IV PEKERJAAN STRUKTUR BETON
1 Pekerjaan Sloef Beton 15 x 25 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 1 ,54 Rp -
- Besi 6 Ǿ12 mm (Tulangan) Kg 2 26,11 Rp -
- Besi Ǿ8 -200 mm (Beugel) Kg 5 3,12 Rp -
- Bekisting Sloef (2 kali pakai) M² 2 0,48 Rp -
2 Pekerjaan Sloef Beton 15 x 20 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 0 ,31 Rp -
- Besi 4 Ǿ12 mm (Tulangan) Kg 4 1,90 Rp -
- Besi Ǿ8 -200 mm (Beugel) Kg 1 1,27 Rp -
- Bekisting Sloef (2 kali pakai) M² 4 ,12 Rp -
3 Pekerjaan Kolom Beton K2, 20 x 20 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 1 ,26 Rp -
- Besi 8 Ǿ12 mm (Tulangan) Kg 2 55,67 Rp -
- Besi Ǿ8 -200 mm (Beugel) Kg 4 6,87 Rp -
- Bekisting Kolom (2 kali pakai) M² 2 5,20 Rp -
4 Pekerjaan Kolom Beton KP, 15 x 15 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 1 ,18 Rp -
- Besi 4 Ǿ12 mm (Tulangan) Kg 2 13,06 Rp -
- Besi Ǿ8 -200 mm (Beugel) Kg 5 2,08 Rp -
- Bekisting Kolom (2 kali pakai) M² 1 5,75 Rp -
5 Pekerjaan Ringbalk Beton RB1, 15 x 20 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 1 ,54 Rp -
- Besi 4 Ǿ12 mm (Tulangan) Kg 1 91,22 Rp -
Engineer Estimate (EE) 2
HARGA J U M L A H
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA
- Besi Ǿ8 -200 mm (Beugel) Kg 5 4,33 Rp -
- Bekisting Balok (2 kali pakai) M² 2 0,50 Rp -
6 Pekerjaan Balok Lintel, 15 x 15 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 0 ,40 Rp -
- Besi 4 Ǿ12 mm (Tulangan) Kg 6 8,89 Rp -
- Besi Ǿ8 -200 mm (Beugel) Kg 1 5,10 Rp -
- Bekisting Balok (2 kali pakai) M² 7 ,92 Rp -
7 Pekerjaan Plat Kantilever T = 8 cm
- Beton Mutu f'c = 14,5 MPa (K 175) M³ 0 ,32 Rp -
- Besi Ǿ12 - 200 mm (Tulangan Pokok Melintang) Kg 2 1,35 Rp -
- Besi Ǿ8 -150 mm (Tulangan Bagi Memanjang) Kg 1 1,84 Rp -
- Bekisting Plat (2 kali pakai) M² 4 ,83 Rp -
JUMLAH (IV) Rp -
V PEKERJAAN LANTAI DAN DINDING
1 Pek. Pas. Dinding Bata Merah 1/2 Batu, Campuran 1 SP : 4 PP M² 1 24,94 Rp -
2 Pek. Partisi Dinding Bata Merah 1/2 Batu, Camp. 1 SP : 2 PP M² 4 ,56 Rp -
3 Pek. Plesteran T. 15 mm Cp. 1:4 M² 2 64,58 Rp -
4 Pek. Plesteran Partisi Dinding T. 15 mm Cp. 1:2 M² 1 5,42 Rp -
5 Pek. Acian M² 2 69,73 Rp -
6 Pek. Lantai Kerja Beton Bawah Keramik Tebal 10 cm (K.100) M³ 8 ,47 Rp -
7 Pek. Lantai Keramik 40 x 40 cm Polished M² 8 2,19 Rp -
8 Pek. Lantai Keramik 40 x 40 cm Unpolished (Tangga Bata) M² 6 ,38 Rp -
9 Pek. Lantai Keramik 20 x 20 cm Unpolished (KM/WC) M² 2 ,50 Rp -
10 Pek. Dinding Keramik 20 x 25 cm Polished M² 1 0,28 Rp -
JUMLAH (V) Rp -
VI PEKERJAAN ATAP DAN PLAFOND
1 Pek. Rangka Atap (Kuda-kuda + Reng ) Baja Ringan M³ 1 44,85 Rp -
2 Pek. Penutup Atap Spandek tebal 0,35 mm M² 1 44,85 Rp -
3 Pek. Nok Atap Spandek Plat Lebar 40 cm M' 3 3,03 Rp -
4 Pek. Listplank GRC Lebar 30 cm M' 4 5,72 Rp -
5 Pek. Rangka Plafond Hollow Baja Ringan, Modul 60 x 60 cm M² 1 17,12 Rp -
6 Pek. Plafond Kalsiboard GRC Tebal 4 mm M² 1 17,12 Rp -
7 Pek. List Plafond Kayu Profil M' 6 0,10 Rp -
JUMLAH (VI) Rp -
VII PEKERJAAN KUSEN DAN PENGGANTUNG
1 Pekerjaan Pintu Type P1
- Pek. Pemasangan Kusen Kayu Kls. II M³ 0 ,07 Rp -
- Pek. Pemasangan Daun Pintu Kayu Kls. II M² 3 ,45 Rp -
- Pek. Pemasangan Bingkai Kayu Kls. II M² 0 ,27 Rp -
- Pek. Pemasangan Kaca Bening T. 5 mm M² 0 ,38 Rp -
- Pek. Pemasangan Engsel Pintu Bh 6 ,00 Rp -
- Pek. Pemasangan Engsel Ventilasi Bh 2 ,00 Rp -
- Pek. Pemasangan Kait Angin Ventilasi Bh 2 ,00 Rp -
- Pek. Pemasangan Handel Pintu Set 2 ,00 Rp -
- Pek. Pemasangan Kunci Tanam Bh 1 ,00 Rp -
- Pek. Pemasangan Grendel Tanam Bh 2 ,00 Rp -
- Pek. Pemasangan Grendel Ventilasi Bh 1 ,00 Rp -
2 Pekerjaan Jendela Type J1
- Pek. Pemasangan Kusen Kayu Kls. II M³ 0 ,11 Rp -
- Pek. Pemasangan Bingkai Kayu Kls. II M² 0 ,98 Rp -
Engineer Estimate (EE) 3
HARGA J U M L A H
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA
- Pek. Pemasangan Kaca Bening T. 5 mm M² 2 ,91 Rp -
- Pek. Pemasangan Engsel Jendela dan Ventilasi Bh 8 ,00 Rp -
Engineer Estimate (EE) 4
HARGA J U M L A H
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA
- Pek. Pemasangan Kait Angin Jendela dan Ventilasi Bh 8 ,00 Rp -
- Pek. Pemasangan Grendel Jendela dan Ventilasi Bh 4 ,00 Rp -
- Pek. Pemasangan Handel Jendela dan Ventilasi Bh 4 ,00 Rp -
3 Pekerjaan Jendela Type J2
- Pek. Pemasangan Kusen Kayu Kls. II M³ 0 ,19 Rp -
- Pek. Pemasangan Bingkai Kayu Kls. II M² 1 ,64 Rp -
- Pek. Pemasangan Kaca Bening T. 5 mm M² 4 ,05 Rp -
- Pek. Pemasangan Engsel Jendela dan Ventilasi Bh 1 6,00 Rp -
- Pek. Pemasangan Kait Angin Jendela dan Ventilasi Bh 1 6,00 Rp -
- Pek. Pemasangan Grendel Jendela dan Ventilasi Bh 8 ,00 Rp -
- Pek. Pemasangan Handel Jendela dan Ventilasi Bh 8 ,00 Rp -
4 Pekerjaan Jendela Type J3
- Pek. Pemasangan Kusen Kayu Kls. II M³ 0 ,08 Rp -
- Pek. Pemasangan Bingkai Kayu Kls. II M² 0 ,98 Rp -
- Pek. Pemasangan Kaca Bening T. 5 mm M² 1 ,86 Rp -
- Pek. Pemasangan Engsel Jendela dan Ventilasi Bh 8 ,00 Rp -
- Pek. Pemasangan Kait Angin Jendela dan Ventilasi Bh 8 ,00 Rp -
- Pek. Pemasangan Grendel Jendela dan Ventilasi Bh 4 ,00 Rp -
- Pek. Pemasangan Handel Jendela dan Ventilasi Bh 4 ,00 Rp -
5 Pekerjaan Ventilasi V1
- Pek. Pemasangan Kusen Kayu Kls. II M³ 0 ,04 Rp -
- Pek. Pemasangan Bingkai Kayu Kls. II M² 0 ,34 Rp -
- Pek. Pemasangan Kaca Bening T. 5 mm M² 0 ,36 Rp -
- Pek. Pemasangan Engsel Ventilasi Bh 4 ,00 Rp -
- Pek. Pemasangan Kait Angin Ventilasi Bh 4 ,00 Rp -
- Pek. Pemasangan Grendel Ventilasi Bh 2 ,00 Rp -
- Pek. Pemasangan Handel Ventilasi Bh 2 ,00 Rp -
JUMLAH (VII) Rp -
VIII PEKERJAAN PENGECATAN
1 Pek. Pengecatan Bidang Tembok M² 2 61,09 Rp -
2 Pek. Pengecatan Bidang Plafond M² 1 17,12 Rp -
3 Pek. Pengecatan Bidang Kayu, Kusen dan Lisplank M² 5 6,65 Rp -
JUMLAH (VIII) Rp -
IX PEKERJAAN INSTALASI LISTRIK
1 Pemasanagn MCB Bh 1 ,00 Rp -
2 Pek. Titik Instalasi Lampu Titik 7 ,00 Rp -
3 Pek. Titik Instalasi Stop Kontak Titik 2 ,00 Rp -
4 Pek. Pas. Lampu SL LED 8 Watt (Setara Philips) Bh 5 ,00 Rp -
5 Pek. Pas. Lampu SL LED 5 Watt (Setara Philips) Bh 5 ,00 Rp -
6 Pek. Pas. Saklar Ganda Bh 3 ,00 Rp -
7 Pek. Pas. Saklar Tunggal Bh 1 ,00 Rp -
8 Pek. Pas. Stop Kontak Bh 2 ,00 Rp -
JUMLAH (IX) Rp -
X PEKERJAAN SANITASI
1 Pek. Pas. Klosed Jongkok Bh 1 ,00 Rp -
2 Pek. Pas. Kran Air Bh 2 ,00 Rp -
3 Pek. Pas. Wastafel Keramik Bh 1 ,00 Rp -
4 Pek. Pas. Floor Drain Bh 1 ,00 Rp -
5 Pek. Pas. Pipa Air Bersih PVC AW 1/2" M1 1 6,00 Rp -
6 Pek. Pas. Pipa Air Kotor Cair PVC AW 3" M1 1 4,00 Rp -
Engineer Estimate (EE) 5
HARGA J U M L A H
NO. URAIAN PEKERJAAN SATUAN VOLUME
SATUAN HARGA
7 Pek. Pas. Pipa Air Kotor Padat PVC AW 4" M1 4 ,00 Rp -
8 Pek. Septiktank Unit 1 ,00 Rp -
JUMLAH (X) Rp -
XI PEKERJAAN PERABOT MEBEL
1 Meja Guru (Rangka kayu daerah KLS. II) Bh 2 ,00 Rp -
2 Lemari arsip 2 pintu pakai kaca (Bahan Kayu Daerah KLS. II) Uk. 9B0hx50x18 5 1 ,00 Rp -
JUMLAH (XI) Rp -
XII PEKERJAAN AKHIR
1 Pelaporan dan Dokumentasi Ls 1 ,00 Rp -
2 Asbuilt Drawing Ls 1 ,00 Rp -
3 Pembersihan Akhir Ls 1 ,00 Rp -
JUMLAH (XII) Rp -
Engineer Estimate (EE) 6
RINCIAN DAFTAR KUNTITAS DAN HARGA
PENYELENGARAAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
SATUAN KUAN HARGA SATUAN TOTAL HARGA
NO. URAIAN PEKERJAAN KET
UKURAN TITAS (Rp.) (Rp.)
