| Reason | |||
|---|---|---|---|
| 0314641473121000 | Rp 452,981,430 | Tidak menghadiri Undangan Klarifikasi dan Evaluasi Kewajaran Harga | |
| 0011431103128000 | Rp 482,580,000 | Tidak dapat menunjukkan kontrak, sebagai bukti pengalaman pekerjaan | |
| 0664444940128000 | Rp 568,755,000 | - | |
CV Mitra Mandiri | 0029315371128000 | - | - |
| 0747970150128000 | - | - | |
| 0923229108128000 | - | - | |
| 0315193961128000 | - | - | |
| 0021068242127000 | - | - | |
CV Redy | 09*8**2****28**0 | - | - |
| 0668499130128000 | - | - | |
| 0839138377128000 | - | - | |
CV Nahoda Raja | 00*9**7****28**0 | - | - |
| 0668505035128000 | - | - | |
| 0534790142125000 | - | - | |
Vinboti Mandiri | 06*5**5****28**0 | - | - |
| 0836940338128000 | - | - | |
| 0760269738125000 | - | - | |
| 0952497295128000 | - | - | |
| 0413873050128000 | - | - | |
| 0763668522124000 | - | - | |
| 0724180179121000 | - | - | |
| 0820936763117000 | - | - | |
| 0020197570127000 | - | - | |
CV Lenteq Jaya | 04*7**2****15**0 | - | - |
| 0024525263127000 | - | - | |
CV Shangrila Kirana Pratama | 10*1**1****23**2 | - | - |
CV Gemilang Soaloon | 01*4**5****24**0 | - | - |
| 0809955826121000 | - | - | |
| 0763876570121000 | - | - | |
| 0831713722121000 | - | - | |
CV Bermuda Jaya | 00*3**1****27**0 | - | - |
| 0311826366113000 | - | - | |
Pawitra Surya Indonesia | 06*7**0****02**0 | - | - |
| 0925723991121000 | - | - | |
| 0926124009124000 | - | - | |
CV San Vahoda | 05*4**9****28**0 | - | - |
CV Hasoman Aman Jaya | 00*7**4****28**0 | - | - |
| 0830937355121000 | - | - | |
| 0022952774121000 | - | - | |
| 0314009697121000 | - | - |
DAFTAR KUANTITAS HARGA
PEKERJAAN : Belanja Jasa Konsultansi Perencanaan Arsitektur-Jasa Desain Arsitektural
(Pembangunan Ruang Kelas Baru Beserta Perabotnya)
PEKERJAAN FISIK : Pembangunan Ruang Kelas Baru Beserta Perabotnya SD Negeri 033913 Kalang Baru
L O K A S I : SD Negeri 033913 Kalang Baru Kec. Sidikalang Kab. Dairi
SUMBER DANA : Dana Alokasi Umum (DAU) Kabupaten Dairi Tahun Anggaran 2025
HARGA PPN 11% JUMLAH
KODE
NO. URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
ANALISA
(Rp.) (Rp.) (Rp.)
