| 0012426078407000 | Rp 5,185,500,529 | |
| 0916336340117000 | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - |
CV Nur Abadi Perkasa | 09*2**6****32**0 | - |
| 0818495210432000 | - | |
CV Nirwana Rahma Makmur | 09*9**6****01**0 | - |
| 0028354363001000 | - | |
| 0959301458321000 | - | |
CV Torgabe Artha Nugraha | 0818185761432000 | - |
PT Ginza Sukses Mandiri | 04*4**4****14**0 | - |
| 0023334485008000 | - | |
| 0210512778451000 | - | |
PT Erista Jaya | 03*3**8****07**0 | - |
CV Bintang Multimedia Indonesia | 02*0**3****07**0 | - |
| 0317821882451000 | - | |
PT Napauli Dionma Sukses | 09*1**0****01**0 | - |
| 0818654386412000 | - | |
CV Sihar Putra | 00*3**8****08**0 | - |
| 0033509183404000 | - | |
| 0013218458008000 | - | |
PT Daniel Sumber Rezeki | 09*9**3****32**0 | - |
| 0030219976811000 | - | |
| 0818064461432000 | - | |
| 0717753313008000 | - | |
| 0024483620002000 | - | |
Mutiara Syifa | 00*6**3****08**0 | - |
Berkah Sejahtera Mandiri | 0029711330101000 | - |
| 0016286619008000 | - | |
| 0418580395023000 | - | |
| 0013205190009000 | - |
BILL OF QUANTITY (BOQ)
Pekerjaan : Belanja Modal Pembangunan Puskesmas Kelurahan Sepanjang Jaya
Lokasi : KOTA BEKASI
Tahun Anggaran : 2022
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
I PEKERJAAN PERSIAPAN
1 Papan nama proyek A.17. 1,00 bh -
2 Mobilisasi/Demobilisasi tenaga kerja dan bahan terhitung 1,00 ls -
3 Listrik Kerja terhitung 4,00 bln -
4 Pembersihan lokasi dan perataan sebelum dan sesudah proyek A.9. 251,25 m2 -
Sub Jumlah -
II SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3) KONSTRUKSI
1 Penyiapan RKK
a. Pembuatan Kartu Identitas Pekerja (KIP) terhitung 20,00 org -
2 Sosialisasi dan Promosi K3
a. Spanduk (banner) terhitung 2,00 lb -
b. Poster terhitung 2,00 lb -
c. Papan Informasi K3 terhitung 1,00 bh -
3 Alat Pelindung Diri (APD)
Alat Pelindung Diri, terdiri atas :
a. Topi Pelindung (Safety Helmet) terhitung 30,00 bh -
b. Pelindung Mata (Goggles, Spectacles) terhitung 3,00 psg -
c. Tameng Muka (Face Shield) terhitung 2,00 bh -
d. Pelindung Pernapasan dan Mulut (Masker) terhitung 30,00 bh -
e. Sarung Tangan (Safety Gloves) terhitung 30,00 psg -
f. Sepatu Keselamatan (Safety Shoes); untuk Staf terhitung 2,00 psg -
g Sepatu Keselamatan (Rubber Safety Shoes and Toe Cap) terhitung 5,00 psg -
h Penunjang Seluruh Tubuh (Full Body Harness) terhitung 2,00 bh -
i Rompi Keselamatan ( Safety vest) terhitung 30,00 bh -
j Pelindung jatuh (Fall Arrester) terhitung 2,00 bh -
4 Asuransi dan Perijinan
a. BPJS Ketenagakerjaan dan Kesehatan Kerja ; (BERDASARKAN KEPMENAKER terhitung 1,00 ls -
NOMOR : KEP-196/MEN/1999, untuk Tenaga Harian Proyek)
5 Fasilitas Sarana Kesehatan
a. Peralatan P3K (Kotak P3K, Tandu, Tabung Oksigen, Obat Luka, Perban, terhitung 1,00 ls -
Sarana Cuci Tangan, Thermometer Infrared, dll)
6 Rambu-rambu
a. Rambu Petunjuk terhitung 2,00 bh -
b. Rambu Larangan terhitung 2,00 bh -
c. Rambu Peringatan terhitung 2,00 bh -
d. Rambu Kewajiban terhitung 2,00 bh -
e. Rambu Informasi terhitung 1,00 bh -
7 Lain-lain Terkait Pengendalian Resiko K3
a. Alat Pemadam Api Ringan (APAR) ; 10 kg terhitung 2,00 bh -
b. Bendera K3 terhitung 1,00 bh -
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi:
a Ahli K3 Konstruksi terhitung 8,00 OJ -
b. Petugas K.3 terhitung 4,00 bln -
