| Reason | |||
|---|---|---|---|
| 0717753313008000 | Rp 5,652,386,513 | - | |
CV Shohibu Darojati Ropi'ah | 09*8**7****08**0 | - | - |
| 0211508270432000 | Rp 5,035,000,815 | 1. Tidak Menyampaikan KIR Concrete Pump yang masih berlaku. 2. Kapasitas bucket excavator melebihi kapasitas yang disyaratkan dalam Dokpil. | |
Roy Abadi Sejahtera | 05*8**1****25**0 | - | - |
| 0945967487518000 | - | - | |
CV Torgabe Artha Nugraha | 0818185761432000 | - | - |
| 0316797737008000 | - | - | |
CV Nirwana Rahma Makmur | 09*9**6****01**0 | - | - |
| 0013270327002000 | - | - | |
| 0808378756407000 | - | - | |
| 0722586500009000 | - | - | |
PT Ginza Sukses Mandiri | 04*4**4****14**0 | - | - |
CV Bintang Multimedia Indonesia | 02*0**3****07**0 | - | - |
| 0900830233455000 | - | - | |
PT Media Editor Publik | 09*9**7****07**0 | - | - |
| 0023334485008000 | - | - | |
| 0210512778451000 | - | - | |
PT Erista Jaya | 03*3**8****07**0 | - | - |
PT Rade Sumber Berkat | 06*5**2****08**0 | - | - |
| 0317821882451000 | - | - | |
PT Napauli Dionma Sukses | 09*1**0****01**0 | - | - |
CV Fajar Pratama | 00*9**4****32**0 | - | - |
CV Sihar Putra | 00*3**8****08**0 | - | - |
CV Basun Tosi Mandiri | 06*9**6****08**0 | - | - |
| 0903613222407000 | - | - | |
| 0013218458008000 | - | - | |
PT Daniel Sumber Rezeki | 09*9**3****32**0 | - | - |
| 0943020206432000 | - | - | |
| 0838307965412000 | - | - | |
| 0818064461432000 | - | - | |
| 0030219976811000 | - | - | |
| 0730403375027000 | - | - | |
| 0024483620002000 | - | - | |
Mutiara Syifa | 00*6**3****08**0 | - | - |
Berkah Sejahtera Mandiri | 0029711330101000 | - | - |
| 0312497571075000 | - | - | |
| 0530543263003000 | - | - | |
| 0016286619008000 | - | - | |
| 0418580395023000 | - | - | |
PT Moses Putra Perkasa | 04*6**5****32**0 | - | - |
| 0906808555003000 | - | - | |
| 0916336340117000 | - | - |
BOQ
KEGIATAN : PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH KABUPATEN/KOTA
PEKERJAAN : PEMBANGUNAN GEDUNG PUSKESMAS JATIRASA KOTA BEKASI
LOKASI : KECAMATAN JATIASIH - KOTA BEKASI
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
A PEKERJAAN PERSIAPAN DAN SMK3
A.1 Papan Nama Kegiatan A.17. 1,00 set
A.2 Pek. Pembersihan dan perataaan A.9. 511,66 set
A.3 Listrik dan Air kerja Selama pekerjaan konstruksi Dihitung 1,00 Ls
A.4 Pelaporan dan Dokumentasi Dihitung 1,00 Ls
A.5 Sistem Manajemen Keselamatan dan Kesehatan Kerja
1 Penyiapan RKK :
- Pembuatan Dokumen Rencana Keselamatan Konstruksi
- Pembuatan Prosedur dan Instruksi Kerja 1,00 Set
- Penyiapan Formulir
2 Sosialisasi dan Promosi Dan Pelatihan:
- Induksi K3 (Safety Induction) 15,00 org
- Pengarahan K3 (Safety Briefing) 15,00 org
- Pelatihan K3:
Bekerja di ketinggian 5,00 org
Penggunaan bahan kimia (MSDS)
Simulasi K3 15,00 org
- Spanduk (Banner) 1,00 Lbr
- Poster 1,00 Lbr
- Papan Informasi K3 1,00 Buah
3 Alat Pelindung Kerja dan Alat Pelindung Diri:
a Alat Pelindung Kerja (APK) antara lain:
- Jaring pengaman (Safety Net) 1,00 LS