I II III IV V VI (IV*V) VII
1 Penyiapan RKK:
a Pembuatan dokumen Rencana Keslamatan Kontruksi Set Memperhatikan jumlah dan jenis pekerjaan yang dikerjakan
b Pembuatan prosedur dan instruksi kerja Ls Rp - Memperhatikan perkiraan jumlah pekerja
c Penyiapan formulir Ls
Sub Total Penyiapan RKK Rp -
2 Sosialisasi, promosi dan pelatihan:
a Induksi K3 (Safety Induction ) Org Rp - Memperhatikan perkiraan jumlah pekerja tamu dan staf
Pengarahan K3 (safety briefing) Pertemuan Keselamatan (Safety Talk
b Org Rp -
dan/atau Tool Box Meeting) setiap hari
Memperhatikan perkiraan jumlah pekerja serta jumlah dan jenis
d Pelatihan K3:
pekerjaan
1) Bekerja di ketinggian Org Rp -
2) Penggunaan bahan kimia (MSDS) Org Rp -
3) Analisis keselamatan pekerjaan Perilaku berbasis keselamatan Org Rp -
4) (Budaya K3) Org Rp -
5) P3K Org Rp -
e Sosialisasi HIV/AIDS Org Rp -
f Simulasi K3 Org Rp - Memperhatikan perkiraan jumlah Pekerja dan resiko K3 pekerjaan
g Spanduk (Banner ) Bh Rp - Memperhatikan lokasi pekerjaan dan waktu pekerjaan
h Poster Lb Rp - Memperhatikan lokasi pekerjaan dan waktu pekerjaan
i Papan Informasi K3 Bh Rp - Memperhatikan perkiraan jumlah Pekerja dan resiko k3 pekerjaan
Sub Total Sosialisasi, Promosi dan Pelatihan Rp -
3 Alat Pelindung Kerja dan Alat Pelindung Diri:
a APK:
1) Jaring pengaman (Safety Net) Ls Rp - Sesuai kebutuhan
2) Tali Keselamatan (Life Line) Ls Rp - Sesuai kebutuhan
3) Penahan jatuh (Safety Deck) Ls Rp - Sesuai kebutuhan
4) Pagar pengaman (Guard Railling) Ls Rp - Sesuai kebutuhan
5) Pembatas area (Restricted Area ) Ls Rp - Sesuai kebutuhan
b APD: Rp -
1) Topi pelindung (Safety Helmet) Bh 7 Rp 5 0.000,00 Rp 3 50.000,00 Memperhatikan perkiraan jumlah pekerja tamu dan staff
2) Pelindung mata (Goggles, Spectacles ) Bh Rp - Sesuai kebutuhan
3) Tameng muka (Face Shield ) Bh Rp - Sesuai kebutuhan
4) Masker selam (Breathing Apparatus ) Bh Rp - Sesuai kebutuhan
5) Pelindung telinga (Ear Plug, Ear Muff) Bh Rp - Sesuai kebutuhan
6) Pelindung Pernafasan Dan Mulut (Masker) Psg 7 Rp 5 .000,00 Rp 3 5.000,00 Sesuai kebutuhan
7) Sarung tangan (Safety Gloves ) Box 7 Rp 1 5.000,00 Rp 1 05.000,00 Sesuai kebutuhan
8) Sepatu kese lamatan (Safety Shoes ) Psg 7 Rp 1 25.000,00 Rp 8 75.000,00 Memperhatikan perkiraan jumlah pekerja tamu dan staff
9) Penunjang seluruh tubuh (Full BodyHarness) Psg Rp - Sesuai kebutuhan
10) Jaket pelampung (Life Vest ) Bh Rp - Sesuai kebutuhan
11) Rompi keselamatan (Safety Vest ) Bh 7 Rp 7 5.000,00 Rp 5 25.000,00 Sesuai kebutuhan
12) Celeme k (Apron/Coveralls ) Bh Rp - Sesuai kebutuhan
13) Pelindung jatuh (Fall Arrester ) Bh Rp - Sesuai kebutuhan
Sub Total Alat Pelindung Kerja dan Rp 1 .890.000,00
4 Asuransi dan perizinan:
a Asuransi Ls 1 Rp 8 65.100,00 Rp 8 65.100,00 Memperhatikan perkiraan jumlah pekerja serta nilai pekerjaan
b Surat Izin Laik Operasi (SILO) Alat/Kend Rp - Memperhatikan perkiraan jumlah alat berat
Surat Kompetensi Operator yangditerbitkan oleh lembaga/instansi
c LS Rp - Memperhatikan perkiraan jumlah operator
yang berwenang sesuai dengan Undang-Undang
Surat Izin Penge sahan Panitia Pembina Keselamatan dan Kesehatan
d LS Rp - Sesuai kebutuhan
Kerja (P2K3)
Sub Total Asuransi dan perizinan Rp 8 65.100,00
5 Personel K3 Konstruksi:
a Ahli K3 Konstruksi Org Rp - Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
b Petugas K3 Konstruksi Org Rp - Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
c Petugas tanggap darurat Org Rp - Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
d Petugas P3K Org 1 Rp 1 .000.000,00 Rp 1 .000.000,00 pekerjaan
e Petugas pengatur lalu lintas (Flagman) Org Rp - Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
f Tenaga paramedis dan/atau kesehatan Org Rp - Memperhatikan perkiraan jumlah pekerja dan resiko k3 pekerjaan
Sub Total Personel K3 Rp 1 .000.000,00
6 Fasilitas, sarana dan prasarana kesehatan:
a Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban) Ls 1 Rp 2 50.000,00 Rp 2 50.000,00 Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
Ruang P3K (Tempat Tidur Pasien, Tabung Oksigen, Stetoskop,
b Ls Rp - Memperhatikan perkiraan jumlah pekerja dan risiko k3 pekerjaan
Timbangan Berat Badan)
c Obat Pengasapan Ls Rp - pekerjaan
d Peralatan Pengasapan (Fogging) Bh Rp - Sesuai kebutuhan
e Ambulans Unit Rp - Sesuai kebutuhan
Sub Total Fasilitas, sarana dan prasarana kesehatan Rp 2 50.000,00
7 Rambu- rambu yang diperlukan:
a Rambu petunjuk Bh Rp - Sesuai kebutuhan
b Rambu larangan Bh Rp - Sesuai kebutuhan
c Rambu peringatan Bh Rp - Sesuai
d Rambu kewajiban Bh Rp - Sesuai kebutuhan
e Rambu informasi Bh 1 Rp 1 50.000,00 Rp 1 50.000,00 Sesuai kebutuhan
f Rambu pekerjaan seme ntara Ls Rp - Sesuai kebutuhan
SATUAN KUAN HARGA SATUAN TOTAL HARGA
NO. URAIAN PEKERJAAN KET
UKURAN TITAS (Rp.) (Rp.)
