| 0824639108311000 | Rp 1,602,829,948 | |
| 0020407250311000 | - | |
| 0012062907311000 | - | |
| 0027458363311000 | - | |
| 0709294888311000 | - | |
CV Buana Indo Perkasa | 09*9**5****11**0 | - |
CV Pandu Raja | 05*6**3****11**0 | - |
CV Cahaya Ratu Emas | 05*4**8****11**0 | - |
| 0016337339328000 | - | |
Chaya Bhutala Bengkulu | 07*0**0****11**0 | - |
| 0437296023201000 | - | |
CV Js Brother | 01*5**7****11**0 | - |
| 0023521792311000 | - | |
| 0014732978311000 | - | |
| 0438029613328000 | - | |
CV Gelora Gita Konstruksi | 09*8**5****11**0 | - |
| 0316642107328000 | - | |
| 0024773160327000 | - | |
| 0868222126009000 | - | |
Garis Langit | 17*3**1****00**1 | - |
CV Barometer Indo Perkasa | 00*5**9****28**0 | - |
| 0661673681311000 | - | |
| 0812307304201000 | - |
PEMERINTAH PROVINSI BENGKULU
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Mayjend S. Parman No. 07 Telp 21620-21623 Fax (0736) 22117 Bengkulu
URAIAN SINGKAT PEKERJAAN (USP)
PEKERJAAN
PEMBANGUNAN RUANG LABORATORIUM
SMKN1 KOTA BENGKULU
TAHUN ANGGARAN
2024
URAIAN SINGKAT PEKERJAAN
PEKERJAAN PEMBANGUNAN RUANG LABORATORIUM SMKN 1 KOTA BENGKULU
Adapun lingkup pekerjaan yang harus dilaksanakan oleh penyedia jasa dalam pekerjaan ini meliputi :
1. Pembangunan Ruang Laboratorium Kimia
2. Pembangunan Ruang Laboratorium Biologi
3. Pembangunan Ruang Laboratorium Bahasa
4. Pembangunan Ruang Laboratorium Fisika
Uraian Item Pekerjaan:
A. PEKERJAAN LANTAI 1
I DIVISI 1. PERSIAPAN LAPANGAN
I.A UMUM
1 Pembersihan lokasi
2 Pek. Papan nama pekerjaan
3 Pasangan Bowplank
4 Sewa Direksi Keet + Gudang
5 Pengadaan listrik dan Air kerja
6 Desain DMF, JMF dan Uji Beton
7 Sistem Manajemen Keselamatan Konstruksi
Alat Pelindung Kerja dan Alat Pelindung Diri
Topi Pelindung
Sepatu Keselamatan
Rompi keselamatan
Asuransi dan Perizinan Terkait Keselamatan Konstruksi
Asuransi
Fasilitas, Sarana dan Prasarana Kesehatan
Peralatan P3K
I.B PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan tanah kembali
3 Urugan didatangkan
4 Pemadatan tanah manual
5 Urugan pasir bawah lantai
II DIVISI 2. STRUKTUR
II.A PEKERJAAN PASANGAN PONDASI
1 Pas Batu Kosong
2 Pas Batu Kali
3 Cor lantai kerja f'c 10
4 Galian pondasi Bore pile Ø30
II.B PEKERJAAN BETON
1 Pondasi Bore Pile Ø30
- Cor Beton plat f'c 17
- Besi Ulir Ø 13
- Besi Polos Ø 8
2 Pondasi plat 1,25x1,25
- Cor Beton plat f'c 17
- Besi Ulir Ø 13
3 Sloof 30.40
- Cor Beton sloof f'c 17
- Besi Polos Ø 10
- Besi Ulir Ø 16
- Bekisting sloof
4 Sloof 15.20
- Cor Beton sloof f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting sloof
5 Kolom KL1 (35.35)
- Cor Beton Kolom f'c 17
- Besi Polos Ø 12
- Besi Ulir Ø 16
- Bekisting Kolom
6 Kolom KL2 20.20
- Cor Beton kolom f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting kolom