Sub Jumlah -
III PEKERJAAN TANAH DAN PONDASI
1. Pekerjaan Bouwplank A.4. 90,40 m1 -
2 Pondasi Tapak Type P.1 140 x 100 x 30 cm
a. Galian Tanah Tapak (P 1 ) B.1. 75,37 m3 -
b. Pasir Urug Tapak (P 1 ) tbl = 10 cm B.11. 5,52 m3 -
c. Lantai Kerja Ad. 1 : 3 : 5, Tapak (P 1 ) tbl = 5 cm D.1. 5,52 m3 -
d. Tapak (P 1 )
Membuat Beton Struktur Pond.Tapak P1 100x140 cm K 250 Pondasi Besi 221.5 kg (tb. 30 cDm.)31.b 7,06 m3 -
e. Tapak (P 2 )
Membuat Beton Struktur Pond.Tapak P1 80x80 cm K 250 Pondasi Besi 183.4 kg (tb. 30 cm)D.31.c 2,30 m3 -
f. Urugan Tanah Kembali Tapak (P 1 ) B.9. 50,99 m3 -
3 Beton kolom bawah 0.00 K. 250
a. Kolom (K1) Uk. 35 x 35 cm
Membuat Beton Struktur K1 35/35 K 250 Besi 299.8 kg D.33.c1 2,66 m3 -
b. Kolom (K2) Uk. 15 x 30 cm
Membuat Beton Struktur K2 15/30 Uk. Besi Dia. D13 K 250 Besi 197.2 kg D.33.c2 0,56 m3 -
c. Kolom (K3) Uk. 35 x 35 cm
Membuat Beton Struktur K3 35/35 LT.1 Uk. Besi Dia. D16 K 250 Besi 189 kg D.33.c3 0,76 m3 -
4 Pondasi Pasangan Batu Kali
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
a. Galian Tanah B.1. 24,57 m3 -
b. Pasangan Batu Kali, 1 pc : 5 ps C.3. 7,09 m3 -
c. Urugan Tanah Kembali Pondasi batu kali B.9. 17,48 m3 -
5 Tiebeam
a. Tiebeam(SL 1)
Membuat Beton Struktur SL1 K 250 Besi 192.7 kg D.32.g 6,00 m3 -
b. Tiebeam(SL 2)
Membuat Beton Struktur SL2 K250 Sloof 15/20 Besi 127.9 kg D.32.h 2,34 1 m3 -
c. Tiebeam(SL 3)
Membuat Beton Struktur SL3 K200 Sloof 15/20 Besi 97.3 kg D.32.i 3,04 1 m3 -
6 Pekerjaan Pondasi Tangga
a. Pondasi Tangga D.36.b 0,15 m3 -
7 Urugan tanah peninggian pile lantai setinggi 40 cm B.14.a 27,50 m3 -
8 Pemadatan tanah peninggian peil lantai B.10. 27,50 m3 -
9 Pekerjaan Plat Lantai 1 tbl = 8 cm ( Waremash M-8 ) (Vol BANGUNAN + RAMP ) D.8. 11,00 m3 -
Sub Jumlah -
IV PEKERJAAN STRUKTUR
A. PEKERJAAN STRUKTUR ELEVASI - 0,00 m s/d + 4,00 m LT. 1
1 Pekerjaan Kolom
a. Kolom (K1) Uk. 35 x 35 cm
Membuat Beton Struktur K1 35/35 K 250 Besi 299.8 kg D.33.c1 6,65 m3 -
b. Kolom (K2) Uk. 15 x 30 cm
Membuat Beton Struktur K2 15/30 Uk. Besi Dia. D13 K 250 Besi 197.2 kg D.33.c2 1,44 m3 -
c. Kolom (K3) Uk. 35 x 35 cm
Membuat Beton Struktur K3 35/35 LT.1 Uk. Besi Dia. D16 K 250 Besi 189 kg D.33.d1 1,90 m3 -
d. Kolom (Kp) Uk. 15 x 15 cm D.29. 164,50 m' -
2 Pekerjaan Balok Elevasi + 4,00 m
a. Balok (B1) Uk. 25 x 40 cm
Membuat Beton Struktur B1 Balok 25/40 K 250 Besi 249.9 kg D.34.c1 6,48 m3 -
b. Balok (B2) Uk. 20 x 30 cm
Membuat Beton Struktur B2 balok 20/30 K.250 K 225 Besi 227.7 kg D.34.e1 1,28 m3 -
c. Balok (B3) Uk. 15 x 30 cm
Membuat Beton Struktur B3 Balok 15/30 K 225 Besi 191.2 kg D.34.f1 0,55 m3 -
d. Balok (B4) Uk. 15 x 20 cm
Membuat Beton Struktur B4 Balok 15/20 K 225 Besi 139.5 kg D.34.fa 0,27 m3 -
d. Balok 15 x 20 cm Diatas Kusen D.30. 122,70 m' -
3 Pekerjaan Plat Lantai tbl = 12 cm
a. Plat Lantai tbl = 12 cm Elevasi + 4,0 m D.35.a 23,02 m3 -
b. Plat Lantai tbl = 10 cm ( Topi beton + meja wastafel ) D.35.c 6,54 m3 -
4 Pekerjaan Tangga lantai 1 ke lantai 2
a. Plat Tangga tbl = 12 cm D.36.b 1,45 m3 -
b. Balok Bordes Uk. 15 x 30 cm D.34.f1 0,09 m3 -
c. Plat bordes tbl = 12 cm D.36.a 0,54 m3 -
d. Anak Tangga D.36.b 1,51 m3 -
Sub Jumlah -
B. PEKERJAAN STRUKTUR ELEVASI +4,00 m s/d + 7,60 m LT. 2
1 Pekerjaan Kolom
a. Kolom (K1) Uk. 35 x 35 cm
