| Reason | |||
|---|---|---|---|
| 0015563455522000 | Rp 1,200,000,000 | Harga penawaran dinyatakan tidak wajar setelah dilakukan Evaluasi Kewajaran Harga | |
| 0015561095522000 | Rp 1,243,415,152 | - | |
| 0014913891522000 | Rp 1,337,165,245 | - | |
| 0828954966522000 | Rp 1,395,385,089 | - | |
Tanjung Bangun Persada | 0312854870501000 | - | - |
| 0021587431522000 | Rp 1,420,192,374 | - | |
| 0812272045522000 | Rp 1,434,581,871 | - | |
Shankara Abadi Karya | 10*1**1****42**1 | - | - |
| 0739075547522000 | - | - | |
| 0614214062522000 | - | - | |
| 0767187867522000 | - | - | |
Anugrah Kirana Perkasa | 08*2**2****24**0 | - | - |
| 0015052160522000 | - | - | |
| 0014326003522000 | - | - | |
CV Sinar Matahari Terbit | 06*5**1****22**0 | - | - |
| 0313847006522000 | - | - | |
| 0825622442522000 | - | - | |
| 0316895556522000 | - | - | |
CV Cerme Indah | 0011586011522000 | - | - |
| 0019614114522000 | - | - | |
| 0012022281522000 | - | - | |
| 0014913537522000 | - | - | |
| 0019614718522000 | - | - | |
| 0012448809522000 | - | - | |
| 0856964887645000 | - | - | |
CV Fathiyan | 06*0**6****29**0 | - | - |
PT Wijoksono Jaya Sakti | 03*5**6****45**0 | - | - |
| 0019611763522000 | - | - | |
| 0011213881522000 | - | - | |
| 0865431241425000 | - | - | |
| 0024033920501000 | - | - | |
| 0314218116522000 | - | - | |
| 0016378879522000 | - | - | |
| 0016378846522000 | - | - | |
| 0625397690522000 | - | - | |
| 0811644558522000 | - | - | |
| 0316861012522000 | - | - | |
| 0017277716522000 | - | - | |
| 0763090917522000 | - | - | |
| 0919466128522000 | - | - |
LINGKUP PEKERJAAN
A. JENIS PEKERJAAN dan LOKASI
1. Pelaksanaan pekerjaan meliputi :
Mendatangkan, pengolahan, pengangkutan semua bahan, pengerahan tenaga
kerja, pengadaan semua alat-alat bantu dan sebagainya. Yang pada umumnya
langsung atau tidak langsung termasuk didalam usaha penyelesaian dengan
baik dan menyerahkan pekerjaan dengan sempurna dan lengkap.
Juga disini dimaksudkan pekerjaan-pekerjaan atau bagian-bagian pekerjaan
yang walaupun tidak disebutkan didalam bestek tetapi masih berada didalam
lingkungan pekerjaan haruslah dilaksanakan sesuai petunjuk Direksi.
2. Pekerjaan yang dilaksanakan ialah :
PEMBANGUNAN PSU RELOKASI BENCANA DI DESA CIBEUNYING
KEC. MAJENANG.
Berlokasi di Kelurahan Cibeunying, Kecamatan Majenang, yang selanjutnya
akan ditunjukkan oleh Direksi.
Pekerjaan yang direncanakan meliputi:
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pengukuran Ulang
3 Penyediaan Perlengkapan Penunjang K3
II. PEKERJAAN PENATAAN LAHAN
1 Stripping Tanah
III. PEKERJAAN JALAN
A. Jalan Utama
1 LPA Kelas A (Levelling)
2 Plastik Beton
3 Bekisting
4 Wiremesh M6
5 Beton K-250
6 Besi Dowel
- Pembesian
- Cat Besi
- Pipa PVC 1" (Pembungkus)
7 Cuting Beton
8 Aspal Pengunci
B. Jalan Kavling
1 Galian Tanah
2 Pas. Batu Kosong
3 Waterbound Macadam utk. Pek. Minor
4 Plastik Cor
5 Wiremesh M6
6 Bekisting
7 Beton K-175
IV. PEKERJAAN DRAINASE
1 Galian Tanah
2 Beton Lantai Kerja K-100
3 Saluran U-Ditch 500x600x1200 mm
4 Cover U-Ditch 500x600x100 mm
5 Saluran U-Ditch 300x300x1200 mm
6 Cover U-Ditch LD 300x600 mm
V. PEKERJAAN TALUD
1 Galian Tanah
2 Trucuk Bambu
3 Pas. Batukali 1pp:4pp
4 Pipa Kapiler 1,5''
5 Plesteran 1pp:4pp
6 Acian
VI. PEKERJAAN AKSES KERUMAH
1 Beton K-175
2 Bekisting
VII. PEKERJAAN LPJU
1 Pasang Pondasi 30x30x60cm
- Galian Tanah
- Cor Beton K-100
- Bekisting
2 Pasang Tiang PJU
3 Pasang Dagstang Lampu PJU (Tiang Baru)
4 Pasang Komponen J4 (Tiang Baru)
5 Pasang Lampu LED Street 30 Watt
6 Pemasangan Jaringan Kabel LVTC 2x10mm
VIII. PEKERJAAN INSTALASI AIR BERSIH
1 Galian Tanah
2 Urugan Tanah Kembali
3 Memasang Pipa PVC tipe AW Ø 1½"
4 Pasang Sambungan Rumah
IX. PEKERJAAN PENATAAN TAMAN BERMAIN
1 Memasang Bekisting Kansteen
2 Kansteen Beton K-100
3 Paving Block Segi Empat Natural (K-200)
4 Pengecatan Kansteen
3. Pekerjaan ini terletak di Kecamatan Majenang.
4. Pekerjaan ini mengikat Rencana Kerja & Syarat-syarat (RKS) / Dokumen
Lelang ini, Rencana Anggaran Biaya (RAB) dan Gambar Rencana yang
menyatu menjadi bestek.
5. Konstruksi bangunan secara garis besar adalah sebagai berikut :
5.1 Jalan : Cor Beton K-250
Cor beton K-175
5.2 Drainase : U-Ditch 500x600x1200 mm + Cover
U-Ditch 300x300x1200 mm + Cover
5.3 Talud : Pas. Batukali 1pc:4pp
6. Peraturan-peraturan pembangunan yang mengikat dalam pekerjaan ini, antara
lain adalah :
6.1 Peraturan Syarat-syarat Umum Pelaksana Pekerjaan Pemborong di
Indonesia.
6.2 Spesifikasi Bahan Bangunan
6.3 Peraturan Beton Indonesia
6.4 Peraturan Besi Baja Indonesia.
6.5 Peraturan Kapur sebagai Bahan Bangunan
6.6 Peraturan Batu merah sebagai Bahan Bangunan
6.7 Peraturan Umum untuk Pemeriksaan Bahan Bangunan
6.8 Peraturan Kayu untuk Bahan Bangunan
6.9 Peraturan Batu alam untuk Bahan Bangunan
6.10 Peraturan Muatan Indonesia
6.11 Peraturan dari Dinas Teknis Kabupaten Cilacap
6.12 Peraturan Air Bersih/Minum
6.13 Peraturan dari Pemerintah Daerah setempat.
6.14 Peraturan lain yang relevan.