- Pembatas Area (Restricted Area) 1,00 Ls
b Alat Pelindung Diri (APD) terdiri atas:
- Topi pelindung (Safety helmet) 15,00 Buah
- Pelindung pernafasan dan mulut (Masker) 5,00 Box
- Sarung tangan (Safety gloves) 15,00 Psg
- Sepatu keselamatan (Safety shoes) 5,00 Psg
- Rompi keselamatan (Safety vest) 15,00 Buah
4 Asuransi dan perizinan :
- Asuransi 1,00 Ls
5 Personel K3 Konstruksi :
- Petugas K3 Konstruksi 1,00 Ls
6 Fasilitas sarana kesehatan
- Peralatan P3K (Kotak P3K, Tandu, Obat Luka, Perban, Dll) 1,00 Ls
7 Rambu-rambu
- Rambu Larangan 2,00 Buah
- Rambu Peringatan 2,00 Buah
- Rambu Kewajiban 2,00 Buah
- Rambu Informasi 1,00 Buah
- Police Line 15,00 m
- Jalur Evakuasi 1,00 Ls
8 Konsultasi dengan Ahli terkait Keselamatan Konstruksi:
- Ahli K3 Konstruksi 1,00 OB
9 Lain-lain terkait pengendalian risiko K3
- Alat pemadam api ringan (APAR) 1,00 Buah
- Bendera K3 1,00 Buah
- Pembuatan Kartu Identitas Pekerja (KIP) 15,00 Lb
- Titik Kumpul (assembly Poin) 1,00 Ls
TOTAL BIAYA SMKK
PEKERJAAN GEDUNG
B PEKERJAAN TANAH DAN PONDASI
B.1 Pek. Bouwplank dan Pengukuran A.4. 94,45 m
B.2 Pek. Galian Tanah Pilecap B.1. 153,60 m3
B.3 Pek. Galian Tanah Tiebeam B.1. 18,64 m3
B.4 Pek. Galian Tanah Pondasi Batu Kali B.1. 85,39 m3
B.5 Pek. Urugan Tanah Kembali B.9. 77,29 m3
B.6 Pek. Urugan Tanah dipadatkan peninggian bangunan B.14.a 14,17 m3
B.7 Pek. Urugan Pasir Bawah Pondasi tb 5 cm B.11. 3,20 m3
B.8 Pek. Urugan Pasir Bawah Tie Beam tb 5 cm B.11. 2,33 m3
B.9 Pek. Urugan Pasir Bawah Lantai tb 5 cm B.11. 24,31 m3
B.12 Pek. Lantai Kerja dibawah pondasi tapak tebal 5 cm D.1. 2,81 m3
B.13 Pek. Lantai Kerja dibawah Tie Beam tebal 5 cm D.1. 2,33 m3
B.14 Pek. Pondasi Beton Tapak PC1 uk 150 x 150 x 50 cm K-225, pembesian 174 kg/m4 D.31.a 28,13 m3
B.15 Pek. Aanstamping Batu Kosong C.9. 13,48 m3
B.16 Pek. Pondasi Batu Kali 1pc : 5 ps C.3. 35,39 m3
B.17 Pek. Tie Beam Beton uk. 25 x 40 cm K-225, pembesian 177,5 kg/m3 D.32.a 18,64 m3
B.18 Pek. Sloof Beton uk. 15 x 25 cm K-225, pembeesian 191,9 kg/cm3 D.32.e 4,21 m3
JUMLAH B
Page 1
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
C PEKERJAAN STRUKTUR
LANTAI 1
C.1 Pek. Kolom Beton K1, uk 25 x 35 cm K-225, pembesian 224,8 kg/m3 D.33.l 12,91 m3
C.2 Pek. Balok Beton B1, uk. 25 x 50 cm K-225, pembesian 229,3 kg/m3 D.34.a 13,42 m3
C.3 Pek. Balok Beton B2, uk. 20 x 30 cm K-225, pembesian 343,4 kg/m3 D.34.d 8,39 m3
C.4 Pek. Balok Beton B3, uk. 20 x 30 cm K-225, pembesian 326,8 kg/m3 D.34.e 1,56 m3
C.5 Pek. Balok Beton B4, uk. 15 x 40 cm K-225, pembesian 195,9 kg/m3 D.34.f 5,67 m3
C.6 Pek. Plat Lantai Beton tebal 12 cm K-225. pembesian 141,6 kg/m3 D.35.a 47,74 m3
C.7 Pek. Plat dan Trap Tangga Beton K-225, pembesian kg/m3 D.36.b 1,61 m3
C.8 Pek. Plat Lantai Bordes Tangga Beton tebal 12 cm K-225, pembesian kg/m3 D.36.a 0,36 m3
C.9 Pek. Balok Beton B6 (balok tangga), uk. 20 x 25 cm K-225, pembesian 142,9 kg/m3 D.34.i 0,27 m3
LANTAI 2
C.10 Pek. Kolom Beton K1, uk 25 x 35 cm K-225, pembesian 224,8 kg/m3 D.33.l 8,05 m3