Membuat Beton Struktur K1 35/35 K 250 Besi 299.8 kg D.33.c1 5,97 m3 -
b. Kolom (K3) Uk. 35 x 35 cm
Membuat Beton Struktur K3 35/35 LT.1 Uk. Besi Dia. D16 K 250 Besi 189 kg D.33.d1 1,71 m3 -
c. Kolom (Kp) Uk. 15 x 15 cm D.29. 154,00 m' -
2 Pekerjaan Balok Elevasi + 7,60 m
a. Balok (B1) Uk. 25 x 40 cm
Membuat Beton Struktur B1 Balok 25/40 K 250 Besi 249.9 kg D.34.c1 6,48 m3 -
b. Balok (B2) Uk. 20 x 30 cm
Membuat Beton Struktur B2 balok 20/30 K.250 K 225 Besi 227.7 kg D.34.e1 1,28 m3 -
c. Balok 15 x 20 cm Diatas Kusen D.30. 120,90 m' -
3 Pekerjaan Plat Lantai tbl = 12 cm
a. Plat Lantai tbl = 12 cm Elevasi + 7,6 m D.35.a 19,10 m3 -
b. Plat Lantai tbl = 10 cm ( Topi beton + meja wastafel ) D.35.c 6,54 m3 -
4 Pekerjaan Tangga lantai 2 ke lantai 3
a. Plat Tangga tbl = 12 cm D.36.b 1,45 m3 -
b. Balok Bordes Uk. 15 x 30 cm D.34.f1 0,09 m3 -
c. Plat bordes tbl = 12 cm D.36.a 0,54 m3 -
d. Anak Tangga D.36.b 1,51 m3 -
Sub Jumlah -
C. PEKERJAAN STRUKTUR ELEVASI + 7,6 m s/d + 11,00 m LT. 3
1 Pekerjaan Kolom
a. Kolom (K3) Uk. 35 x 35 cm
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
Membuat Beton Struktur K3 35/35 LT.1 Uk. Besi Dia. D16 K 250 Besi 189 kg D.33.d1 4,82 m3 -
b. Kolom (Kp) Uk. 15 x 15 cm D.29. 31,50 m' -
2 Pekerjaan Balok Elevasi + 11,00 m
a. Balok (B1) Uk. 25 x 40 cm
Membuat Beton Struktur B1 Balok 25/40 K 250 Besi 249.9 kg D.34.c1 6,48 m3 -
b. Balok (B2) Uk. 20 x 30 cm
Membuat Beton Struktur B2 balok 20/30 K.250 K 225 Besi 227.7 kg D.34.e1 1,28 m3 -
c. Balok 15 x 20 cm Diatas Kusen D.30. 109,10 m' -
3 Pekerjaan Plat Lantai tbl = 12 cm
a. Plat Lantai tbl = 12 cm Elevasi + 11,00 m D.35.a 15,86 m3 -
b. Plat Lantai tbl = 10 cm ( Topi beton + meja wastafel ) D.35.c 6,54 m3 -
Sub Jumlah -
V PEKERJAAN ARSITEKTUR
A PEKERJAAN ARSITEKTUR LANTAI I
1. PEKERJAAN PASANGAN
a. Pasangan Bata Ringan uk. 60x20x10 cm ( vol termasuk kolom kamuflase / cover pipa pGe.m25b.uang a 5n8 )3,35 m2 -
b. Plesteran Dinding Hebel dengan Mortar Instan t = 15 mm H.28. 892,02 m2 -
c. Acian Dinding Hebel dengan Mortar Instan H.29. 892,02 m2 -
d. Plesteran Openingan Kusen Jendela H.31. 146,96 m1 -
e. Pasang Acian Beton Struktur + topian H.27. 196,96 m2 -
f Pekerjaan pasangan batu alam candi fin.coting I.58. 64,37 m 2 -
g Roster G.23. 9,23 m 2 -
Sub Jumlah -
2. PEKERJAAN LANTAI & DINDING HOMOGENIUS TILE
a. Pekerjaan Lantai Homogenius Tile 60 X 60 cm Polished ( termasuk beda warna ) I.9.a 317,80 m2 -
b. Pekerjaan Lantai Homogenius Tile 60 X 60 cm UNPolished ( Area Ramp,selasar dan trIa.p9. btangga t e 1r7a,s1 )2 m2 -
c. Pekerjaan Lantai Homogenius Tile 25 X 25 cm Un Polished I.36.b 28,09 m2 -
d. Pekerjaan Tangga Homogenius Tile 25 x 60 cm Polished I.9.b 33,90 m2 -
e. Pekerjaan dinding Homogenius Tile 25 x 40 cm Polished I.54.b 95,10 m2 -
g. Pekerjaan Plint Homogenius Tile 10x60 cm Polished I.24.a 206,57 m1 -
h. Pekerjaan Step nosing Homogenius Tile 10x60 cm I.24.c 59,40 m1 -
i. Pekerjaan Railling Lantai I ke Lantai II
- Railling tangga stainless stell Sesuai Gambar F.24.a 29,44 m1 -
Sub Jumlah -
3. PEKERJAAN PLAFOND
a. Plafond Gypsum board 9 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.a 309,76 m2 -
b. Plafond GRC board 6 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.b 28,09 m2 -
c. Pasangan List Gypsum L = 10 cm J.10. 387,94 m1 -