a b c d e f g h = (d x f) + g
I. PEKERJAAN PERSIAPAN
1 Pek. Patok-patok profil, Pengukuran dan Pemasangan bowplank Ls 1 ,00 Ls 1.000.000,00 110.000,00 1 .110.000,00
2 Mobilisasi/ Demobilisasi Peralatan Ls 1 ,00 Ls 550.000,00 60.500,00 610.500,00
3 Pembersihan lokasi pekerjaan Ls 1 ,00 Ls 350.000,00 38.500,00 388.500,00
4 Membeli/ Menyewa perancah kerja Ls 1 ,00 Ls 700.000,00 77.000,00 777.000,00
5 Biaya Kesehatan dan Keselamatan Kerja Ls 1 ,00 Ls 1.356.800,00 149.248,00 1 .506.048,00
6 Photo-photo Dokumentasi dan Pembuatan Laporan Ls 1 ,00 Ls 329.309,24 36.224,02 365.533,25
7 Papan proyek Ls 1 ,00 Ls 350.000,00 38.500,00 388.500,00
8 Membuat/ Sewa gudang dan Direksikeet Ls 1 ,00 Ls 500.000,00 55.000,00 555.000,00
JUMLAH BIAYA PEKERJAAN PERSIAPAN 5.701.081,25
II. PEKERJAAN PONDASI
1 Pek. Galian tanah 1.2.1.1.1 3 2,90 M3 124.805,13 451.669,77 4 .557.758,54
2 Pek. Urugan kembali dipadatkan (bekas galian tanah) 1.3.1.1 3 2,90 M3 83.127,75 300.839,33 3 .035.742,30
3 Pek. Lantai Kerja (Pasir urug) 1.3.1.2 0 ,09 M3 301.726,65 2.987,09 30.142,49
4 Pek. Sloof Uk. 15 x 20 cm
- Pek. Bekisting sloof 2.2.1.3.3 2 6,92 M² 248.982,59 737.287,25 7 .439.898,56
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 1 7,95 M² 10.656,36 21.040,98 212.322,64
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 8 ,97 M² 7.104,24 7.009,75 70.734,78
- Pek. Besi 2.2.1.1.3 3 08,27 Kg. 18.878,87 640.176,82 6 .459.966,07
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 2 ,02 M3 1 .510.480,42 335.628,75 3 .386.799,19
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 2 ,02 M3 35.521,20 7.892,81 79.645,63
5 Pek. Pasangan batu belah/ gunung untuk pondasi camp 1 : 4 2.2.2.1.7 1 4,88 M3 1 .156.942,87 1.893.684,09 1 9.108.993,99
JUMLAH BIAYA PEKERJAAN PONDASI 44.382.004,19
III. PEKERJAAN PASANGAN DAN BETON
1 Pek. Kolom Induk Uk. 20 x 20 cm
- Pek. Bekisting kolom 2.2.1.3.4 3 3,60 M² 253.504,66 936.953,22 9 .454.709,79
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 2 2,40 M² 10.656,36 26.257,27 264.959,73
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 1 1,20 M² 7.104,24 8.752,42 88.319,91
- Pek. Besi 2.2.1.1.3 1 99,85 Kg. 18.878,87 415.023,64 4 .187.965,80
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 1 ,68 M3 1 .510.480,42 279.136,78 2 .816.743,88
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 1 ,68 M3 35.521,20 6.564,32 66.239,93
2 Pek. Kolom Teras Uk. 20 x 20 cm
- Pek. Bekisting kolom 2.2.1.3.4 7 ,80 M² 253.504,66 217.507,00 2 .194.843,34
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 5 ,20 M² 10.656,36 6.095,44 61.508,50
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 2 ,60 M² 7.104,24 2.031,81 20.502,83
- Pek. Besi 2.2.1.1.3 3 5,82 Kg. 18.878,87 74.386,52 750.627,64
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0 ,39 M3 1 .510.480,42 64.799,61 653.886,97