C.11 Pek. Balok Beton B1, uk. 25 x 50 cm K-225, pembesian 229,3 kg/m3 D.34.a 6,10 m3
C.12 Pek. Balok Beton B2, uk. 20 x 30 cm K-225, pembesian 343,4 kg/m3 D.34.d 4,08 m3
C.13 Pek. Balok Beton B3, uk. 20 x 30 cm K-225, pembesian 326,8 kg/m3 D.34.e 0,67 m3
C.14 Pek. Balok Beton B4, uk. 15 x 40 cm K-225, pembesian 195,9 kg/m3 D.34.f 2,57 m3
C.15 Pek. Balok Beton B5, uk. 15 x 30 cm K-225, pembesian 169,9 kg/m3 D.34.g 4,07 m3
C.16 Pek. Balok Beton RB, uk. 15 x 20 cm K-225, pembesian 204,9 kg/m3 D.37.f 1,08 m3
C.17 Pek. Plat Lantai Beton tebal 12 cm K-225. pembesian 141,6 kg/m3 D.35.a 20,96 m3
LANTAI ATAP BETON
C.18 Pek. Kolom Beton K2, uk 15 x 15 cm K-225, pembesian 202,6 kg/m3 D.33.w 0,35 m3
C.19 Pek. Balok Beton RB, uk. 15 x 20 cm K-225, pembesian 204,9 kg/m3 D.37.f 1,67 m3
JUMLAH C
D PEKERJAAN ATAP
D.1 Pek. Rangka atap baja ringan C.75 (Design by Product) F.22.a 343,90 m2
D.2 Pas. Penutup Atap Genteng Bitumen ONDUVILA warna K.32.b 343,90 m2
D.3 Pas. Nok Atap Genteng Bitumen warna K.37.a 48,76 m'
D.4 Pas. Listplank GRC tebal 2 cm tinggi 30 cm ,Motif Gigi Balang + pengecatan L.21.f 53,55 m'
D.5 Pas. Sreeding Underlayer waterproofing H.19. 230,01 m2
D.6 Pas. Waterproofing membrance bakar untuk atap beton I.71. 230,01 m2
D.7 Pas. Roof Drain 4 ' O.14. 6,00 bh
D.8 Pas.Talang Vertikal pipa PVC 4 " O.32. 72,00 m'
JUMLAH D
E PEKERJAAN ARSITEKTUR
E.1 PEKERJAAN DINDING DAN LANTAI
LANTAI 1
E.1.1 Pek. Kolom dan Balok Praktis 11x11 cm D.29. 258,40 m
E.1.2 Pas. Dinding Bata Ringan tb. 10 cm (20x60) G.25. 722,57 m2
E.1.3 Pas. Plesteran dengan mortar siap pakai H.28. 1.209,36 m2
E.1.4 Pas. Acian Mortar siap pakai H.29. 973,59 m2
E.1.5 Pek. Finishing beton expose kolom dan balok lintel (opening kusen) H.30. 307,30 m2
E.1.6 Pek. Balok Praktis 11x11 cm untuk Opening D.29. 272,30 m
E.1.7 Pas. Dinding Keramik (toilet) uk. 25x40 I.54.b 235,77 m2
E.1.8 Pas. Dinding Ornamen Gigi Balang Calcium Cilicate Panel tb=20 mm, dihitung 12,75 m2
E.1.9 Pas. Aluminuim Composite Panel (ACP) perporated Rangka besi hollow alumunium F.25.a 23,83 m2
E.1.10 Pas. Plint Lantai 10x60 cm I.24.b 252,65 m
E.1.11 Pas. Lantai Homogenous Unpolished 60x60 cm (area teras) I.9.b 62,42 m2
E.1.12 Pas. Lantai Homogenous Polished 60x60 cm, I.9.a 323,20 m2
E.1.13 Pas. Lantai Homogenous Polished 60x60 cm + step nozing (area tangga) I.9.a 24,00 m
E.1.14 Pas. Lantai keramik KM 25X25 Unpolished, I.36.b 32,32 m2
E.1.15 Pas. Railing Tangga Besi Hollow 40x40 & 20x20 +pengecatan F.23.c 9,46 m2
E.1.16 Pas. Railing Pipa Galvanis 2" + Pengecatan F.24.a 12,21 m2
E.1.17 Pas. Railing Akses difable Pipa Galvanise 2" + pengecatan
E.1.18 Pek. Meja Beton (area laboratorium) D.35.d 0,17 m2
E.1.19 Pek. Garnite 60x60 cm untuk Meja Beton I.9.a 1,70 m2
E.1.20 Pekerjaan lantai rabat t = 10 cm D.1. 6,62 m3
E.1.21 Pek. Pas. Bata Merah 1/2 Bata (Penahan Rabat beton) G.10. 49,32 m2
E.1.22 Pekerjaan plester dinding 1 : 5 (Penahan Rabat beton) H.16. 55,49 m2
