| 0317133536121000 | - | |
CV Binawah Junior | 09*0**4****25**0 | - |
| 0014877666113000 | Rp 2,686,131,342 | |
| 0704591890114000 | Rp 2,688,950,923 | |
| 0314728494125000 | Rp 2,855,226,661 | |
| 0030606875112000 | Rp 2,677,534,634 | |
| 0724180179121000 | Rp 2,399,093,600 | |
PT Maha Akbar Sejahtera | 09*4**8****21**0 | Rp 2,429,275,285 |
CV Tondiku | 05*6**9****25**0 | - |
| 0828248435124000 | - | |
CV Bahtera Amaris Kencana | 09*0**2****21**0 | - |
| 0824698211124000 | - | |
| 0412479651115000 | - | |
| 0210751772122000 | - | |
| 0211280540122000 | - | |
CV Putra Barata Deli | 07*7**5****25**0 | - |
| 0033337700112000 | - | |
| 0021779665125000 | - | |
| 0022006423122000 | - | |
| 0390222867121000 | - | |
| 0733070783125000 | - | |
| 0633492574128000 | - | |
CV Busimor Engineering | 0210247656122000 | - |
| 0705339406121000 | - | |
| 0840559934124000 | - | |
| 0815113329113000 | - | |
| 0313065815117000 | - | |
| 0614642783118000 | - |
Pekerjaan : RENOVASI DAN PENGEMBANGAN LABKESDA KAB. DELI SERDANG
SKPD : DINAS KESEHATAN
Lokasi : JLN. KARYA ASIH NO, 4 LUBUK PAKAM
Kabupaten : DELI SERDANG
Propinsi : SUMATERA UTARA
T.A : 2024
HARGA JUMLAH
NO URAIAN KEGIATAN VOLUME STN ANALISA SATUAN HARGA
(Rp) (Rp)
A PEKERJAAN PERSIAPAN
1 Pagar sementara
2 Gudang dan Loos kerja 2,4*3,6
3 Pengukuran/bowplank
4 Biaya bongkar bangunan existing
B PENERAPAN SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI
B.1 Penyiapan RKK
1 Pek. Persiapan Pembuatan Dokumen RKK
B.2 Sosialisasi, Promosi dan Pelatihan
a. Pengarahan Keselamatan Konstruksi
b. Sepanduk (Benner)
B.3 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
Alat Pelindung Diri (APD) Antara Lain :
a. Topi Pelindung (Sefety Helmet)
b. Sarung Tangan (Sefety Gloves)
c. Sepatu Keselamatan (Sefety Shoes)
d. Rompi Keselamatan (Sefety Vest)
B.4 Ansuransi dan Perizinan
a. Ansuransi/BPJS Keselamatan
B.5 Personil K3 konstruksi
a. Petugas K3
B.6 Fasalitas Sarana Kesehatan
B.7 Rambu-Rambu Terdir Dari :
a. Rambu Petunjuk
b. Rambu Peringatan
c. Rambu Informasi
B.8 Konsultansi Dengan Ahli Terkait Keselamatan Konstruksi
B.9 Konsultansi dengan Ahli Terkait Keselamatan Konstruksi
a. Alat Pemadam Api Ringan (APAR)
B.10 Pencegahan dan Penangulangan Bencana COVID - 19
(Instruksi Menteri PURR No. 02/IN/M/2020
a. Sewa Pengukur Suhu Badan (Termogun)
b. Peralatan P3K ( Kotak P3K, Tandu, Obat Luka, Perban )
c. Masker Medis
C PEKERJAAN TANAH
1 Galian tanah pondasi dan sloof
2 Timbunan kembali ex galian tanah pondasi dan sloof
3 Timbunan tanah peninggian elevasi
4 Urugan pasir dibawah pondasi dan lantai
HARGA JUMLAH
NO URAIAN KEGIATAN VOLUME STN ANALISA SATUAN HARGA
(Rp) (Rp)
D PEKERJAAN PONDASI DAN BETON STRUKTUR LT,1 (SATU)
1 Pondasi menerus pas, batu kali camp, 1:4
2 Pondasi setempat
- Lantai kerja beton camp, 1:3:5
- Beton mutu K225
- Besi beton ulir
- Mal/ Bekesting
3 Kolom Pedestral 40x40 cm
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
4 Sloof ukuran 30x30 cm
- Lantai kerja beton camp, 1:3:5
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
5 Sloof 12x15 cm
6 Kolom ukuran 40x40 cm
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
7 Kolom praktis 12x12 cm
8 Balok melintang ukuran 30x60 cm (Elev. +4.00)
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
9 Balok memanjang ukuran 30x45 cm (Elev. +4.00)
