| 0751903568215000 | Rp 7,642,673,789 | |
| 0016636300214000 | - | |
Mekar Yakin Sejahtera | 00*1**8****18**0 | - |
| 0012317400214000 | - | |
| 0660784208215000 | - | |
| 0024042251214000 | - | |
CV Firman Jaya Sakti | 08*3**0****09**0 | - |
PT Geo Indogreen Karya | 07*0**9****52**0 | - |
| 0311911754124000 | - | |
| 0802525444225000 | - | |
PT Ensargus Indra Utama | 02*0**0****01**0 | - |
| 0752763599333000 | - | |
| 0027121912701000 | - | |
Baik Asia Kepri | 0600236764225000 | - |
| 0813303336225000 | - | |
| 0025726142215000 | - | |
| 0017687013214000 | - | |
| 0015483902445000 | - | |
| 0032844565214000 | - | |
| 0030068027215000 | - | |
| 0660117912503000 | - | |
| 0024154528017000 | - | |
| 0025803818216000 | - | |
| 0013591243027000 | - | |
| 0030567432105000 | - | |
| 0022415145423000 | - | |
| 0316534981215000 | - | |
Atria Consult | 0017139106111000 | - |
| 0021576970214000 | - | |
CV Sinar Jaya Engineering | 01*6**6****28**0 | - |
| 0017688441214000 | - | |
| 0757027305216000 | - |
URAIAN SINGKAT
PEMBANGUNAN JALAN AKSES KELONG MANGROVE DESA SEI.KECIL KEC. TELUK
SEBONG KAB. BINTAN (450M) TAHAP 2
Pembangunan Jalan Akses Kelong Mangrove Desa Sei.Kecil Kec. Teluk Sebong Kab. Bintan
(450M) Tahap 2 yang dilakukan oleh penyedia dengan masa pelaksanaan 150 HK (Hari
Kalender) pekerjaan konstruksi ini meliputi:
DIVISI 1. UMUM
1.2 Mobilisasi
1.2 Mobilisasi
1.21 Manajemen Mutu
1.21 Manajemen Mutu
SKh-1.22. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
(SMKK)
1 Penyiapan dokumen penerapan SMKK:
SKh-1.1.22.(1a) Pembuatan dokumen RKK, RMPK
2 Sosialisasi, promosi dan pelatihan:
SKh-1.1.22.(2g) Spanduk
SKh-1.1.22.(2i) Papan Informasi Keselamatan konstruksi
3 Alat Pelindung Kerja dan Alat Pelindung Diri:
3b APD, antara lain :
SKh-1.1.22.(3b1) Topi pelindung (Safety Helmet)
SKh-1.1.22.(3b6) Pelindung pernafasan dan mulut (masker, masker respirator)
SKh-1.1.22.(3b7) Sarung tangan (Safety Gloves)
Sepatu keselamatan (Safety Shoes, rubber safety shoes and toe
SKh-1.1.22.(3b8) cap)
SKh-1.1.22.(3b11) Rompi keselamatan (Safety Vest)
4 Asuransi dan perizinan terkait keselamatan konstruksi:
Asuransi
SKh-1.1.22.(4a) (Construction All Risk/ CAR)
5 Personel Keselamatan Konstruksi:
SKh-1.1.22.(5c) Petugas Keselamatan Konstruksi, Petugas K3 Konstruksi
6 Fasilitas sarana, Prasarana, dan alat kesehatan
SKh-1.1.22.(6a) Peralatan P3K
Rambu dan Perlengkapan lalu lintas yang diperlukan atau
7 manajemen lalu lintas:
SKh-1.1.22.(7a) Rambu petunjuk
SKh-1.1.22.(7c) Rambu peringatan
SKh-1.1.22.(7h) Kerucut lalu lintas (traffic cone)
9 Kegiatan dan peralatan terkait Pengendalian Risiko
Keselamatan Konstruksi:
