| 0019063775805000 | Rp 35,125,000,000 | |
| 0313108771432000 | - | |
| 0028405991609000 | - | |
| 0017058439912000 | - | |
| 0029245107915000 | - | |
| 0805543444912000 | - | |
| 0032345845913000 | - | |
| 0015066657913000 | - | |
| 0943803692912000 | - | |
Arzaf Jaya Gemilang | 04*9**9****12**0 | - |
| 0029725157912000 | - | |
| 0018841007912000 | - | |
PT Tiga Tujuh Sejahtera | 05*2**5****11**0 | - |
| 0012265120912000 | - | |
| 0020300851912000 | - | |
| 0015435910904000 | - | |
| 0748629839612000 | - | |
Said Budairy | 36*1**2****60**4 | - |
PT Adhimas Jaya Perkasa | 07*9**4****12**0 | - |
| 0027202365911000 | - | |
| 0738991611912000 | - |
URAIAN PEKERJAAN T.A. 2025
PEKERJAAN : PEMBANGUNAN RUANG RAWAT INAP DALAM RANGKA PENINGKATAN
KELAS RS DALAM MENDUKUNG LAYANAN KJSU
SUB PEKERJAAN : STRUKTUR
LOKASI : KOTA BIMA
TH. ANGGARAN : 2025 - 2026
NO URAIAN PEKERJAAN VOLUME
01 02 03
A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN
1 Papan Nama Pekerjaan 1 ,00 bh
2 Pagar Proyek 1 ,00 ls
3 Pengukuran dan pemasangan bouwplank 2 40,00 m'
4 Air Kerja & Listrik 1 ,00 lot
5 Direksi Keet 3 6,00 m2
6 Gudang & Barak Kerja 3 6,00 m2
7 Penyiapan RK3K
Pembuatan Manual, Prosedur, Instruksi Kerja 1 ,00 Set
Pembuatan Kartu Identitas Kerja 5 0,00 Bh
8 Sosialisasi dan Promosi K3
Induksi K3 1 ,00 Kali
Pengarahan K3 (Safety Briefing) 1 ,00 Kali
Pelatihan K3 1 ,00 Kali
Bekerja di Ketinggian 1 ,00 Kali
9 Alat Pelindung Kerja & Alat Pelindung Diri
Topi Pelindung 5 0,00 Bh
Sarung Tangan 5 0,00 Bh
Sepatu keselamatan 5 0,00 Bh
Rompi keselamatan 5 0,00 Bh
10 Konsultasi dengan ahli terkait Keselmatan Konstruksi 1 ,00 Set
11 Personil K3
Ahli K3 5 ,00 OB
Petugas K3 Konstruksi 5 ,00 OB
12 Fasilitas Sarana Kesehatan
Peralatan P3K (kotak P3K, Tandu, Obat Luka, Perban, dll) 1 ,00 Set
13 Rambu - rambu
Rambu Petunjuk 1 ,00 Bh
Rambu Larangan 1 ,00 Bh
Rambu Peringatan 1 ,00 Bh
Rambu Kewajiban 1 ,00 Bh
14 Lain-lain terkait pengendalian risiko K3
Alat Pemadam Kebakaran Ringan 3 kg 1 ,00 bh
Bendera K3 1 ,00 bh
15 Asuransi dan Perijinan terkait keselamatan konstruksi 1 ,00 lot
II PEKERJAAN PONDASI BORE PILE
1 Mob. Dan Demob. Alat Boring 1 ,00 lot
2 Pengeboran Bored Pile Ø40 1 .183,00 m'
3 Pasang Casing Ø40 1 69,00 titik
4 Beton Bertulang Bored Pile diameter 40 cm
Beton f'c 25 Mpa 1 48,58 m3
Pembesian 2 1.706,73 kg
6 Tes PDA 4 ,00 titik
7 Tes PIT 2 ,00 titik
9 Pembuangan Tanah Pengeboran ke Luar Proyek 1 48,58 m3
10 Pecah Kepala Bored Pile 1 69,00 titik
III PEKERJAAN PILE CAP, PIT LIFT & PONDASI BATU KALI
1 Galian Tanah Pile Cap & Pit Lift 2 47,26 m3
2 Urugan Pasir Pile Cap & Pit Lift 2 1,20 m3
3 Lantai Kerja Pile Cap & Pit Lift 1 0,60 m3
Beton Bertulang Pile Cap
4 Pile Cap Type P3
Beton f'c 25 Mpa 2 ,00 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pembesian 2 53,98 kg
Bekisting Batako 6 ,48 m2
5 Pile Cap Type P4
Beton f'c 25 Mpa 3 ,00 m3
Pembesian 3 24,89 kg
Bekisting Batako 7 ,56 m2
6 Pile Cap Type P6
Beton f'c 25 Mpa 6 1,44 m3
Pembesian 7 .084,26 kg
Bekisting Batako 1 23,12 m2
7 Pile Cap Type P8
Beton f'c 25 Mpa 7 5,42 m3
Pembesian 9 .959,06 kg
Bekisting Batako 1 15,75 m2
8 Pile Cap Type P12
Beton f'c 25 Mpa 1 0,88 m3
Pembesian 1 .259,29 kg
Bekisting Batako 1 7,10 m2
9 Pile Cap Type P14
Beton f'c 25 Mpa 1 7,08 m3
Pembesian 1 .967,10 kg
Bekisting Batako 2 1,61 m2
10 Beton Bertulang Plat Pit Lift
Beton f'c 25 Mpa 3 ,05 m3
Pembesian 5 32,06 kg
Bekisting Batako 6 ,28 m2
11 Beton Bertulang Dinding Pit Lift
Beton f'c 25 Mpa 3 ,24 m3
Pembesian 4 75,90 kg
Bekisting Multiplek 1 2,96 m2
Bekisting batako 1 2,96 m2
12 Pekerjaan Waterproofing 3 2,03 m2
15 Pekerjaan Waterstop 1 4,00 m'
Pondasi Batu Kali
1 Galian Tanah 2 84,13 m3
2 Pasir Urug 1 8,09 m3
3 Pas Batu Kosong 7 2,38 m3
4 Pas Batu Belah 1PC : 6PS 1 80,47 m3
5 Urugan Tanah Kembali 6 6,28 m3
IV PEKERJAAN TANAH
1 Peninggian Elevasi Tanah Gedung Utama 6 18,00 m3
2 Pemadatan Gedung Utama 6 18,00 m3
URAIAN PEKERJAAN T.A. 2026
PEKERJAAN : PEMBANGUNAN RUANG RAWAT INAP DALAM RANGKA
PENINGKATAN KELAS RS DALAM MENDUKUNG LAYANAN KJSU
SUB PEKERJAAN : STRUKTUR
LOKASI : KOTA BIMA
TH. ANGGARAN : 2025 - 2026
NO URAIAN PEKERJAAN VOLUME
01 02 03
A PEKERJAAN STRUKTUR
I PEKERJAAN BETON BERTULANG
A LANTAI 01
Beton Bertulang Sloof
1 Pasir Urug 3 ,12 m3
2 Lantai Kerja 3 ,12 m3
3 Sloof Type S1
Beton f'c 25 Mpa 1 7,57 m3
Pembesian 3 .690,43 kg
Bekisting Sloof 1 40,56 m2
4 Sloof Type S2
Beton f'c 25 Mpa 9 ,21 m3
Pembesian 1 .908,18 kg
Bekisting Sloof 7 3,70 m2
5 Sloof Type SP
Beton f'c 14,5 Mpa 8 ,08 m3
Pembesian 1 .160,67 kg
Bekisting Sloof 1 07,74 m2
Beton Bertulang Kolom
1 Kolom Type K1A
Beton f'c 25 Mpa 4 8,30 m3
Pembesian 1 1.277,86 kg
Bekisting Kolom 2 99,00 m2
2 Kolom Type K3
Beton f'c 25 Mpa 2 ,90 m3
Pembesian 6 36,17 kg
Bekisting Kolom 2 3,20 m2
Balok Separator
1 Balok Type BS
Beton f'c 25 Mpa 0 ,34 m3
Pembesian 9 0,36 kg
Bekisting Balok 4 ,48 m2
B LANTAI 02
Beton Bertulang Balok
1 Balok Type G1A
Beton f'c 25 Mpa 1 0,73 m3
Pembesian 2 .831,18 kg
Bekisting Balok 7 6,65 m2
2 Balok Type G1B
Beton f'c 25 Mpa 1 9,87 m3
Pembesian 6 .086,81 kg
Bekisting Balok 1 41,93 m2
3 Balok Type G1C
Beton f'c 25 Mpa 1 8,55 m3
Pembesian 3 .884,37 kg
Bekisting Balok 1 32,48 m2
4 Balok Type G2A
Beton f'c 25 Mpa 2 ,50 m3
Pembesian 6 28,26 kg
Bekisting Balok 1 8,45 m2
5 Balok Type G3
Beton f'c 25 Mpa 3 ,62 m3
Pembesian 8 19,46 kg
Bekisting Balok 2 7,95 m2
6 Balok Type B1A
Beton f'c 25 Mpa 1 5,30 m3
Pembesian 3 .878,09 kg
NO URAIAN PEKERJAAN VOLUME
01 02 03
Bekisting Balok 1 53,00 m2
7 Balok Type B1B
Beton f'c 25 Mpa 8 ,08 m3
Pembesian 1 .464,09 kg
Bekisting Balok 8 0,81 m2
8 Balok Type B3
Beton f'c 25 Mpa 4 ,17 m3
Pembesian 6 87,03 kg
Bekisting Balok 5 2,14 m2
9 Balok Type B4
Beton f'c 25 Mpa 1 ,58 m3
Pembesian 3 03,95 kg
Bekisting Balok 2 1,06 m2
10 Balok Type B5
Beton f'c 25 Mpa 1 ,56 m3
Pembesian 3 50,08 kg
Bekisting Balok 2 6,00 m2
11 Balok Type GK
Beton f'c 25 Mpa 1 ,16 m3
Pembesian 5 48,05 kg
Bekisting Balok 8 ,77 m2
Beton Bertulang Plat
1 Plat Type S1A
Beton f'c 25 Mpa 5 1,55 m3
Wiremesh M6 3 .245,04 kg
Steel Deck Tebal 0,75 mm 4 84,63 m2
2 Plat Type S1B
Beton f'c 25 Mpa 2 2,80 m3
Pembesian 3 .659,33 kg
Bekisting Plat 1 90,03 m2
Beton Bertulang Kolom
1 Kolom Type K1A
Beton f'c 25 Mpa 4 0,32 m3
Pembesian 8 .554,00 kg
Bekisting Kolom 2 49,60 m2
2 Kolom Type K3
Beton f'c 25 Mpa 2 ,00 m3
Pembesian 4 27,89 kg
Bekisting Kolom 1 6,00 m2
Balok Separator
1 Balok Type BS
Beton f'c 25 Mpa 0 ,34 m3
Pembesian 9 0,36 kg
Bekisting Balok 4 ,48 m2
C LANTAI 03
Beton Bertulang Balok
1 Balok Type G1A
Beton f'c 25 Mpa 1 0,73 m3
Pembesian 2 .827,37 kg
Bekisting Balok 7 6,65 m2
2 Balok Type G1B
Beton f'c 25 Mpa 1 9,87 m3
Pembesian 4 .547,33 kg
Bekisting Balok 1 41,93 m2
3 Balok Type G1C
Beton f'c 25 Mpa 1 8,55 m3
Pembesian 3 .884,37 kg
Bekisting Balok 1 32,48 m2
4 Balok Type G2A
Beton f'c 25 Mpa 2 ,02 m3
Pembesian 5 25,06 kg
Bekisting Balok 1 4,88 m2
5 Balok Type G3
Beton f'c 25 Mpa 3 ,62 m3
Pembesian 8 11,48 kg
Bekisting Balok 2 7,95 m2
NO URAIAN PEKERJAAN VOLUME
01 02 03
6 Balok Type B1A
Beton f'c 25 Mpa 1 5,30 m3
Pembesian 3 .849,51 kg
Bekisting Balok 1 53,00 m2
7 Balok Type B1B
Beton f'c 25 Mpa 8 ,16 m3
Pembesian 1 .472,91 kg
Bekisting Balok 8 1,63 m2
8 Balok Type B3
Beton f'c 25 Mpa 4 ,15 m3
Pembesian 6 84,36 kg
Bekisting Balok 5 1,92 m2
9 Balok Type B4
Beton f'c 25 Mpa 1 ,58 m3
Pembesian 3 03,95 kg
Bekisting Balok 2 1,06 m2
10 Balok Type B5
Beton f'c 25 Mpa 1 ,56 m3
Pembesian 3 50,08 kg
Bekisting Balok 2 6,00 m2
11 Balok Type GK
Beton f'c 25 Mpa 1 ,16 m3
Pembesian 5 53,90 kg
Bekisting Balok 8 ,77 m2
Beton Bertulang Plat
1 Plat Type S1A
Beton f'c 25 Mpa 5 1,54 m3
Wiremesh M6 3 .126,73 kg
Steel Deck Tebal 0,75 mm 4 83,80 m2
2 Plat Type S1B
Beton f'c 25 Mpa 2 1,85 m3
Pembesian 3 .512,00 kg
Bekisting Plat 1 82,11 m2
Beton Bertulang Kolom
1 Kolom Type K1B
Beton f'c 25 Mpa 3 3,60 m3
Pembesian 5 .806,34 kg
Bekisting Kolom 2 08,00 m2
2 Kolom Type K2
Beton f'c 25 Mpa 5 ,20 m3
Pembesian 1 .021,70 kg
Bekisting Kolom 3 6,80 m2
3 Kolom Type K3
Beton f'c 25 Mpa 2 ,00 m3
Pembesian 4 27,89 kg
Bekisting Kolom 1 6,00 m2
Balok Separator
1 Balok Type BS
Beton f'c 25 Mpa 0 ,34 m3
Pembesian 9 0,36 kg
Bekisting Balok 4 ,48 m2
D LANTAI ATAP
Beton Bertulang Balok
1 Balok Type G1B
Beton f'c 25 Mpa 1 4,97 m3
Pembesian 3 .433,90 kg
Bekisting Balok 1 06,93 m2
2 Balok Type G1C
Beton f'c 25 Mpa 6 ,20 m3
Pembesian 1 .293,83 kg
Bekisting Balok 4 4,28 m2
3 Balok Type G2A
Beton f'c 25 Mpa 2 ,69 m3
Pembesian 6 68,65 kg
Bekisting Balok 1 9,84 m2
4 Balok Type G2B
NO URAIAN PEKERJAAN VOLUME
01 02 03
Beton f'c 25 Mpa 1 7,65 m3
Pembesian 2 .719,59 kg
Bekisting Balok 1 30,28 m2
5 Balok Type G3
Beton f'c 25 Mpa 3 ,77 m3
Pembesian 8 40,85 kg
Bekisting Balok 2 9,09 m2
