| 0020904975926000 | Rp 6,511,817,180 | |
| 0029428752701000 | - | |
| 0027482900008000 | - | |
| 0027648179701000 | - | |
| 0417339652501000 | - | |
CV Mandawe | 00*8**1****15**0 | - |
PT Permata Angkola Sejahtera | 01*8**1****01**0 | - |
| 0016396806804000 | - | |
| 0026857607926000 | - | |
| 0739091494426000 | - | |
| 0711230243831000 | - | |
| 0804457232529000 | - | |
| 0032620395101000 | - | |
| 0949997175831000 | - | |
| 0018933473101000 | - | |
| 0015570229655000 | - | |
| 0031410764325000 | - | |
| 0022565683614000 | - | |
| 0020537593912000 | - | |
CV Papua Cerdas Mandiri | 09*5**5****52**0 | - |
| 0822695656101000 | - | |
| 0865431241425000 | - | |
Ayay Putra Pamungkas | 01*9**0****48**0 | - |
CV Taluvi Star | 08*9**2****34**0 | - |
BILL OF QUANTITY
Unit Kerja / Satpel : BANDAR UDARA UMBU MEHANG KUNDA
Lokasi : BANDAR UDARA UMBU MEHANG KUNDA - WAINGAPU
Program : PROGRAM PEMBANGUNAN TRANSPORTASI UDARA
Pekerjaan : LANJUTAN PELAPISAN APRON
Tahun Anggaran : 2025
Utama/ Rincian Perhitungan Harga Satuan Jumlah Harga
No Uraian Pekerjaan Volume Satuan
Pendukung A B C (Rp) (Rp)
I PEKERJAAN PERSIAPAN
1 Mobilisasi dan Demobilisasi 1,00 Ls PENDUKUNG 1 Ls -
2 Penyelenggaraan SMK3 1,00 Ls PENDUKUNG 1 Ls -
SUB TOTAL I - PEKERJAAN PERSIAPAN -
II PEKERJAAN PEMBUATAN FILET AKSES PKP-PK
1 Galian Biasa 238,05 m3 UTAMA 238,05 -
2 Pekerjaan Sirtu untuk Sub Base CBR > 25% 132,25 m3 UTAMA 132,25 -
3 Pekerjaan Base couse Crush Agregate 66,13 m3 UTAMA 66,13 -
4 Lapis Resap Pengikat (Prime Coat) (1 ltr/m2) 132,50 m2 UTAMA 26,50 m2 x 5,00 m -
5 Lapis Perekat (Tack Coat) 0,50ltr/m2 132,50 m2 UTAMA 26,50 m2 x 5,00 m -
6 Pelapisan Asphalt Concrete (AC) (t=0,05 m) 36,50 ton UTAMA 36,50 -
7 Pelapisan Asphalt Concrete Bearing Course (AC -BC) (t=0,075 m) 24,33 ton UTAMA 24,33 -
SUB TOTAL II - PEKERJAAN GALIAN DAN TIMBUNAN -
III PEKERJAAN PELAPISAN (LEVELING DAN OVERLAY)
PELAPISAN APRON
1 Lapis Perekat (Tack Coat) 0,50ltr/m2 21.798,00 m2 UTAMA 166,00 m2 x 80,00 m x m -
2 Pelapisan Asphalt Concrete (AC) (t=0,05 m) 1.493 ton UTAMA 21.798,00 m2 x 0,05 m x 2 ,29 ton -
3 Pelapisan Asphalt Concrete (AC) (t=0,075 m) 877 ton UTAMA -
SUB TOTAL III - PEKERJAAN PELAPISAN -
IV PEKERJAAN PENGECATAN MARKA
1 MARKA APRON
- Apron Edge Line Marking 200,70 m2 UTAMA 669,00 m x 0,15 m x 2 ,00 bh -
- Apron Lead in dan Lead out Marking 125,59 m2 UTAMA 837,26 m x 0,15 m -
- Marshaller Stopline Marking 3,60 m2 UTAMA 6,00 m2 x 0,15 m x 4 ,00 bh -
- Aircraft Stand Number Marking 10,93 m2 UTAMA 10,93 m2 x -
SUB TOTAL IV - PEKERJAAN PENGECATAN MARKA -
V Pekerjaan Reinstalasi Air Field Lightning System AFL
- Reinstalasi Air Field Lightning System AFL 2,00 bh UTAMA -
SUB TOTAL V - PEKERJAAN LAMPU -
JUMLAH -
PPN 12% (12%*11/12) -
TOTAL -
PEMBULATAN -
TERBILANG :
Waingapu, 14 Oktober 2025
Pejabat Pembuat Komitmen
Judytisman Kalumbang
NIP. 19790125 200812 1 001| Authority | |||
|---|---|---|---|
| 3 January 2023 | Peningkatan Jalan Malinjak - Sp. Konda Maloba (Hotmix) - Dak Penugasan Konektivitas Dan Elektrivikasi | Kab. Sumba Tengah | Rp 13,140,000,000 |
| 9 February 2024 | Jalan Katikuloku - Hobajangi | Kab. Sumba Barat | Rp 11,067,104,900 |
| 14 December 2023 | Penanganan Long Segmen Jalan Weekapoda· Kikukarambo | Kab. Sumba Barat Daya | Rp 10,500,000,000 |
| 14 September 2022 | Penanganan Bencana Jembatan Waiburak | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 9,572,224,000 |
| 14 December 2023 | Penanganan Long Segmen Jalan Dalam Kota Tambolaka | Kab. Sumba Barat Daya | Rp 8,831,250,000 |
| 9 February 2024 | Jalan Ponu Ngaba (Relly Tvri) - Wanokaza | Kab. Sumba Barat | Rp 7,850,000,000 |
| 20 February 2024 | Peningkatan Jalan Katura - Sp. Pondok | Kab. Sumba Tengah | Rp 7,837,395,500 |
| 20 February 2024 | Peningkatan Jalan Lawonda - Maradesa - Alanga | Kab. Sumba Tengah | Rp 7,747,822,850 |
| 23 July 2025 | Pembangunan Rumah Transmigran | Kementerian Transmigrasi | Rp 7,582,950,000 |
| 3 June 2025 | Peningkatan Jalan Karipi - Janggamangu Kecamatan Matawai La Pawu - Kecamatan Karera | Kab. Sumba Timur | Rp 7,240,000,000 |