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0 ,39 M3 35.521,20 1.523,86 15.377,12
3 Pek. Kolom Teras Uk. 30 x 30 cm
- Pek. Bekisting kolom 2.2.1.3.4 7 ,68 M² 253.504,66 214.160,74 2 .161.076,52
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 5 ,12 M² 10.656,36 6.001,66 60.562,22
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 2 ,56 M² 7.104,24 2.000,55 20.187,40
- Pek. Besi 2.2.1.1.3 2 3,48 Kg. 18.878,87 48.760,35 492.036,21
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0 ,58 M3 1 .510.480,42 96.368,65 972.447,29
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0 ,58 M3 35.521,20 2.266,25 22.868,54
4 Pek. Kolom Praktis Uk. 10 x 10 cm 2.2.1.10.1 3 5,95 M' 121.062,11 478.740,11 4 .830.922,96
5 Pek. Ring Balok Uk. 10 x 20 cm
- Pek. Bekisting balok 2.2.1.3.5 2 3,76 M² 258.772,05 676.326,63 6 .824.750,53
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 1 5,84 M² 10.656,36 18.567,64 187.364,38
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 7 ,92 M² 7.104,24 6.189,21 62.454,79
- Pek. Besi 2.2.1.1.3 2 65,79 Kg. 18.878,87 551.959,63 5 .569.774,49
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 1 ,19 M3 1 .510.480,42 197.721,89 1 .995.193,58
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 1 ,19 M3 35.521,20 4.649,73 46.919,95
6 Pek. Balok Selasar Uk. 15 x 20 cm
- Pek. Bekisting balok 2.2.1.3.5 1 3,42 M² 258.772,05 381.999,30 3 .854.720,21
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 8 ,95 M² 10.656,36 10.491,19 105.865,60
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 4 ,47 M² 7.104,24 3.493,15 35.249,10
- Pek. Besi 2.2.1.1.3 1 11,75 Kg. 18.878,87 232.068,51 2 .341.782,23
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0 ,73 M3 1 .510.480,42 121.291,58 1 .223.942,28
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0 ,73 M3 35.521,20 2.852,35 28.782,82
7 Pek. Pasangan dinding 1/2 batu bata camp. 1 : 4 3.6.1.8 2 36,90 M2 147.825,50 3.852.184,70 3 8.872.045,65
8 Pek. Plesteran camp. 1 : 4 3.7.4 4 20,00 M2 73.127,83 3.378.505,75 3 4.092.194,34
9 Pek. Acian plesteran 3.7.8 4 20,00 M2 33.688,34 1.556.401,31 1 5.705.504,10
JUMLAH BIAYA PEKERJAAN PASANGAN DAN BETON 1 40.082.330,63
IV. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
1 Pek. Timbunan Tanah Pilihan untuk Peninggian Lantai 1.3.1.4 0 ,18 M3 169.583,60 3.357,76 33.882,80
2 Pek. Pemadatan Tanah pilihan secara Manual 1.3.2.1 0 ,18 M3 83.127,75 1.645,93 16.608,92
3 Pek. Timbunan pasir urug di bawah lantai 1.3.1.2 8 ,98 M3 301.726,65 298.045,58 3 .007.550,90
4 Pek. Lantai Granit licin Uk. 60 x 60 cm 3.9.5.3 1 42,38 M2 295.969,17 4.635.409,95 4 6.775.500,37
5 Pek. Lantai Granit kesat Uk. 60 x 60 cm 3.9.5.3A 5 ,31 M2 312.339,37 182.437,43 1 .840.959,48
6 Pek. Lantai Keramik kasar Uk. 40 x 40 cm 3.9.8.3B 1 3,07 M2 217.846,83 313.198,39 3 .160.456,45