6 Balok Type B1B
Beton f'c 25 Mpa 8 ,36 m3
Pembesian 1 .608,99 kg
Bekisting Balok 8 3,64 m2
7 Balok Type B2
Beton f'c 25 Mpa 1 ,19 m3
Pembesian 1 81,95 kg
Bekisting Balok 1 2,54 m2
8 Balok Type B3
Beton f'c 25 Mpa 1 2,57 m3
Pembesian 1 .849,46 kg
Bekisting Balok 1 57,16 m2
9 Balok Type B5
Beton f'c 25 Mpa 0 ,55 m3
Pembesian 1 35,70 kg
Bekisting Balok 9 ,18 m2
10 Balok Type GK
Beton f'c 25 Mpa 1 ,27 m3
Pembesian 5 81,08 kg
Bekisting Balok 9 ,57 m2
11 Balok Type BK
Beton f'c 25 Mpa 1 ,36 m3
Pembesian 4 10,76 kg
Bekisting Balok 1 3,94 m2
Beton Bertulang Plat
1 Plat Type S1B
Beton f'c 25 Mpa 1 4,43 m3
Pembesian 2 .498,55 kg
Bekisting Plat 1 20,24 m2
2 Plat Type S3
Beton f'c 25 Mpa 2 8,62 m3
Pembesian 7 .369,00 kg
Bekisting Plat 1 90,83 m2
Beton Bertulang Kolom
1 Kolom Type K3
Beton f'c 25 Mpa 1 ,75 m3
Pembesian 3 85,26 kg
Bekisting Kolom 1 4,00 m2
2 Kolom Type K4
Beton f'c 25 Mpa 1 ,26 m3
Pembesian 2 91,25 kg
Bekisting Kolom 1 6,80 m2
Beton Bertulang Hoistway
1 Dinding Hoistway
Beton f'c 25 Mpa 1 ,79 m3
Pembesian 4 49,77 kg
Bekisting Dinding 1 7,85 m2
2 Plat Hoistway
Beton f'c 25 Mpa 1 ,02 m3
Pembesian 3 64,83 kg
Bekisting Plat 7 ,80 m2
E LANTAI ATAP LIFT
Beton Bertulang Balok
1 Balok Type B2
Beton f'c 25 Mpa 3 ,03 m3
Pembesian 4 54,38 kg
Bekisting Balok 3 1,82 m2
2 Balok Type B5
Beton f'c 25 Mpa 1 ,04 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pembesian 1 94,50 kg
Bekisting Balok 1 7,40 m2
Beton Bertulang Plat
1 Plat Type S1B
Beton f'c 25 Mpa 3 ,21 m3
Pembesian 5 00,25 kg
Bekisting Plat 2 6,73 m2
II PEKERJAAN KONTRUKSI BAJA
Pekerjaan Atap Utama
1 Pekerjaaan Rangka Atap Baja Konvensional (termasuk kuda-kuda, 5 .144,85 kg
gording,track stang ,ikatan angin, plendes, mur baut dan finish zinchromate)
2 Pekerjaan Gunungan :
Beton Bertulang Kolom Type KP 1 0,24 m'
Beton Bertulang Balok Type BP 8 0,86 m'
Pasangan dinding bata ringan tebal 10 cm 5 9,55 m2
Plesteran & Acian bata ringan dengan mortar siap pakai 1 19,10 m2
Cat Eksterior 1 19,10 m2
3 Pasang Atap Zincalume t = 0,45 mm + Insulation XLPE tebal 8 mm 4 08,30 m2
4 Pasang Bubungan Atap Zincalume 2 2,81 m'
III PEKERJAAN STRUKTUR RAMP
Beton Bertulang Bore Pile
1 Pengeboran Bored Pile Ø40 2 31,00 m'
2 Pasang Casing Ø40 3 3,00 titik
3 Beton Bertulang Bored Pile diameter 40 cm
Beton f'c 25 Mpa 2 9,01 m3
Pembesian 4 .238,59 kg
6 Pembuangan Tanah Pengeboran ke Luar Proyek 2 9,01 m3
7 Pecah Kepala Bored Pile 3 3,00 titik
Beton Bertulang Pile Cap
1 Galian Tanah Pile Cap 2 9,73 m3
2 Urugan Pasir Pile Cap 2 ,30 m3
3 Lantai Kerja Pile Cap 1 ,15 m3
4 Pile Cap Type P1
Beton f'c 25 Mpa 9 ,41 m3
Pembesian 1 .365,95 kg
Bekisting Batako 6 4,26 m2
5 Pile Cap Type P2
Beton f'c 25 Mpa 7 ,20 m3
Pembesian 8 88,95 kg
Bekisting Batako 3 2,40 m2
Pondasi Batu Kali
1 Galian Tanah 1 13,53 m3
2 Pasir Urug 8 ,62 m3
3 Pas Batu Kosong 3 4,47 m3
4 Pas Batu Belah 1PC : 6PS 8 4,56 m3
5 Urugan Tanah Kembali 1 6,98 m3
Beton Bertulang Sloof
1 Pasir Urug 1 ,28 m3
2 Lantai Kerja 1 ,28 m3
3 Sloof Type S1
Beton f'c 25 Mpa 1 0,25 m3
Pembesian 2 .518,26 kg
Bekisting Sloof 8 1,96 m2
4 Sloof Type SP
Beton f'c 14,5 Mpa 0 ,33 m3
Pembesian 5 0,30 kg
Bekisting Sloof 4 ,36 m2
Beton Bertulang Kolom Ramp Lantai 01
1 Kolom Type KR1
Beton f'c 25 Mpa 5 ,08 m3
Pembesian 1 .283,73 kg
Bekisting Kolom 5 0,76 m2
2 Kolom Type KR2
Beton f'c 25 Mpa 1 4,81 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pembesian 3 .703,19 kg
Bekisting Kolom 1 57,92 m2
Beton Bertulang Ramp Lantai 01-02
1 Balok Type BA
Beton f'c 25 Mpa 1 ,13 m3
Pembesian 1 77,92 kg
Bekisting Balok 9 ,45 m2
2 Balok Type BB
Beton f'c 25 Mpa 1 ,89 m3
Pembesian 3 04,57 kg
Bekisting Balok 1 6,38 m2
3 Balok Type BR2
Beton f'c 25 Mpa 7 ,70 m3
Pembesian 1 .122,44 kg
Bekisting Balok 7 7,00 m2
4 Balok Type BR3
Beton f'c 25 Mpa 1 ,97 m3
Pembesian 2 89,73 kg
Bekisting Balok 2 0,63 m2
5 Plat Type S1B
Beton f'c 25 Mpa 1 1,20 m3
Pembesian 1 .528,20 kg
Bekisting Plat 9 3,32 m2
Beton Bertulang Tangga
1 Balok Bordes Type BB
Beton f'c 25 Mpa 0 ,27 m3
Pembesian 6 0,57 kg
Bekisting Balok 2 ,84 m2
2 Beton Bertulang Plat Tangga
Beton f'c 25 Mpa 3 ,03 m3
Pembesian 1 .035,02 kg
Bekisting Tangga 2 4,63 m2
Beton Bertulang Ramp Lantai 02
1 Balok Type BA
Beton f'c 25 Mpa 3 ,00 m3
Pembesian 4 61,34 kg
Bekisting Balok 2 4,98 m2
2 Balok Type BB
Beton f'c 25 Mpa 0 ,63 m3
Pembesian 9 7,78 kg
Bekisting Balok 5 ,46 m2
3 Balok Type BC
Beton f'c 25 Mpa 0 ,14 m3
Pembesian 2 4,23 kg
Bekisting Balok 1 ,27 m2
4 Balok Type BR2
Beton f'c 25 Mpa 2 ,30 m3
Pembesian 3 60,88 kg
Bekisting Balok 2 3,00 m2
5 Balok Type BR3
Beton f'c 25 Mpa 5 ,36 m3
Pembesian 7 68,57 kg
Bekisting Balok 5 6,28 m2
6 Balok Type BR4
Beton f'c 25 Mpa 0 ,41 m3
Pembesian 8 1,44 kg
Bekisting Balok 5 ,46 m2
7 Balok Type GK
Beton f'c 25 Mpa 0 ,90 m3
Pembesian 2 58,20 kg
Bekisting Balok 6 ,76 m2
8 Plat Type S1B
Beton f'c 25 Mpa 4 ,98 m3
Pembesian 7 46,24 kg
Bekisting Plat 4 1,54 m2
Beton Bertulang Kolom Ramp Lantai 02
1 Kolom Type KR1
Beton f'c 25 Mpa 2 ,16 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pembesian 5 37,16 kg
Bekisting Kolom 2 1,60 m2
2 Kolom Type KR2
Beton f'c 25 Mpa 1 4,40 m3
Pembesian 3 .410,11 kg
Bekisting Kolom 1 53,60 m2
Beton Bertulang Ramp Lantai 02-03
1 Balok Type BA
Beton f'c 25 Mpa 1 ,13 m3
Pembesian 1 77,92 kg
Bekisting Balok 9 ,45 m2
2 Balok Type BB
Beton f'c 25 Mpa 1 ,89 m3
Pembesian 3 04,57 kg
Bekisting Balok 1 6,38 m2
3 Balok Type BR2
Beton f'c 25 Mpa 7 ,70 m3
Pembesian 1 .122,44 kg
Bekisting Balok 7 7,00 m2
4 Balok Type BR3
Beton f'c 25 Mpa 1 ,97 m3
Pembesian 2 89,73 kg
Bekisting Balok 2 0,63 m2
5 Plat Type S1B
Beton f'c 25 Mpa 1 1,20 m3
Pembesian 1 .528,20 kg
Bekisting Plat 9 3,32 m2
Beton Bertulang Tangga
1 Balok Bordes Type BB
Beton f'c 25 Mpa 0 ,27 m3
Pembesian 6 0,57 kg
Bekisting Balok 2 ,84 m2
2 Beton Bertulang Plat Tangga
Beton f'c 25 Mpa 3 ,03 m3
Pembesian 1 .029,69 kg
Bekisting Tangga 2 3,86 m2
Beton Bertulang Ramp Lantai 03
1 Balok Type BA
Beton f'c 25 Mpa 3 ,00 m3
Pembesian 4 61,34 kg
Bekisting Balok 2 4,98 m2
2 Balok Type BB
Beton f'c 25 Mpa 0 ,63 m3
Pembesian 9 7,78 kg
Bekisting Balok 5 ,46 m2
3 Balok Type BC
Beton f'c 25 Mpa 0 ,14 m3
Pembesian 2 4,23 kg
Bekisting Balok 1 ,27 m2
4 Balok Type BR2
Beton f'c 25 Mpa 2 ,30 m3
Pembesian 3 60,88 kg
Bekisting Balok 2 3,00 m2
5 Balok Type BR3
Beton f'c 25 Mpa 5 ,36 m3
Pembesian 7 68,57 kg
Bekisting Balok 5 6,28 m2
6 Balok Type BR4
Beton f'c 25 Mpa 0 ,41 m3
Pembesian 8 1,44 kg
Bekisting Balok 5 ,46 m2
7 Balok Type GK
Beton f'c 25 Mpa 0 ,90 m3
Pembesian 2 58,20 kg
Bekisting Balok 6 ,76 m2
6 Plat Type S1B
Beton f'c 25 Mpa 4 ,98 m3
Pembesian 7 46,24 kg
NO URAIAN PEKERJAAN VOLUME
01 02 03
Bekisting Plat 4 1,54 m2
Beton Bertulang Kolom Ramp Lantai 03
1 Kolom Type KR1
Beton f'c 25 Mpa 2 ,16 m3
Pembesian 5 37,16 kg
Bekisting Kolom 2 1,60 m2
2 Kolom Type KR2
Beton f'c 25 Mpa 1 1,86 m3
Pembesian 2 .668,69 kg
Bekisting Kolom 1 26,53 m2
Pekerjaan Balok Ramp Lantai 03-Atap
1 Balok Type BA
Beton f'c 25 Mpa 3 ,75 m3
Pembesian 5 76,55 kg
Bekisting Balok 3 1,28 m2
2 Plat Type BB
Beton f'c 25 Mpa 0 ,63 m3
Pembesian 9 7,78 kg
Bekisting Plat 5 ,46 m2
3 Plat Type BC
Beton f'c 25 Mpa 0 ,14 m3
Pembesian 2 4,23 kg
Bekisting Plat 1 ,27 m2
4 Plat Type BR1
Beton f'c 25 Mpa 6 ,98 m3
Pembesian 9 33,75 kg
Bekisting Plat 6 7,43 m2
5 Plat Type BR2
Beton f'c 25 Mpa 3 ,32 m3
Pembesian 5 15,10 kg
Bekisting Plat 3 3,16 m2
6 Plat Type BR3
Beton f'c 25 Mpa 2 ,58 m3
Pembesian 3 98,41 kg
Bekisting Plat 2 7,09 m2
7 Plat Type BR4
Beton f'c 25 Mpa 0 ,41 m3
Pembesian 8 1,51 kg
Bekisting Plat 5 ,46 m2
8 Plat Type GK
Beton f'c 25 Mpa 0 ,90 m3
Pembesian 2 58,20 kg
Bekisting Plat 6 ,76 m2
9 Plat Type S1B
Beton f'c 25 Mpa 1 6,92 m3
Pembesian 2 .376,14 kg
Bekisting Plat 1 41,04 m2
Beton Bertulang Tangga
1 Balok Bordes Type BB
Beton f'c 25 Mpa 3 ,03 m3
Pembesian 1 .029,69 kg
Bekisting Balok 2 3,86 m2
2 Beton Bertulang Plat Tangga
Beton f'c 25 Mpa 3 ,03 m3
Pembesian 1 .029,69 kg
Bekisting Tangga 2 3,86 m2
Beton Bertulang Kolom Ramp Lantai Atap
1 Kolom Type K4
Beton f'c 25 Mpa 1 ,89 m3
Pembesian 4 36,88 kg
Bekisting Kolom 2 5,20 m2
Beton Bertulang Ramp Atap Tangga
1 Balok Type BR3
Beton f'c 25 Mpa 2 ,18 m3
Pembesian 3 27,64 kg
Bekisting Balok 2 2,89 m2
2 Plat Type BR5
Beton f'c 25 Mpa 1 ,08 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pembesian 1 61,91 kg
Bekisting Plat 1 4,45 m2
3 Plat Type S1B
Beton f'c 25 Mpa 2 ,18 m3
Pembesian 3 48,00 kg
Bekisting Plat 1 8,18 m2
IV PEKERJAAN BAK PENAMPUNG AIR BEKAS & KOTOR
1 Galian Tanah 2 1,53 m3
2 Pasir Urug 1 ,06 m3
3 Lantai Kerja 0 ,53 m3
4 Plat Lantai Bawah
Beton f'c 25 Mpa+Integral 2 ,11 m3
Pembesian 3 08,88 kg
Bekisting Batako 4 ,76 m2
5 Plat Dinding
Beton f'c 25 Mpa+Integral 3 ,79 m3
Pembesian 7 39,18 kg
