REKAPITULASI
BILL OF QUANTITY
KEGIATAN : PEMBANGUNAN SISTEM DRAINASE LINGKUNGAN
PEKERJAAN : DRAINASE DESA LEBANI
KABUPATEN : ENREKANG
DINAS : DINAS PEKERJAAN UMUM DAN TATA RUANG
LOKASI : KEC. MAIWA KAB. ENREKANG PROVINSI SULAWESI SELATAN
T.A. : 2024
JUMLAH HARGA
No. URAIAN PEKERJAAN
(Rupiah)
(1) (2) (3)
I PEKERJAAN PERSIAPAN AWAL -
II PEKERJAAN KONSTRUKSI DUEKER -
III PEKERJAAN KONSTRUKSI DRAINASE -
REAL COST -
PPN 11% -
TOTAL ANGGARAN -
PEMBULATAN -
Terbilang :
….............................................
Penawar
PT/CV ….....................
….............................................
Direktur
BILL OF QUANTITY (BOQ)
KEGIATAN : PEMBANGUNAN SISTEM DRAINASE LINGKUNGAN
PEKERJAAN : DRAINASE DESA LEBANI
KABUPATEN : ENREKANG
DINAS : DINAS PEKERJAAN UMUM DAN TATA RUANG
LOKASI : KEC. MAIWA KAB. ENREKANG PROVINSI SULAWESI SELATAN
T.A. : 2024
HARGA SATUAN JUMLAH HARGA
No URAIAN PEKERJAAN Kode SAT VOLUME
(Rp) (Rp)
1 2 3 4 5 6 = 4 x 5
I PEKERJAAN PERSIAPAN AWAL
1 Pembuatan Tanda Pengenal Proyek - Ls 1 ,00 -
2 Pengukuran Dan Pemasangan Bowplank - Ls 1 ,00 -
3 K3 / Adminitrasi - Ls 1 ,00 -
4 As Built Drawing - Ls 1 ,00 -
SUB. TOTAL I -
II PEKERJAAN KONSTRUKSI DUEKER
1 Galian Tanah Biasa Sedalam 1 m U.3.4.1.a.1 m3 18,68 -
2 Pek. Batu Belah 1SP : 3PP A.3.2.1.1. m3 12,37 -
3 Pek. Plesteran 1SP : 3PP tebal 15 mm 3.2.1.(c) m2 16,46 -
4 Pek. Campuran Beton 1 : 2 : 3 A.4.1.1.5. m3 3,39 -
5 Pembesian A.4.1.1.17. kg 2 77,43 -
6 Pemasangan Bekisting A.4.1.1.19. m2 5 ,14 -
7 Urugan Kembali A.2.3.1.9. m3 3 ,74 -
8 Pembongkaran Beton 2.2.10.a(a) m3 2 ,00 -
SUB. TOTAL II -
III PEKERJAAN KONSTRUKSI DRAINASE
1 Galian Tanah Biasa Sedalam 1 m U.3.4.1.a.1 m3 3 1,68 -
2 Pek. Batu Belah 1SP : 3PP A.3.2.1.1. m3 1 6,97 -
3 Pek. Plesteran 1SP : 3PP tebal 15 mm 3.2.1.(c) m2 7 8,92 -
4 Pek. Campuran Beton 1 : 2 : 3 A.4.1.1.5. m2 3 ,65 -
5 Mobilisasi Material Sisa Galian Drainase Ls 1 ,00
SUB TOTAL III -