7 Pek. Bon-bon keramik Dihitung 3 ,62 M' 7.740,00 3.082,07 31.100,86
8 Pek. Lantai Beton cor f'c 15 Mpa Selasar dan Drainase 2.2.1.5.2 1 ,80 M3 1 .424.213,17 281.994,21 2 .845.577,91
9 Pek. Acian Lantai Beton cor Selasar dan Drainase 3.7.8 3 6,28 M2 33.688,34 134.443,43 1 .356.656,40
10 Pek. Dinding Granit licin Uk. 60 x 60 cm 3.10.1.4H 2 2,09 M2 297.782,23 723.581,04 7 .301.590,50
11 Pek. Relief Dihitung 1 6,00 M' 120.000,00 211.200,00 2 .131.200,00
JUMLAH BIAYA PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING 6 8.501.084,59
V. PEKERJAAN PENUTUP ATAP DAN LANGIT-LANGIT (PLAFOND)
1 Pek. Rangka plafond) furing Baja ringan Dihitung 2 03,62 M2 91.600,00 2.051.675,12 2 0.703.267,12
2 Pek. Plafond PVC 8 mm Dihitung 2 03,62 M' 174.300,00 3.904.006,26 3 9.394.972,26
Pek. Atap spandeck warna 0,30 mm (model Spanrib) + rangka Baja
3 Dihitung 2 34,47 M2 261.000,00 6.731.633,70 6 7.928.303,70
ringan + Rabung + Talang dalam
4 Pek. Listplank GRC uk 1 x 20 cm 3.3.6 6 7,44 M' 79.164,03 587.270,44 5 .926.092,62
JUMLAH BIAYA PEKERJAAN PENUTUP ATAP DAN LANGIT-LANGIT (PLAFOND) 1 33.952.635,70
VI. PEKERJAAN PINTU DAN JENDELA
1 Pek. Kusen Pintu, Jendela dan Ventilasi (Kayu Sembarang Keras) 3.11.3.3 1 26,08 M' 142.380,02 1.974.640,02 1 9.925.912,94
2 Pek. Daun Pintu panil (Kayu Sembarang Keras) 3.11.1.11 5 ,04 M2 1 .051.679,60 583.051,17 5 .883.516,35
3 Pek. Daun Pintu aluminium (Kamar mandi) Dihitung 2 ,00 Unit 1 .450.000,00 319.000,00 3 .219.000,00
4 Pek. Jendela Kaca (Kayu Sembarang Keras) 3.11.1.9A 1 3,44 M2 302.339,43 446.978,61 4 .510.420,55
5 Pek. Pasangan Kaca mati 3.12.3 1 0,96 M2 376.269,07 453.629,99 4 .577.538,99
6 Pek. Jalusi kusen (Kayu Sembarang Keras) 3.11.3.6A 8 ,53 M2 883.305,31 828.805,37 8 .363.399,66
7 Pek. Jerjak jendela dan Pintu besi
- Biaya Pengadaan bahan Dihitung 3 63,18 Kg. 18.900,00 755.051,22 7 .619.153,22
- Biaya Perakitan A.4.2.1.3 3 63,18 Kg. 1.241,35 49.591,68 500.425,17
- Biaya Pengelasan 3.13.3 3 4,77 M' 148.487,52 567.920,21 5 .730.831,17
JUMLAH BIAYA PEKERJAAN PINTU DAN JENDELA 6 0.330.198,05
VII. PEKERJAAN ALAT-ALAT PENGGANTUNG DAN KUNCI
1 Biaya pembelian dan pemasangan kunci tanam biasa 3.11.4.2 2 ,00 Bh. 280.039,72 61.608,74 621.688,17
2 Biaya pembelian dan pemasangan engsel besar untuk pintu 3.11.4.5 6 ,00 Psg. 62.894,07 41.510,09 418.874,50
3 Biaya pembelian dan pemasangan engsel kecil untuk jendela 3.11.4.15 2 8,00 Psg. 42.458,48 130.772,12 1 .319.609,55
4 Biaya pembelian dan pemasangan grendel untuk pintu Ls 4 ,00 Bh. 20.900,00 9.196,00 92.796,00
5 Biaya pembelian dan pemasangan grendel Kodok untuk jendela Ls 2 8,00 Bh. 20.900,00 64.372,00 649.572,00
6 Biaya pembelian dan pemasangan hak angin untuk jendela Ls 2 8,00 Psg. 16.300,00 50.204,00 506.604,00