E.1.23 Pekerjaan acian dinding (Penahan Rabat beton) H.27. 55,49 m2
LANTAI 2
E.1.24 Pek. Kolom dan Balok Praktis 11x11 cm D.29. 197,60 m
E.1.25 Pas. Dinding Bata Ringan tb. 10 cm (20x60) G.25. 603,37 m2
E.1.26 Pas. Plesteran dengan mortar siap pakai H.28. 1.206,74 m2
E.1.27 Pas. Acian Mortar siap pakai H.29. 811,64 m2
E.1.28 Pek. Finishing beton expose kolom dan balok lintel (opening kusen) H.30. 357,80 m2
E.1.29 Pek. Balok Praktis 11x11 cm untuk Opening D.29. 310,25 m
E.1.30 Pas. Dinding Keramik (toilet) uk. 25x40 cm I.54.b 180,57 m2
E.1.31 Pas. Aluminium Composite Panel (ACP) 0,3 mm PVDF rangka besi hollow aluminium F.25.b 107,27 m2
E.1.32 Pas. Aluminuim Composite Panel (ACP) perporated Rangka besi hollow alumunium F.25.a 34,66 m2
E.1.33 Pas. Plint Lantai 10x60 cm I.24.b 242,90 m
E.1.34 Pas. Lantai Homogenous Polished 60x60 cm, I.9.a 312,43 m2
E.1.35 Pas. Waterproofing (Area Basah) I.71. 34,41 m2
E.1.36 Pas. Lantai keramik Toilet/KM 25X25 cm Unpolished, I.36.b 31,28 m2
Page 2
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
E.1.37 Pek. Meja Beton (area Pantry) D.35.d 0,31 m2
E.1.38 Pek. Granite 60x60 cm untuk Meja Beton termasuk dinding I.9.a 4,44 m2
E.1.39 Pek. Logo Timbul PUSKESMAS ukuran 100x100x15 cm bahan plat besi finishing cat duco dihitung 1,00 unit
E.1.40 Pas. Huruf Timbul "PUSKESMAS" bahan Plat finshing cat duco tinggi 60 cm dihitung 9,00 bh
E.1.41 Pas. Huruf Timbul "JATIRASA KOTA BEKASI" bahan plat finishing cat duco tinggi 30 cm dihitung 10,00 bh
LANTAI ATAP
E.1.42 Pas. Dinding Bata Ringan tb. 10 cm (20x60) G.25. 59,13 m2
E.1.43 Pas. Plesteran dengan mortar siap pakai H.28. 118,25 m2
E.1.44 Pas. Acian Mortar siap pakai H.29. 37,67 m2
E.1.45 Pas. Aluminium Composite Panel (ACP) 0,3 mm PVDF rangka besi hollow aluminium F.25.b 80,58 m2
E.1.46 Pas. Tangga Maintanance Pipa galvanise 2" + pengecatan dihitung 1,00 ls
E.1.47 Pas. Pentup Manhole plat besi Rangka besi Siku dihitung 1,00 ls
JUMLAH E.1
E.2 PEK. KUSEN PINTU/JENDELA & PARTISI, LENGKAP ASSESORIES
LANTAI 1
E.2.1 Pasang Kusen+Pintu Alumunium Type PA1 (4 unit) 4,00 Unit
-Kusen Alumunium 4', Warna F.11.a 30,40 m
-Pasang pintu plywood rangkap + lapis HPL, L.8.b 7,56 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 4,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 12,00 bh
-Door Closer M.10. 4,00 bh
-Kaca Polos 5 mm M.17. 2,45 m2
E.2.2 Pasang Kusen+Pintu Alumunium Type PA2 (3 unit) 3,00 Unit
-Kusen Alumunium 4', Warna F.11.a 15,90 m
-Daun Pintu Alumunium Spanrel 2 layer F.12. 3,78 m2
-Pasang kunci Kamar Mandi (Toilet) M.3. 3,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 9,00 bh
E.2.3 Pasang Kusen+Pintu Alumunium Type PA3 (9 unit) 9,00 Unit
-Kusen Alumunium 4', Warna F.11.a 46,80 m
-Daun Pintu Alumunium Spanrel 2 layer F.12. 15,12 m2
-Pasang kunci Kamar Mandi (Toilet) M.3. 9,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 27,00 bh
E.2.4 Pasang Kusen+Pintu Alumunium Type PA4 (8 unit) 8,00 Unit