Bekisting Dinding 4 0,48 m2
6 Balok Type GB1
Beton f'c 25 Mpa+Integral 0 ,90 m3
Pembesian 1 97,93 kg
Bekisting Balok 1 1,20 m2
7 Plat Penutup Atas
Beton f'c 25 Mpa+Integral 0 ,79 m3
Pembesian 2 35,20 kg
Bekisting Plat 7 ,08 m2
V PEKERJAAN SELASAR
Pondasi Batu Kali
1 Galian Tanah 2 3,13 m3
2 Pasir Urug 1 ,10 m3
3 Pas Batu Kosong 4 ,41 m3
4 Pas Batu Belah 1PC : 6PS 1 1,57 m3
5 Urugan Tanah Kembali 6 ,61 m3
Struktur Atas
6 Sloof Type SP
Beton f'c 14,5 Mpa 0 ,76 m3
Pembesian 1 09,80 kg
Bekisting Sloof 1 0,12 m2
7 Kolom Pedestal
Beton f'c 14,5 Mpa 0 ,14 m3
Pembesian 4 1,98 kg
Bekisting Sloof 2 ,25 m2
Pekerjaan Atap
1 Pekerjaaan Rangka Baja Konvensional (termasuk kuda-kuda, 1 .399,83 kg
gording,track stang ,ikatan angin, plendes, mur baut dan finish zinchromate)
2 Finishing Cat Baja 3 8,68 m2
3 Pasang Penutup Atap UPVC 7 2,42 m2
4 Pasang Bubungan Atap UPVC 6 ,53 m'
5 Pasang Listplank 2 5,41 m'
6 Finishing Cat Kayu Listplank 7 ,62 m2
7 Pasang Flashing BJLS 1 2,35 m'
VI PEKERJAAN STRUKTUR DEPO OBAT
Pondasi Batu Kali
1 Galian Tanah 1 7,65 m3
2 Pasir Urug 0 ,98 m3
3 Pas Batu Kosong 3 ,92 m3
4 Pas Batu Belah 1PC : 6PS 9 ,60 m3
5 Urugan Tanah Kembali 3 ,83 m3
Struktur Atas
6 Sloof Type SP
Beton f'c 14,5 Mpa 0 ,75 m3
Pembesian 1 06,62 kg
NO URAIAN PEKERJAAN VOLUME
01 02 03
Bekisting Sloof 9 ,98 m2
7 Kolom Praktis 2 5,60 m'
Pekerjaan Atap
1 Pekerjaaan Rangka Baja Konvensional (termasuk kuda-kuda, 1 42,28 kg
gording,track stang ,ikatan angin, plendes, mur baut dan finish zinchromate)
2 Pekerjaan Gunungan :
Beton Bertulang Kolom Type KP 4 ,06 m'
Beton Bertulang Balok Type BP 3 8,39 m'
Pasangan dinding bata ringan tebal 10 cm 1 0,60 m2
Plesteran & Acian bata ringan dengan mortar siap pakai 2 1,20 m2
Cat Eksterior 2 1,20 m2
3 Pasang Atap Zincalume t = 0,45 mm + Insulation XLPE tebal 8 mm 2 7,00 m2
DAFTAR KUANTITAS DAN HARGA T.A. 2026
PEKERJAAN : PEMBANGUNAN RUANG RAWAT INAP DALAM RANGKA PENINGKATAN KELAS RS
DALAM MENDUKUNG LAYANAN KJSU
SUB PEKERJAAN : ARSITEKTUR
LOKASI : KOTA BIMA
TH. ANGGARAN : 2025 - 2026
NO URAIAN PEKERJAAN VOLUME
01 02 03
A PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA
LANTAI 01
Pekerjaan Dinding
1 Pasangan dinding bata ringan tebal 10 cm 1.604,15 m2
2 Plesteran & Acian bata ringan dengan mortar siap pakai 3.208,29 m2
3 Acian Beton Ekspose 199,00 m2
4 Pekerjaan Ring Balok 577,01 m'
5 Pekerjaan Kolom Praktis 640,50 m'
6 Pekerjaan Balok Latiu 152,50 m'
7 Pasang Partisi Gypsum 12 mm 2 sisi finish cat rangka Metal Stud :
Rangka Metal Stud 75 mm kombinasi U Channel 76 mm : Modul 60x120 cm 43,20 m2
Pasang Gypsum uk. (120 x 240) cm, tebal 12 mm 2 sisi 43,20 m2
Finishing Cat Interior 86,40 m2
Pekerjaan Kusen
1 Kusen Type P1 2,00 unit
2 Kusen Type P1' 1,00 unit
3 Kusen Type P2 16,00 unit
4 Kusen Type P3 9,00 unit
5 Kusen Type P3' 2,00 unit
6 Kusen Type P3" 1,00 unit
7 Kusen Type P4 12,00 unit
8 Kusen Type P4' 6,00 unit
9 Kusen Type P4'' 3,00 unit
10 Kusen Type P5 1,00 unit
9 Kusen Type J1 16,00 unit
10 Kusen Type J2 1,00 unit
11 Kusen Type J3 1,00 unit
12 Kusen Type J4 1,00 unit
13 Kusen Type PS 7,00 unit
14 Kusen Type PS' 1,00 unit
15 Kusen Type BV1 7,00 unit
16 Kusen Type F1 6,00 unit
LANTAI 02
Pekerjaan Dinding
1 Pasangan dinding bata ringan tebal 10 cm 1.305,68 m2
2 Plesteran & Acian bata ringan dengan mortar siap pakai 2.611,36 m2
3 Acian Beton Ekspose 199,00 m2
4 Pekerjaan Ring Balok 522,12 m'
5 Pekerjaan Kolom Praktis 383,50 m'
6 Pekerjaan Balok Latiu 125,80 m'
Pekerjaan Kusen
1 Kusen Type P1 1,00 unit
2 Kusen Type P1' 1,00 unit
3 Kusen Type P2 13,00 unit
4 Kusen Type P3 7,00 unit
5 Kusen Type P3' 1,00 unit
6 Kusen Type P4 12,00 unit
7 Kusen Type P4' 4,00 unit
8 Kusen Type J1 15,00 unit
9 Kusen Type J2 1,00 unit
10 Kusen Type J3 2,00 unit
11 Kusen Type J4 1,00 unit
12 Kusen Type PS 7,00 unit
13 Kusen Type PS' 1,00 unit
14 Kusen Type BV1 2,00 unit
LANTAI 03
NO URAIAN PEKERJAAN VOLUME
01 02 03
Pekerjaan Dinding
1 Pasangan dinding bata ringan tebal 10 cm 1.259,95 m2
2 Plesteran & Acian bata ringan dengan mortar siap pakai 2.519,91 m2
3 Acian Beton Ekspose 199,00 m2
4 Pekerjaan Ring Balok 463,12 m'
5 Pekerjaan Kolom Praktis 448,50 m'
6 Pekerjaan Balok Latiu 122,80 m'
Pekerjaan Kusen
1 Kusen Type P1 1,00 unit
2 Kusen Type P1' 1,00 unit
3 Kusen Type P2 10,00 unit
4 Kusen Type P3 10,00 unit
5 Kusen Type P3' 1,00 unit
6 Kusen Type P4 12,00 unit
7 Kusen Type P4' 4,00 unit
8 Kusen Type J1 15,00 unit
9 Kusen Type J2 1,00 unit
10 Kusen Type J3 2,00 unit
11 Kusen Type J4 1,00 unit
12 Kusen Type PS 5,00 unit
13 Kusen Type PS' 1,00 unit
14 Kusen Type BV1 2,00 unit
LANTAI ATAP
Pekerjaan Dinding
1 Pasangan dinding bata ringan tebal 10 cm 294,08 m2
2 Plesteran & Acian bata ringan dengan mortar siap pakai 588,17 m2
3 Acian Beton Ekspose 21,00 m2
4 Pekerjaan Ring Balok 167,08 m'
5 Pekerjaan Kolom Praktis 48,00 m'
6 Pekerjaan Balok Latiu 12,50 m'
Pekerjaan Kusen
1 Kusen Type P6 2,00 unit
2 Kusen Type BV2 2,00 unit
3 Kusen Type BV3 2,00 unit
II PEKERJAAN PLAFOND
LANTAI 01
1 Plafond PVC Tebal 8 mm Lengkap dengan Rangka 791,74 m2
2 Pasang List Plafond PVC 881,07 m'
3 Finishing Plat Expose
Acian Beton Ekspose 129,46 m2
Finish Cat 129,46 m2
LANTAI 02
1 Plafond PVC Tebal 8 mm Lengkap dengan Rangka 731,19 m2
2 Pasang List Plafond PVC 711,00 m'
3 Finishing Plat Expose
Acian Beton Ekspose 140,32 m2
Finish Cat 140,32 m2
LANTAI 03
1 Plafond PVC Tebal 8 mm Lengkap dengan Rangka 733,35 m2
2 Pasang List Plafond PVC 724,15 m'
3 Finishing Plat Expose
Acian Beton Ekspose 129,43 m2
Finish Cat 129,43 m2
LANTAI ATAP
1 Finishing Plat Expose
Acian Beton Ekspose 151,44 m2
Finish Cat 151,44 m2
III PEKERJAAN FINISHING LANTAI DAN DINDING
LANTAI 01
1 Urugan Pasir Bawah Lantai 47,37 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
2 Rabat Lantai 94,75 m3
3 Granite Tile Polished 60 x 60 termasuk tangga 755,98 m2
4 Granite Tile Unpolished 60 x 60 109,07 m2
5 Keramik lantai 30 x 30 Unpolished 65,74 m2
6 Plint Lantai Granite 262,17 m'
7 Hospital Plint 281,20 m'
8 Keramik dinding 30 x 60 423,71 m2
9 Step Noshing Tangga 32,50 m'
10 Pasang Dinding Granite Tile Gawangan Lift 3,65 m2
11 Rabat Keliling Bangunan 8,31 m3
LANTAI 02
1 Granite Tile Polished 60 x 60 termasuk tangga 715,08 m2
2 Granite Tile Unpolished 60 x 60 108,90 m2
3 Keramik lantai 30 x 30 Unpolished 41,04 m2
4 Plint Lantai Granite 201,40 m'
5 Hospital Plint 283,00 m'
6 Keramik dinding 30 x 60 265,02 m2
7 Step Nosing Tangga 29,90 m'
8 Pasang Dinding Granite Tile Gawangan Lift 3,65 m2
9 Finishing Waterproofing 55,15 m2
LANTAI 03
1 Granite Tile Polished 60 x 60 termasuk tangga 659,43 m2
2 Keramik lantai 30 x 30 Unpolished 39,96 m2
3 Plint Lantai Granite 313,48 m'
4 Hospital Plint 265,07 m'
5 Keramik dinding 30 x 60 283,08 m2
6 Step Nosing Tangga 29,90 m'
7 Pasang Dinding Granite Tile Gawangan Lift 3,65 m2
8 Finishing Waterproofing 39,96 m2
LANTAI ATAP
1 Granite Tile Polished 60 x 60 9,27 m2
2 Plint Lantai Granite 8,36 m'
3 Finishing Waterproofing Atap & Atap Lift 631,59 m2
4 Finishing Beton Screed 631,59 m2
IV PEKERJAAN CAT
LANTAI 01
1 Cat tembok Interior 2.725,84 m2
2 Cat Tembok Eksterior 681,46 m2
LANTAI 02
1 Cat tembok Interior 2.248,29 m2
2 Cat Tembok Eksterior 562,07 m2
LANTAI 03
1 Cat tembok Interior 2.039,18 m2
2 Cat Tembok Eksterior 679,73 m2
LANTAI ATAP
1 Cat tembok Interior 243,67 m2
2 Cat Tembok Eksterior 365,50 m2
V PEKERJAAN WALL PROTECTOR & RAILLING
LANTAI 01
1 Pekerjaan Railling Tangga Stainless Steel 2" termasuk pengisi 25,30 m'
pipa Steinless Steel 1" lengkap dengan aksesoris
2 Pekerjaan Railling Ramp Pipa Stainless Steel 2" lengkap dengan aksesoris 87,50 m'
3 Pekerjaan Hand Railling 39,57 m'
LANTAI 02
1 Pekerjaan Railling Tangga Stainless Steel 2" termasuk pengisi 25,30 m'
pipa Steinless Steel 1" lengkap dengan aksesoris
2 Pekerjaan Railling Ramp Pipa Stainless Steel 2" lengkap dengan aksesoris 87,50 m'
NO URAIAN PEKERJAAN VOLUME
01 02 03
3 Pekerjaan Hand Railling 38,90 m'
LANTAI 03
1 Pekerjaan Railling Tangga Stainless Steel 2" termasuk pengisi 22,20 m'
pipa Steinless Steel 1" lengkap dengan aksesoris
2 Pekerjaan Hand Railling 35,05 m'
VI PEKERJAAN SANITAIR
LANTAI 01
1 Floor drain 22,00 bh
2 Kran Air Standart 7,00 bh
3 Kran Air Tangkai Panjang 3,00 bh
4 Jet Washer 19,00 unit
5 Hand Shower Panas Dingin 12,00 unit
6 Kloset duduk Lengkap Flusher 18,00 unit
7 Kloset Diffable Lengkap Flusher 1,00 unit
8 Wastafel Meja Lengkap Kran 7,00 unit
9 Wastafel Gantung Lengkap Kran 14,00 unit
10 Kaca Cermin 21,00 bh
11 Sink 1 Lubang 2,00 bh
12 Service Sink Lengkap Kran 2,00 bh
13 Sink Sloop Lengkap Kran 2,00 bh
14 Hand Railling Toilet 12,00 unit
15 Hand Railling Diffable 1,00 unit
16 Grill Besi 3,80 m'
17 Meja Beton
Beton f'c 14,5 Mpa 0,84 m3
Tulangan 84,48 kg