d. Langit-langit PVC Board lb, 25 cm tb. 8 mm + rangka hollow 40/40 (60 x 120 cm) J.8.b 36,80 m2 -
Sub Jumlah -
4. PEKERJAAN KUSEN DAN JENDELA
1 P1 terhitung 1,00 bh -
2 P2 terhitung 1,00 bh -
3 P3 terhitung 2,00 bh -
4 P4 terhitung 5,00 bh -
5 P5 terhitung 2,00 bh -
6 P6 terhitung 13,00 bh -
7 P7 terhitung 10,00 bh -
8 J1 terhitung 2,00 bh -
9 J2 terhitung 8,00 bh -
1 0 J3 terhitung 2,00 bh -
1 1 BV1 terhitung 1,00 bh -
1 2 BV2 terhitung 6,00 bh -
Sub Jumlah -
5. PEKERJAAN PENGECATAN
a. Pengecatan Exterior Weathersield ICI / Propan N.10.a. 295,21 m2 -
b. Pengecatan Interior ICI / Propan N.10. 714,10 m2 -
c. Pengecatan Plafon / Propan N.10. 309,76 m2 -
Sub Jumlah -
6. PEKERJAAN SANITAIR
a. Kloset Duduk Toto Type CW660J O.1. 6,00 bh -
b. Jet washer THX20MCRB terhitung 6,00 bh -
c. Washtafel toto type LW533J O.5. 9,00 bh -
d. Kran dinding toto type T23B13 O.19. 7,00 bh -
e. Floordrain toto type TX1BN O.14. 10,00 bh -
f. Kran leher angsa O.19. 1,00 BH -
g. Pemasangan bak cuci piring stainless steel O.12. 1,00 bh -
h. Pek. Pasangan Kaca Cermin 5 mm, Backing Multiplek 9 mm Rangka Besi Hollow terhitung 9,00 bh -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
Sub Jumlah -
B PEKERJAAN ARSITEKTUR LANTAI II
1. PEKERJAAN DINDING
a. Pasangan Bata Ringan uk. 60x20x10 cm ( vol termasuk kolom kamuflase / cover pipa pGe.m25b.uang a 4n2 )5,58 m2 -
b. Plesteran Dinding Hebel dengan Mortar Instan t = 15 mm H.28. 663,33 m2 -
c. Acian Dinding Hebel dengan Mortar Instan H.29. 663,33 m2 -
d. Plesteran Openingan Kusen Jendela H.31. 103,47 m1 -
e. Pasang Acian Beton Struktur + topian H.27. 152,51 m2 -
f. Pasang Aluminium Composite Panel (ACP) 0,5 mm PVDF rangka besi hollow aluminiumF. 2450..c40 m m 2 9(690,6 x7 120 cmm )2 -
g. Pekerjaan pasangan Roster minimalis G.22. 7,36 m 2 -
Sub Jumlah -
2. PEKERJAAN LANTAI & DINDING HOMOGENIUS TILE
a Pekerjaan Lantai Homogenius Tile 60 X 60 cm Polished ( termasuk beda warna ) I.9.a 249,82 m2 -
b. Pekerjaan Lantai Homogenius Tile 25 X 25 cm Un Polished I.36.b 24,35 m2 -
c. Pekerjaan Tangga Homogenius Tile 25 x 60 cm Polished I.9.b 24,35 m2 -
d. Pekerjaan dinding Homogenius Tile 25 x 40 cm Polished I.54.b 46,11 m2 -
e. Pekerjaan Plint Homogenius Tile 10x60 cm Polished I.24.a 137,40 m ' -
f. Pekerjaan Step nosing Homogenius Tile 10x60 cm I.24.c 59,40 m1 -
g. Pekerjaan Railling Lantai II ke Lantai III
- Railling tangga stainless stell Sesuai Gambar F.24.a 29,44 m1 -
h. Pekerjaan Water proofing coating ( area toilet ) N.23 84,96 m2 -
Sub Jumlah -
3. PEKERJAAN PLAFOND
a. Plafond Gypsum board 9 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.a 266,57 m2 -
b. Plafond GRC board 6 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.b 24,35 m2 -
c. Plafond Droop ceiling + rangka besi hollow 4x4 dan 2x4 cm J.11.a 8,00 m2 -
d. Pasangan List Gypsum L = 10 cm J.10. 295,80 m1 -
e. Langit-langit PVC Board lb, 25 cm tb. 8 mm + rangka hollow 40/40 (60 x 120 cm) J.8.b 34,90 m2 -
Sub Jumlah -
4. PEKERJAAN KUSEN DAN JENDELA
1 P3 terhitung 1,00 bh -
2 P4 terhitung 2,00 bh -
3 P5 terhitung 1,00 bh -
4 P6 terhitung 12,00 bh -
5 P7 terhitung 7,00 bh -
6 J1 terhitung 2,00 bh -
7 J2 terhitung 10,00 bh -
8 J3 terhitung 1,00 bh -
9 BV2 terhitung 4,00 bh -
1 0 J4 terhitung 2,00 bh -
1 1 JK1 terhitung 2,00 bh -
Sub Jumlah -
5. PEKERJAAN PENGECATAN
