| 0028354363001000 | Rp 897,854,189 | |
| 0916336340117000 | - | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - |
| 0018171546001000 | - | |
| 0707539219015000 | - | |
| 0862725025403000 | - | |
| 0754018174006000 | - | |
| 0438812356451000 | - | |
PT Erista Jaya | 03*3**8****07**0 | - |
CV Bintang Multimedia Indonesia | 02*0**3****07**0 | - |
PT Napauli Dionma Sukses | 09*1**0****01**0 | - |
CV Sihar Putra | 00*3**8****08**0 | - |
PT Daniel Sumber Rezeki | 09*9**3****32**0 | - |
CV Torgabe Artha Nugraha | 0818185761432000 | - |
| 0818064461432000 | - | |
| 0030219976811000 | - | |
| 0024483620002000 | - | |
Berkah Sejahtera Mandiri | 0029711330101000 | - |
BILL OF QUANTITY (BOQ)
PROYEK : PEMBANGUNAN GEDUNG KANTOR PERSATUAN WREDATAMA INDONESIA (PWRI)
PEMBERI TUGAS : DINAS PERUMAHAN, KAWASAN PERMUKIMAN DAN PERTANAHAN
PEKERJAAN : GEDUNG KANTOR PWRI
LOKASI : KOTA BEKASI - JAWA BARAT
TAHUN ANGGARAN : 2023
Kode Harga Satuan Jumlah Harga
NO URAIAN PEKERJAAN Sat
Analisa (Rp.) (Rp.)
1 2 3 5 6 7
A PEKERJAAN PENDAHULUAN DAN PERSIAPAN
A.1 PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek digital printing A.17. 1 ,00 bh - -
2 Sistem Manajemen Dan Keselamatan Kerja - -
1 Penyiapan RK3K - -
- Pembuatan Manual, Prosedur, Instruksi Kerja, Ijin Kerja HIT 1 ,00 set -
- Pembuatan Kartu Identitas Pekerja (KIP) HIT 1 2,00 lb -
2 Sosialisasi dan Promosi K3 - -
- Spanduk (banner); HIT 1 ,00 lb -
- Poster; HIT 1 ,00 lb -
3 Alat Pelindung Diri - -
- Topi Pelindung (Safety Helmet); HIT 8 ,00 bh -
- Pelindung Mata (Goggles,Spectacles); HIT 5 ,00 psg -
- Pelindung Pernafasan dan Mulut (Masker) HIT 8 ,00 bh -
- Sarung Tangan (Safety Gloves); HIT 8 ,00 psg -
- Sepatu Keselamatan (Safety Shoes) ;untuk Staf HIT 8 ,00 psg -
- Rompi Keselamatan (SafetyVest); HIT 8 ,00 bh -
4 Asuransi Dan Perijinan - -
- BPJS Ketenagakerjaan Dan Kesehatan Kerja HIT 1 ,00 bh -
5 Fasilitas sarana kesehatan - -
- Peralatan P3K( Kotak P3K, Tandu, Tabung Oksigen,ObatH LIuTka, P e r b 1 a,0n0,dll) bh -
6 Rambu-Rambu - -
- Rambu Petunjuk; HIT 2 ,00 bh -
7 Lain- Lain Terkait Pengendalian Risiko K3 - -
- Alat Pemadam Api Ringan (APAR); HIT 1 ,00 bh -
Sub Total Pekerjaan Pendahuluan -
A.2 PEKERJAAN PERSIAPAN
1 Pek. Pengukuran dan Pemasangan Bouwplank A.4. 1 7,00 m' - -
Sub Total Pekerjaan Persiapan -
Total Pekerjaan Pendahuluan dan Persiapan -
B PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Pile Cap (P1) (100x100x150) B.2. 2 1,78 m3 - -
2 Pek. Galian Tanah Pondasi Pile Cap (P2) (70x70x120) B.2. 1 ,54 m3 - -
3 Pek. Pengurugan kembali Pondasi Pilecap (P1) B.9. 1 6,28 m3 - -
4 Pek. Pengurugan kembali Pondasi Pilecap (P2) B.9. 1 ,16 m3 - -
5 Pek. Peninggian Peil Lantai B.14.a 6 9,33 m3 - -
Sub Total Pekerjaan Tanah -
Total Pekerjaan Tanah -
C PEKERJAAN PONDASI
1 Pek. Lantai kerja pondasi Pilecap T:5 cm (P1) D.4. 0 ,60 m3 - -
2 Pek. Lantai kerja pondasi Pilecap T:5 cm (P2) D.4. 0 ,05 m3 - -
3 Pek. Lantai kerja Sloof T:5 cm (S1) D.4. 1 ,02 m3 - -
4 Pek. Lantai kerja Sloof T:5 cm (S2) D.4. 0 ,24 m3 - -