-Kusen Alumunium 4', Warna F.11.a 65,60 m
-Pasang pintu plywood rangkap + lapis HPL, L.8.b 20,64 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 8,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 48,00 bh
-Door Closer M.10. 16,00 bh
-Kaca Polos 5 mm M.17. 7,52 m2
E.2.5 Pasang Kusen+Pintu Alumunium Type PA5 (3 unit) 3,00 Unit
-Kusen Alumunium 4', Warna F.11.a 27,00 m
-Rangka Daun Pintu Kaca Alumunium warna F.13.a 10,32 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 3,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 18,00 bh
-Door Closer M.10. 6,00 bh
-Kaca Polos 5 mm M.17. 3,12 m2
-Kaca Polos 8 mm M.17. 7,77 m2
E.2.6 Pasang Kusen+Pintu Alumunium Type PJA1 (1 unit) 1,00 Unit
-Kusen Alumunium 4', Warna F.11.a 35,12 m
-Rangka Daun Pintu Kaca Alumunium warna F.13.a 3,44 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 1,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 6,00 bh
-Door Closer M.10. 2,00 bh
-Rangka Daun Jendela Aluunium, Warna F.13.d 4,26 m2
-Friction stay jendela M.6.a 16,00 bh
-Pasang slot jendela rambucis M.8.b 8,00 bh
-Kaca Polos 5 mm M.17. 9,22 m2
-Kaca Polos 8 mm M.17. 2,59 m2
E.2.7 Pasang Kusen+Pintu Alumunium Type PJA2 (1 unit) 1,00 Unit
-Kusen Alumunium 4', Warna F.11.a 18,40 m
-Rangka Daun Pintu Kaca Alumunium warna F.13.a 3,44 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 1,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 6,00 bh
-Door Closer M.10. 2,00 bh
-Rangka Daun Jendela Aluunium, Warna F.13.d 1,66 m2
-Friction stay jendela M.6.a 8,00 bh
-Pasang slot jendela rambucis M.8.b 4,00 bh
-Kaca Polos 5 mm M.17. 5,32 m2
-Kaca Polos 8 mm M.17. 2,59 m2
E.2.8 Pasang Kusen+jendela Alumunium Type BVA1 (9 unit) 9,00 Unit
-Kusen Alumunium 3', Warna F.11.d 28,80 m
-Kaca Polos 5 mm M.17. 4,32 m2
E.2.9 Pasang Kusen+jendela Alumunium Type BVA2 (7 unit) 7,00 Unit
-Kusen Alumunium 3', Warna F.11.d 47,60 m
-Kaca Polos 5 mm M.17. 10,08 m2
E.2.10 Pasang Kusen+jendela Alumunium Type BVA3 (1 unit) 1,00 Unit
-Kusen Alumunium 3', Warna F.11.d 6,50 m
-Kaca Polos 5 mm M.17. 0,99 m2
Page 3
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
E.2.11 Pasang Kusen+jendela Alumunium Type BVA4 (6 unit) 6,00 Unit
-Kusen Alumunium 3', Warna F.11.d 52,80 m
-Kaca Polos 5 mm M.17. 7,92 m2
LANTAI 2
E.2.12 Pasang Kusen+Pintu Alumunium Type PB1 (4 unit) 3,00 Unit
-Kusen Alumunium 4', Warna F.11.a 22,80 m
-Pasang pintu plywood rangkap + lapis HPL, L.8.b 5,67 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 3,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 9,00 bh
-Door Closer M.10. 3,00 bh
-Kaca Polos 5 mm M.17. 1,84 m2
E.2.13 Pasang Kusen+Pintu Alumunium Type PB2 (3 unit) 1,00 Unit
-Kusen Alumunium 4', Warna F.11.a 5,30 m
-Daun Pintu Alumunium Spanrel 2 layer F.12. 1,89 m2
-Pasang kunci Kamar Mandi (Toilet) M.3. 1,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 3,00 bh
E.2.14 Pasang Kusen+Pintu Alumunium Type PB3 (9 unit) 10,00 Unit
-Kusen Alumunium 4', Warna F.11.a 52,00 m
