| Reason | |||
|---|---|---|---|
| 0811752237311000 | Rp 436,598,543 | - | |
| 0016337339328000 | - | - | |
| 0749435848311000 | Rp 418,647,071 | Pemberi sewa Tidak melampirkan bukti kepemilikan/penguasaan alat mobil pickup kapasitas 1500 cc | |
| 0849496674311000 | - | - | |
CV Cahaya Ratu Emas | 05*4**8****11**0 | - | - |
| 0826371957311000 | - | - | |
CV Mitra Pprima Engineer | 05*7**9****41**0 | - | - |
| 0967636135311000 | - | - | |
| 0839461738327000 | - | - | |
CV Js Brother | 01*5**7****11**0 | - | - |
| 0438029613328000 | - | - | |
| 0601398316311000 | - | - | |
| 0024773160327000 | - | - | |
| 0625640016311000 | - | - | |
| 0620016295327000 | - | - |
PEMERINTAH PROVINSI BENGKULU
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Mayjend S. Parman No. 07 Telp 21620-21623 Fax (0736) 22117 Bengkulu
URAIAN SINGKAT PEKERJAAN (USP)
PEKERJAAN
PEMBANGUNAN RUANG LABORATORIUM FISIKA
SMK NEGERI 5 KOTA BENGKULU
TAHUN ANGGARAN
2024
URAIAN SINGKAT PEKERJAAN
PEKERJAAN PEMBANGUNAN RUANG LABORATORIUM FISIKA SMK NEGERI 5 KOTA BENGKULU
Adapun lingkup pekerjaan yang harus dilaksanakan oleh penyedia jasa dalam pekerjaan ini meliputi :
I DIVISI 1. PERSIAPAN LAPANGAN
I.A UMUM
1 Pembersihan lokasi
2 Pek. Papan nama pekerjaan
3 Pasangan Bowplank
4 Sewa Direksi Keet + Gudang
5 Pemasangan Prasasti
6 Pengadaan listrik dan Air kerja
7 Desain DMF, JMF dan Uji Beton
8 Sistem Manajemen Keselamatan Konstruksi
Alat Pelindung Kerja dan Alat Pelindung Diri
Topi Pelindung
Sepatu Keselamatan
Rompi keselamatan
Asuransi dan Perizinan Terkait Keselamatan Konstruksi
Asuransi
Fasilitas, Sarana dan Prasarana Kesehatan
Peralatan P3K
I.B PEKERJAAN TANAH
1 Galian tanah pondasi
2 Urugan tanah kembali
3 Urugan didatangkan
4 Pemadatan tanah manual
5 Urugan pasir bawah lantai
II DIVISI 2. STRUKTUR
II.A PEKERJAAN PASANGAN PONDASI
1 Pas Batu Kosong
2 Pas Batu gunung
II.B PEKERJAAN BETON
1 Sloof 20.25
- Cor Beton sloof f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 10
- Besi Polos Ø 12
- Bekisting sloof
2 Kolom 20.20
- Cor Kolom f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting Kolom 20.20
3 Kolom Praktis 11.11
- Cor Kolom praktis f'c 17
- Besi Polos Ø 6
- Besi Polos Ø 10
- Bekisting Kolom Praktis
4 Balok 15.20 (B-1)
- Cor Balok f'c 17
- Besi Polos Ø 8
- Besi Polos Ø 12
- Bekisting Balok 15.20 (B-1)
II.C PEKERJAAN PAS KUDA-KUDA
1 Pas. Kuda-kuda baja ringan C.75.75 R.32.45
III DIVISI 3. ARSITEKTUR
III.A PEKERJAAN DINDING
1 Pas dinding batu bata 1:2
2 Pas dinding batu bata 1:4
3 Plesteran 1:2
4 Plesteran 1:4
III.B PEKERJAAN LANTAI
1 Cor beton lantai f'c 15
2 Pas Keramik Lantai 40.40
3 Pas Plint Keramik 10.40
III.C PEKERJAAN KUSEN, PINTU DAN JENDELA
1 Pintu PA
2 Kusen PA
3 Kusen JA
4 Teralis jendela
III.D PEKERJAAN ATAP DAN PLAFOND
1 Rangka Plafond
2 Pas plafond PVC
3 Pas List plafond PVC
4 Pas Atap Seng Gelombang Warna
5 Nok seng plat warna
6 Lisplank GRC 20 Cm
7 Jalusi atap baja ringan
III.E PEKERJAAN FINISHING CAT
1 Cat kayu
2 Cat Besi
3 Cat Tembok
IV DIVISI 4. LANSEKAP
V DIVISI 5. MEKANIKAL DAN ELEKTRIKAL
1 Pasangan kabel TC
2 Pas box MCB
3 Pas saklar seri
4 Pas saklar triple
5 Pas stop kontak
6 Pas titik instalasi stop kontak
7 Instalasi titik lampu
8 Pas. Fitting E27 + 11 Watt LED
9 Pas. Fitting E27 + 19 Watt LED
VI DIVISI 6. PLAMBING
VII PEKERJAAN LAIN-LAIN
1 Administrasi dan pelaporan
2 Pembersihan akhir pekerjaan
Bengkulu, Mei 2024
Pengguna Anggaran (PA)
Dinas Pendidikan dan Kebudayaan
Provinsi Bengkulu
SAIDIRMAN, SE, M.Si.
NIP. 19750201 200604 1 007