g Jalur Evakuasi (Escape Route ) Bh Rp - Sesuai kebutuhan
h Tongkat pengatur lalu lintas (Warning Lights Stick) Bh Rp - Sesuai kebutuhan
i Ke rucut lalu lintas (Traffic Cone) Bh Rp - Sesuai kebutuhan
j Lampu putar (Rotary Lamp ) Ls Rp - Sesuai kebutuhan
k Lampu selang lalu lintas Ls Rp - Sesuai kebutuhan
Sub Total Fasilitas, Rambu Rambu yang di perlukan : Rp 1 50.000,00
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi:
a Ahli Lingkungan Sesuai kebutuhan memperhatikan jenis pekerjaan dan waktu
OJ Rp -
pelaksanaan pekerjaan
b Ahli Struktur Sesuai kebutuhan memperhatikan jenis pekerjaan dan waktu
OJ Rp -
pelaksanaan pekerjaan
Sub Total Konsultasi dengan Ahli terkait Keselamatan Konstruksi Rp -
9 Lain- Lain Terkait Pengendalian Risiko Keselamatan Konstruksi:
a Pemeriksaan dan Pengujian Peralatan Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
Ls Rp -
pekerjaan
b Alat Pemadam Api Ringan (APAR) Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
Bh Rp -
pekerjaan
c Sirine Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
Bh Rp -
pekerjaan
d Bendera K3 Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
Bh Rp -
pekerjaan
e Lampu darurat (Emergency Lamp ) Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
Bh Rp -
pekerjaan
f Pemeriksaan lingkungan kerja: Rp -
Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko k3
1) Limbah B3 Ls Rp -
pekerjaan
Sesuai kebutuhan memperhatikan jenis pekerjaan dan risiko
2) Polusi udara Ls Rp -
k3 pekerjaan
g Program inspe ksi dan audit Internal Ls Rp - Sesuai kebutuhan
h Pelaporan dan penyelidikan insiden Ls Rp - Sesuai kebutuhan
i Patroli Keselamatan Unit Rp - Sesuai kebutuhan
j CCTV Unit Rp - Sesuai kebutuhan
Lain- Lain Terkait Pengendalian Unit Rp - Sesuai kebutuhan
Subtotal Risiko Keselamatan Konstruksi: Rp -
TOTAL BIAYA SMK3 Rp 4.155.100,00
RINCIAN IURAN JASA KONSTRUKSI
Sesuai PP 44
PEMBANGUNAN LABORATORIUM KOMPUTER BESERTA
NAMA PROYEK :
PERABOTNYA
NILAI PROYEK : Rp 476.186.000,00
PPN/IMB : 11%
NILAI PROYEK - PPN/IMB : Rp 428.996.680,98
Batas I Rp 100.000.000,00
Batas II Rp 400.000.000,00
Batas III Rp 500.000.000,00
Batas IV Rp 4.000.000.000,00
Batas V Selebihnya
TARIF
NILAI PROYEK IURAN PROYEK
JKK JKM
0,21% 0,03% Rp 1 00.000.000,00 Rp 240.000,00
0,17% 0,02% Rp 3 28.996.680,98 Rp 625.093,69
0,13% 0,02% Rp - Rp -
0,11% 0,01% Rp - Rp -
0,09% 0,01% Rp - Rp -
IURAN YANG DIHITUNG Rp 865.093,69
IURAN YANG DIBAYAR Rp 865.100,00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
SKPD : DINAS PENDIDIKAN, PEMUDA DAN OLAHRAGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA
LOKASI : SD INPRES DODUNG
TAHUN ANGGARAN : 2023
I. AHSP - A.2.2.1 ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.2.1.4 AHSP - A.2.2.1
KODE/ JENIS PEKERJAAN : Pengukuran dan Pemsangan Bouwplank
SATUAN PEMBAYARAN : M1
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,100 - -
Tukang Kayu L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Balok 5/7 m3 0,012 - -
Paku Campuran 5 cm - 7 cm kg 0,02 - -
Kayu Papan 2/20 - m3 0,007 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 10
II. AHSP - A.2.3.1 ANALISA HARGA SATUAN PEKERJAAN TANAH
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.3.1.1 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Penggalian Tanah Biasa Sedalam 1 Meter
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,750 - -
Mandor L.04 Org/Hari 0,025 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
- - - - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.3.1.9 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Pengurugan Kembali Galian Tanah
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,500 - -
Mandor L.04 Org/Hari 0,050 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
- - - - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 11
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.3.1.10 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Pemadatan Tanah per 20 cm
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,500 - -
Mandor L.04 Org/Hari 0,050 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
- - - - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.3.1.11 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Pengurugan Dengan Pasir Urug
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Mandor L.04 Org/Hari 0,010 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pasir Urug - M3 1,200 - -
JUMLAH HARGA BAHAN -
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 12
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.2.3.1.14 AHSP - A.2.3.1
KODE/ JENIS PEKERJAAN : Pengurugan Timbunan Sirtu Padat
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,250 - -
Mandor L.04 Org/Hari 0,025 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Tanah Timbunan - M3 1,200 - -
JUMLAH HARGA BAHAN -
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
III. AHSP - A.3.2.1 ANALISA HARGA SATUAN PEKERJAAN TANAH
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.3.2.1.3 AHSP - A.3.2.1
KODE/ JENIS PEKERJAAN : Pemasangan Pondasi Batu Belah Campuran 1 SP : 5 PP
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1,500 - -
Tukang Batu L.02 Org/Hari 0,750 - -
Kepala Tukang L.03 Org/Hari 0,075 - -
Mandor L.04 Org/Hari 0,075 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Batu Kali/ Batu Gunung - M3 1 ,200 - -
Semen Portland - Kg 1 36,000 - -
Pasir Pasang - M3 0 ,544 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 13
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.3.2.1.9 AHSP - A.3.2.1
KODE/ JENIS PEKERJAAN : Pemasangan Batu Kosong (Aanstamping)
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,780 - -
Tukang Batu L.02 Org/Hari 0,390 - -
Kepala Tukang L.03 Org/Hari 0,039 - -
Mandor L.04 Org/Hari 0,039 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Batu Kali/ Batu Gunung - M3 1 ,200 - -
Pasir Urug - M3 0 ,432 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
IV. AHSP - A.4.1.1 ANALISA HARGA SATUAN PEKERJAAN BETON
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.1 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Membuat Beton Mutu f'c = 7,4 MPa (K 100), Slump (12 ± 2) cm, W/C = 0,87
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1,650 - -
Tukang Batu L.02 Org/Hari 0,275 - -
Kepala Tukang L.03 Org/Hari 0,028 - -
Mandor L.04 Org/Hari 0,083 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 2 47,000 - -
Pasir Beton - Kg 8 69,000 - -
Kerikil Split (Maks 30 mm) - Kg 9 99,000 - -
Air - Liter 2 15,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 14
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.5 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Membuat Lantai Kerja Beton Mutu f'c = 14,5 MPa (K 175), Slump (12 ± 2) cm, W/C = 0,66
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1,650 - -
Tukang Batu L.02 Org/Hari 0,275 - -
Kepala Tukang L.03 Org/Hari 0,028 - -
Mandor L.04 Org/Hari 0,083 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 3 26,00 - -
Pasir Beton - Kg 7 60,00 - -
Kerikil Split (Maks 30 mm) - Kg 1 .029,00 - -
Air - Liter 2 15,00 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.17.a AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pembesian 10 Kg Dengan Besi Polos atau Besi Ulir (Besi Polos Ø 12 mm)
SATUAN PEMBAYARAN : 10 Kg
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,070 - -
Tukang Besi L.02 Org/Hari 0,070 - -
Kepala Tukang L.03 Org/Hari 0,007 - -
Mandor L.04 Org/Hari 0,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
a. Besi Beton (Besi Ø12) - Kg 1 0,500 - -
b. Kawat Beton - Kg 0 ,150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir (Harga Satuan Pekerjaan / 10) -
Analisa Harga Satuan Pekerjaan (AHSP) 15
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.17.b AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pembesian 10 Kg Dengan Besi Polos atau Besi Ulir (Besi Polos Ø 10 mm)
SATUAN PEMBAYARAN : 10 Kg
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,070 - -
Tukang Besi L.02 Org/Hari 0,070 - -
Kepala Tukang L.03 Org/Hari 0,007 - -
Mandor L.04 Org/Hari 0,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
a. Besi Beton (Besi Ø10) - Kg 1 0,500 - -
b. Kawat Beton - Kg 0 ,150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir (Harga Satuan Pekerjaan / 10) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.17.c AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pembesian 10 Kg Dengan Besi Polos atau Besi Ulir (Besi Polos Ø 8 mm)
SATUAN PEMBAYARAN : 10 Kg
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,070 - -
Tukang Besi L.02 Org/Hari 0,070 - -
Kepala Tukang L.03 Org/Hari 0,007 - -
Mandor L.04 Org/Hari 0,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
a. Besi Beton (Besi Ø8) - Kg 1 0,500 - -
b. Kawat Beton - Kg 0 ,150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir (Harga Satuan Pekerjaan / 10) -
Analisa Harga Satuan Pekerjaan (AHSP) 16
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.17.d AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pembesian 10 Kg Dengan Besi Polos atau Besi Ulir (Besi Polos Ø 6 mm)
SATUAN PEMBAYARAN : 10 Kg
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,070 - -
Tukang Besi L.02 Org/Hari 0,070 - -
Kepala Tukang L.03 Org/Hari 0,007 - -
Mandor L.04 Org/Hari 0,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
a. Besi Beton (Besi Ø6) - Kg 1 0,500 - -
b. Kawat Beton - Kg 0 ,150 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Untuk Pembesian 1 Kg dengan Besi Polos atau Besi Ulir (Harga Satuan Pekerjaan / 10) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.21 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Sloof
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,520 - -
Tukang Kayu L.02 Org/Hari 0,260 - -
Kepala Tukang L.03 Org/Hari 0,026 - -
Mandor L.04 Org/Hari 0,026 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Kelas III - m³ 0 ,014 - -
Paku 5 cm - 10 cm - Kg 0 ,300 - -
Minyak Bekisting - Liter 0 ,100 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Harga Satuan Pekerjaan Bakesting/2 (Dua Kali Pakai) -
Analisa Harga Satuan Pekerjaan (AHSP) 17
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.22 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Kolom
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,660 - -
Tukang Kayu L.02 Org/Hari 0,330 - -
Kepala Tukang L.03 Org/Hari 0,033 - -
Mandor L.04 Org/Hari 0,033 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Kelas III - m³ 0 ,040 - -
Paku 5 cm - 10 cm - Kg 0 ,300 - -
Minyak Bekisting - Liter 0 ,200 - -
Balok Kayu Kelas III - m³ 0 ,015 - -
Plywood Tebal 4 mm - Lbr 0 ,350 - -
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Btg 2 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Harga Satuan Pekerjaan Bakesting/2 (Dua Kali Pakai) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.22.a AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Kolom (Praktis)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,660 - -
Tukang Kayu L.02 Org/Hari 0,330 - -
Kepala Tukang L.03 Org/Hari 0,033 - -
Mandor L.04 Org/Hari 0,033 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Kelas III - m³ 0 ,040 - -