SKh-1.1.22.(9a1) Alat Pemadam Api Ringan (APAR)
SKh-1.1.22.(9a4) Bendera K3
SKh-1.1.22.(9a5) Pembuatan Kartu Identitas Pekerja (KIP)
DIVISI 2. DRAINASE
2.3.(22) Saluran berbentuk U Tipe DS 1
2.4.(1) Bahan Drainase Porous atau Penyaring (Filter)
Pipa Berlubang Banyak (Perforated Pipe) utk Pekerjaan Drainase
2.4.(2)
Bawah Permukaan, diameter 4 inch
DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK
3.1.(1) Galian Biasa
3.2.(1a) Timbunan Biasa dari sumber galian
3.2.(1b) Timbunan Biasa dari hasil galian
3.3.(1) Penyiapan Badan Jalan
3.5.(1) Geotekstil Filter untuk Drainage Bawah Permukaan (Kelas 2)
DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON
SEMEN
5.1.(1) Lapis Pondasi Agregat Kelas A
6.1.(2) Lapis Pondasi Agregat Kelas B
DIVISI 6. PERKERASAN ASPAL
6.1 (1) Lapis Resap Pengikat - Aspal Cair/Emulsi
6.1 (2a) Lapis Perekat - Aspal Cair/Emulsi
6.3(5a) Laston Lapis Aus (AC-WC)
DIVISI 7. STRUKTUR
7.1 (7a) Beton strukur, fc’20 Mpa
7.1 (8) Beton , fc’15 Mpa
7.1 (10) Beton, fc’10 Mpa
7.3 (2) Baja Tulangan Sirip BjTS 280
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemancangan
7.9.(1) Pasangan Batu
DIVISI 9. PEKERJAAN HARIAN & PEKERJAAN LAIN-LAIN
9.2.(1) Marka Jalan Termoplastik
9.2.(6c) Patok Rumija (RMJ)| Authority | |||
|---|---|---|---|
| 16 March 2023 | Pembangunan Jalur Kedua Jalan Jembatan III Dompak - Sp Pelabuhan Roro Dompak (Lanjutan) | Badan Pengusahaan Kawasan Perdagangan Bebas Dan Pelabuhan Bebas Batam (984423) | Rp 11,500,000,000 |
| 11 March 2024 | Pembangunan Jalan Akses Kelong Mangrove Desa Sei Kecil Kec. Teluk Sebong Kab. Bintan (1,00 Km) Tahap 1 | Badan Pengusahaan Kawasan Perdagangan Bebas Dan Pelabuhan Bebas Batam (984423) | Rp 10,232,848,000 |
| 7 May 2019 | Penataan Jalan Simp. Jam - Simp. Bni / Rosedale (Lanjutan) | Kota Batam | Rp 6,000,000,000 |
| 23 September 2022 | Perbaikan Jalan Hang Kesturi Jalur Lama Depan Industri Taiwan | Badan Pengusahaan Kawasan Perdagangan Bebas Dan Pelabuhan Bebas Batam | Rp 5,891,230,000 |
| 25 May 2022 | Peningkatan Jalan Simp. Bni - Underpass, Kota Batam (Lanjutan) | Provinsi Kepulauan Riau | Rp 4,000,000,000 |
| 10 September 2024 | Pemeliharaan Berkala/Rehabilitasi Jalan Kp. Lengkuas Kec. Bintan Timur | Kab. Bintan | Rp 3,500,000,000 |
| 26 April 2019 | Pembangunan Drainase Depan Perum Griya Surya Kharisma (Lanjutan) | Kota Batam | Rp 2,700,000,000 |
| 7 July 2020 | Pemeliharaan Berkala Jl. Perum Bida Ayu Pintu 2 | Kota Batam | Rp 2,077,000,000 |
| 17 July 2017 | Belanja Modal Penataan Rth Kel. Baloi Permai | Pemerintah Daerah Kota Batam | Rp 880,019,000 |
| 13 May 2022 | Pembangunan Marka Jalan | Kota Batam | Rp 612,208,000 |