a. Pengecatan Exterior Weathersield ICI / Propan N.10.a. 295,18 m2 -
b. Pengecatan Interior ICI / Propan N.10. 544,69 m2 -
c. Pengecatan Plafon / Propan N.10. 266,57 m2 -
Sub Jumlah -
6. PEKERJAAN SANITAIR
a. Kloset Duduk Toto Type CW660J O.1. 5,00 bh -
b. Jet washer THX20MCRB terhitung 5,00 bh -
c. Washtafel toto type LW533J O.5. 5,00 bh -
d. Kran dinding toto type T23B13 O.19. 7,00 bh -
e. Floordrain toto type TX1BN O.14. 8,00 bh -
f. Pek. Pasangan Kaca Cermin 5 mm, Backing Multiplek 9 mm Rangka Besi Hollow terhitung 5,00 bh -
Ukuran 100 x 200 cm + Coverlight Teakwood + Fluoroescent Lamp
g. Zink almunium terhitung 1,00 bh -
h. Kran leher angsa O.19. 1,00 bh -
Sub Jumlah -
C PEKERJAAN ARSITEKTUR LANTAI III
1 PEKERJAAN DINDING
a. Pasangan Bata Ringan uk. 60x20x10 cm ( vol termasuk kolom kamuflase / cover pipa pGem.2b5u.anga n 2 2)0,23 m2 -
b. Plesteran Dinding Hebel dengan Mortar Instan t = 15 mm H.28. 381,94 m2 -
c. Acian Dinding Hebel dengan Mortar Instan H.29. 381,94 m2 -
d. Plesteran ad 1 : 5 Opening Kusen Alumunium H.31. 45,75 m1 -
e. Pasang Acian Beton Struktur + topian H.27. 82,96 m2 -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
f. Pekerjaan pasangan Roster minimalis G.22. 7,36 m 2 -
Sub Jumlah -
2 PEKERJAAN LANTAI & DINDING HOMOGENIUS TILE
a Pekerjaan Lantai Homogenius Tile 60 X 60 cm Polished ( termasuk beda warna ) I.9.a 101,21 m2 -
b. Pekerjaan Lantai Homogenius Tile 25 X 25 cm Un Polished I.36.b 5,00 m2 -
c. Pekerjaan dinding Homogenius Tile 25 x 40 cm Polished I.9.b 21,27 m 2 -
d. Pekerjaan Plint Homogenius Tile 10x60 cm Polished I.24.a 55,67 m ' -
e. Pekerjaan Water proofing coating ( area toilet ) N.23 101,21 m2 -
f. Pekerjaan Teks Stainless Stell T. 0.4 mm Tinggi 42 Cm
Teks "PUSKESMAS KELURAHAN SEPANJANG JAYA " terhitung 31,00 bh -
Sub Jumlah -
3 PEKERJAAN PLAFOND
a. Plafond Gypsum board 9 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.a 101,21 m2 -
b. Plafond GRC board 6 mm + rangka besi hollow 4x4 dan 2x4 cm J.11.b 5,00 m2 -
c. Plafond Droop ceiling + rangka besi hollow 4x4 dan 2x4 cm J.11.a 7,28 m2 -
d. Pasangan List Gypsum L = 10 cm J.10. 89,00 m1 -
Sub Jumlah -
4 PEKERJAAN PASANGAN KUSEN PINTU DAN JENDELA
1 P3 terhitung 1,00 bh -
2 P6 terhitung 1,00 bh -
3 P7 terhitung 2,00 bh -
4 J2 terhitung 7,00 bh -
5 BV2 terhitung 1,00 bh -
6 J4 terhitung 2,00 bh -
Sub Jumlah -
5 PEKERJAAN PENGECATAN
a. Pengecatan Exterior Weathersield ICI / Propan N.10.a. 229,94 m2 -
b. Pengecatan Interior ICI / Propan N.10. 209,65 m2 -
c. Pengecatan Plafon / Propan N.10. 101,21 m2 -
Sub Jumlah -
6 PEKERJAAN SANITAIR
a. Kloset Duduk Toto Type CW660J O.1. 2,00 bh -
b. Jet washer THX20MCRB terhitung 2,00 bh -
c. Washtafel toto type LW533J O.5. 2,00 bh -
d. Kran dinding toto type T23B13 O.19. 2,00 bh -
e. Floordrain toto type TX1BN O.14. 2,00 bh -
f. Roof drain terhitung 8,00 bh -
g. Pek. Pasangan Kaca Cermin 5 mm, Backing Multiplek 9 mm Rangka Besi Hollow terhitung 2,00 bh -
Ukuran 100 x 200 cm + Coverlight Teakwood + Fluoroescent Lamp
Sub Jumlah -
V PEKERJAAN ELEKTRIKAL
A PEKERJAAN ELEKTRIKAL LT.1
1 Panel Listrik lantai 1 terhitung 1,00 unit -
2 Pasang MCB 6 Ampere / 220 V Q.16. 6,00 bh -
3 Kabel distribusi Dari meter listrik PLN ke Panel Listrik (NYY 4x25 mm) Q.18. 70,00 m' -
4 Pasang titik lampu, RM 2 x 36 watt komplit Q.11. 31,00 bh -