7 Biaya pembelian dan pemasangan handle untuk jendela Ls 2 8,00 Bh. 16.300,00 50.204,00 506.604,00
JUMLAH BIAYA PEKERJAAN ALAT-ALAT PENGGANTUNG DAN KUNCI 4 .115.748,22
VIII. PEKERJAAN PENGECATAN
1 Pek. Cat minyak kilat untuk Kozen, Pintu, Jendela dan Ventilasi 3.8.4 7 5,08 M2 69.138,32 570.999,56 5 .761.904,62
2 Pek. Mengecat dinding (Cat tembok) 3.8.10 3 33,30 M2 43.364,75 1.589.881,83 1 6.043.353,00
3 Pek. Cat minyak kilat untuk Listplank 3.8.4 1 4,84 M2 69.138,32 112.861,39 1 .138.874,06
4 Pek. Cat minyak kilat untuk Jerjak jendela dan Pintu besi 3.8.16 2 7,81 M2 72.349,23 221.323,53 2 .233.355,61
JUMLAH BIAYA PEKERJAAN PENGECATAN 2 5.177.487,29
IX. PEKERJAAN ELEKTRIKAL
1 Pemasangan Instalasi listrik Ls 1 4,00 Titik 150.000,00 231.000,00 2 .331.000,00
2 Lampu LED Persegi kecil SNI 18 Watt komplit Ls 4 ,00 Set 245.000,00 107.800,00 1 .087.800,00
3 Lampu LED Persegi besar SNI 24 Watt komplit Ls 8 ,00 Set 330.000,00 290.400,00 2 .930.400,00
4 Saklar tunggal Ls 1 ,00 Bh 18.500,00 2.035,00 20.535,00
5 Saklar ganda Ls 2 ,00 Bh 40.500,00 8.910,00 89.910,00
6 Stop kontak Ls 4 ,00 Bh 24.300,00 10.692,00 107.892,00
JUMLAH BIAYA PEKERJAAN ELEKTRIKAL 6 .567.537,00
X. PEKERJAAN SANITAIR
1 Pemasangan Closed Jongkok komplet 3.18.3.2 2 ,00 Set 559.568,71 123.105,12 1 .242.242,53
2 Pemasangan Bak Fiberglass Ls. 2 ,00 Bh 245.900,00 54.098,00 545.898,00
3 Pemasangan Floor Drain Ls. 2 ,00 Bh 15.300,00 3.366,00 33.966,00
4 Pemasangan Kran Air Biasa, Dia. 1/2" Ls. 2 ,00 Bh 22.600,00 4.972,00 50.172,00
5 Pekerjaan Plumbing Air Bersih dia. 1/2" 6.4.1.1 3 ,76 M' 26.645,38 11.020,53 111.207,15
6 Pekerjaan Plumbing Air Bersih dia. 3/4" 6.4.1.2 2 2,00 M' 37.051,85 89.665,48 904.806,17
7 Pekerjaan Plumbing Air Kotor dia. 3" 6.4.1.8 8 ,41 M' 176.738,32 163.500,62 1 .649.869,89
8 Pekerjaan Plumbing Air Kotor dia. 4" 6.4.1.9 1 1,28 M' 266.151,63 330.240,94 3 .332.431,32
9 Pembuatan Septiktank + Resapan
a. Pek. Galian tanah 1.2.1.1.1 14,20 M3 124.805,13 194.945,61 1.967.178,45
b. Pek. Pasangan batu belah/ gunung untuk pondasi camp 1 : 4 2.2.2.1.7 0,63 M3 1.156.942,87 80.176,14 809.050,14
c. Urugan tanah kembali 1.3.1.1 14,20 M3 83.127,75 129.845,55 1.310.259,59
d. Pekerjaan beton cor untuk lantai septik tank
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0,33 M3 1.510.480,42 54.830,44 553.288,97
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0,33 M3 35.521,20 1.289,42 13.011,41
e. Pekerjaan balok 15 cm x 15 cm
- Pek. Bekisting balok 2.2.1.3.5 0,67 M² 258.772,05 19.071,50 192.448,77
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 0,45 M² 10.656,36 527,49 5.322,85
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 0,22 M² 7.104,24 171,92 1.734,85
- Pek. Besi 2.2.1.1.3 5,79 Kg. 18.878,87 12.023,95 121.332,60
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0,04 M3 1.510.480,42 6.646,11 67.065,33