Bekisting 10,56 m2
Finishing Keramik 30x30 10,56 m2
LANTAI 02
1 Floor drain 15,00 bh
2 Kran Air Standart 2,00 bh
3 Kran Air Tangkai Panjang 2,00 bh
4 Jet Washer 14,00 unit
5 Hand Shower Panas Dingin 12,00 unit
6 Kloset duduk Lengkap Flusher 14,00 unit
7 Wastafel Meja Lengkap Kran 2,00 unit
8 Wastafel Gantung Lengkap Kran 14,00 unit
9 Kaca Cermin 16,00 bh
10 Sink 1 Lubang 2,00 bh
11 Service Sink Lengkap Kran 1,00 bh
12 Sink Sloop Lengkap Kran 1,00 bh
13 Hand Railling Toilet 12,00 unit
14 Meja Beton
Beton f'c 14,5 Mpa 0,62 m3
Tulangan 62,40 kg
Bekisting 7,80 m2
Finishing Keramik 30x30 7,80 m2
LANTAI 03
1 Floor drain 16,00 bh
2 Kran Air Standart 3,00 bh
3 Kran Air Tangkai Panjang 3,00 bh
4 Jet Washer 13,00 unit
5 Hand Shower Panas Dingin 10,00 unit
6 Kloset duduk Lengkap Flusher 13,00 unit
7 Wastafel Meja Lengkap Kran 3,00 unit
8 Wastafel Gantung Lengkap Kran 13,00 unit
9 Kaca Cermin 16,00 bh
10 Sink 1 Lubang 3,00 bh
11 Service Sink Lengkap Kran 3,00 bh
12 Sink Sloop Lengkap Kran 3,00 bh
13 Hand Railling Toilet 10,00 unit
14 Meja Beton
Beton f'c 14,5 Mpa 0,94 m3
NO URAIAN PEKERJAAN VOLUME
01 02 03
Tulangan 93,60 kg
Bekisting 11,70 m2
Finishing Keramik 30x30 11,70 m2
VII PEKERJAAN LAIN-LAIN
Pekerjaan Fasad
1 Pekerjaan Alumunium Composite Panel (ACP) alloy 5005 PVDF FR 423,71 m2
lengkap terpasang dengan rangka
VIII PEKERJAAN SELASAR
1 Urugan Pasir Bawah Lantai 3,21 m3
2 Rabat Lantai 3,21 m3
3 Granite Tile Polished 60 x 60 19,83 m2
4 U-Ditch Ukuran 30x40 19,83 m'
5 Finishing Waterproofing Atap 19,83 m2
6 Rabat Beton Keliling Bangunan Selasar 1,34 m3
DAFTAR KUANTITAS DAN HARGA T.A. 2026
PEKERJAAN : PEMBANGUNAN RUANG RAWAT INAP DALAM RANGKA PENINGKATAN
KELAS RS DALAM MENDUKUNG LAYANAN KJSU
SUB PEKERJAAN : MEKANIKAL ELEKTRIKAL PLUMBING
LOKASI : KOTA BIMA
TH. ANGGARAN : 2025 - 2026
NO URAIAN PEKERJAAN VOLUME
01 02 03
B PEKERJAAN MEKANIKAL ELEKTRIKAL PLUMBING
I PEKERJAAN MDP, SDP & PANEL DAYA LAINNYA
MDP GEDUNG
1 Panel 80 x 200 x 80 , lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20 A / 10KA 5 ,00 bh
3 MCCB 60 A / 18KA 1 ,00 bh
4 MCCB 80 A / 18KA 1 ,00 bh
5 MCCB 200 A / 25KA 3 ,00 bh
6 MCCB 500 A / 50KA 1 ,00 bh
7 Power meter PM2120 1 ,00 bh
8 CT 500/5 A 3 ,00 bh
9 Surge Arester 3P+N 40 ka 1 ,00 bh
10 Motorized COS 80 A 1 ,00 bh
11 Motor Mechanism 220V 48212 1 ,00 bh
12 UVT 220V AC 47383 1 ,00 bh
13 Closing Released 220V AC 47353 1 ,00 bh
14 Kabel Grounding BCC 150 mm2 2 2,00 m'
15 Kabel NYFGBY 4 x 300 mm2 dari LVMDP 1 35,00 m'
16 Grounding MDP dengan bak kontrol uk.40cm x 40cm, max. 2 ohm 1 ,00 titik
17 Ducting Elektrikal dari LVMDP
U-Ditch 30 x 40 x 120 cm 1 14,00 m'
Tutup U-Ditch 30, t=10 cm, P=60 cm 1 14,00 m'
SDP LT.1
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 3 ,00 bh
3 MCCB 30A / 10 KA 1 ,00 bh
4 MCCB 80A / 18 KA 1 ,00 bh
5 MCCB 125A / 18 KA 1 ,00 bh
6 MCCB 200 A / 25KA 1 ,00 bh
7 Power meter PM2120 1 ,00 bh
8 CT 200/5 A 3 ,00 bh
9 Surge Arester 3P+N 40 ka 1 ,00 bh
10 Kabel Grounding BCC 50 mm2 6 ,00 m'
11 Kabel NYY 4 x 95 mm2 dari MDP Gedung 6 ,00 m'
SDP LT.2
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 3 ,00 bh
3 MCCB 80A / 18KA 1 ,00 bh
4 MCCB 100 A / 18KA 1 ,00 bh
6 MCCB 200 A / 25KA 1 ,00 bh
5 Power meter PM2120 1 ,00 bh
6 CT 200/5 A 3 ,00 bh
7 Surge Arester 3P+N 40 ka 1 ,00 bh
8 Kabel Grounding BCC 35 mm2 1 8,00 m'
9 Kabel NYY 4 x 70 mm2 dari MDP Gedung 1 8,00 m'
SDP LT.3
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 3 ,00 bh
3 MCCB 80A / 18KA 1 ,00 bh
4 MCCB 125A / 18 KA 1 ,00 bh
5 MCCB 200 A / 25KA 1 ,00 bh
6 Power meter PM2120 1 ,00 bh
7 CT 200/5 A 3 ,00 bh
8 Surge Arester 3P+N 40 ka 1 ,00 bh
9 Kabel Grounding BCC 35 mm2 2 3,00 m'
10 Kabel NYY 4 x 70 mm2 dari MDP Gedung 2 3,00 m'
SDP LT.ATAP
1 Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 2 ,00 bh
3 MCCB 20A / 10 KA 3 ,00 bh
4 MCCB 50A / 10 KA 1 ,00 bh
5 MCCB 60A / 18KA 1 ,00 bh
6 Power meter PM2120 1 ,00 bh
NO URAIAN PEKERJAAN VOLUME
01 02 03
7 CT 100/5 A 3 ,00 bh
8 Surge Arester 3P+N 40 kA 1 ,00 bh
9 Kabel Grounding BCC 16 mm2 3 3,00 m'
10 Kabel FRC 4 x 16 mm2 dari MDP Gedung 3 3,00 m'
LANTAI 01
PP-LT.01
1 Panel 40 x 60 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 1 2,00 bh
3 MCCB 20A / 10 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 50/5 A 3 ,00 bh
6 Kabel Grounding BCC 6 mm2 6 ,00 m'
7 NYY 4 x 6 mm2 dari SDP LT.1 6 ,00 m'
PS-LT.01
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 5 0,00 bh
3 MCCB 125A / 18 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 150/5 A 3 ,00 bh
6 Kabel Grounding BCC 16 mm2 6 ,00 m'
7 NYY 4 x 35 mm2 dari SDP LT.1 6 ,00 m'
PAC-LT.01
1 Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 1 4,00 bh
3 MCB 10A / 6KA, 3P 3 ,00 bh
4 MCB 16A / 6KA 8 ,00 bh
5 MCB 20A / 6KA 5 ,00 bh
6 MCCB 80A / 18 KA 1 ,00 bh
7 Power meter DM6200H 1 ,00 bh
8 CT 100/5 A 3 ,00 bh
9 Kabel Grounding BCC 16 mm2 6 ,00 m'
10 NYY 4 x 25 mm2 dari SDP LT.1 6 ,00 m'
P. POMPA SEWAGE
1 Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 3 ,00 bh
3 MCCB 30A / 10 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 50/5 A 3 ,00 bh
6 Kabel Grounding BCC 6 mm2 4 0,00 m
7 NYY 4 x 6 mm2 dari SDP LT.1 dan ke PK Bak Penampung 5 5,00 m
LANTAI 02
PP-LT.02
1 Panel 40 x 60 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 1 2,00 bh
3 MCCB 20A / 10 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 50/5 A 3 ,00 bh
6 Kabel Grounding BCC 6 mm2 6 ,00 m'
7 NYY 4 x 6 mm2 dari SDP LT.2 6 ,00 m'
PS-LT.02
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 4 9,00 bh
3 MCCB 100A / 18 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 100/5 A 3 ,00 bh
6 Kabel Grounding BCC 16 mm2 6 ,00 m'
7 NYY 4 x 35 mm2 dari SDP LT.2 6 ,00 m'
PAC-LT.02
1 Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 8 ,00 bh
3 MCB 10A / 6KA, 3P 3 ,00 bh
4 MCB 16A / 6KA 1 2,00 bh
5 MCCB 80A / 18 KA 1 ,00 bh
6 Power meter DM6200H 1 ,00 bh
7 CT 100/5 A 3 ,00 bh
8 Kabel Grounding BCC 16 mm2 6 ,00 m'
9 NYY 4 x 25 mm2 dari SDP LT.2 6 ,00 m'
LANTAI 03
NO URAIAN PEKERJAAN VOLUME
01 02 03
PP-LT.03
1 Panel 40 x 60 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 1 2,00 bh
3 MCCB 20A / 10 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 50/5 A 3 ,00 bh
6 Kabel Grounding BCC 6 mm2 6 ,00 m'
7 NYY 4 x 6 mm2 dari SDP LT.3 6 ,00 m'
PS-LT.03
1 Panel 80 x 100 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 4 5,00 bh
3 MCCB 125A / 18 KA 1 ,00 bh
4 Power meter DM6200H 1 ,00 bh
5 CT 100/5 A 3 ,00 bh
6 Kabel Grounding BCC 16 mm2 6 ,00 m'
7 NYY 4 x 35 mm2 dari SDP LT.3 6 ,00 m'
PAC-LT.03
1 Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 1 1,00 bh
3 MCB 10A / 6KA, 3P 3 ,00 bh
4 MCB 16A / 6KA 1 0,00 bh
5 MCCB 80A / 18 KA 1 ,00 bh
6 Power meter DM6200H 1 ,00 bh
7 CT 100/5 A 3 ,00 bh
8 Kabel Grounding BCC 16 mm2 6 ,00 m'
9 NYY 4 x 25 mm2 dari SDP LT.3 6 ,00 m'
LANTAI ATAP
P. POMPA BOOSTER
1 Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 3 ,00 bh
3 Power meter DM6200H 1 ,00 bh
4 CT 50/5 A 3 ,00 bh
5 Kabel Grounding BCC 6 mm2 6 ,00 m
6 NYY 4 x 6 mm2 dari SDP LT. Atap dan ke PK Booster 1 6,00 m
P. LIFT
1 Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1 ,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10A / 6KA 2 ,00 bh
3 MCCB 20A / 10 KA 1 ,00 bh
4 MCCB 50A / 10 KA 2 ,00 bh
5 Power meter DM6200H 1 ,00 bh
6 CT 50/5 A 3 ,00 bh
7 Kabel Grounding BCC 16 mm2 3 8,00 m
8 FRC 4 x 16 mm2 dari SDP LT. Atap dan ke PK Lift 1 6,00 m
9 Grounding dengan bak kontrol uk.40cm x 40cm, max. 2 ohm 1 ,00 titik
II PEKERJAAN PENERANGAN
LANTAI 01
PP-LT.01
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 2 66,00 Titik
2 Lampu LED Panel 60x60 28W 3 1,00 Unit
3 Lampu LED Batten 8W 3 1,00 Unit
4 Lampu Waterproof LED Tube 2x18W 1 ,00 Unit
5 Lampu Waterproof LED Tube 1x18W 1 1,00 Unit
4 Lampu Downlight Inbow LED Panel 6W 2 0,00 Unit
5 Lampu Downlight Inbow LED Panel 12W 6 0,00 Unit
6 Lampu Downlight Inbow LED Panel 19W 4 2,00 Unit
7 Lampu Downlight Outbow LED Panel 12W 4 7,00 Unit
8 Exit Lamp LED 10W 2 ,00 Unit
9 Exhaust fan 30 W 2 1,00 Unit
PS-LT.01
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 2 13,00 Titik
2 Stop Kontak Dinding 200 W 2 13,00 Unit
Saklar
1 Saklar Tunggal 3 1,00 Unit
2 Saklar Ganda 6 6,00 Unit
3 Saklar Tukar Tunggal 2 ,00 Unit
4 Niccad battery 1 4,00 Unit
Kabel Tray
1 Kable Tray STU 30x10 4 7,00 m
2 Kable Tray STU 20x10 4 0,10 m
3 Kable Ladder STU 40x10 4 ,20 m
NO URAIAN PEKERJAAN VOLUME
01 02 03
4 Kable Ladder STU 30x10 4 ,20 m
LANTAI 02
PP-LT.02
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 1 94,00 Titik
2 Lampu LED Panel 60x60 28W 3 0,00 Unit
3 Lampu LED Batten 8W 3 0,00 Unit
4 Lampu Waterproof LED Tube 2x18W 1 ,00 Unit
5 Lampu Waterproof LED Tube 1x18W 1 1,00 Unit