Paku 5 cm - 10 cm - Kg 0 ,300 - -
Minyak Bekisting - Liter 0 ,200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Harga Satuan Pekerjaan Bakesting/2 (Dua Kali Pakai) -
Analisa Harga Satuan Pekerjaan (AHSP) 18
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.23 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Balok
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,660 - -
Tukang Kayu L.02 Org/Hari 0,330 - -
Kepala Tukang L.03 Org/Hari 0,033 - -
Mandor L.04 Org/Hari 0,033 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Kelas III - m³ 0 ,040 - -
Paku 5 cm - 10 cm - Kg 0 ,400 - -
Minyak Bekisting - Liter 0 ,200 - -
Balok Kayu Kelas III - m³ 0 ,018 - -
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Btg 2 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Harga Satuan Pekerjaan Bakesting/2 (Dua Kali Pakai) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.1.1.24 AHSP - A.4.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Bekisting Untuk Lantai
2
SATUAN PEMBAYARAN : M
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,660 - -
Tukang Kayu L.02 Org/Hari 0,330 - -
Kepala Tukang L.03 Org/Hari 0,033 - -
Mandor L.04 Org/Hari 0,033 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kayu Kelas III - m³ 0 ,040 - -
Paku 5 cm - 10 cm - Kg 0 ,300 - -
Minyak Bekisting - Liter 0 ,200 - -
Balok Kayu Kelas III - m³ 0 ,015 - -
Plywood Tebal 4 mm - Lbr 0 ,350 - -
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' - Btg 6 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Harga Satuan Pekerjaan Bakesting/2 (Dua Kali Pakai) -
Analisa Harga Satuan Pekerjaan (AHSP) 19
V. AHSP - A.4.2.1 ANALISA HARGA SATUAN PEKERJAAN BESI DAN ALUMINIUM
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.2.1.21.a (Praktis) AHSP - A.4.2.1
KODE/ JENIS PEKERJAAN : Pemasangan Rangka Besi Holow Baja Ringan, Modul (60 x 60) cm, Untuk Plafond
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,200 - -
Tukang Kayu L.02 Org/Hari 0,200 - -
Kepala Tukang L.03 Org/Hari 0,020 - -
Mandor L.04 Org/Hari 0,010 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Holow Baja Ringan 4/2 - m1 4 ,500 - -
Sekrup - Bh 1 0,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.2.1.22.a (Praktis) AHSP - A.4.2.1
KODE/ JENIS PEKERJAAN : Pemasangan Rangka Atap Baja Ringan Profil C75
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,200 - -
Tukang Kayu L.02 Org/Hari 0,400 - -
Kepala Tukang L.03 Org/Hari 0,040 - -
Mandor L.04 Org/Hari 0,010 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Canal 75.75 -
M1
3,000 - -
Reng R32. 0.45 -
M1
2,000 - -
Baut (Screw) - Bh 12,000 - -
Dinabolt - Bh 1,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 20
VI. AHSP - A.4.4.1 ANALISA HARGA SATUAN PEKERJAAN PASANGAN DINDING
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.1.7 AHSP - A.4.4.1
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Campuran 1 SP : 2 PP
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Bata Merah - Buah 7 0,000 - -
Semen Portland - Kg 1 8,950 - -
Pasir Pasang - Kg 0 ,038 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.1.8 AHSP - A.4.4.1
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Campuran 1 SP : 3 PP
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Bata Merah - Buah 7 0,000 - -
Semen Portland - Kg 1 4,370 - -
Pasir Pasang - Kg 0 ,040 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 21
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.1.9 AHSP - A.4.4.1
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Bata Merah (5 x 11 x 22) cm Tebal 1/2 Batu, Campuran 1 SP : 4 PP
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Bata Merah - Buah 7 0,000 - -
Semen Portland - Kg 1 1,500 - -
Pasir Pasang - Kg 0 ,043 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
VII. AHSP - A.4.4.2 ANALISA HARGA SATUAN PEKERJAAN PLESTERAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.2.2 AHSP - A.4.4.2
KODE/ JENIS PEKERJAAN : Pemasangan Plesteran, Campuran 1 SP : 2 PP Tebal 15 mm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 1 0,224 - -
Pasir Pasang - Kg 0 ,020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 22
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.2.3 AHSP - A.4.4.2
KODE/ JENIS PEKERJAAN : Pemasangan Plesteran, Campuran 1 SP : 3 PP Tebal 15 mm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 7 ,776 - -
Pasir Pasang - Kg 0 ,023 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.2.4 AHSP - A.4.4.2
KODE/ JENIS PEKERJAAN : Pemasangan Plesteran, Campuran 1 SP : 4 PP Tebal 15 mm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,300 - -
Tukang Batu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,015 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 6 ,240 - -
Pasir Pasang - Kg 0 ,024 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 23
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.2.27 AHSP - A.4.4.2
KODE/ JENIS PEKERJAAN : Pemasangan Acian
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,200 - -
Tukang Batu L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,010 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Semen Portland - Kg 3 ,250 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
VIII. AHSP - A.4.4.2 ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.3.14 AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan lantai keramik Ukuran 40cm x 40cm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,250 - -
Tukang Batu L.02 Org/Hari 0,125 - -
Kepala Tukang L.03 Org/Hari 0,013 - -
Mandor L.04 Org/Hari 0,013 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Keramik Ukuran 60 cm x 60 cm - Bh 6 ,630 - -
Semen Portland - Kg 9 ,800 - -
Semen Warna - Kg 1 ,300 - -
Pasir Pasang - M3 0 ,045 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 24
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.3.14.a AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan lantai keramik Ukuran 40cm x 40cm (Kasar)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,250 - -
Tukang Batu L.02 Org/Hari 0,125 - -
Kepala Tukang L.03 Org/Hari 0,013 - -
Mandor L.04 Org/Hari 0,013 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Keramik Ukuran 60 cm x 60 cm (Kasar) - Bh 6 ,630 - -
Semen Portland - Kg 9 ,800 - -
Semen Warna - Kg 1 ,300 - -
Pasir Pasang - M3 0 ,045 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.3.36 AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan Lantai Keramik 20 x 20 cm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,700 - -
Tukang Batu L.02 Org/Hari 0,350 - -
Kepala Tukang L.03 Org/Hari 0,035 - -
Mandor L.04 Org/Hari 0,035 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Keramik 20 x 20 cm - Bh 2 6,250 - -
Semen Portland - Kg 1 0,400 - -
Semen Warna - Kg 0 ,500 - -
Pasir Pasang - M3 0 ,045 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 25
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.4.3.54.a AHSP - A.4.4.3
KODE/ JENIS PEKERJAAN : Pemasangan Dinding Keramik 20 x 25 cm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,900 - -
Tukang Batu L.02 Org/Hari 0,450 - -
Kepala Tukang L.03 Org/Hari 0,045 - -
Mandor L.04 Org/Hari 0,045 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Keramik 20 x 25 cm - Bh 2 1,000 - -
Semen Portland - Kg 9 ,300 - -
Semen Warna - Kg 0 ,500 - -
Pasir Pasang - M3 0 ,018 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
IX. AHSP - A.4.5.1 ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFON)
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.5.1.5.a AHSP - A.4.5.1
KODE/ JENIS PEKERJAAN : Pemasangan Langit-langit Kalsiboard GRC cm, Tebal 3,5 mm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,100 - -
Tukang L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kalsiboard GRC 120 x 240 T=4 mm - Lbr 0 ,375 - -
Paku Sekrup - Kg 0 ,030 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 26
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.5.1.9 AHSP - A.4.5.1
KODE/ JENIS PEKERJAAN : Pemasangan List Langit-langit Kayu Profil
SATUAN PEMBAYARAN : M1
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,050 - -
Tukang Kayu L.02 Org/Hari 0,050 - -
Kepala Tukang L.03 Org/Hari 0,005 - -
Mandor L.04 Org/Hari 0,003 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
List Profil Kayu 5 cm - M1 1 ,050 - -
Paku - Kg 0 ,010 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
X. AHSP - A.4.5.2 ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.5.2.39 AHSP - A.4.5.2
KODE/ JENIS PEKERJAAN : Pemasangan Atap Spandex
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,120 - -
Tukang Kayu L.02 Org/Hari 0,060 - -
Kepala Tukang L.03 Org/Hari 0,006 - -
Mandor L.04 Org/Hari 0,006 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Atap galvanis Spandex Tebal 0,35 mm - Lber 0 ,700 - -
Paku Skrup - Kg 0 ,020 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 27
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.5.2.40 AHSP - A.4.5.2
KODE/ JENIS PEKERJAAN : Pemasangan Nok Atap Spandek
SATUAN PEMBAYARAN : M1
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,150 - -
Tukang Alumunium L.02 Org/Hari 0,070 - -
Kepala Tukang L.03 Org/Hari 0,007 - -
Mandor L.04 Org/Hari 0,006 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Nok Atap Spandek - m' 1 ,200 - -
Paku Skrup - Kg 0 ,040 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
XI. AHSP - A.4.6.1 ANALISA HARGA SATUAN PEKERJAAN KAYU
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.1.2 AHSP - A.4.6.1
KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Kusen Pintu, Jendela Kayu Kelas II
SATUAN PEMBAYARAN : M3
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 6,000 - -
Tukang Kayu L.02 Org/Hari 18,000 - -
Kepala Tukang L.03 Org/Hari 1,800 - -
Mandor L.04 Org/Hari 0,300 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Papan Kayu Kelas II -
M3
1 ,200 - -
Paku 10 cm - Kg 1 ,250 - -
Lem Kayu - Kg 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 28
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.1.5 AHSP - A.4.6.1
KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Daun Pintu Panil, Kayu Kelas I dan II
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1,000 - -
Tukang Kayu L.02 Org/Hari 3,000 - -
Kepala Tukang L.03 Org/Hari 0,300 - -
Mandor L.04 Org/Hari 0,050 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Papan Kayu Kelas II -
M3
0 ,040 - -
Lem Kayu - Kg 0 ,500 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.1.6 AHSP - A.4.6.1
KODE/ JENIS PEKERJAAN : Pembuatan dan Pemasangan Daun Pintu dan Jendela Kaca, Kayu Kelas I atau II
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,800 - -
Tukang Kayu L.02 Org/Hari 2,400 - -
Kepala Tukang L.03 Org/Hari 0,240 - -
Mandor L.04 Org/Hari 0,040 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Papan Kayu Kelas II -
M3
0 ,024 - -
Lem Kayu - Kg 0 ,300 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 29
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.1.21.a (Praktis) AHSP - A.4.6.1
KODE/ JENIS PEKERJAAN : Pemasangan Lisplank GRC Ukuran Lebar 30 cm
SATUAN PEMBAYARAN : M1
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,100 - -