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0,04 M3 35.521,20 156,29 1.577,14
f. Pek. Dinding batu bata 1 : 4 tebal 1/2 bata 3.6.1.8 18,48 M² 147.825,50 300.499,68 3.032.314,91
g. Pek. Plesteran 1 : 4 3.7.4 10,24 M² 73.127,83 82.371,19 831.200,16
h. Pek. Acian plesteran 3.7.8 10,24 M2 33.688,34 37.946,55 382.915,14
i. Pekerjaan beton bertulang K-225 untuk penutup septik tank
- Pek. Bekisting plat 2.2.1.3.6 4,14 M² 274.573,44 125.040,74 1.261.774,78
- Pek. Membongkar Bekisting secara Hati-hati 2.2.1.3.11 2,76 M² 10.656,36 3.235,27 32.646,82
- Pek. Membongkar Bekisting secara Biasa 2.2.1.3.10 1,38 M² 7.104,24 1.078,42 10.882,27
- Pek. Besi 2.2.1.1.3 38,65 Kg. 18.878,87 80.263,52 809.931,84
- Pek. Beton f'c 20 Mpa 2.2.1.5.4 0,45 M3 1.510.480,42 74.768,78 754.484,96
- Pek. Pemadatan Beton secara Manual menggunakan penusuk besi 2.2.1.8.1 0,45 M3 35.521,20 1.758,30 17.742,83
j. Pek. Pipa PVC dia. 4" 6.4.1.9 5,40 M' 266.151,63 158.094,07 1.595.312,87
k. Pek. Aanstambing batu padas 2.2.2.1.1 1,20 M3 655.693,20 86.551,50 873.383,34
l. Pek. Pengadaan dan Pemasangan Lapisan ijuk Dihitung 1,00 Ls. 250.000,00 27.500,00 277.500,00
m. Pek. Pengadaan dan Pemasangan Pipa hawa Dihitung 1,00 Bh. 70.000,00 7.700,00 77.700,00
JUMLAH BIAYA PEKERJAAN SANITAIR 2 2.870.653,08
XI. PEKERJAAN MEUBILER
1 Pek. Pengadaan Kursi siswa Ls 6 4,00 Bh 278.000,00 1.957.120,00 1 9.749.120,00
2 Pek. Pengadaan Kursi kerja/ guru Ls 2 ,00 Bh 357.000,00 78.540,00 792.540,00
3 Pek. Pengadaan Meja siswa ganda Ls 3 2,00 Bh 882.000,00 3.104.640,00 3 1.328.640,00
4 Pek. Pengadaan Meja kerja/ guru (1/2 biro) Ls 2 ,00 Bh 1 .087.000,00 239.140,00 2 .413.140,00
5 Pek. Pengadaan Lemari administrasi Ls 2 ,00 Bh 2 .688.000,00 591.360,00 5 .967.360,00
6 Pek. Pengadaan Papan tulis gantung Ls 2 ,00 Bh 1 .197.000,00 263.340,00 2 .657.340,00
7 Pek. Pengadaan Papan Piket Ls 2 ,00 Bh 210.000,00 46.200,00 466.200,00
8 Pek. Pengadaan Papan Jadwal Ls 2 ,00 Bh 210.000,00 46.200,00 466.200,00
9 Pek. Pengadaan Papan Absen Ls 2 ,00 Bh 210.000,00 46.200,00 466.200,00
JUMLAH BIAYA PEKERJAAN MEUBILER 6 4.306.740,00
R E K A P I T U L A S I
I. PEKERJAAN PERSIAPAN Rp. 5.701.081,25
II. PEKERJAAN PONDASI Rp. 44.382.004,19
III. PEKERJAAN PASANGAN DAN BETON Rp. 140.082.330,63
IV. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Rp. 68.501.084,59
V. PEKERJAAN PENUTUP ATAP DAN LANGIT-LANGIT (PLAFOND) Rp. 133.952.635,70
VI. PEKERJAAN PINTU DAN JENDELA Rp. 60.330.198,05
VII. PEKERJAAN ALAT-ALAT PENGGANTUNG DAN KUNCI Rp. 4.115.748,22
VIII. PEKERJAAN PENGECATAN Rp. 25.177.487,29
IX. PEKERJAAN ELEKTRIKAL Rp. 6.567.537,00
X. PEKERJAAN SANITAIR Rp. 22.870.653,08
XI. PEKERJAAN MEUBILER Rp. 64.306.740,00
JUMLAH TOTAL Rp. 575.987.500,00
Terbilang : Lima ratus tujuh puluh lima juta sembilan ratus delapan puluh tujuh ribu lima ratus rupiah,-