5 Pasang titik lampu, RM 1 x 36 watt komplit Q.10. 3,00 bh -
6 Pasang titik lampu, PL 18 watt (downlight dia. 4") Q.4. 26,00 bh -
7 Lampu Baret Kotak persegi 18 watt terhitung 11,00 bh -
8 Exhausfan 12" terhitung 7,00 bh -
9 Sakelar Tunggal Q.14. 23,00 bh -
# Sakelar Seri Q.15. 12,00 bh -
# Stop Kontak Q.12. 45,00 bh -
# Stop Kontak AC Q.13. 17,00 bh -
-
B PEKERJAAN ELEKTRIKAL LT.2
1 Panel Listrik lantai 2 terhitung 1,00 unit -
2 Pasang MCB 6 Ampere / 220 V Q.16. 6,00 bh -
3 Pasang titik lampu, RM 2 x 36 watt komplit Q.11. 28,00 bh -
4 Pasang titik lampu, PL 18 watt (downlight dia. 4") Q.10. 11,00 bh -
5 Lampu Baret Kotak persegi 18 watt Q.4. 10,00 bh -
6 Exhausfan 12" terhitung 5,00 bh -
7 Sakelar Tunggal Q.14. 14,00 bh -
8 Sakelar Seri Q.15. 16,00 bh -
9 Stop Kontak Q.12. 39,00 bh -
# Stop Kontak AC Q.13. 11,00 bh -
-
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
C PEKERJAAN ELEKTRIKAL LT.3
1 Panel Listrik lantai 3 terhitung 1,00 unit -
2 Pasang MCB 6 Ampere / 220 V Q.16. 4,00 bh -
3 Pasang titik lampu, RM 2 x 36 watt komplit Q.11. 7,00 bh -
4 Pasang titik lampu, PL 18 watt (downlight dia. 4") Q.10. 4,00 bh -
5 Lampu Baret Kotak persegi 18 watt Q.4. 2,00 bh -
6 Exhausfan 12" terhitung 2,00 bh -
7 Sakelar Tunggal Q.14. 2,00 bh -
8 Sakelar Seri Q.15. 2,00 bh -
9 Stop Kontak Q.12. 8,00 bh -
# Stop Kontak AC Q.13. 2,00 bh -
-
VI PEKERJAAN NON STANDAR
VI.1 PEKERJAAN MEKANIKAL
A PEKERJAAN MEKANIKAL LT.1
1 Plumbing
Instalasi air bersih menggunakan pipa PVC AW
Pipa distribusi dari roof tank :
- dia. 1 1/4" O.28. 27,70 m1 -
Pemipaan dalam gedung :
- dia. 1 " O.27. 15,30 m1 -
- dia. 3/4 " O.26. 32,00 m1 -
- dia. 1/2 " O.25. 30,60 m1 -
2 Fitting & material bantu terhitung 1,00 ls -
3 stop kran 1 " terhitung 3,00 m1 -
4 Peneboran sumur dangkal (lengkap jet pump & instalasi) terhitung 1,00 ls -
5 Pompa Booster (Lengkap Panel Kontrol dan Instalasi) terhitung 1,00 bh -
6 Torn air kap.2 M3 lengkap wlc terhitung 2,00 bh -
7 Instalasi Air bekas & air kotor menggunakan pipa PVC AW
Pipa air bekas dan ipal:
- dia. 2 " P.1. 43,21 m1 -
- dia. 3 " P.2. 33,75 m1 -
- dia. 4 " P.3. 24,19 m1 -
Pipa air kotor :
- dia. 2 " P.1. 28,73 m1 -
- dia. 4 " P.3. 9,45 m1 -
- dia. 6 " P.4. 21,64 m1 -
8 Fitting & material bantu terhitung 1,00 ls -
9 Ventilation & Air Conditioning (VAC)
- Pengadaan dan pemasangan unit AC kap. 4.500 BTU/h (1/2 PK) lengkap dengan terhitung 1,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
- Pengadaan dan pemasangan unit AC kap. 7.500 BTU/h (3/4 PK) lengkap dengan terhitung 11,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
- Pengadaan dan pemasangan unit AC kap. 9.000 BTU/h (1 PK) lengkap dengan terhitung 3,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
- Pengadaan dan pemasangan unit AC kap. 12.000 BTU/h (1 1/2 PK) lengkap dengan terhitung 1,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
10 Pek. Septic Tank Biotek (galian, instalasi, perapihan area atas) Kap. 3.2 M³ O.37. 1,00 unit -
11 IPAL Kapasitas 5 M3/Hari (lengkap panel, blower, pompa, dan Rumah IPAL) terhitung 1,00 unit -
-
B PEKERJAAN MEKANIKAL LT.2
1 Plumbing
Instalasi air bersih menggunakan pipa PVC AW
Pemipaan dalam gedung :
- dia. 1 " O.27. 18,90 m1 -
- dia. 3/4 " O.26. 24,60 m1 -
- dia. 1/2 " O.25. 46,20 m1 -