Tukang Kayu L.02 Org/Hari 0,200 - -
Kepala Tukang L.03 Org/Hari 0,020 - -
Mandor L.04 Org/Hari 0,005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Lisplank GRC 30 Cm -
M1
1 ,1000 - -
Screww - Bh 4 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
XII. AHSP - A.4.6.2 ANALISA HARGA SATUAN PEKERJAAN KUNCI DAN KACA
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.2 AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Kunci Tanam
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,010 - -
Tukang L.02 Org/Hari 0,500 - -
Kepala Tukang L.03 Org/Hari 0,050 - -
Mandor L.04 Org/Hari 0,005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kunci Tanam setara dekkson - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 30
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.5 AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Engsel Pintu
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,0008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Engsel Pintu - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.6 AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Engsel Jendela Kupu-kupu
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,010 - -
Tukang L.02 Org/Hari 0,100 - -
Kepala Tukang L.03 Org/Hari 0,010 - -
Mandor L.04 Org/Hari 0,0005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Engsel Jendela Kupu-kupu - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 31
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.9 AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Kait Angin
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kait Angin - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.8.a AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Grendel Pintu
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang Kayu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Grendel Pintu - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 32
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.8.b AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Grendel Jendela dan Ventilasi
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang Kayu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Grendel Jendela dan Ventilasi - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.8.c AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Handel Pintu
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang Kayu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Handel Pintu - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 33
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.8.d AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Pemasangan Handel Jendela dan Ventilasi
SATUAN PEMBAYARAN : Buah
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang Kayu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Handel Jendela dan Ventilasi - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.6.2.17 AHSP - A.4.6.2
KODE/ JENIS PEKERJAAN : Memasang Kaca Bening, Tebal 5 mm
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,015 - -
Tukang Kayu L.02 Org/Hari 0,150 - -
Kepala Tukang L.03 Org/Hari 0,015 - -
Mandor L.04 Org/Hari 0,0008 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kaca Bening Tebal 5 mm - m2 1 ,100 - -
Sealant - Kg 0 ,050 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 34
XIII. AHSP - A.4.7.1 ANALISA HARGA SATUAN PEKERJAAN PENGECATAN
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.7.1.4 AHSP - A.4.7.1
KODE/ JENIS PEKERJAAN : Pengecatan Bidang Kayu Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,070 - -
Tukang Kayu L.02 Org/Hari 0 ,009 - -
Kepala Tukang L.03 Org/Hari 0 ,006 - -
Mandor L.04 Org/Hari 0 ,003 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Cat Meni - Liter 0 ,200 - -
Plamur Kayu Kg 0 ,150 - -
Cat Dasar Kg 0 ,170 - -
Cat Penutup Kg 0 ,260 - -
Kuas Bh 0 ,010 - -
Pengencer Kg 0 ,030 - -
Ampelas - Lembar 0 ,200 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.4.7.1.10 AHSP - A.4.7.1
KODE/ JENIS PEKERJAAN : Pengecatan Tembok Baru (1 Lapis Plamur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
SATUAN PEMBAYARAN : M2
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0,020 - -
Tukang Kayu L.02 Org/Hari 0,063 - -
Kepala Tukang L.03 Org/Hari 0,0063 - -
Mandor L.04 Org/Hari 0,003 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Plamur - Kg 0 ,100 - -
Cat Dasar - Kg 0 ,100 - -
Cat Penutup - Kg 0 ,260 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 35
XIV. AHSP - A.5.1.1 ANALISA HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.3 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Klosed Jongkok
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1 ,000 - -
Tukang Kayu L.02 Org/Hari 1 ,500 - -
Kepala Tukang L.03 Org/Hari 0 ,150 - -
Mandor L.04 Org/Hari 0 ,050 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Klosed Jongkok - Bh 1 ,000 - -
Semen Portland Kg 6 ,000 - -
Pasir Pasang m3 0 ,010 - -
Bata Merah Bh 7 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.5 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Wastafel
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 1 ,200 - -
Tukang Kayu L.02 Org/Hari 1 ,450 - -
Kepala Tukang L.03 Org/Hari 0 ,150 - -
Mandor L.04 Org/Hari 0 ,060 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Wastafel - Bh 1 ,000 - -
Semen Portland Kg 6 ,000 - -
Pasir Pasang m3 0 ,010 - -
Bata Merah % 1 2,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 36
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.14 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Floor Drain
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,010 - -
Tukang Kayu L.02 Org/Hari 0 ,100 - -
Kepala Tukang L.03 Org/Hari 0 ,010 - -
Mandor L.04 Org/Hari 0 ,005 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Floor Drain - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.19 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Kran Air Diamter 1/2" atau 3/4"
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,010 - -
Tukang Kayu L.02 Org/Hari 0 ,400 - -
Kepala Tukang L.03 Org/Hari 0 ,040 - -
Mandor L.04 Org/Hari 0 ,050 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Kran Air - Bh 1 ,000 - -
Sealtape Bh 0 ,025 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 37
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.25 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diamter 1/2"
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,036 - -
Tukang Kayu L.02 Org/Hari 0 ,060 - -
Kepala Tukang L.03 Org/Hari 0 ,006 - -
Mandor L.04 Org/Hari 0 ,002 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa PVC Diamter 1/2" - m' 1 ,200 - -
Perlengkapan % 3 5,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.31 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diamter 3"
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,081 - -
Tukang Kayu L.02 Org/Hari 0 ,135 - -
Kepala Tukang L.03 Org/Hari 0 ,0135 - -
Mandor L.04 Org/Hari 0 ,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa PVC Diamter 3" - m' 1 ,200 - -
Perlengkapan % 3 5,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 38
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : A.5.1.1.32 AHSP - A.5.1.1
KODE/ JENIS PEKERJAAN : Pemasangan Pipa PVC Tipe AW Diamter 4"
SATUAN PEMBAYARAN : m'
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Pekerja L.01 Org/Hari 0 ,081 - -
Tukang Kayu L.02 Org/Hari 0 ,135 - -
Kepala Tukang L.03 Org/Hari 0 ,0135 - -
Mandor L.04 Org/Hari 0 ,004 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa PVC Diamter 4" - m' 1 ,200 - -
Perlengkapan % 3 5,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
XIV. AHSP - A.8.4.6 ANALISA HARGA SATUAN PEKERJAAN ELEKTRIKAL
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.8.4.6
ITEM PEMBAYARAN NO. : A.8.4.6.1
KODE/ JENIS PEKERJAAN : 1 Titik Instalasi Lampu
SATUAN PEMBAYARAN : Titik
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah - % bahan 50,000 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa listrik 5/8” Btg 1 ,0000 - -
Kabel NYM 2X2,5 m' 1 0,0000 - -
T Dus Bh 1 ,0000 - -
L Bow Bh 1 ,0000 - -
Las dop Bh 1 ,0000 - -
Klem biasa Bh 3 0,0000 - -
Mongkok Bh 1 ,0000 - -
Fitting - Bh 1 ,0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 39
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.8.4.6
ITEM PEMBAYARAN NO. : A.8.4.6.1.a
KODE/ JENIS PEKERJAAN : 1 Titik Instalasi Stop Kontak
SATUAN PEMBAYARAN : Titik
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah - % bahan 50,000 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa listrik 5/8” Btg 1 ,0000 - -
Kabel NYM 2X2,5 m' 7 ,0000 - -
T Dus Bh 1 ,0000 - -
L Bow Bh 1 ,0000 - -
Las dop Bh 1 ,0000 - -
Klem biasa Bh 2 1,0000 - -
Mongkok Bh 1 ,0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.8.4.6
ITEM PEMBAYARAN NO. : A.6.2.1.2
KODE/ JENIS PEKERJAAN : Pemasangan MCB
SATUAN PEMBAYARAN : Titik
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Upah - % bahan 100,000 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Pipa listrik 5/8” Btg 3 ,0000 - -
Kabel NYM 2X2,5 m' 1 5,0000 - -
T Dus Bh 1 ,0000 - -
L Bow Bh 2 ,0000 - -
Klem biasa Bh 2 4,0000 - -
MCCB (Boks MCB) Bh 1 ,0000 - -
MCB - Bh 2 ,0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 40
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.8.4.6
ITEM PEMBAYARAN NO. : An - Praktis 1
KODE/ JENIS PEKERJAAN Pemasangan Lampu 8 Watt
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Tukang Listrik L.01 Org/Hari 0,100 - -
Kepala Tukang L.04 Org/Hari 0,0500 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Lampu SL 8 Watt Setara Philips - bh 1 ,0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
AHSP - A.8.4.6
ITEM PEMBAYARAN NO. : An - Praktis 1.a
KODE/ JENIS PEKERJAAN Pemasangan Lampu 5 Watt
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
A. TENAGA :
Tukang Listrik L.01 Org/Hari 0,100 - -
Kepala Tukang L.04 Org/Hari 0,0500 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Lampu SL 5 Watt Setara Philips - bh 1 ,0000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 41
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : An - Praktis 2 AHSP - A.8.4.6
KODE/ JENIS PEKERJAAN : Pemasangan Stop Kontak
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
2. Pemasangan Stop Kontak AC Daya 200 Watt 1 Phase
A. TENAGA :
Tukang Instalasi Listrik L.02 Ls 0,200 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Stop Kontak 1 Phase - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : An - Praktis 3 AHSP - A.8.4.6
KODE/ JENIS PEKERJAAN : Pemasangan Saklar Ganda
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
2. Pemasangan Stop Kontak AC Daya 200 Watt 1 Phase
A. TENAGA :
Tukang Instalasi Listrik L.02 Ls 0,200 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Saklar Ganda - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 42
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
ITEM PEMBAYARAN NO. : An - Praktis 4 AHSP - A.8.4.6
KODE/ JENIS PEKERJAAN : Pemasangan Saklar Tunggal
SATUAN PEMBAYARAN : Bh
HARGA SATUAN JUMLAH HARGA
No. URAIAN KODE SATUANKOEFISIEN
(Rp). (Rp).