7 Balok BL1 (30.50)
- Cor Balok BL1 f'c 17
- Besi Polos Ø 12
- Besi Ulir Ø 16
- Bekisting Balok
8 Balok BL2 (30.60)
- Cor Balok BL1 f'c 17
- Besi Polos Ø 12
- Besi Ulir Ø 16
- Besi Ulir Ø 19
- Bekisting Balok BL
9 Balok BL3 (15.30)
- Cor Balok BL1 f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting Balok BL
10 Dak Beton t : 12 Cm
- Cor Dak f'c 17
- Besi Polos Ø 8
- Bekisting Dak Beton
11 Dak tangga t : 12 Cm
- Cor Dak f'c 17
- Besi Polos Ø 12
- Besi Polos Ø 8
- Bekisting Dak Beton
II.C PEKERJAAN PAS KUDA-KUDA
1 Pas. Kuda-kuda baja ringan C.75.75 R.32.45
III DIVISI 3. ARSITEKTUR
III.A PEKERJAAN DINDING
1 Pas dinding batu bata 1:2
2 Pas dinding batu bata 1:4
3 Plesteran 1:2
4 Plesteran 1:4
5 Pas dinding partisi GRC
III.B PEKERJAAN LANTAI
1 Cor beton lantai f'c 15
2 Pas Keramik Lantai 40.40
3 Pas Plint Keramik 10.40
III.C PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu Besi PA
2 Kusen PA
3 Kusen JA
6 Realing tangga
III.D PEKERJAAN ATAP DAN PLAFOND
1 Pas Atap Seng Gelombang Warna
2 Nok seng plat warna
3 Lisplank GRC 20 Cm
III.E PEKERJAAN FINISHING CAT
1 Cat kayu
2 Cat Besi
3 Cat Tembok
IV DIVISI 4. LANSEKAP
V DIVISI 5. MEKANIKAL DAN ELEKTRIKAL
VI DIVISI 6. PLAMBING
B. PEKERJAAN LANTAI 2
I DIVISI 1. PERSIAPAN LAPANGAN
I.A UMUM
1 Pengangkutan Material ke atas
2 Steger kerja
II DIVISI 2. STRUKTUR
II.A PEKERJAAN BETON
1 Kolom KL3 (35.35)
- Cor Beton Kolom f'c 17
- Besi Polos Ø 12
- Besi Ulir Ø 16
- Bekisting Kolom
2 Kolom KL4 15.15
- Cor Beton kolom f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 10
- Bekisting kolom
3 Balok BL4 (12.15)
- Cor Balok BL3 f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 10
- Bekisting Balok
4 Balok BL4 (20.25)
- Cor Balok BL4 f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting Balok BL
II.B PEKERJAAN PAS KUDA-KUDA
1 Pas. Kuda-kuda baja ringan C.75.75 R.32.45
III DIVISI 3. ARSITEKTUR
III.A PEKERJAAN DINDING
1 Pas dinding batu bata 1:4
2 Plesteran 1:4
3 Pas dinding partisi GRC
III.B PEKERJAAN LANTAI
1 Pas Keramik Lantai 40.40
2 Pas Plint Keramik 10.40
III.C PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu Besi PA
2 Kusen PA
3 Kusen JA
III.D PEKERJAAN ATAP DAN PLAFOND
1 Pas Atap Seng Gelombang Warna
2 Nok seng plat warna
3 Lisplank GRC 20 Cm
4 Jalusi atap baja ringan
5 Rangka Plafond
6 Pas plafond PVC
7 Pas List plafond PVC
III.E PEKERJAAN FINISHING CAT
1 Cat kayu
2 Cat Besi
3 Cat Tembok
IV DIVISI 4. LANSEKAP
V DIVISI 5. MEKANIKAL DAN ELEKTRIKAL
VI DIVISI 6. PLAMBING
VII PEKERJAAN LAIN-LAIN
1 Administrasi dan pelaporan
2 Pemasangan Prasasti
3 Pembersihan akhir pekerjaan
Bengkulu, Mei 2024
Pengguna Anggaran (PA)
Dinas Pendidikan dan Kebudayaan
Provinsi Bengkulu
SAIDIRMAN, SE, M.Si.
NIP. 19750201 200604 1 007