2 Fitting & material bantu terhitung 1,00 ls -
3 Instalasi Air bekas & air kotor menggunakan pipa PVC AW
Pipa air bekas dan ipal:
- dia. 2 " P.1. 34,03 m1 -
- dia. 3 " P.2. 68,03 m1 -
- dia. 4 " P.3. 48,00 m1 -
Pipa air kotor :
- dia. 2 " P.1. 26,04 m1 -
- dia. 4 " P.2. 22,97 m1 -
4 Fitting & material bantu terhitung 1,00 ls -
5 Ventilation & Air Conditioning (VAC)
- Pengadaan dan pemasangan unit AC kap. 4.500 BTU/h (1/2 PK) lengkap dengan terhitung 1,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
- Pengadaan dan pemasangan unit AC kap. 7.500 BTU/h (3/4 PK) lengkap dengan terhitung 7,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
- Pengadaan dan pemasangan unit AC kap. 9.000 BTU/h (1 PK) lengkap dengan terhitung 2,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
- Pengadaan dan pemasangan unit AC kap. 12.000 BTU/h (1 1/2 PK) lengkap dengan O.37. 1,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
-
C PEKERJAAN MEKANIKAL LT.3
1 Plumbing
Instalasi air bersih menggunakan pipa PVC AW
Pemipaan dalam gedung :
- dia. 1 " O.27. 13,30 m1 -
- dia. 3/4 " O.26. 12,40 m1 -
- dia. 1/2 " O.25. 20,10 m1 -
2 Fitting & material bantu terhitung 1,00 ls -
3 Instalasi Air bekas & air kotor menggunakan pipa PVC AW
Pipa air bekas dan ipal:
- dia. 2 " P.1. 20,30 m1 -
- dia. 3 " P.2. 27,20 m1 -
- dia. 4 " P.3. 12,10 m1 -
Pipa air kotor :
- dia. 2 " P.1. 12,40 m1 -
- dia. 4 " P.2. 6,30 m1 -
4 Fitting & material bantu terhitung 1,00 ls -
5 Ventilation & Air Conditioning (VAC)
- Pengadaan dan pemasangan unit AC kap. 12.000 BTU/h (1 1/2 PK) lengkap dengan terhitung 2,00 unit -
pipa refrigerant, pipa drain, kabel power dan Stop Kontak AC.
-
D Penangkal petir type konvensional dengan pertanahan maks. 5 Ohm terhitung 1,00 ls -
- Splitzer dia. 1 " ( 3 batang)
- klem copper tape
- bak kontrol
- pertanahan/pantekan
- kabel BC 50 mm dalam conduit
- peralatan bantu
- perijian
- test & commisioning
-
VII PEKERJAAN HALAMAN DAN LAIN-LAIN
A Pekerjaan saluran keliling bangunan
a. Memasang U-Ditch beton, 30 x 40 cm - 100 cm I.72. 104,60 m ' -
B Pekerjaan pasangan Paving Block, Lokal, Tinggi 8 cm, K-350, Warna Abu-Abu + Abu Batu t = 5 cmI.65. 225,20 m 2 -
C Pekerjaan pasangan Paving Block ( TILE BLIND ), Tinggi 8 cm, K-350, Warna Kuning + Abu Batu t =I. 657 c.m 36,30 m 2 -
D Pekerjaan pasangan Kanstin, model Kst. DKI, 15.30.40, K-300, warna Abu-Abu I.70. 67,56 m ' -
E Pekerjaan bak sampah terhitung 1,00 Unit -
F Pekerjaan Tiang Bendera
1 Galian tanah pondasi B.1. 1,44 m3 -
2 Urugan pasir t=15 cm B.11. 0,24 m3 -
3 Beton ad. K.225 besi 140 kg/m3 D.7. 0,64 m3 -
4 Besi angkur terhitung 3,00 m' -
5 Pipa besi stainless stell Ø 3"masuk dalam coran terhitung 4,00 m' -
6 Pipa besi stainless stell Ø 3" tiang bendera terhitung 3,00 m' -
7 Pipa besi stainless stell Ø 2.5" tiang bendera terhitung 2,00 m' -
8 Pipa besi stainless stell Ø 2" tiang bendera terhitung 2,00 m' -
9 Baut Ø 10 + cesing stainless stell terhitung 2,00 bh -
# Roda terhitung 1,00 bh -
# Tali tiang bendera terhitung 20,00 m' -
# Besi diatas tiang bendera terhitung 1,00 bh -
# Reducer terhitung 2,00 bh -
# Dop penutup atas Ø 2" stainless stell terhitung 1,00 bh -
# Dop penutup stoper Ø 3" stainless stell terhitung 2,00 bh -
I PEKERJAAN PAGAR TYPE B
1 Pondasi Plate Setempat Type PS. 60 x 60 x 15 cm