1 2 3 4 5 6 7 = (5x6)
2. Pemasangan Stop Kontak AC Daya 200 Watt 1 Phase
A. TENAGA :
Tukang Instalasi Listrik L.02 Ls 0,200 - -
JUMLAH TENAGA KERJA -
B. BAHAN :
Saklar Tunggal - Bh 1 ,000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN :
- - - - -
JUMLAH HARGA ALAT -
D. Jumlah (A+B+C) -
E. Overhead & Profit 10% x D -
F. Harga Satuan Pekerjaan(D + E) -
Analisa Harga Satuan Pekerjaan (AHSP) 43
DAFTAR HARGA SATUAN UPAH DAN BAHAN
SKPD : DINAS PENDIDIKAN, PEMUDA DAN OLAHRAGA
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH DASAR
PEKERJAAN : PEMBANGUNAN RUANG GURU BESERTA PERABOTNYA
LOKASI : SD INPRES DODUNG
TAHUN ANGGARAN : 2023
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
I. UPAH KERJA
1 Mandor Hari
2 Kepala Tukang Hari
3 Tukang Kayu, Batu, Besi, Cat Hari
4 Pekerja Hari
II. BAHAN MATERIAL
1. Tanah dan Pasir
Pasir Urug M3
Pasir Pasang M3
Pasir Beton/ Cor M3 / Kg
Sirtu M3
Pasir Plester M3
Tanah Timbunan M3
Tanah Humus (Tanah Hitam) M3
2. Kerikil
Kerikil (Lokal) M3 /Kg
Kerikil Sungai Pilihan/ Koral M3
Kerikil Sungai Tak Tersaring M3
Batu Pecah 5 - 7 M3
Batu Pecah 3 - 5 M3
Batu Pecah 2 - 3 M3
Batu Pecah 1 - 2 M3
Batu Pecah 0,5 - 1 Cm Spilt M3
3. Batu - Batuan
Batu Utuh, Batu Kali, Batu Gunung M3
Batu Karang M3
Batu Alam M2
Batu Sikat Motif Besar/ Kecil ktg 30 X 50 (M1)
4. Batu Cetak :
Batu Bata Ukuran 5 x 11 x 22 cm Bh
Batu Bata Ukuran 5 x 9 x 22 cm Bh
III. BAHAN BANGUNAN
1. Kapur
Kapur Pasang (Mil) Kg Zak
Kapur Bakar Kg
2. Semen
Semen Pc (50 Kg) Zak /Kg
Semen Warna/ Putih Kg /Zak
Nat (Mortar Flex) Kg
Perekat Bata Ringan Lemkra LBM - 116 Zak
Perekat Bata Ringan MU - 380 - 40 Kg/Zak Zak
Harga Satuan Upah dan Bahan 44
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
3. Bahan Atap
Seng Gelombang BJLS 0.20 Lbr
Seng Gelombang BJLS 0.18 Lbr
Seng Plat BJLS 0.20 (40 cm ) M'
Genteng Metal 0,800 x 0,770 - T= 0,25 mm Lbr
Genteng Metal (Sakura Roof) 0,3 mm Lbr
Nok Sakura Roff Bh
Metal Zincalume`(Soka Jempol 0,22) 74 x 160 cm Lbr
Atap Galvalum Spandeck Lbr
Nok Spndeks M1
Atap galvanis (Spandex Tebal 0,35 mm) M1
Polycarbonate Twinlite 2,1mx11,8m Lbr
4. Bahan Bubungan/ Nok
Seng Plat Lebar 90 Cm M1
Seng Plat Lebar 45 Cm M1
Seng Plat Lebar 30 Cm M1
Genteng Metal (Multi Roof) 0,3 mm Lbr
Genteng Metal (Sakura Roof) 0,25 mm Lbr
Metal Zincalume 0,25 mm Lbr
5. Bahan Kayu
Balok 6/16 x 4 m (Kayu Kelas I) M3
Balok 6/16 x 4 m (Kayu Kelas II) M3
Balok 8/12 x 4 m (Kayu Kelas II) M3
Balok 6/10 x 4 m (Kayu Kelas II) M3
Balok 5/7 x 4 m (Kayu Kelas II) M3
Balok 5/7 x 4 m (Kayu Kelas III) M3
Reng 2/3 x 4 m (Kayu Kelas II) M3
Kayu Bakesting (Kayu Kelas III) M3
Papan Palapi M3
Papan (Kayu Kelas II) M3
Papan Mall M3
Papan Lembar Seri 8 Cm Lbr
Papan Lembar Seri 10 Cm Lbr
List Profil Kayu 10 Cm Btg /M1
List Profil Kayu 3 Cm Btg /M1
List Profil Kayu 5 Cm Btg /M1
Listplank Ornament Jadi Bh
Dolken Kayu Galam Ø 8 -10 Cm/ 4 M' Btg
Gymfloor M2
Penjaga Jarak Bekisting/ Spacer Buah
Bambu Batang
7. Bahan Lantai dan Dinding/ Keramik
Tegel Keramik Uk. 10 x 20 Cm Dos /Bh
Tegel Keramik Uk. 10 x 30 Cm Buah /Bh
Tegel Keramik Uk. 10 x 40 Cm Buah /Bh
Tegel Keramik Uk. 20 x 20 Cm Buah /Bh
Tegel Wafel Uk. 20 x 20 Cm Buah /Bh
Tegel Keramik Uk. 20 x 25 Cm Buah /Bh
Tegel Keramik Uk. 25 x 40 Cm Buah /Bh
Tegel Keramik Uk. 20 x 40 Cm Buah /Bh
Tegel Keramik Uk. 30 x 30 Cm Buah /Bh
Tegel Keramik Uk. 30 x 30 Cm (kasar) Buah /Bh
Tegel Keramik Uk. 40 x 40 Cm Buah /Bh
Tegel Keramik Uk. 40 x 40 Cm (Kasar) Buah /Bh
Tegel Keramik Uk. 60 x 60 Cm Buah /Bh
Keramik Granit Tile Uk. 60 x 60 Cm (Colosseum) Dos /Bh
Keramik Granit Tile Uk. 60 x 60 Cm (Kasar) Dos /Bh
Harga Satuan Upah dan Bahan 45
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Keramik Granit Tile Uk. 80 x 80 Cm Buah /Bh
Plint Granit Tile Uk. 10 x 60 Cm Bh
Plint Granit Tile Uk. 10 x 40 Cm Bh
Plint Keramik Uk. 10 x 40 Cm Bh
Plint Keramik Uk. 10 x 20 Cm Bh
Plint Granit Tile Uk. 10 x 30 Cm Bh
Plint Keramik Uk. 10 x 30 Cm Bh
Lantai marmer 100 x 100 cm Bh
Plint Keramik Uk. 10 x 60 Cm Bh
Roster 12x11x24 Bh
Roster 20x20x11 Bh Dos
Batu Alam m2
8. Bahan Besi dan Alumunium
Besi Beton Polos Uk. Ǿ 4 mm Btg /Btg
Besi Beton Polos Uk. Ǿ 6 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 8 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 10 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 12 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 14 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 16 mm Kg /Btg
Besi Beton Polos Uk. Ǿ 19 mm Kg /Kg
Besi Beton Polos Uk. Ǿ 20 mm Kg /Kg
Besi Beton Polos Uk. Ǿ 22 mm Kg /Kg
Besi Beton Ulir Uk. Ǿ 10 mm Kg /Kg
Besi Beton Ulir Uk. Ǿ 12 mm Kg /Kg
Besi Beton Ulir Uk. Ǿ 16 mm Kg /Kg
Besi Beton Ulir Uk. Ǿ 19 mm Kg /Kg
Besi Beton Ulir Uk. Ǿ 22 mm Kg /Kg
Besi Profil Kg /Kg
Besi WF Kg /Kg
Wiremesh M6 2,1 x 5,4 M1 /Kg
Besi Hollow Embos 10 x 20 x 2 mm x 6 mm Btg M1
Besi Hollow Embos 20 x 20 x 2 mm x 6 mm Btg M1
Besi Hollow Embos 30 x 30 x 2 mm x 6 mm Btg M1
Besi Hollow Embos 20 x 40 x 2 mm x 6 mm Btg M1
Besi Hollow Embos 40 x 40 x 2 mm x 6 mm Btg M1
Besi Hollow Embos 50 x 50 x 2 mm x 6 mm Btg M1
Pipa Penguapan Septictank Bh
Besi Plat 5 mm M2
Besi Plat 3 mm M2
Besi Plat 2 mm M2
Besi Plat 2 mm Kg
Besi Plat 1,4 mm M2
Besi Plat 1,2 mm M2
Besi Plat 1,2 mm M2
Besi Siku Ukuran 30 x 3 mm - 6 M' M1 Btg
Besi Siku Ukuran 40 x 3 mm - 6 M' M1 Btg
Besi Siku Ukuran 40 x 4 mm - 6 M' M1 Btg
Besi Siku Ukuran 50 x 5 mm - 6 M' Kg Btg
Besi Strip 4x2x6 M' Btg
Besi Virkan 9 mm m'
Truss Canal / TS C75.75 Btg / m'
Reng R32. 0.45 Btg / m'
Braket L Bh
Ramset bh
Hollow Baja Ringan 4/2 Btg / m'
Harga Satuan Upah dan Bahan 46
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
9. Bahan Kawat