-Daun Pintu Alumunium Spanrel 2 layer F.12. 16,80 m2
-Pasang kunci Kamar Mandi (Toilet) M.3. 10,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 30,00 bh
E.2.15 Pasang Kusen+Pintu Alumunium Type PB4 (7 unit) 7,00 Unit
-Kusen Alumunium 4', Warna F.11.a 57,40 m
-Pasang pintu plywood rangkap + lapis HPL, L.8.b 18,06 m2
-Pasang kunci tanam Alumunium lockcase + Handle M.2. 7,00 bh
-Engsel pintu 4"x3"x2,5 M.5. 42,00 bh
-Door Closer M.10. 14,00 bh
-Kaca Polos 5 mm M.17. 6,58 m2
E.2.16 Pasang Kusen+jendela Alumunium Type JB1 (13 unit) 13,00 Unit
-Kusen Alumunium 3', Warna (jendela geser) F.11.d 83,20 m
-Rangka Daun Jendela Aluunium, Warna F.13.d 32,23 m2
-Pasang slot jendela rambucis M.8.b 26,00 bh
-Kaca Polos 5 mm M.17. 30,42 m2
E.2.17 Pasang Kusen+Pintu Alumunium Type JB2 (1 unit) 1,00 Unit
-Kusen Alumunium 4', Warna F.11.a 18,40 m
-Rangka Daun Jendela Aluunium, Warna F.13.d 1,66 m2
-Friction stay jendela M.6.a 8,00 bh
-Pasang slot jendela rambucis M.8.b 4,00 bh
-Kaca Polos 5 mm M.17. 5,32 m2
E.2.18 Pasang Kusen+jendela Alumunium Type BVB1 (9 unit) 9,00 Unit
-Kusen Alumunium 3', Warna F.11.d 28,80 m
-Kaca Polos 5 mm M.17. 4,32 m2
E.2.19 Pasang Kusen+jendela Alumunium Type BVB2 (6 unit) 6,00 Unit
-Kusen Alumunium 3', Warna F.11.d 40,80 m
-Kaca Polos 5 mm M.17. 8,64 m2
E.2.20 Pasang Kusen+jendela Alumunium Type BVB3 (6 unit) 6,00 Unit
-Kusen Alumunium 3', Warna F.11.d 52,80 m
-Kaca Polos 5 mm M.17. 7,92 m2
JUMLAH E.2
E.3 PEKERJAAN PLAFOND
LANTAI 1
E.3.1 Pek. Plafond PVC Board GL lb, 30cm tb. 8 mm + rangka Holl0w J.8.b 397,95 m2
E.3.2 Pek. Plafond GRC tebal 4 mm + Rangka Hollow Galvanis J.11.b 32,32 m2
E.3.3 Pek. Finishing Plafond Ekspose beton H.30. 12,00 m2
E.3.4 Pas. List Profile Gypsum J.10. 62,64 m
LANTAI 2
E.3.5 Pek. Plafond PVC Board GL lb, 30cm tb. 8 mm + rangka metal J.8.b 388,19 m2
E.3.6 Pek. Plafond GRC tebal 4 mm + Rangka Hollow Galvanis J.11.b 28,78 m2
E.3.8 Pas. List Profile Gypsum J.10. 55,34 m
JUMLAH E.3
E.4 PEKERJAAN FINISHING & PENGECATAN
LANTAI 1
E.4.1 Pengecatan Tembok Baru Interior N.10. 618,40 m2
E.4.2 Pengecatan Tembok Baru Eksterior Weathersield N.10.a. 379,60 m2
E.4.3 Pengecatan Plafond Interior N.10. 44,32 m2
LANTAI 2
E.4.4 Pengecatan Tembok Baru Interior N.10. 626,92 m2
E.4.5 Pengecatan Tembok Baru Eksterior Weathersield N.10.a. 266,40 m2
E.4.6 Pengecatan Plafond Interior N.10. 28,78 m2
LANTAI ATAP
E.4.5 Pengecatan Tembok Baru Eksterior Weathersield N.10.a. 59,13 m2
JUMLAH E.4
E.5 PEKERJAAN SANITARY
LANTAI 1
E.5.1 Pas. Floor drained stainless, O.14. 10,00 bh
E.5.2 Pas. Kran air 1/2" stainless, O.19. 10,00 bh
E.5.3 Pas. Washtafel lengkap aksesories + Cermin, O.5. 14,00 bh
E.5.4 Pas. Kitchenzink Stainless lengkap aksesories O.12. 3,00 bh
E.5.5 Pas. Closet Jongkok Porselen O.2. 2,00 bh
E.5.6 Pas. Closet Duduk lengkap aksesories, O.1. 1,00 bh
E.5.7 Pas. Urinoar lengkap aksesories, O.4. 2,00 bh
E.5.8 Pas. Hand Railing Sliding Toilet Stainless Steel (toilet difable) dihitung 1,00 bh