a. Galian Tanah Plate Setempat (PS) B.1. 3,53 m3 -
b. Pasir Urug Plate Setempat (PS) tbl = 5 cm B.11. 0,20 m3 -
c. Lantai Kerja Ad. 1 : 3 : 5, Plate Setempat (PS) tbl = 5 cm D.1. 0,20 m3 -
d. Plate Setempat (PS)
- Bekisting Untuk Pondasi 2x pakai D.21.a 1,44 m2 -
- Pembesian D.18.a 116,48 kg -
- Beton mutu K225 D.7.a. 0,43 m3 -
e. Urugan Tanah Kembali Plate Setempat (PS) B.9. 2,70 m3 -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
2 Sloof Type (SL 1) Uk. 15 x 20 cm
- Bekisting untuk Sloof 2x pakai D.21.a 5,20 m2 -
- Pembesian D.18.a 113,34 kg -
- Beton mutu K225 D.7.a. 0,78 m3 -
3 Pek. Kolom K1 25 x 25 cm
- Bekisting kolom D.23.a 9,80 m2 -
- Pembesian D.18. 133,21 kg -
- Beton mutu K225 D.7.a. 1,23 m3 -
4 Pek. Kolom Praktis 15 x 15 cm
- Bekisting kolom D.23.a 2,31 m2 -
- Pembesian D.18. 60,09 kg -
- Beton mutu K225 D.7.a. 0,52 m3 -
5 Ring balok (RB.1) Uk. 15 x 15 cm
- Bekisting untuk Balok 2x pakai D.23.a 2,60 m2 -
- Pembesian D.18. 53,78 kg -
- Beton mutu K225 D.7.a. 0,59 m3 -
6 Pek.pondasi batu kali
Pek.galian pondasi B.1. 9,36 m3 -
Pek.pasir urug bawah pondasi t=5 cm B.11. 0,78 m3 -
Pek.lantai kerja t=5 cm D.1. 0,78 m3 -
Pek.pondasi batu kali 1 : 5 C.3. 7,02 m3 -
Pek.urugan kembali bekas galian B.9. 0,78 m3 -
7 Pek.Pasangan bata ringan tb. 8 cm (20 x 60 cm) dinding pagar G.25.a 48,07 m2 -
8 Pek.plesteran H.3. 96,14 m2 -
9 Pek.acian H.27. 96,14 m2 -
1 0 Pek.list profil semen fin.cat H.20. 7,80 m2 -
1 1 Pek.pengecatan kolom dan dinding pagar N.10.a. 92,24 m2 -
1 2 Pek.batu alam ornamen pagar I.58. 3,36 m2 -
1 3 Pek.roster minimalis uk.20x20 G.22. 9,18 m2 -
1 4 Pek.Pasang railling/pagar besi hollow galvanis 4x4 cm & 4x2 cm + pengecatan t=1,00 Fm.23.c 10,20 m2 -
J PEKERJAAN PAGAR TYPE C
1 Pondasi Plate Setempat Type PS. 60 x 60 x 15 cm
a. Galian Tanah Plate Setempat (PS) B.1. 4,41 m3 -
b. Pasir Urug Plate Setempat (PS) tbl = 5 cm B.11. 0,25 m3 -
c. Lantai Kerja Ad. 1 : 3 : 5, Plate Setempat (PS) tbl = 5 cm D.1. 0,25 m3 -
d. Plate Setempat (PS)
- Bekisting Untuk Pondasi 2x pakai D.21.a 1,80 m2 -
- Pembesian D.18.a 145,60 kg -
- Beton mutu K225 D.7.a. 0,54 m3 -
e. Urugan Tanah Kembali Plate Setempat (PS) B.9. 3,38 m3 -
2 Sloof Type (SL 1) Uk. 20 x 30 cm
- Bekisting untuk Sloof 2x pakai D.21.a 8,48 m2 -
- Pembesian D.18.a 330,90 kg -
- Beton mutu K225 D.7.a. 1,70 m3 -
3 Pek. Kolom K1 25 x 25 cm
- Bekisting kolom D.23.a 18,00 m2 -
- Pembesian D.18. 367,85 kg -
- Beton mutu K225 D.7.a. 2,25 m3 -
4 Pek. Kolom Praktis 15 x 15 cm
- Bekisting kolom D.23.a 2,70 m2 -
- Pembesian D.18. 66,82 kg -
- Beton mutu K225 D.7.a. 0,61 m3 -
5 Ring balok (RB.1) Uk. 15 x 20 cm
- Bekisting untuk Balok 2x pakai D.23.a 2,83 m2 -
- Pembesian D.18. 103,20 kg -
- Beton mutu K225 D.7.a. 0,85 m3 -
6 Pek.Pasangan bata ringan tb. 8 cm (20 x 60 cm) dinding pagar G.25.a 108,38 m2 -
7 Pek.plesteran dinding dan kolom H.3. 118,88 m2 -
8 Pek.acian H.27. 118,88 m2 -
9 Pek.pengecatan kolom dan dinding pagar N.10.a. 126,25 m2 -
K PEKERJAAN AKHIR
1 Pek. Pembersihan akhir pekerjaan terhitung 1,00 ls -
Sub Jumlah -
Harga Satuan Jumlah Harga
No Uraian Pekerjaan Kode Volume Satuan
Rp Rp
Jumlah -
PPn 11% -
Jumlah Total -
Dibulatkan -
Terbilang :
Bekasi, 2023
PENAWAR
PT/CV.............................
................................
DIREKTUR