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
10 Balok anak 20x30 cm (Elev. +4.00)
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
11 Plat beton lantai Lt,2 # 12 cm
- Beton mutu K225
- Besi beton polos
- Mal/ Bekesting
12 Leuvel beton Lt,2 # 8 cm
- Beton mutu K225
- Besi beton ulir
- Mal/ Bekesting
13 Pondasi, balok dan anak tangga beton bertulang
- Beton mutu K225
- Besi beton polos
- Besi beton ulir
- Mal/ Bekesting
HARGA JUMLAH
NO URAIAN KEGIATAN VOLUME STN ANALISA SATUAN HARGA
(Rp) (Rp)
E PEKERJAAN PASANGAN DAN PLESTERAN LT 1 (SATU)
1 Pasangan tembok batu bata camp, 1:4
2 Plesteran tembok batu bata camp, 1:4
3 Acian Plesteran tembok batu bata
F PEKERJAAN PLAFOND LT. 1 (SATU)
1 Rangka plafond besi furing
2 Plafond gypsump # 9 mm
G PEKERJAAN PELAPIS LANTAI DAN DINDING
1 Lantai cor camp, beton K225
2 Plesteran lantai camp, 1:4
3 Acian Plesteran lantai
4 Lantai Vinyl anti bakteri # 0,5 mm (Mipolam)
5 Lantai keramik ukuran 60x60 cm
6 Lantai keramik ukuran 30x30 cm (KM/WC)
7 Dinding keramik ukuran 30x60 cm (KM/WC) T= 2
H PEKERJAAN DINDING PANEL DAN KOZEN PINTU DAN JENDELA
1 Pemasangan dinding SUNDWICK PANEL EPS 50.5
anti bakter
2 Curving Internal dan external (Male Female)
3 Threeway Internal dan external
4 Double swing door 2x895,5x2100 mm Type PSP1
- Kozen Sandwick panel C Finishing Coatng
- Pintu double plywood # 6 mm dilapis HPL
- Kunci tanam pintu
- Engsel pintu 4"
- Grendel pintu bukak 2
5 Single swing door 1x90x2100 mm Type PSP2
- Kozen Sandwick panel C Finishing Coatng
- Pintu double plywood # 6 mm dilapis HPL
- Kunci tanam pintu
- Engsel pintu 4"
- Grendel pintu bukak 2
6 Loket 300x600 (lengkap) Lk1
7 Pintu Toilet 70x200 cm aluminium sisir (P3)
8 Kozen dan pintu type P1
- Kozen aluminium putih susu (setra metalindo)
- Pintu double plywood # 6 mm dilapis HPL
- Kunci tanam pintu
- Engsel pintu 4"
- Grendel pintu bukak 2
9 Kozen dan pintu type P2
- Kozen aluminium putih susu (setra metalindo)
- Pintu double plywood # 6 mm dilapis HPL
- Kunci tanam pintu
- Engsel pintu 4"
10 Pintu sliding toilet difabel type PS1
- Pintu double plywood # 6 mm dilapis HPL
- Rel dan roda sliding
HARGA JUMLAH
NO URAIAN KEGIATAN VOLUME STN ANALISA SATUAN HARGA
(Rp) (Rp)
I PEKERJAAN LISTRIK,ARMATURE
1 Lampu tanam LED 20 Watt (setara Hannoch)
2 Stop kontak arde (setara pansonic)
3 Sakelar tunggal (setara pansonic)
4 Sakelar ganda (setara pansonic)
5 Panel penerangan box 60x50x20 cm
6 Instalasi listrik dengan kabel 2,5 mm
J PEKERJAAN PLUMBING DAN ALAT - ALAT SANITAIR
1 Instalasi air bersih pipa PVC Ф 1" AW
2 Instalasi air bersih pipa PVC Ф 3/4" AW
3 Instalasi air kotor dari klosed pipa PVC Ф 4" AW
4 Instalasi air kotor bekas dri KM pipa PVC Ф 3" AW
5 Klosed duduk setara AS
6 Klosed Jongkok keramik
7 Wostafle gantung keramik setara AS
8 Kran air bak 1/2"
9 Kran cebok
10 Flow drain SS
11 Meja beton lapis keramik
12 Bak air 50x40x22 cm setara WINSAR (lengkap)
13 Septicktank
14 Bak kontrol 45x45x50 cm
K PEKERJAAN PENGECATAN
1 Pengecatan tembok dengan cat air setara Vinileks
2 Pengecatan plafond dengan cat air setara Vinileks
L PEKERJAAN PERSIAPAN LANTAI 2 (DUA)
1 Beton lunak pembungkus setik besi kolom lt, 2
2 Kuda - kuda rangka baja ringan penutup tangga
3 Atap zincalume penutup tangga
M PEKERJAAN LAIN - LAIN
1 Pembuatan laporan dan As Build Drawing
2 Photo dokumentasi
3 Pembersihan akhir