4 Lampu Downlight Inbow LED Panel 6W 8 ,00 Unit
5 Lampu Downlight Inbow LED Panel 12W 5 3,00 Unit
6 Lampu Downlight Inbow LED Panel 19W 3 9,00 Unit
7 Exit Lamp LED 10W 3 ,00 Unit
8 Exhaust fan 30 W 1 9,00 Unit
PS-LT.02
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 2 06,00 Titik
2 Stop Kontak Dinding 200 W 2 06,00 Unit
Saklar
1 Saklar Tunggal 2 3,00 Unit
2 Saklar Ganda 5 2,00 Unit
3 Saklar Tukar Tunggal 3 ,00 Unit
4 Niccad battery 1 7,00 Unit
Kabel Tray
1 Kable Tray STU 30x10 4 6,80 m
2 Kable Tray STU 20x10 4 0,10 m
3 Kable Ladder STU 40x10 4 ,00 m
4 Kable Ladder STU 30x10 4 ,00 m
LANTAI 03
PP-LT.03
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 1 79,00 Titik
2 Lampu LED Panel 60x60 28W 3 0,00 Unit
3 Lampu LED Batten 8W 3 0,00 Unit
4 Lampu Waterproof LED Tube 2x18W 3 ,00 Unit
6 Lampu Downlight Inbow LED Panel 6W 8 ,00 Unit
7 Lampu Downlight Inbow LED Panel 12W 4 7,00 Unit
8 Lampu Downlight Inbow LED Panel 19W 3 9,00 Unit
9 Exit Lamp LED 10W 3 ,00 Unit
10 Exhaust fan 30 W 1 9,00 Unit
PS-LT.03
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 2 15,00 Titik
2 Stop Kontak Dinding 200 W 2 15,00 Unit
Saklar
1 Saklar Tunggal 2 6,00 Unit
2 Saklar Ganda 5 3,00 Unit
3 Saklar Tukar Tunggal 2 ,00 Unit
4 Niccad battery 1 6,00 Unit
Kabel Tray
1 Kable Tray STU 30x10 4 6,80 m
2 Kable Tray STU 20x10 4 0,10 m
3 Kable Ladder STU 40x10 3 ,95 m
4 Kable Ladder STU 30x10 3 ,95 m
LANTAI ATAP
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 6 ,00 Titik
2 Lampu Waterproof LED Tube 2x18W 4 ,00 Unit
3 Stop Kontak Dinding 200 W 2 ,00 Unit
Saklar
1 Saklar Ganda 2 ,00 Unit
2 Niccad battery 3 ,00 Unit
III PEKERJAAN PENANGKAL PETIR
Penangkal Petir tipe electro static non radio aktif Radius 100 m
1 Head Terminal (elektrostatik radius 100 meter) lengkap dengan termination kit ke tiang pen y a n g g1 a,00 Unit
2 Tiang Penyangga, Pipa GIP lengkap dengan pondasi 1 ,00 Unit
3 Obstruction Lamp (bersertifikat) lengkap dengan photocell, steker, pipa gip, klem 1 ,00 Unit
4 Down conductor NYY 1C-70 mm2 lengkap dengan pipa instalasi dan klem 4 7,00 m'
5 Lightning Counter 1 ,00 Unit
6 Bak Kontrol Uk. 40 x 40 x 40 cm grounding max.2 ohm 1 ,00 Unit
lengkap dengan ground rod 3/4" dan klem
7 Fitting, Klem, Connector, dan Asesoris testing commsioning dan perijinan 1 ,00 Lot
IV PEKERJAAN TATA SUARA
PERALATAN UTAMA
1 MDF-TS 1 ,00 unit
2 Power Amplifier 240 W 2 ,00 unit
NO URAIAN PEKERJAAN VOLUME
01 02 03
3 Instalasi Kabel NYMHY 3 x 2,5 mm2 dalam PVC Conduit 20mm 2 80,00 m
Ke Sentral Eksisting
4 Instalasi Kabel FRC 2 x 2,5 mm2 dalam PVC Conduit 20mm 7 0,00 m
Ke Sentral Eksisting
TATA SUARA LANTAI 1
1 TB Sound System 1 ,00 unit
2 Column Speaker, 10W 3 ,00 unit
2 Celling Speaker, 3W 2 0,00 unit
3 Volume Control 1 5,00 unit
4 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 3 5,00 ttk
dalam PVC Conduit 20mm
6 Instalasi titik Sound System dg Kabel FRC 2 x 1,5 mm2 3 ,00 ttk
dalam PVC Conduit 20mm
5 Instalasi Kabel NYMHY 3 x 2,5 mm2 dalam PVC Conduit 20 mm 5 ,00 m
dari MDF TS
TATA SUARA LANTAI 02
1 TB Sound System 1 ,00 unit
2 Column Speaker, 10W 5 ,00 unit
2 Celling Speaker, 3W 1 9,00 unit
3 Volume Control 1 4,00 unit
4 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 3 3,00 ttk
dalam PVC Conduit 20mm
6 Instalasi titik Sound System dg Kabel FRC 2 x 1,5 mm2 5 ,00 ttk
dalam PVC Conduit 20mm
5 Instalasi Kabel NYMHY 3 x 2,5 mm2 dalam PVC Conduit 20 mm 1 5,00 m
dari MDF TS
TATA SUARA LANTAI 03
1 TB Sound System 1 ,00 unit
2 Column Speaker, 10W 3 ,00 unit
3 Celling Speaker, 3W 1 8,00 unit
4 Volume Control 1 3,00 unit
5 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 3 1,00 ttk
dalam PVC Conduit 20mm
6 Instalasi titik Sound System dg Kabel FRC 2 x 1,5 mm2 3 ,00 ttk
dalam PVC Conduit 20mm
7 Instalasi Kabel NYMHY 3 x 2,5 mm2 dalam PVC Conduit 20 mm 2 0,00 m
dari MDF TS
V PEKERJAAN INSTALASI TELEPON
Peralatan Utama
1 Box MDF lengkap dengan LSA 30 Ext with terminal krone 1 ,00 unit
LSA plus lain-lainwith terminal krone LSA dll
2 Dari MDF-TP ke Sentral Eksisting , 40 Pair 7 5,00 m
Lantai 01
1 Terminal Box 1 ,00 unit
2 Pesawat Telepon 4 ,00 bh
3 Instalasi kabel ITC, dari out let telp ke TB 4 ,00 titik
4 Outlet RJ11 4 ,00 titik
5 Kabel feeder induk TB ke MDF-TP , Kabel ITC 10 pair 5 ,00 m
Lantai 02
1 Terminal Box 1 ,00 unit
2 Pesawat Telepon 4 ,00 bh
3 Instalasi kabel ITC, dari out let telp ke TB 4 ,00 titik
4 Outlet RJ11 4 ,00 titik
5 Kabel feeder induk TB ke MDF-TP , Kabel ITC 10 pair 1 5,00 m
Lantai 03
1 Terminal Box 1 ,00 unit
2 Pesawat Telepon 6 ,00 bh
3 Instalasi kabel ITC, dari out let telp ke TB 6 ,00 titik
4 Outlet RJ11 6 ,00 titik
5 Kabel feeder induk TB ke MDF-TP , Kabel ITC 10 pair 2 0,00 m
VI PEKERJAAN INSTALASI DATA
Lantai 01
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi 8 ,00 titik
2 Outlet RJ45 6 ,00 titik
3 Wifi Acces Point 2 ,00 bh
4 Main Switch Hub Managed POE 16 Port 1 ,00 bh
5 Switch Hub Managed POE 16 Port 1 ,00 bh
6 Kabel UTP Cat 6 ke Main Switch Hub 5 ,00 m'
7 Kabel FO 6 Core Singlemode ke Server Eksisting 7 5,00 m'
8 Wall Mount Rack 8U 1 ,00 bh
Lantai 02
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi 8 ,00 titik
2 Outlet RJ45 6 ,00 titik
3 Wifi Acces Point 2 ,00 bh
NO URAIAN PEKERJAAN VOLUME
01 02 03
4 Switch Hub Managed POE 16 Port 1 ,00 bh
5 Kabel UTP Cat 6 ke Main Switch Hub 1 5,00 m'
6 Wall Mount Rack 8U 1 ,00 bh
Lantai 03
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi 1 1,00 titik
2 Outlet RJ45 9 ,00 titik
3 Wifi Acces Point 2 ,00 bh
4 Switch Hub Managed POE 16 Port 1 ,00 bh
5 Kabel UTP Cat 6 ke Main Switch Hub 2 0,00 m'
6 Wall Mount Rack 8U 1 ,00 bh
VII PEKERJAAN CCTV
Peralatan Utama
1 Network Video Recorder 32CH 1 ,00 unit
2 LED monitor 32 '' 1 ,00 Buah
3 Mouse 1 ,00 Buah
4 Hardisk Seagate 8 TB 1 ,00 Buah
5 Main Switch Hub POE 24 port 1 ,00 bh
CCTV Lantai 01
1 IP Dome Camera, 4 MP c/w camera bracket 6 ,00 Buah
2 Main Switch Hub POE 24 port 1 ,00 bh
3 Switch Hub POE 16 Port 1 ,00 Buah
4 Instalasi Cable UTP. Cat 6 6 ,00 Titik
5 Kabel UTP Cat 6 ke Main Switch Hub 5 ,00 m'
6 Kabel FO 6 Core Singlemode ke Sentral Eksisting 7 5,00 m'
CCTV Lantai 02
1 IP Dome Camera, 4 MP c/w camera bracket 5 ,00 Buah
2 Switch Hub POE 16 Port 1 ,00 Buah
3 Instalasi Cable UTP. Cat 6 5 ,00 Titik
4 Kabel UTP Cat 6 ke Main Switch Hub 1 5,00 m'
CCTV Lantai 03
1 IP Dome Camera, 4 MP c/w camera bracket 5 ,00 Buah
2 IP Bullet Camera, 4 MP c/w camera bracket 1 ,00 Buah
3 Switch Hub POE 16 Port 1 ,00 Buah
4 Instalasi Cable UTP. Cat 6 6 ,00 Titik
5 Kabel UTP Cat 6 ke Main Switch Hub 2 0,00 m'
VIII PEKERJAAN MATV
1 Instalasi Lantai 1
Booster Amplifier 1 ,00 unit
Outlet TV 1 4,00 bh
Splitter 2 Way 1 ,00 bh
Splitter 4 Way 2 ,00 bh
Tap Off 4 Way 2 ,00 bh
Instalasi MATV dgn kabel Coaxial RG6 1 4,00 ttk
Instalasi Kabel Coaxial RG11 dari Shaft ke Splitter / Coupler (Tap Off) 1 35,00 m
2 Instalasi Lantai 2
Outlet TV 1 4,00 bh
Splitter 2 Way 1 ,00 bh
Splitter 4 Way 2 ,00 bh
Tap Off 4 Way 2 ,00 bh
Instalasi MATV dgn kabel Coaxial RG6 1 4,00 ttk
Instalasi Kabel Coaxial RG11 dari Shaft ke Splitter / Coupler (Tap Off) 5 0,00 m
3 Instalasi Lantai 3
Outlet TV 1 4,00 bh
Splitter 2 Way 1 ,00 bh
Splitter 4 Way 2 ,00 bh
Tap Off 4 Way 2 ,00 bh
Instalasi MATV dgn kabel Coaxial RG6 1 4,00 ttk
Instalasi Kabel Coaxial RG11 dari Shaft ke Splitter / Coupler (Tap Off) 5 5,00 m
IX PEKERJAAN FIRE ALARM
Lantai 01
Modul & Box
1 Terminal Box ( TB - FA ) 1 ,00 Unit
2 Zone Modul 2 ,00 Unit
3 Control Modul 1 ,00 Unit
4 Isolator Modul 1 ,00 Unit
5 Mini Monitor Modul 1 ,00 Unit
Detector
6 Smoke Detector 1 4,00 Buah
7 ROR Heat Detector 1 1,00 Buah
8 Fixed Heat Detector 3 ,00 Buah
Alarm Set
9 Alarm Bell 1 ,00 Buah
NO URAIAN PEKERJAAN VOLUME
01 02 03
10 Indicator lamp 1 ,00 Buah
11 Fireman Intercom Jack 1 ,00 Buah
12 Manual push button 1 ,00 Buah
Instalasi
13 End of line resistor 2 ,00 Buah
14 Instalasi Detector NYA 2 x 1,5 mm2 dalam conduit 20mm 2 8,00 Titik
15 Instalasi Alarm, Flow & Tamper Switch NYA 2 x 1,5 mm2 dalam conduit 20mm 5 ,00 Titik
16 Instalasi ITC 2x2x0,6mm dalam conduit 20mm 1 ,00 Titik
17 Panel Annunciator 1 ,00 Unit
18 Instalasi Kabel Feeder Panel & Annunciator 1 35,00 m'
FRC 2 x 2,5 mm2 + FRC STP (2 pair) dalam conduit 20mm
Lantai 02
Modul & Box
1 Terminal Box ( TB - FA ) 1 ,00 Unit
2 Zone Modul 2 ,00 Unit
3 Control Modul 1 ,00 Unit
4 Isolator Modul 1 ,00 Unit
5 Mini Monitor Modul 1 ,00 Unit
Detector
6 Smoke Detector 1 4,00 Buah
7 ROR Heat Detector 1 0,00 Buah
8 Fixed Heat Detector 2 ,00 Buah
Alarm Set
9 Alarm Bell 1 ,00 Buah
10 Indicator lamp 1 ,00 Buah
11 Fireman Intercom Jack 1 ,00 Buah
12 Manual push button 1 ,00 Buah
Instalasi
13 End of line resistor 2 ,00 Buah
14 Instalasi Detector NYA 2 x 1,5 mm2 dalam conduit 20mm 2 6,00 Titik