Kawat Ikat Beton/ Bendrat Kg
Kawat Duri (50 m) 4 Kg Roll
Kawat Jaringan/ Ayakan M1
Kawat Harmonika (50x50x3x1,8) M1
Kawat Bronjong Roll
Kawat Las Kg
10. Bahan Langit - Langit
Tripleks Uk. 122 Cm x 244 Cm x 2 mm Lbr
Tripleks Uk. 122 Cm x 244 Cm x 3 mm Lbr
Tripleks Uk. 122 Cm x 244 Cm x 4 mm Lbr
Tripleks Uk. 122 Cm x 244 Cm x 5 mm Lbr
Tripleks Lapis Kulit Jeruk Lbr
Teakwood 90 Cm x 210 Cm x 3 mm Lbr
Teakwood 122 Cm x 244 Cm x 3 mm Lbr
Plywood 90 x 240 x 4 mm Lbr
Playwood 122 Cm x 244 Cm x 9 mm Lbr
Playwood 122 Cm x 244 Cm x 4 mm Lbr
Playwood 122 Cm x 244 Cm x 12 mm Lbr
Playwood 122 Cm x 244 Cm x 15 mm Lbr
Playwood 122 Cm x 244 Cm x 18 mm Lbr
Gypsumboard 120 x 240 x 5 mm Lbr
Gypsumboard 120 x 240 x 9 mm Lbr
Kalsiboard GRC 120 x 240 T=4 mm Lbr
Kalsiboard GRC 120 x 240 T=6 mm Lbr
Lisplank GRC 30 Cm Lbr / m'
Lisplank GRC 20 Cm Panjang 3 m Lbr
Profil Gypsum M1 Btg
List Profil Gypsum (Besar) Btg /M1
List Profil Gypsum (Kecil) Btg /M1
Profil Alluminium "T" M1
Kawat Dia. 4 mm Kg
Profil Alumunium Jepitan Kaca m
11. Bahan Sanitair/ Saluran Air
Bak Mandi Fibber Glass 70 x 70 x 66 Bh
Bak Reservoir Fibber Glass Kap. 1.000 Ltr Bh
Bak Reservoir Almunium Kap. 1.000 Ltr Bh
Buis Beton Dia 100 Cm Tinggi 50 cm Bh
Kran Air 1/2" Bh
Kran Air Stainless Bh
Seal Tape Bh
Bak Teraso Bh
Shower Basuh Bh
Floor Drain Plastik Bh
Floor Drain Stainlees Bh
Pipa Gip :
Diameter 1/2" Btg /M1
Diameter 3/4" Btg /M1
Diameter 1" Btg /M1
Diameter 2" Btg /M1
Diameter 2" Medium A Btg /M1
Diameter 2" Medium B Btg /M1
Diameter 2 1/2" Medium C Btg /M1
Diameter 3" Btg /M1
Diameter 4" Btg /M1
Harga Satuan Upah dan Bahan 47
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Knie Gip 1/2" Bh /M1
Double Niple 1" Bh /M1
Clame Sadle 1/2"-3" Bh /M1
Tee Gip 1/2" Bh
Socket Drat Gip 1/2" Bh /M1
Hanger + Support Pipa GIP 4" Set
Hanger + Support Pipa GIP 3" Set
Hanger + Support Pipa GIP 2" Set
Hanger + Support Pipa GIP 3/4" Set
Hanger + Support Pipa GIP 1/2" Set
Pipa PVC Aw (4 mm) :
Diameter 1/2" Panjang 4 m1 Btg /M1
Diameter 3/4" Btg /M1
Diameter 1" Btg /M1
Diameter 1 1/4" Btg /M1
Diameter 1 1/2" Btg /M1
Diameter 2" Btg /M1
Diameter 2,5" Btg /M1
Diameter 3" Btg /M1
Diameter 4" Btg /M1
Hanger + Support Pipa PVC 4" Bh
Hanger + Support Pipa PVC 3" Bh
Hanger + Support Pipa PVC 2,5" Bh
Hanger + Support Pipa PVC 2" Bh
12. Bahan Finishing
Cat Kayu :
Cat Kayu Kg
Meni Kayu Kg
Meni Besi/ Seng Kg
Minyak Cat Kg
Plamur Kayu Kg
Dempul Jadi Kg
Afduner/ Tinner Ltr
Vernis Kg
Politur Ltr
Residu/ Ter Kg
Tineer Ltr
Cat Tembok :
Cat Tembok & Plafond (Interior) Kg
Cat Tembok Wathersield (Exterior) Kg
Cat Tembok Metrolait Kg
Cat Tembok Paragon Kg
Cat Tembok Dulux Kg
Plamur Tembok Kg Klg
Dempul Tembok Kg
Polimer Mortar Kg
Cat Tembok Nodrop Anti Bocor Kg
Cat Besi :
Meny Seng Kg
Meny Besi Kg
Meny Kayu Kg
Cat Glotex Kg
Cat Atap Seng Kg Klg
Cat Atap dan Genting Kg Klg
Harga Satuan Upah dan Bahan 48
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
13. Bahan Penggantung
Kunci - Kunci :
Kunci Tanam Antik Set
Kunci Tanam Stainless ex. Dekkson Set
Kunci Pintu Gagang Ex. Muller Set
Kunci Pintu Tanam Kualitas Baik Set
Kunci Tanam Royal 2 Slaag Set
Kunci Tanam Royal 1 Slaag Set
Kunci Tanam Kuda Terbang Set
Kunci Tanam 2 slaag (setara dekkson ) Set
Kunci Tanam Putar untuk Km/Wc Set
Kunci Pintu Bulat Ex. Muller Set
Handle Stainless Steel 80 cm Set
Handle Stainless Steel 30 cm Set
Handle Jendela Alumunium Buah
Door Closer Set /Bh
Door Holder Bh /Bh
Hak Angin Jendela Psg /Bh
Hak Angin Jendela Biasa Psg /Bh
Kait Angin Jendela Bh /Bh
Hak Tarikan Pintu Lemari Bh
Grendel Pintu Bh
Grendel Jendela Bh
Handle Pintu 30 cm (Lever On Rose Type) Set
Hengsel Kupu - Kupu Bh /Bh
Hengsel Ring Pintu Psg /Bh
Hengsel Per Pintu Koboy Buah
Hengsel Pintu Nilon Buah
Hengsel Pintu Kualitas Baik Buah
Hengsel Jendela Casement 8" Buah
Hengsel Jendela Nilon Buah /Bh
Friction Stay (Hak Angin Alumunium) Bh
Spring Knip (Grendel Alumunium) Bh
Floor Hinges Kaca Frameless Set
Paku dan Sekrup :
Paku Beton 1" - 2" Bh
Paku Beton 2,5" - 3,5" Bh
Paku Beton 4" - 6" Bh
Paku Tripleks Kg
Paku Biasa 1/2" - 1" Kg
Paku Biasa 2" - 5" Kg
Paku Biasa 2,5" - 3,5" Kg
Paku Biasa 4" - 10" Kg
Paku Payung Dos
Paku Gypsum Kg
Paku Seng Kepala Kecil Kg
Paku Seng Kepala Besar Kg
Paku Genteng Metal Kg
Paku Sekrup 3 - 5" Dos
Screw 12 - 14 x 20 Bh
Screw 10 - 16 x 16 Bh
Screw 1" Bh
Paku Sekrup Kg
Paku Sekrup Bh
Paku Tripleks Kg
Sekrup Genteng Metal Kg
Skrup Baja Ringan Bh
Harga Satuan Upah dan Bahan 49
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Skrup Fixer Bh
Skrup Fixer Kg
Baut Mur Bh
Besi Beugel/Baut, Kawat Jepit Bh
Dinabolt Bh
14. Bahan Listrik
Macam - macam Kabel :
NYM 2 x 1,5 mm (Eterna) M1 Roll
NYM 2 x 2,5 mm (Eterna) M1 Roll
NYM 2 x 4 mm (Eterna) M1 Roll
NYM 2 x 6 mm (Eterna) M1 Roll
NYM 2 x 10 mm (Eterna) M1 Roll
NYM 3 x 2,5 mm (Eterna) M1 Roll
NYM 4 x 2,5 mm (Eterna) M1 Roll
NYY 2 x 1,5 mm M1 Roll
NYY 2 x 2,5 mm M1 Roll
NYY 2 x 4 mm M1 Roll
NYY 2 x 6 mm M1 Roll
NYY 2 x 10 mm M1 Roll
NYA 2 x 1,5 mm M1 Roll
NYA 2 x 2,5 mm M1 Roll
NYA 3 x 2,5 mm M1 Roll
Pipa Listrik :
Pipa listrik 5/8" Btg
Saklar/ Sekring :
Saklar Double (Setara Broco) Bh
Saklar Tunggal (Setara Broco) Bh
Stop Kontak (Setara Broco) Bh
Saklar Double Bh
Saklar Tunggal Bh
Saklar + Stop Kontak Standart Bh
Saklar Engkel Standart Bh
Saklar Seri Standart Bh
Stop Kontak Standart Bh
Saklar Engkel Panasonic Bh
Saklar Seri Panasonic Bh
Saklar Triple Panasonic Bh
Stop Kontak Daya 200 Watt 2 Phase Bh
Stop Kontak Daya 200 Watt 1 Phase Bh
Stop Kontak AC Daya 200 Watt 1 Phase Bh
Box Sekring 1 Fase Bh
Box Sekring 2 Fase Bh
Sekring Kas Kosong DN 2 G Bh
Sekring Kas Kosong DN 3 G Bh
Mongkok/Inbow dus Bh
Fitting Plafond Bh
T Duss Bh