E.5.9 Pas. Hand Railing Closet Stainless Steel (toilet difable) dihitung 1,00 bh
Page 4
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
LANTAI 2
E.5.10 Pas. Floor drained stainless, O.14. 10,00 bh
E.5.11 Pas. Kran air 1/2" stainless, O.19. 10,00 bh
E.5.12 Pas. Washtafel lengkap aksesories + Cermin, O.5. 12,00 bh
E.5.13 Pas. Closet Jongkok Porselen O.2. 2,00 bh
E.5.14 Pas. Closet Duduk lengkap aksesories, O.1. 6,00 bh
E.5.15 Pas. Urinoar lengkap aksesories, O.4. 2,00 bh
E.5.16 Pas. Kitchenzink Stainless lengkap aksesories O.12. 1,00 bh
JUMLAH E.5
F PEKERJAAN MEKANIKAL/PLUMBING
F.1 PEKERJAAN INSTALASI AIR BERSIH
LANTAI 1
F.1.1 Pipa PVC, Class AW , Standard JIS K - 6741/6742
- Dia. 3/4" O.26. 52,00 m'
- Dia. 1/2" O.25. 24,00 m'
F.1.2 Fitting dan Accessories 1,00 ls
F.1.3 Gate valve dia 2" 2,00 bh
F.1.4 Material Bantu 1,00 ls
PEKERJAAN SUMUR BOR DANGKAL
F.1.5 Pengeboran Sumur dangkal CW Instalasi Pipa Dihitung 1,00 unit
Lokasi : Site Plan
T y p e : Jet Pump
Category : Jet Pump
Daya Listrik : 0,5 Kw,
Daya dorong : 15 meter
Kapasitas : 2 m3/jam
Inlet/Outlet : Ø 3/4"
Pompa Booster Dihitung 1,00 bh
Pompa Transfer Dihitung 1,00 bh
PEKERJAAN PEMIPAAN, FITTING DAN VALVE
F.1.7 Pipa Header 1,00 bh
Lengkap dengan Blind flange, accessories + Fitting
F.1.8 Pipa PVC Class AW Dia. 1-1/2" O.28. 8,00 m'
F.1.9 Fitting dan Accessories 1,00 ls
F.1.10 Gate valve Dia. 1-1/4" 2,00 bh
LANTAI 2
F.1.11 Pipa PVC, Class AW , Standard JIS K - 6741/6742
- Dia. 3/4" O.26. 52,00 m'
- Dia. 1/2" O.25. 32,00 m'
F.1.12 Fitting dan Accessories 1,00 ls
F.1.13 Gate valve dia 2" 2,00 bh
F.1.14 Material Bantu 1,00 ls
PIPA TEGAK AIR BERSIH
F.1.15 Pipa PVC, Class AW , Standard JIS K - 6741/6742
- Dia. 3/4" O.26. 8,00 m'
WATER TORN
F.1.6 Tangki air bersih (Tandon air)
kapasitas : 2 m3 lengkap dengan WLC Dihitung 2,00 unit
PEKERJAAN PEMIPAAN, FITTING DAN VALVE
F.1.16 Pipa Header 1,00 bh
Lengkap dengan Blind flange, accessories + Fitting
F.1.17 Pipa PVC Class AW Dia. 1-1/2" O.28. 8,00 m
F.1.18 Fitting dan Accessories 1,00 ls
F.1.19 Gate valve Dia. 1-1/4" 2,00 bh
JUMLAH F.1
F.2 PEKERJAAN INSTALASI AIR KOTOR
LANTAI 1
F.2.1 Pipa PVC, Class D
- Dia. 4" O.32. 64,00 m'
- Dia. 2" O.29. 36,00 m'
- Dia.1 1/4" O.28. 24,00 m'
F.2.2 Fitting dan Accessories 1,00 ls
F.2.3 Clean Out Dia. 4" 2,00 bh
F.2.4 PEKERJAAN BIOTECH
- Pek. Galian Tanah B.1. 6,80 m3
- Pek. Urugan Tanah Kembali B.9. 6,80 m3
- Pek. Urugan Pasir tebal = 5 cm B.11. 0,20 m3
- Pek. Lantai Beton K-100, tebal 10 cm D.1. 0,40 m3
- Pas. Pipa PVC 4" O.32. 12,00 m'
- Pas. Bio Septictank Kavasitas 2 M3 lengkap aksesories dihitung 1,00 unit
F.2.4 PEKERJAAN IPAL KAPASITAS 7 M3 LENGKAP INSTALASI DAN RUMAH IPAL dihitung 1,00 unit
LANTAI 2
F.2.5 Pipa PVC, Class D
- Dia. 4" O.32. 44,00 m'
- Dia. 2" O.29. 36,00 m'
- Dia.1 1/4" O.28. 16,00 m'
F.2.6 Fitting dan Accessories 1,00 ls
F.2.7 Clean Out Dia. 4" 2,00 bh
JUMLAH F.2
Page 5
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