15 Instalasi Alarm, Flow & Tamper Switch NYA 2 x 1,5 mm2 dalam conduit 20mm 5 ,00 Titik
16 Instalasi ITC 2x2x0,6mm dalam conduit 20mm 1 ,00 Titik
Lantai 03 & Atap
Modul & Box
1 Terminal Box ( TB - FA ) 1 ,00 Unit
2 Zone Modul 2 ,00 Unit
3 Control Modul 1 ,00 Unit
4 Isolator Modul 1 ,00 Unit
5 Mini Monitor Modul 1 ,00 Unit
Detector
6 Smoke Detector 1 3,00 Buah
7 ROR Heat Detector 1 3,00 Buah
8 Fixed Heat Detector 3 ,00 Buah
Alarm Set
9 Alarm Bell 1 ,00 Buah
10 Indicator lamp 1 ,00 Buah
11 Fireman Intercom Jack 1 ,00 Buah
12 Manual push button 1 ,00 Buah
Instalasi
13 End of line resistor 2 ,00 Buah
14 Instalasi Detector NYA 2 x 1,5 mm2 dalam conduit 20mm 2 9,00 Titik
15 Instalasi Alarm, Flow & Tamper Switch NYA 2 x 1,5 mm2 dalam conduit 20mm 5 ,00 Titik
16 Instalasi ITC 2x2x0,6mm dalam conduit 20mm 1 ,00 Titik
X PEKERJAAN NURSE CALL
Lantai 01
1 Master Station 20 call w/adaptor 2 ,00 unit
2 Power Supply 2 ,00 unit
3 UPS 2 KVA, 1 phase 2 ,00 unit
4 Bedhead Console Unit 3 1,00 unit
5 Bedside Call Button 3 1,00 unit
6 Corridor Light 1 2,00 unit
7 Bathroom Call Button 1 2,00 unit
8 Instalasi ITC Multicord 2x2x0.6mm2 dlm pipa PVC 8 6,00 Titik
Lantai 02
1 Master Station 20 call w/adaptor 2 ,00 unit
2 Power Supply 2 ,00 unit
3 UPS 2 KVA, 1 phase 2 ,00 unit
4 Bedhead Console Unit 3 0,00 unit
5 Bedside Call Button 3 0,00 unit
6 Corridor Light 1 2,00 unit
7 Bathroom Call Button 1 2,00 unit
8 Instalasi ITC Multicord 2x2x0.6mm2 dlm pipa PVC 8 4,00 Titik
Lantai 03
1 Master Station 20 call w/adaptor 3 ,00 unit
2 Power Supply 3 ,00 unit
3 UPS 2 KVA, 1 phase 3 ,00 unit
NO URAIAN PEKERJAAN VOLUME
01 02 03
4 Bedhead Console Unit 3 0,00 unit
5 Bedside Call Button 3 0,00 unit
6 Corridor Light 1 0,00 unit
7 Bathroom Call Button 1 0,00 unit
8 Instalasi ITC Multicord 2x2x0.6mm2 dlm pipa PVC 8 0,00 Titik
XI PEKERJAAN TATA UDARA
Pengadaan dan pemasangan unit AC Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
LANTAI 1
AC SPLIT WALL
1 AC split 5.000 BTU/H + Remote 4 ,00 Unit
2 AC split 9.000 BTU/H + Remote 2 ,00 Unit
3 AC split 12.000 BTU/H + Remote 1 ,00 Unit
4 AC split 18.000 BTU/H + Remote 8 ,00 Unit
5 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 1 5,00 Unit
6 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 7 ,00 Titik
7 Instalasi listrik, NYM 3x4 mm2 + Pipa Conduit 8 ,00 Titik
8 Stop Kontak 1 5,00 Unit
AC CEILLING CASSETE
1 AC Cassete 27.000 BTU/H + Remote 3 ,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 3 ,00 Unit
3 Instalasi listrik, NYM 4x4 mm2 + Pipa Conduit 3 ,00 Titik
AC SPLIT DUCT
1 AC split Duct 23.000 BTU/H + Remote 4 ,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 4 ,00 Unit
3 Instalasi listrik, NYM 3x4 mm2 + Pipa Conduit 4 ,00 Titik
LANTAI 2
AC SPLIT WALL
1 AC split 5.000 BTU/H + Remote 2 ,00 Unit
2 AC split 7.000 BTU/H + Remote 2 ,00 Unit
3 AC split 9.000 BTU/H + Remote 2 ,00 Unit
4 AC split 18.000 BTU/H + Remote 1 2,00 Unit
5 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 1 8,00 Unit
6 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 6 ,00 Titik
7 Instalasi listrik, NYM 3x4 mm2 + Pipa Conduit 1 2,00 Titik
8 Stop Kontak 1 8,00 Unit
AC CEILLING CASSETE
1 AC Cassete 27.000 BTU/H + Remote 3 ,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 3 ,00 Unit
3 Instalasi listrik, NYM 4x4 mm2 + Pipa Conduit 3 ,00 Titik
LANTAI 3
AC SPLIT WALL
1 AC split 5.000 BTU/H + Remote 2 ,00 Unit
2 AC split 7.000 BTU/H + Remote 4 ,00 Unit
3 AC split 9.000 BTU/H + Remote 3 ,00 Unit
4 AC split 18.000 BTU/H + Remote 1 0,00 Unit
5 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 1 9,00 Unit
6 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 9 ,00 Titik
7 Instalasi listrik, NYM 3x4 mm2 + Pipa Conduit 1 0,00 Titik
8 Stop Kontak 1 9,00 Unit
AC CEILLING CASSETE
1 AC Cassete 27.000 BTU/H + Remote 3 ,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 3 ,00 Unit
3 Instalasi listrik, NYM 4x4 mm2 + Pipa Conduit 3 ,00 Titik
LANTAI ATAP
AC SPLIT WALL
1 AC split 9.000 BTU/H + Remote 1 ,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 1 ,00 Unit
3 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 1 ,00 Titik
4 Stop Kontak 1 ,00 Unit
PEKERJAAN DUCTING EXHAUST FAN
LANTAI 01
1 Pipa PVC D Dia.4" 2 6,90 m'
2 Pipa PVC D Dia.6" 1 1,50 m'
3 Fitting dan Accessories 1 ,00 Lot
LANTAI 02
1 Pipa PVC D Dia.4" 1 9,30 m'
2 Pipa PVC D Dia.6" 1 2,75 m'
3 Fitting dan Accessories 1 ,00 Lot
LANTAI 03
1 Pipa PVC D Dia.4" 2 2,55 m'
NO URAIAN PEKERJAAN VOLUME
01 02 03
2 Pipa PVC D Dia.6" 1 9,35 m'
3 Fitting dan Accessories 1 ,00 Lot
PEKERJAAN EXHAUST FAN & FRESH AIR FAN ISOLASI
LANTAI 01
1 Instalasi Ducting BJLS Lengkap dengan penggantung 1 26,80 m2
2 Pekerjaan Diffuser & Grille
SAD 12"x12" 7 ,00 bh
EAG 10"x10" 8 ,00 bh
EAG 12"x24" 7 ,00 bh
3 Volume Dumper (semua ukuran) 2 6,00 bh
4 Pre Filter 2 ,00 unit
5 Medium Filter 2 ,00 unit
6 Housing Pre+Medium Filter 2 ,00 unit
7 Hepa Filter 3 ,00 unit
8 Housing Hepa Filter 3 ,00 unit
9 Magnehelic 40 Pa (Digital) 4 ,00 unit
10 Exhaust Fan Low noise 600 cfm, 400 pa Lengkap dengan Plenum Box 4 ,00 unit
11 Inline Fan Fresh Air 340 cfm lengkap dengan aksesoris 1 ,00 Unit
12 Inline Fan Fresh Air 1000 cfm lengkap dengan aksesoris 1 ,00 Unit
13 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 6 ,00 Titik
XII PEKERJAAN GAS MEDIS
WALL POINT OUTLET
NO URAIAN PEKERJAAN VOLUME
01 02 03
Quick Connect system
Lantai 1
1 Oxygen ( O ) 3 1,00 bh
2 Vacum ( V ) 3 1,00 bh
Lantai 2
1 Oxygen ( O ) 3 0,00 bh
2 Vacum ( V ) 3 0,00 bh
Lantai 3
1 Oxygen ( O ) 3 0,00 bh
2 Vacum ( V ) 3 0,00 bh
INSTALASI GAS MEDIS
Copper Tube ASTM B 819 L
Pipa Riser dan Pipa ke Main Line Gedung Eksisting
Oxygen ( O )
1 Copper Tube dia 1 3/8" 3 7,00 m'
Vaccum ( V )
2 Copper Tube dia 1 5/8" 3 7,00 m'
Lantai 01
Oxygen ( O )
1 Copper Tube dia 7/8" 4 2,00 m'
2 Copper Tube dia 1/2" 1 09,05 m'
3 Copper Tube dia 3/8" 9 3,00 m'
Vaccum ( V )
4 Copper Tube dia 1 1/8" 4 2,00 m'
5 Copper Tube dia 5/8" 1 09,05 m'
6 Copper Tube dia 1/2" 9 3,00 m'
Lantai 02
Oxygen ( O )
1 Copper Tube dia 7/8" 3 6,60 m'
2 Copper Tube dia 1/2" 1 00,20 m'
3 Copper Tube dia 3/8" 9 0,00 m'
Vaccum ( V )
4 Copper Tube dia 1 1/8" 3 6,60 m'
5 Copper Tube dia 5/8" 1 00,20 m'
6 Copper Tube dia 1/2" 9 0,00 m'
Lantai 03
Oxygen ( O )
1 Copper Tube dia 7/8" 3 6,90 m'
2 Copper Tube dia 1/2" 9 3,75 m'
3 Copper Tube dia 3/8" 9 0,00 m'
Vaccum ( V )
4 Copper Tube dia 1 1/8" 3 6,90 m'
5 Copper Tube dia 5/8" 9 3,75 m'
6 Copper Tube dia 1/2" 9 0,00 m'
Fitting & Accessories 1 ,00 Lot
Zone Valve dan Alarm System
Lantai 1
Zone Valve type 2 Gas 1 ,00 bh
Alarm system 2 Gas 1 ,00 bh
Lantai 3
Zone Valve type 2 Gas 1 ,00 bh
Alarm system 2 Gas 1 ,00 bh
Lantai 3
Zone Valve type 2 Gas 1 ,00 bh
Alarm system 2 Gas 1 ,00 bh
Bed Head
Model : Bedhead single unit
Dims : 1200 mm x 80 mm x 220 mm
Lantai 1 3 1,00 unit
Lantai 2 3 0,00 unit
Lantai 3 3 0,00 unit
Testing & Commisioning 1 ,00 lot
XIII PEKERJAAN LIFT
Penyediaan Lift Lengkap dengan aksessories, dan
semua material bantu yang diperlukan sesuai dengan spesifikasi
teknik dan petunjuk pabrik seperti pada gambar Digital Electronic Control, ACVVVF
Traction Machine Worm Gear Box Traction Machine ,
Termasuk pelatihan, perijinan, buku petunjuk operasional, Testing Commissioning,
LIFT HOSPITAL
Penggunaan : Bed Lift hospital 1 ,00 Unit
Kapasitas : Minimal 1.600 Kg
Speed : 60 MPM
Car Size : 150x250x240 cm
Opening Size : 130x210 cm
Power Control : AC Variable Voltage Variable Frequency
NO URAIAN PEKERJAAN VOLUME
01 02 03
No. of Stop / Service : 3 Stop / 3 Lantai
Jasa Pemasangan ,Testing Commisioning , Ijin Depnaker 1 ,00 Unit
XIV PEKERJAAN FIRE HYDRANT, SPRINKLER, DAN FIRE EXTINGUISHER
Pengadaan,pemasangan, instalasi pipa, instalasi, pondasi,galian,
urugan, bobokan, penggantung, klem, testing commsioning dan perijinan
LANTAI 01
1 HBI (125x75x18) w/o Glass & Lock 1 ,00 unit
Fire Hose TPU c/w MC 1,5"x30mtr / 13 Bar
Jet Nozzle 1,5"
Chrome Hydrant Valve 1,5"
Hose Rack 1,5"
Chrome Hydrant Valve 2,5"
2 Pipa Blacksteel SCH.40 Dia 6" 5 0,00 m
3 Pipa Blacksteel SCH.40 Dia 4" 3 9,20 m
4 Pipa Blacksteel SCH.40 Dia 3" 3 4,90 m
5 Pipa Blacksteel SCH.40 Dia 2 1/2" 1 2,00 m
6 Pipa Blacksteel SCH.40 Dia 2' 8 ,60 m
7 Pipa Blacksteel SCH.40 Dia 1 1/2" 2 9,60 m
8 Pipa Blacksteel SCH.40 Dia 1" 1 92,05 m
9 Head Sprinkler Down 5 2,00 bh
10 gate valve 6`` 1 ,00 bh
11 gate valve 3`` 1 ,00 bh
12 gate valve 1`` 1 ,00 bh
13 BCV3" (butterfly valve c/w tamper switch 3", flow switch 3", test and drain + sight glass) 1 ,00 bh
14 Fitting dan Accecories 1 ,00 Lot
15 PRV 4" 1 ,00 bh
LANTAI 02
1 HBI (125x75x18) w/o Glass & Lock 1 ,00 unit
Fire Hose TPU c/w MC 1,5"x30mtr / 13 Bar
Jet Nozzle 1,5"
Chrome Hydrant Valve 1,5"
Hose Rack 1,5"
Chrome Hydrant Valve 2,5"