L Bow Bh
Las dop Bh
Klem Biasa Bh
Panel Box 25 x 30 cm Unit
Lampu Pijar :
Lampu Hemat Energi 15 Watt Bh
Lampu Pijar 10 - 40 Watt Bh
Lampu Pijar 60 - 100 Watt Bh
Harga Satuan Upah dan Bahan 50
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Lampu Philips SL 23 Watt Bh
Lampu Philips SL 15 Watt Bh
Lampu Philips SL 10 Watt Bh
Lampu Philips SL 8 Watt Bh
Lampu Philips SL 5 Watt Bh
Lampu 20 Watt Type Down Light + Box (Setara Phillip) Set
Lampu 18 Watt Type Down Light + Box (Setara Phillip) Set
Lampu 15 Watt Type Down Light + Box (Setara Phillip) Set
Lampu 11 Watt Type Down Light + Box (Setara Phillip) Set
Lampu 8 Watt Type Down Light + Box (Setara Phillip) Set
Armatur Down Light Bh
Lampu Mercury 400 Watt Bh
Down light 4,5" Bh
Down light 3,5" Bh
Fitting Lampu Bh
Balon Lampu TL :
TL Biasa 20 Watt Philips Bh
TL Biasa 40 Watt Philips Bh
TL Blok Bambu 20 Watt Set
RM 2 X 20 watt komplit Set
15. Bahan Kaca
Kaca Bening 3 mm M2
Kaca Bening 5 mm M2
Kaca Bening 8 mm M2
Kaca Rayben 3 mm M2
Kaca Rayben 5 mm M2
Kaca Rayben 8 mm M2
Sealent (lem Kaca) Tube
Sealent (lem Kaca) Kg
Karet Kaca Kg
Kaca Glass Block Bh
Kaca Tempered 12 mm m2
Cermin 5 mm m2
16. Bahan Sanitair
Closet :
Kloset Duduk Monoblock (Komplit) Buah
Kloset Duduk Standar Type INA Buah
Kloset Duduk Lengkap Buah
Kloset Jongkok Standar Ex. INA Buah
Kloset Jongkok Biasa Ex. INA Buah
Urinoir Dinding Standart Buah
Westafel standar Biasa Buah
Tangki Air 1000 Liter Buah
Tangki Air 2000 Liter Buah
Meja Dapur/ Pantri :
Wastafel Standar Ex KIA Set
Wastafel Biasa Ex KIA Set
Bak Cuci Stainless Steel 1 Lubang Set
Bak Cuci Stainless Steel 2 Lubang Set
Water Drain + Acessories Set
Floor Drain Bh
Pompa Air :
Sanyo 150 Watt Set
National 125 Watt Set
National 250 Watt Set
Harga Satuan Upah dan Bahan 51
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
18. Bahan Lain - Lain
Minyak Bekisting Ltr
Aspal Kg
Air Ltr
List Profil Beton Jadi M1
HPL (High Pressure Laminate) Uk. 1,22 x 2,44 cm Lbr
Wall Paper m²
Sticker Kaca Sanblast M1
Ventilasi Matahari Adat Banggai Bh
Water Proofing Aquaproof Kg
Kwas No. 1" Bh
Kwas No. 2" Bh
Kwas No. 3" Bh
Kwas No. 4" Bh
Kwas No. 5" Bh
Kwas Roll Bh
Kertas Pasir (Amplas) Lbr
MCB 10 A BH
Lem Kayu Kg
Lem HPL Kg
Lem Wallpaper Kg
Cornice Adhesive Kg
Perban Gypsum Roll
Pisau Dempul Set
Strorox - 100 Kg
Soda Api Kg
Sabun Rinso Kg
Sealant Tube
Batu Apung Kg
Ijuk Kg
Ijuk M3
Tali Ijuk Kg
Urinoir Keramik Bh
Kitchen Zink 1 Lubang Bh
Kitchen Zink 2 Lubang Bh
Wather Drain + Acessories Bh
Shower Basuh Bh
Railing Tangga Stainless M1 Btg
Reservoir Air Rangka Baja 1 M3 Bh
Septictank dan Rembesan 1 M3 Bh
Penangkal Petir Set
Acrylic Cm2
List aluminium U M1
Floor hinges bh
Alcupanel (ACP) M2
Top Patch Fitting bh
Bottom Patch bh
Bottom Patch + cylinder bh
Pull handle bh
Baja WF 200x100x5.5x8 mm Kg
Gording Besi Canal CNP 125x50x20x3,2 mm Kg
Plat Buhul 16 mm Kg
Plat Buhul 12 mm Kg
Bracing Dan Trekstang Besi Kg
Angker Tanam Baut Ø 19 mm - 40 cm Kg
Moorbaut Kuda-Kuda Ø 16 mm - 30 cm Kg
Moorbaut Gording Ø 10 mm - 5 cm Kg
Besi Hollow 40x40 mm plafon Btg
Harga Satuan Upah dan Bahan 52
HARGA
NO. UPAH KERJA / BAHAN SATUAN KETERANGAN
(Rp)
1 2 3 4 5
Besi Hollow 20x40 mm plafon Btg
Paku peluru ramset bh
Paku beton kg
Skrup bh
Textile tape rol
Compound zak
Semen Sika kg
Profil Aluminium Jepitan Kaca (setara YKK) m
Aluminium Strip Lebar 8 cm m
Aluminium Composite Panel (ACP) tebal 4 mm m2
Banner m2
Jack Hammer Hari
Pompa Lumpur Diesel 7,5 KW; 4 " Hari
Pompa Sedot Pasir Diesel 7,5 KW; 5 " Hari
Mesin Stamper Hari
Sewa alat crane Jam
Panel Beton Pracetak Lebar
Kolom Beton Pracetak 160x200 tinggi 2,25 m K.300 Btg
Floordeck 0,75 mm m2
Rolling Door Alluminium m2
Karpet m2
Lem Karpet Kg
Underlayer Karpet m2
Parquet Kayu m2
Parquet Kayu Gymfloor m2
Aluminium foil m2
Kuas Bh
Huruf Stainless Tinggi 32 cm Bh
Huruf Stainless Tinggi 25 cm Bh
Huruf Stainless Tinggi 10-15 cm Bh
Kotak P3K (11 Item) Set
Meja+kursi Siswa SD/SMP (Rangka kayu daerah KLS. II) Set
Kursi Siswa tunggal (Rangka kayu daerah KLS. II) Bh
Meja Guru (Rangka kayu daerah KLS. II) Bh
Kursi Guru (Rangka kayu daerah KLS. II) Bh
Lemari arsip 2 pintu pakai kaca (Bahan Kayu Bh
Daerah KLS. II) Uk. 90x50x185
Meja 1/2 Biro (Rangka kayu daerah KLS. II) Bh
Meja 1 Biro (Rangka kayu daerah KLS. II) Bh
Lemari Pakaian (Bahan Kayu Daerah KLS. II) Uk. 90x50x185 Bh
Papan Tulis Bh
Tong Sampah Bh
Meja makan/ kursi makan (Type 4 Kursi) Set Btg
Kursi tamu/sofa set
Kursi tamu/ kayu set
Divan tidur uk. 200 x 100 m Bh
Ember uk. 25 liter Bh
Gayung besar Bh
Harga Satuan Upah dan Bahan 53| Authority | |||
|---|---|---|---|
| 28 March 2023 | Pembangunan Normalisasi Sungai Desa Mominit Kec. Banggai Tengah | Kab. Banggai Laut | Rp 1,013,985,000 |
| 24 May 2022 | Pembangunan Ruang Laboratorium Komputer Smpn 2 Liang | Kab. Banggai Kepulauan | Rp 501,451,134 |
| 5 August 2025 | Pembangunan Kantor Smpn Satap Kawalu | Kab. Banggai Laut | Rp 300,000,000 |
| 9 May 2024 | Pembangunan Bak Penampungan Air Bersih Desa Potilpololoba | Kab. Banggai Laut | Rp 200,000,000 |
| 21 November 2023 | Pembangunan Kantor Mts Darul Istiqomah Bontosi | Kab. Banggai Laut | Rp 200,000,000 |
| 17 August 2023 | Pembangunan Pagar Sdn Inpres Bolitan | Kab. Banggai Laut | Rp 200,000,000 |
| 31 October 2022 | Penambahan Sekat Dinding Selasar/Ruangan Bonua Pososungan | Kab. Banggai Laut | Rp 200,000,000 |
| 6 August 2025 | Pemasangan Tehel Dan Plafond Ruang Kelas (3 Ruang) Satap Minanga | Kab. Banggai Laut | Rp 200,000,000 |
| 9 August 2025 | Pembangunan Pagar Tk Bone-Bone | Kab. Banggai Laut | Rp 180,000,000 |
| 7 July 2024 | Pembangunan Ruang Uks Smpn 1 Bokan Kepulauan | Kab. Banggai Laut | Rp 175,402,000 |