G PEKERJAAN ELEKTRIKAL DAN TATA UDARA
G.1 PEKERJAAN INSTALASI PENERANGAN & STOP KONTAK
LANTAI 1
G.1.1 Pasang titik lampu, RM 2 x 36 watt komplit Q.11. 20,00 bh
G.1.2 Pasang titik lampu, PL 18 watt (downlight dia. 4") Q.4. 92,00 bh
G.1.3 Pasang titik stop kontak Q.12. 30,00 bh
G.1.5 Pasang titik saklar tunggal Q.14. 8,00 bh
G.1.6 Pasang titik saklar double Q.15. 20,00 bh
LANTAI 2
G.1.9 Pasang titik lampu, RM 2 x 36 watt komplit Q.11. 31,00 bh
G.1.10 Pasang titik lampu, PL 18 watt (downlight dia. 4") Q.4. 6,00 bh
G.1.11 Pasang titik stop kontak Q.12. 32,00 bh
G.1.13 Pasang titik saklar tunggal Q.14. 5,00 bh
G.1.14 Pasang titik saklar double Q.15. 15,00 bh
JUMLAH G.1
G.2 PEKERJAAN PANEL LISTRIK
G.2.1 SDP-GEDUNG 1,00 set
G.2.2 PP.LP-LANTAI 1 1,00 set
G.2.3 PP.LP-LANTAI 2 1,00 set
G.2.4 PEKERJAAN KABEL FEEDER
- Dari panel LP/PP-A ke panel LP/PP-B 20,00 m'
NYY 4X4mm2
JUMLAH G.2
G.8 PEKERJAAN INSTALASI PENANGKAL PETIR
G.8.1 Pengkap Petir Radius 50 Meter Sek. Current 2 Generation 1,00 bh
G.8.2 Pas. Kabel BC 50 mm + PVC Dia. 1" 100,00 m'
G.8.3 Pas. Grounding Rod Max 1 Ohm 4,00 bh
G.8.4 Pek. Bak Kontrol 2,00 bh
G.8.5 Busbar Grounding Bar Plat Tembaga 250x30x6mm 2,00 bh
JUMLAH G.2
TOTAL JUMLAH PEKERJAAN GEDUNG
PEKERJAAN PAGAR DAN PENATAAN HALAMAN
H PEKERJAAN TANAH DAN STRUKTUR
H.1 Pek. Bouwplank dan Pengukuran A.4. 59,85 m
H.2 Pek. Galian Tanah Pondasi setempat B.1. 30,72 m3
H.3 Pek. Galian Tanah Pondasi Batu Kali B.1. 67,03 m3
H.4 Pek. Urugan tanah Kembali B.9. 29,33 m3
H.5 Pek. Urugan Pasir bawah Pondasi tebal 5 cm B.11. 0,86 m3
H.6 Pek. Aanstamping C.9. 10,77 m3
H.7 Pek. Pondasi Batu Belah 1:5 C.3. 35,01 m3
H.8 Pek. Lantai Kerja dibawah pondasi tebal 5 cm D.1. 0,86 m3
H.9 Pek. Pondasi Setempat Beton K-225, uk. 60x60x20 cm, pembesian 194,5 kg/m3 D.31.a 0,86 m3
H.10 Pek. Sloof Beton K-225, uk. 15x25 cm, pembesian 191,9 kg/m3 D.32.e 4,49 m3
H.11 Pek. Kolom Beton K-225, uk. 25x25 cm, pembesian 117,2 kg/m4 D.33.u 5,40 m3
H.12 Pek. Ringbalk Beton K-225, uk. 15x15 cm, pembesian 176,4 kg/m3 D.37.g 3,59 m3
JUMLAH H
Page 6
KODE
NO URAIAN PEKERJAAN VOLUME SAT HARGA SATUAN TOTAL JUMLAH HARGA
ANALISA
I PEKERJAAN ARSITEKTUR
I.1 PEKERJAAN DINDING
I.1.1 Pasangan Dinding 1/2 Bata merah 1 : 5 G.10. 215,46 m2
I.1.2 Pekerjaan Plester dinding dan kolom 1 : 5 H.16. 574,80 m2
I.1.4 Pekerjaan Acian H.27. 574,80 m2
JUMLAH I,1
I.2 PEKERJAAN FINISHING & PENGECATAN
I.2.1 Pengecatan Tembok Baru Eksterior N.10.a. 574,80 m2
JUMLAH I.2
J PEKERJAAN PENATAAN HALAMAN
J.1 Pek. Urugan sirtu dipadatkan tebal 10 cm B.14. 40,23 m3
J.2 Pas. Paving blok natural tebal 6 cm I.64. 402,31 m3
J.3 Pas. Kansten Beton I.70. 151,48 m3
J.4 Memasang U-Ditch beton, 30 x 40 cm - 100 cm O.36.a 30,00 m3
J.5 Pas. Plat Duiker Beton tebal 20 cm K-225, Pembesian kg/m3 dihitung 1,44 m3
JUMLAH J
TOTAL JUMLAH PEKERJAAN PAGAR DAN PENATAAN HALAMAN
JUMLAH TOTAL
PPN (11%)
Biaya Sambungan Baru Daya Listrik PLN 41,5 KVA+ SLO + UJL
JUMLAH + PPN
DIBULATKAN
DIBUAT
CV/PT
DIREKTUR
Page 7