2 Pipa Blacksteel SCH.40 Dia 4" 8 ,40 m
3 Pipa Blacksteel SCH.40 Dia 3" 3 0,90 m
4 Pipa Blacksteel SCH.40 Dia 2 1/2" 1 2,00 m
5 Pipa Blacksteel SCH.40 Dia 2' 8 ,20 m
6 Pipa Blacksteel SCH.40 Dia 1 1/2" 1 4,85 m
7 Pipa Blacksteel SCH.40 Dia 1" 1 89,25 m
8 Head Sprinkler Down 4 7,00 bh
9 gate valve 3`` 1 ,00 bh
10 gate valve 1`` 1 ,00 bh
11 BCV3" (butterfly valve c/w tamper switch 3", flow switch 3", test and drain + sight glass) 1 ,00 bh
12 Fitting dan Accecories 1 ,00 Lot
LANTAI 03
1 HBI (125x75x18) w/o Glass & Lock 1 ,00 unit
Fire Hose TPU c/w MC 1,5"x30mtr / 13 Bar
Jet Nozzle 1,5"
Chrome Hydrant Valve 1,5"
Hose Rack 1,5"
Chrome Hydrant Valve 2,5"
2 Pipa Blacksteel SCH.40 Dia 4" 8 ,40 m
3 Pipa Blacksteel SCH.40 Dia 3" 3 0,90 m
4 Pipa Blacksteel SCH.40 Dia 2 1/2" 1 2,00 m
5 Pipa Blacksteel SCH.40 Dia 2' 8 ,20 m
6 Pipa Blacksteel SCH.40 Dia 1 1/2" 1 4,85 m
7 Pipa Blacksteel SCH.40 Dia 1" 1 93,25 m
8 Head Sprinkler Down 4 9,00 bh
9 gate valve 3`` 1 ,00 bh
10 gate valve 1`` 1 ,00 bh
11 BCV3" (butterfly valve c/w tamper switch 3", flow switch 3", test and drain + sight glass) 1 ,00 bh
12 Fitting dan Accecories 1 ,00 Lot
13 gate valve 1`` 2 ,00 bh
14 AAV 1" 2 ,00 bh
15 Pressure Gauge 2 ,00 bh
PEKERJAAN FIRE EXTINGUSHER
1 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 1 4 ,00 Unit
2 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 2 3 ,00 Unit
3 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai 3 3 ,00 Unit
4 Pengadaan Fire Extingusher Dry Chemical 6 kg Lantai atap 1 ,00 Unit
XV PEKERJAAN PLUMBING
PEKERJAAN AIR BERSIH
LANTAI 01
NO URAIAN PEKERJAAN VOLUME
01 02 03
1 Pipa PPR-PN 10 Dia. 2" 8 1,35 m'
2 Pipa PPR-PN 10 Dia. 1 1/4" 1 0,00 m'
3 Pipa PPR-PN 10 Dia. 1" 4 0,05 m'
4 Pipa PPR-PN 10 Dia. 3/4" 1 04,90 m'
5 Pipa PPR-PN 10 Dia. 1/2" 2 94,00 m'
6 Pipa Pengisi HDPE-PN16 Dia. 2" 1 25,20 m'
7 Gate Valve Dia. 1 1/4" 1 ,00 Unit
7 Gate Valve Dia. 1" 8 ,00 Unit
8 Gate Valve Dia. 3/4" 9 ,00 Unit
9 Fitting dan Accessories 1 ,00 Lot
10 Pengadaan Pompa Transfer 2 Unit termasuk panel Kontrol 1 ,00 Set
Tipe : Vertical Multistage Centrifugal
Kapasitas : 15 m3/Jam
Head : 40 meter
Pemipaan, fitting, dan aksesoris lengkap :
Valve-valve, Pressure Tank, Pressure Switch, Pressure Gauge, Booster Skid
Lengkap dengan panel control dan pengkabelan
LANTAI 2
1 Pipa PPR-PN 10 Dia. 2 1/2" 4 ,20 m'
2 Pipa PPR-PN 10 Dia. 2" 7 9,20 m'
3 Pipa PPR-PN 10 Dia. 1" 9 ,20 m'
4 Pipa PPR-PN 10 Dia. 3/4" 7 9,40 m'
5 Pipa PPR-PN 10 Dia. 1/2" 2 43,00 m'
6 Gate Valve Dia. 1" 2 ,00 Unit
7 Gate Valve Dia. 3/4" 1 3,00 Unit
8 Fitting dan Accessories 1 ,00 Lot
LANTAI 3
1 Pipa PPR-PN 10 Dia. 2 1/2" 4 ,20 m'
2 Pipa PPR-PN 10 Dia. 2" 7 9,20 m'
3 Pipa PPR-PN 10 Dia. 1" 1 7,00 m'
4 Pipa PPR-PN 10 Dia. 3/4" 8 4,45 m'
5 Pipa PPR-PN 10 Dia. 1/2" 2 67,00 m'
6 Gate Valve Dia. 1" 3 ,00 Unit
7 Gate Valve Dia. 3/4" 1 2,00 Unit
8 Fitting dan Accessories 1 ,00 Lot
LANTAI ATAP
1 Pipa PPR-PN 10 Dia. 3" 1 ,85 m'
2 Pipa PPR-PN 10 Dia. 2 1/2" 4 ,95 m'
3 Pipa PPR-PN 10 Dia. 2" 7 ,20 m'
4 Pipa Penguras PVC AW Dia. 2" 1 ,20 m'
5 Pipa Penguras PVC AW Dia. 2 1/2" 4 2,70 m'
6 Gate Valve Dia. 3" 2 ,00 Unit
7 Gate Valve Dia. 2 1/2" 1 ,00 Unit
8 Gate Valve Dia. 2" 1 1,00 Unit
9 Check Valve Dia. 2" 1 ,00 Unit
10 Fitting dan Accessories 1 ,00 Lot
11 Pengadaan Roof Tank 24 m3 1 ,00 Unit
12 Pipa Header Dia 2" Lengkap dengan Blind flange & Accesoriesnya 1 ,00 Unit
13 Pipa Header Dia 3" Lengkap dengan Blind flange & Accesoriesnya 1 ,00 Unit
14 Pipa Header Dia 4" Lengkap dengan Blind flange & Accesoriesnya 1 ,00 Unit
15 Pengadaan Pompa Booster 2 Unit termasuk panel Kontrol 1 ,00 Set
Tipe : Vertical Multistage Centrifugal
Kapasitas : 10 m3/Jam
Head : 30 meter
Pemipaan, fitting, dan aksesoris lengkap :
VSD, Valve-valve, Pressure Tank, Pressure Switch, Pressure Gauge, Booster Skid
Lengkap dengan panel control dan pengkabelan
PEKERJAAN AIR KOTOR
LANTAI 01
1 Pipa PVC Type AW 1" 4 6,10 m
2 Pipa PVC Type AW 2" 8 6,40 m
3 Pipa PVC Type AW 3" 2 19,00 m
4 Pipa PVC Type AW 4" 3 69,35 m
5 Pipa PVC Type AW 6" 1 64,00 m
6 Clean Out Dia 6" 4 ,00 Unit
7 Clean Out Dia 4" 1 7,00 Unit
8 Clean Out Dia 3" 1 6,00 Unit
9 Fitting dan Accessories 1 ,00 lot
10 Grease Trap 30L 3 ,00 Unit
11 Pompa Sewage Submersible Cutter 20m3/h, Head 18 m 2 Unit 1 ,00 set
Termasuk Panel Kontrol, QDC lengkap hingga sistem berfungsi dengan baik
LANTAI 02
1 Pipa PVC Type AW 2" 8 0,75 m
2 Pipa PVC Type AW 3" 1 15,25 m
3 Pipa PVC Type AW 4" 1 04,20 m
4 Pipa PVC Type AW 6" 3 2,00 m
5 Clean Out Dia 4" 1 5,00 Unit
NO URAIAN PEKERJAAN VOLUME
01 02 03
6 Clean Out Dia 3" 1 6,00 Unit
7 Fitting dan Accessories 1 ,00 lot
8 Grease Trap 30L 2 ,00 Unit
LANTAI 03
1 Pipa PVC Type AW 2" 9 7,60 m
2 Pipa PVC Type AW 3" 8 6,95 m
3 Pipa PVC Type AW 4" 7 9,65 m
4 Clean Out Dia 4" 1 5,00 Unit
5 Clean Out Dia 3" 1 6,00 Unit
6 Fitting dan Accessories 1 ,00 lot
7 Grease Trap 30L 2 ,00 Unit
PEKERJAAN AIR HUJAN
1 Pipa PVC Class AW Dia. 4" 4 32,55 m
2 Pipa PVC Class AW Dia. 3" 1 3,50 m
3 Fitting dan Accessories 1 ,00 lot
4 Roof Drain Dia. 4" 3 1,00 buah
5 Roof Drain Dia. 3" 3 ,00 buah
6 Saluran U Ditch 30x30 cm 1 35,00 m'
7 Bak Kontrol 45x45 cm 8 ,00 Bh
DAFTAR KUANTITAS DAN HARGA T.A. 2026
PEKERJAAN : PEMBANGUNAN RUANG RAWAT INAP DALAM RANGKA PENINGKATAN
KELAS RS DALAM MENDUKUNG LAYANAN KJSU
SUB PEKERJAAN : GEDUNG LAUNDRY GIZI
LOKASI : KOTA BIMA
TH. ANGGARAN : 2025 - 2026
NO URAIAN PEKERJAAN VOLUME
01 02 03
C GEDUNG LAUNDRY GIZI
I PEKERJAAN PONDASI
1 Galian Tanah Footplat 184,13 m3
2 Pasir Urug Footplat 8,56 m3
3 Lantai Kerja Footplat 4,28 m3
4 Urugan Tanah Kembali Footplat 142,72 m3
5 Footplat Type FP1
a. Beton f'c 25 Mpa 5,18 m3
b. Pembesian 525,76 kg
c. Bekisting 11,52 m2
6 Footplat Type FP2
a. Beton f'c 25 Mpa 11,03 m3
b. Pembesian 1.242,93 kg
c. Bekisting 29,40 m2
7 Footplat Type FP3
a. Beton f'c 25 Mpa 11,15 m3
b. Pembesian 1.473,59 kg
c. Bekisting 34,32 m2
8 Footplat Type FP4
a. Beton f'c 25 Mpa 1,20 m3
b. Pembesian 104,62 kg
c. Bekisting 4,80 m2
9 Peninggian Elevasi Tanah 520,65 m3
10 Pemadatan 520,65 m3
Pondasi Batu Kali
1 Galian Tanah 288,64 m3
2 Urugan Pasir 17,25 m3
3 Pas Batu Kosong 69,02 m3
4 Pas Batu Belah 1 PC : 6 PS 164,40 m3
5 Urugan Tanah Kembali 86,77 m3
II PEKERJAAN BETON BERTULANG
Beton Bertulang Sloof
1 Sloof Type S1
a. Beton f'c 25 Mpa 19,29 m3
b. Pembesian 4.076,57 kg
c. Bekisting 154,32 m2
2 Sloof Type SP
a. Beton f'c 14,5 Mpa 4,45 m3
b. Pembesian 688,93 kg
c. Bekisting 59,27 m2
Beton Bertulang Kolom
1 Kolom Type K1
a. Beton f'c 25 Mpa 21,65 m3
b. Pembesian 5.655,19 kg
c. Bekisting 216,48 m2
2 Kolom Type K2
a. Beton f'c 25 Mpa 12,18 m3
b. Pembesian 3.141,39 kg
c. Bekisting 162,36 m2
Beton Bertulang Balok & Plat
1 Balok Type B1
a. Beton f'c 25 Mpa 7,98 m3
b. Pembesian 933,39 kg
c. Bekisting 79,75 m2
NO URAIAN PEKERJAAN VOLUME
01 02 03
2 Balok Type B2
a. Beton f'c 25 Mpa 12,91 m3
b. Pembesian 1.507,42 kg
c. Bekisting 135,56 m2
3 Balok Type B3
a. Beton f'c 25 Mpa 0,63 m3
b. Pembesian 81,42 kg
c. Bekisting 8,40 m2
4 Balok Type B4+LS
a. Beton f'c 25 Mpa 7,52 m3
b. Pembesian 1.392,97 kg
c. Bekisting 160,54 m2
5 Balok Type GK
a. Beton f'c 25 Mpa 2,40 m3
b. Pembesian 321,85 kg
c. Bekisting 25,20 m2
6 Balok Type BK
a. Beton f'c 25 Mpa 0,52 m3
b. Pembesian 64,64 kg
c. Bekisting 5,48 m2
7 Plat Type S1B
a. Beton f'c 25 Mpa 24,27 m3
b. Pembesian 3.802,19 kg
c. Bekisting 202,23 m2
8 Pekerjaan Waterproofing Plat 279,70 m2
III PEKERJAAN KONSTRUKSI BAJA
1 Pekerjaaan Rangka Atap Baja Konvensional (termasuk kuda-kuda, 7.971,32 kg
gording,track stang ,ikatan angin, plendes, mur baut dan finish zinchromate)
2 Pekerjaan Gunungan :
a. Beton Bertulang Balok Type BP 44,00 m'
b. Pasangan dinding bata ringan tebal 10 cm 57,80 m2
c. Plesteran & Acian bata ringan dengan mortar siap pakai 115,60 m2
e. Cat Eksterior 115,60 m2
3 Pasang Atap Zincalume t = 0,45 mm + Insulation 402,38 m2
4 Pasang Bubungan Atap Zincalume 22,00 m'
PEKERJAAN STRUKTUR
PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING, KUSEN PINTU DAN JENDELA
Pekerjaan Dinding
1 Pasangan dinding bata ringan tebal 10 cm 675,97 m2
2 Plesteran & Acian bata ringan dengan mortar siap pakai 1.351,95 m2
3 Acian Beton Ekspose 184,80 m2
4 Pekerjaan Kolom Praktis 202,50 m'
5 Pekerjaan Ring Balok 228,18 m'
6 Pekerjaan Balok Latiu 89,60 m'
Pekerjaan Kusen
1 Kusen Type P1 4,00 unit
2 Kusen Type P1' 1,00 unit
3 Kusen Type P2 2,00 unit
4 Kusen Type P2' 3,00 unit
5 Kusen Type P3 13,00 unit
6 Kusen Type P4 2,00 unit
7 Kusen Type P5 1,00 unit
8 Kusen Type P6 2,00 unit
9 Kusen Type J1 1,00 unit
10 Kusen Type J2 1,00 unit
11 Kusen Type J3 1,00 unit
12 Kusen Type J4 1,00 unit
13 Kusen Type J4' 1,00 unit
14 Kusen Type BV1 8,00 unit
15 Kusen Type BV2 11,00 unit
NO URAIAN PEKERJAAN VOLUME