5 Pek. Pembetonan Pondasi Pilecap Dengan Kolom K1 (P1) (100XD10.301).a 4 ,20 m3 - -
6 Pek. Pedestal Pondasi Pilecap Dengan Kolom K1 (30X30X120) D.33.g 1 ,30 m3 - -
7 Pek. Pembetonan Pondasi Pilecap Dengan Kolom K2 (P2) (70-X7D0.3)1.a 0 ,29 m3 - -
8 Pek. Pedestal Pondasi Pilecap Dengan Kolom K2 (15X30X90) D.33.r 0 ,08 m3 - -
9 Pek. Pondasi Rolag G.5. 7 ,95 m2 - -
Sub Total Pekerjaan Pondasi -
Total Pekerjaan Pondasi -
D PEKERJAAN STRUKTUR
1 Pek. Sloof Beton uk. 20x40 cm (S1) D.32.a 7 ,75 m3 - -
2 Pek. Sloof Beton uk. 15x20 cm (S2) D.32.e 1 ,20 m3 - -
3 Pek. Kolom Betonan uk. 30x30 cm (K1) D.33.g 4 ,32 m3 - -
4 Pek. Kolom Betonan uk. 15x30 cm (K2) D.33.r 0 ,82 m3 - -
5 Pek. Kolom Betonan uk. 10x10 cm (KP) D.29. 5 6,00 m' - -
6 Pek. Balok Betonan uk. 25x50cm (B1) D.34.a 1 2,11 m3 - -
7 Pek. Balok Betonan uk. 20x40cm (B2) D.34.b 3 ,51 m3 - -
8 Pek. Balok Betonan uk. 15x20cm (B3) D.34.f 0 ,92 m3 - -
Kode Harga Satuan Jumlah Harga
NO URAIAN PEKERJAAN Sat
Analisa (Rp.) (Rp.)
1 2 3 5 6 7
9 Pek. ring balok beton bertulang (10 x 15) cm D.30. 3 5,12 1 m' - -
Sub Total Pekerjaan Struktur -
Total Pekerjaan Struktur -
E PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
1 Pasangan Bata Ringan tb. 10cm (20 x 60 cm) G.25. 2 09,77 m2 - -
Partisi gypsum board rangkap, uk. (120 x 240) tebal 9 mm +
2 G.26.b 1 16,79 m2 - -
rangka baja ringan C-75 (120x60)
3 Plesteran 1 pc : 5 ps, tebal 15 mm H.5. 4 21,49 m2 - -
4 Pekerjaan Acian H.27. 3 87,86 m2 - -
Sub Total Pekerjaan Dinding -
II PEKERJAAN KUSEN PINTU, JENDELA, DAN KACA
1 Pintu P1 HIT 1 ,00 bh -
2 Pintu P2 HIT 1 ,00 bh -
3 Pintu P3 HIT 2 ,00 bh -
4 Pintu P3A HIT 6 ,00 bh -
5 Pintu P4 HIT 1 ,00 bh -
6 Pintu P5 HIT 2 ,00 bh -
7 Jendela J1 HIT 4 ,00 bh -
8 Jendela J2 HIT 4 ,00 bh -
9 Bouven BV HIT 5 ,00 bh -
Sub Total Pekerjaan Kusen Pintu, Jendela, Dan Kaca -
III PEKERJAAN PLAFOND
Langit-langit gypsum board, uk. (120 x 240) tebal 9 mm +
1 J.11.a 2 08,17 m2 - -
rLaannggkita-l ahnoglloit wG gRCal vbaonaisrd 4,0 u.4k0. (&12 400 x.2 204 (01)2 t0exb60a)l 6 mm +
3 J.11.b 1 2,00 m2 - -
rangka hollow galvanis 40.40 & 40.20 (120x60)
4 Pas. List Plafond Gypsum J.10. 8 3,48 m' - -
Sub Total Pekerjaan Plafond -
IV PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pasang lantai ubin granit ukuran 60x60 cm (polished) I.9.a 2 01,33 m2 - -
2 Pasang lantai ubin granit ukuran 60x60 cm (unpolished) (Teras) I.9.b 2 4,12 m2 - -
3 Pasang lantai Keramik ukuran 30x30 cm (Toilet) I.8. 6 ,85 m2 - -
4 Pasang dinding keramik 30 x 60 cm (Toilet) I.54.b 3 1,68 m2 - -
Sub Total Pekerjaan Pelapis Lantai -
V PEKERJAAN PENGECATAN
1 Pengecatan tembok baru interior N.10. 1 78,09 m2 - -
2 Pengecatan tembok baru exterior N.10.a. 2 09,77 m2 - -
3 Pengecatan plafond/langit-langit dengan cat interior N.10. 2 20,17 m2 - -
Sub Total Pekerjaan Pengecatan -
Total Pekerjaan Arsitektur -
F PEKERJAAN ATAP PLAT BETON & TOPIAN BETON
1 Pek. Atap Plat Beton D.35.e 2 3,44 m3 - -
2 Pek. Topian Beton D.35.c 0 ,96 m3 - -