01 02 03
16 Kusen Type BV3 5,00 unit
II PEKERJAAN PLAFOND
1 Plafond PVC Tebal 8 mm Lengkap dengan Rangka 591,75 m2
2 Pasang List Plafond PVC 578,05 m'
III PEKERJAAN FINISHING LANTAI DAN DINDING
1 Urugan pasir bawah lantai 26,03 m3
2 Rabat Lantai Beton f'c 14,5 Mpa 52,07 m3
3 Granite Tile Polished 60 x 60 320,50 m2
4 Keramik lantai 30 x 30 Unpolished 200,15 m2
5 Plint Lantai Granite Tile 234,42 m'
6 Keramik dinding 30 x 60 303,43 m2
7 Finishing Waterproofing 279,95 m2
8 Finishing Beton Screed 279,95 m2
9 Rabat Keliling Bangunan 5,00 m3
IV PEKERJAAN CAT
1 Cat tembok Interior 973,40 m2
2 Cat Tembok Eksterior 378,55 m2
V PEKERJAAN SANITAIR
1 Floor drain 14,00 bh
2 Kran Air Standart 4,00 bh
3 Kran Air Tangkai Panjang 9,00 bh
4 Jet Washer 2,00 bh
5 Kloset duduk Lengkap Flusher 2,00 unit
6 Wastafel Gantung Lengkap Kran 1,00 unit
7 Kaca Cermin 1,00 bh
8 Sink 1 Lubang 7,00 unit
9 Sink 2 Lubang 1,00 unit
10 Grill Besi 26,40 m'
11 Meja Beton
Beton f'c 14,5 Mpa 1,46 m3
Tulangan 145,94 kg
Bekisting 18,24 m2
Finishing Keramik 30x30 18,24 m2
PEKERJAAN ARSITEKTUR
PEKERJAAN MEKANIKAL ELEKTRIKAL & PLUMBING
I PEKERJAAN SDP & PANEL DAYA LAINNYA
SDP GEDUNG SERVIS
1 Panel 80 x 100 x 40 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20 A / 10KA 2,00 bh
3 MCCB 30 A / 10KA 2,00 bh
4 MCCB 80 A / 18KA 1,00 bh
5 MCCB 250 A / 25KA 1,00 bh
6 MCCB 350 A / 36KA 2,00 bh
7 Power meter PM2120 1,00 bh
8 CT 350/5 A 3,00 bh
9 Kabel Grounding BCC 95 mm2 27,00 m'
10 NYY 4 x 1 x 150 mm2 dari LVMDP 75,00 m
11 Grounding SDP dengan bak kontrol uk.40cm x 40cm, max. 2 ohm 1,00 titik
PP-GED.SERVIS
1 Panel 60 x 80 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCB 10 A / 6KA 24,00 bh
3 MCCB 30 A / 10KA 1,00 bh
4 Power meter DM6200H 1,00 bh
NO URAIAN PEKERJAAN VOLUME
01 02 03
5 CT 50/5 A 3,00 bh
6 Kabel Grounding BCC 10 mm2 6,00 m'
7 NYY 4 x 10 mm2 dari SDP Ged. Servis 6,00 m
P. POMPA SEWAGE
1 Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 5,00 bh
3 MCCB 30A / 10 KA 1,00 bh
4 Power meter DM6200H 1,00 bh
5 CT 50/5 A 3,00 bh
6 Kabel Grounding BCC 6 mm2 6,00 m
7 NYY 4 x 6 mm2 ke PK Grease Trap 20,00 m
8 NYY 4 x 6 mm2 ke PK Pre Treatment Laundry 30,00 m
9 NYY 4 x 10 mm2 dari SDP Ged. Servis 6,00 m
P.GIZI
1 Panel 50 x 70 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 7,00 bh
3 MCCB 80 A / 18KA 1,00 bh
4 Power meter DM6200H 1,00 bh
5 CT 100/5 A 3,00 bh
6 Kabel Grounding BCC 16 mm2 20,00 m'
7 NYY 4 x25 mm2 dari SDP Ged. Servis 20,00 m
P.LAUNDRY
1 Panel 70 x 90 x 25 cm, lengkap asesoris : busbar ( phase + N + E ), Rel, Fuse 1,00 unit
isolator, kabel skun, internal wiring, kabel duct, Pilot Lamp( Terpasang )
2 MCCB 20A / 10 KA 2,00 bh
3 MCCB 25A / 10 KA 3,00 bh
4 MCCB 50A / 10 KA 1,00 bh
5 MCCB 80 A / 18KA 2,00 bh
6 MCCB 250 A / 36KA 1,00 bh
7 Power meter DM6200H 1,00 bh
8 CT 250/5 A 3,00 bh
9 Kabel Grounding BCC 50 mm2 15,00 m'
10 NYY 4 x 1 x 95 mm2 dari SDP Ged. Servis 15,00 m
11 NYY 4 x 6 mm2 ke Mesin Cuci 30,00 m
12 NYY 4 x 16 mm2 ke Setrika 10,00 m
13 NYY 4 x25 mm2 ke Mesin Dryer 20,00 m
II PEKERJAAN PENERANGAN
1 Instalasi listrik dan stop kontak, NYM 3x2.5 mm2 + termasuk pipa conduit 124,00 Titik
2 Lampu Waterproof LED Tube 2x18W 14,00 Unit
3 Lampu Downlight Inbow LED Panel 6W 5,00 Unit
4 Lampu Downlight Inbow LED Panel 12W 47,00 Unit
5 Lampu Downlight Inbow LED Panel 19W 11,00 Unit
6 Exhaust fan 30 W 9,00 Unit
7 Wall Exhaust fan 16" 3,00 Unit
8 Stop Kontak 200 W 35,00 Unit
9 Saklar Tunggal 10,00 Unit
10 Saklar Ganda 19,00 Unit
11 Niccad battery 12,00 Unit
12 Kable Tray STU 30x10 35,00 m
13 Kable Tray STU 20x10 19,00 m
III PEKERJAAN TATA SUARA
1 TB Sound System 1,00 unit
2 Column Speaker, 10W 12,00 unit
3 Celling Speaker, 3W 8,00 unit
4 Volume Control 6,00 unit
5 Instalasi titik Sound System dg Kabel NYMHY 3 x 1,5 mm2 26,00 ttk
dalam PVC Conduit 20mm
6 Instalasi Kabel NYMHY 3 x 2,5 mm2 dalam PVC Conduit 20 mm 70,00 m
NO URAIAN PEKERJAAN VOLUME
01 02 03
dari MDF TS
IV PEKERJAAN INSTALASI TELEPON
1 Terminal Box 1,00 unit
2 Pesawat Telepon 5,00 bh
3 Instalasi kabel ITC, dari out let telp ke TB 5,00 titik
4 Outlet RJ11 5,00 titik
5 Kabel feeder induk TB ke MDF-TP , Kabel ITC 10 pair 70,00 m
V PEKERJAAN INSTALASI DATA
1 Instalasi kabel UTP Cat 6 dari Hub ke outlet data dan Wifi 6,00 titik
2 Outlet RJ45 4,00 titik
3 Wifi Acces Point 2,00 bh
4 Switch Hub Managed POE 16 Port 1,00 bh
5 Kabel FO 6 Core Singlemode ke Server 70,00 m'
6 Wall Mount Rack 8U 1,00 bh
VI PEKERJAAN CCTV
1 IP Dome Camera, 4 MP c/w camera bracket 6,00 Buah
2 Switch Hub POE 16 Port 1,00 Buah
3 Instalasi Cable UTP. Cat 6 6,00 Titik
4 Kabel FO 6 Core Singlemode ke Sentral Eksisting 70,00 m'
VII PEKERJAAN FIRE ALARM
Modul & Box
1 Terminal Box ( TB - FA ) 1,00 Unit
2 Zone Modul 1,00 Unit
3 Control Modul 1,00 Unit
4 Isolator Modul 1,00 Unit
5 Mini Monitor Modul 1,00 Unit
Detector
6 ROR Heat Detector 7,00 Buah
7 Fixed Heat Detector 3,00 Buah
Alarm Set
8 Alarm Bell 1,00 Buah
9 Indicator lamp 1,00 Buah
10 Manual push button 1,00 Buah
Instalasi
11 End of line resistor 1,00 Buah
12 Instalasi Detector NYA 2 x 1,5 mm2 dalam conduit 20mm 10,00 Titik
13 Instalasi Alarm NYA 2 x 1,5 mm2 dalam conduit 20mm 3,00 Titik
14 Instalasi Kabel Feeder Panel & Annunciator 180,00 m'
FRC 2 x 2,5 mm2 + FRC STP (2 pair) dalam conduit 20mm
15 Pengadaan Fire Extingusher Dry Chemical 6 kg 4,00 Unit
VIII PEKERJAAN TATA UDARA
Pengadaan dan pemasangan unit AC Indoor + Outdoor dengan asesories
termasuk pondasi, penyangga, pipa refrigent, pipa drain, peredam suara
sesuai standar pabrik
AC SPLIT WALL
1 AC split 5.000 BTU/H + Remote 4,00 Unit
2 Pekerjaan Instalasi Pipa Refrigerant & Pipa Drain 4,00 Unit
3 Instalasi listrik, NYM 3x2.5 mm2 + Pipa Conduit 4,00 Titik
4 Stop Kontak 4,00 Unit
PEKERJAAN DUCTING EXHAUST FAN
1 Pipa PVC D Dia.4" 22,15 m'
2 Pipa PVC D Dia.6" 6,50 m'
3 Fitting dan Accessories 1,00 Lot
PEKERJAAN EXHAUST HOOD
1 Instalasi Ducting BJLS Lengkap dengan penggantung 94,54 m2
NO URAIAN PEKERJAAN VOLUME
01 02 03
2 Grill Louvre 200x200 mm 5 ,00 bh
3 Drum Fan Axial 15000 cfm Lengkap dengan Plenum Box 1 ,00 unit
4 Kitchen Hood lengkap dengan grill dan oil trap 2,00 unit
5 Instalasi listrik, NYM 4x4 mm2 + Pipa Conduit 1,00 Titik
IX PEKERJAAN PLUMBING
PEKERJAAN AIR BERSIH
1 Pipa PPR-PN 10 Dia. 1 1/2" 121,05 m'
2 Pipa PPR-PN 10 Dia. 3/4" 50,75 m'
3 Pipa PPR-PN 10 Dia. 1/2" 69,00 m'
4 Gate Valve Dia. 1 1/2" 3,00 Unit
5 Fitting dan Accessories 1,00 Lot
PEKERJAAN AIR KOTOR
1 Pipa PVC Type AW 2" 85,40 m
2 Pipa PVC Type AW 3" 123,65 m
3 Pipa PVC Type AW 4" 104,00 m
4 Clean Out Dia 4" 1,00 Unit
5 Clean Out Dia 3" 7,00 Unit
6 Fitting dan Accessories 1,00 lot
7 Grease Trap 30L 1,00 Unit
8 Bak Pretreatmen Laundry 5 m3 1,00 Unit
Pre-Treatment Limbah Laundry, termasuk:
a. Screen system
b. Equalizing pump
c. pH Controller
d. Chemical Dosing Pump (for phospating)
e. Air Blower (for Agitation)
f. Transfer pump
g. Control Panel
h. Material Installation
9 Grease Trap 5 m3 1,00 Set
Model Silinder Horisontal
Material : Fiberglass
PEKERJAAN AIR HUJAN
1 Pipa PVC Class AW Dia. 4" 7 4,90 m
2 Fitting dan Accessories 1 ,00 lot
3 Roof Drain Dia. 4" 1 2,00 buah
6 Saluran U Ditch 30x30 cm 6 3,10 m'
7 Bak Kontrol 45x45 cm 4 ,00 Bh
PEKERJAAN MEKANIKAL, ELEKTRIKAL, & PLUMBING| Authority | |||
|---|---|---|---|
| 9 January 2025 | Pembangunan Jaringan Irigasi D.I Randangan | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 44,500,000,000 |
| 9 March 2021 | Rehabilitasi Dan Renovasi Sarana Prasarana Sekolah Malut I | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 42,500,000,000 |
| 18 November 2020 | Pembangunan Bendung Wanggar Di Wanggar 3200 Ha Kabupaten Nabire Tahap III; Papua; Kab. Nabire; 0.2 Bendung; 0.2 Bendung; F; K; Syc | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 40,000,000,000 |
| 10 November 2020 | Pembangunan Saluran Pengendali Banjir Kek Mandalika | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 38,800,000,000 |
| 9 December 2019 | Duplikasi Jembatan Pelempit | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 35,870,460,000 |
| 7 May 2024 | Belanja Modal Bangunan Gedung Tempat Pendidikan | Kab. Halmahera Selatan | Rp 35,000,000,000 |
| 20 August 2025 | Rehabilitasi Dan Renovasi Madrasah Phtc Kalimantan Timur 1 | Kementerian Pekerjaan Umum | Rp 29,953,226,000 |
| 23 November 2020 | Pembangunan Jembatan Mawin VII Cs | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 27,987,750,000 |
| 6 December 2021 | Penggantian Jembatan Makrowen | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 26,770,000,000 |
| 22 November 2020 | Rehabilitasi Jaringan Irigasi Di. Rababaka Kompleks Di Kabupaten Dompu (Ipdmip) | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 26,200,000,000 |