Sub Total Pekerjaan Atap Plat Beton & Topi Beton -
Total Pekerjaan Atap Plat Beton & Topi Beton -
G PEKERJAAN MEP
I PEKERJAAN SANITASI
1 Pemasangan kloset duduk/monoblok O.1. 2 ,00 bh - -
2 Memasang kran diameter 3/4" atau 1/2" O.19. 4 ,00 bh - -
3 Pemasangan Floor drain O.14. 3 ,00 bh - -
4 Pemasangan Roof drain HIT 3 ,00 bh -
5 Pemasangan bak cuci piring stainless steel O.12. 2 ,00 bh - -
Sub Total Pekerjaan Sanitasi -
II PEKERJAAN INSTALASI AIR
1 Pas. Saluran Air Bersih Pipa AW 1/2" O.25. 3 1,80 m' - -
2 Pas. Saluran Air Kotor Hujan & sabun pipa AW 3" O.31. 7 1,60 m' - -
3 Pas. Saluran Air Kotor Padat pipa AW 4" O.32. 2 0,80 m' - -
4 Pas. Bio Septictank 1500 L HIT 1 ,00 Unit -
5 Pas. Pompa Air HIT 2 ,00 Unit -
6 Toren Air 1000 L HIT 1 ,00 Unit -
Memasang 1 bak kontrol pas. Bata ukuran (45x45) cm tinggi
5 O.16. 2 ,00 Unit - -
50 cm dengan tutup beton
Sub Total Pekerjaan Instalasi Air -
III PEKERJAAN INSTALASI LISTRIK
1 Pasang titik lampu, TKI 1 x 36 watt komplit Q.8. 1 8,00 Titik - -
2 Pasang titik lampu, PL 8 watt (fitting standar) Q.2. 2 ,00 Titik - -
3 Pasang titik lampu PL kotak 18 watt HIT 6 ,00 Titik -
4 Pasang titik stop kontak Q.12. 2 0,00 Titik - -
5 Pasang titik stop kontak AC Q.13. 6 ,00 Titik - -
6 Pasang titik saklar tunggal Q.14. 1 0,00 Titik - -
7 Pasang titik saklar double Q.15. 5 ,00 Titik - -
Kode Harga Satuan Jumlah Harga
NO URAIAN PEKERJAAN Sat
Analisa (Rp.) (Rp.)
1 2 3 5 6 7
8 Pasang Exhaust Fan HIT 2 ,00 Titik -
Sub Total Pekerjaan Instalasi Listrik -
Total Pekerjaan MEP -
JUMLAH TOTAL -
PPn 11 % -
Jumlah Total + PPn 11% -
Dibulatkan -
Terbilang :
Bekasi, 2023
PENAWAR
PT/CV........................................
...................................
DIREKTUR| Authority | |||
|---|---|---|---|
| 14 August 2015 | Pengadaan Air Bersih Di Wilayah IV | Kementerian Desa Pembangunan Daerah Tertinggal dan Transmigrasi RI | Rp 20,000,000,000 |
| 24 January 2022 | Pengadaan Pekerjaan Renovasi Gedung Blk Mini Kios 3 In 1 (Tahap 1) Pada Balai Besar Pengembangan Latihan Kerja Bekasi | Kementerian Ketenagakerjaan | Rp 8,361,717,000 |
| 18 July 2019 | Pemeliharaan Sarana Dan Prasarana Rumah Susun Penggilingan | Pemerintah Daerah Provinsi DKI Jakarta | Rp 8,244,780,000 |
| 15 April 2019 | Pelaksanaan Penataan Turap Danau Rakit | Pemerintah Daerah Provinsi DKI Jakarta | Rp 7,400,170,000 |
| 9 May 2023 | Revitalisasi Pompa Di Rumah Pompa Kebon Raya | Provinsi DKI Jakarta | Rp 6,090,711,662 |
| 28 February 2024 | Belanja Modal Rehabilitasi Total Smpn 28 Kota Bekasi | Kota Bekasi | Rp 5,545,042,272 |
| 7 October 2022 | Paket Pekerjaan Landscape, Electrical, Ground Water Tank | Kementerian Pendidikan dan Kebudayaan | Rp 5,375,439,000 |
| 5 October 2022 | Belanja Modal Irigasi (Fertigation System) | Kementerian Pertanian | Rp 5,106,000,000 |
| 23 August 2023 | Pembuatan Sumur Resapan Se-Kota Bekasi | Kota Bekasi | Rp 4,540,000,000 |
| 26 November 2025 | Pemeliharaan Pagar Berupa Pengecatan | Kementerian Energi Dan Sumber Daya Mineral | Rp 3,805,998,000 |