| Reason | |||
|---|---|---|---|
| 0944576800822000 | Rp 8,344,953,942 | hasil evaluasi kewajaran harga, harga penawaran peserta dinyatakan tidak wajar | |
| 0764653473655000 | Rp 9,431,321,761 | - | |
| 0022278964822000 | Rp 9,699,088,361 | - | |
| 0025348335822000 | Rp 9,798,730,085 | - | |
| 0031709454822000 | - | - | |
| 0724936331822000 | - | - | |
| 0028369403822000 | - | - | |
CV Amika Joint Konstruski | 00*7**1****04**0 | - | - |
| 0023946791822000 | - | - | |
| 0011143419822000 | - | - | |
| 0805960267822000 | - | - | |
| 0832257018822000 | Rp 8,502,558,880 | Tidak menginput data isian kualifikasi Sertifikat Badan Usaha SBU sesuai yang dipersyaratkan | |
| 0019823517943000 | - | - | |
| 0809093222822000 | - | - | |
| 0022276380822000 | - | - | |
| 0817875206822000 | - | - | |
CV Satu Ampat Basudara | 06*9**4****22**0 | - | - |
| 0955403399822000 | Rp 9,025,000,000 | Kapasitas peralatan Excavator dan Concrete Pump yang ditawarkan dalam Daftar Peralatan tidak sesuai yang disyaratkan. | |
| 0438243826822000 | Rp 8,502,661,600 | Pengalaman Personil Pelaksana yang ditawarkan kurang dari yang disyaratkan, berdasarkan Dokumen Pemilihan BAB III. IKP Klausul 28.12. huruf c angka (7) Pengalaman kerja yang dinilai adalah pengalaman kerja setelah personel lulus pendidikan minimal sesuai persyaratan untuk memperoleh SKA/SKT sesuai yang disyaratkan dalam LDP. | |
PT Rapha Falita Mora | 05*2**3****31**0 | Rp 9,308,783,912 | Sertifikat Badan Usaha yang ditawarkan telah berstatus dibekukan dan pencabutan mulai tanggal 15 Februari 2024 (Sebelum Batas akhir pemasukan penawaran). |
| 0022274534822000 | - | - | |
| 0664170115825000 | - | - | |
| 0861471068822000 | - | - | |
| 0661119404722000 | - | - | |
| 0911699049822000 | Rp 8,502,661,600 | Berdasarkan hasil klarifikasi ke pemberi sewa peralatan, pemberi sewa tidak menunjukkan/menyampaikan bukti kepemilikan alat bar bender, bar cutter dan concrete vibrator. | |
| 0026432955804000 | Rp 9,540,096,759 | Pengalaman Personil Pelaksana yang ditawarkan kurang dari yang disyaratkan, berdasarkan Dokumen Pemilihan BAB III. IKP Klausul 28.12. huruf c angka (7) Pengalaman kerja yang dinilai adalah pengalaman kerja setelah personel lulus pendidikan minimal sesuai persyaratan untuk memperoleh SKA/SKT sesuai yang disyaratkan dalam LDP. | |
| 0940460728822000 | - | - | |
| 0733133797822000 | Rp 10,332,440,298 | Tidak dievaluasi, karena telah diperoleh 3 (tiga) penawar terendah yang memenuhi syarat. | |
| 0031709884822000 | Rp 9,841,031,559 | Tidak dievaluasi, karena telah diperoleh 3 (tiga) penawar terendah yang memenuhi syarat. | |
| 0313498891034000 | Rp 9,021,121,816 | Tidak mengisi data kualifikasi IUJK/NIB dan SBU yang disyaratkan melalui form isian elektronik data kualifikasi dalam SPSE | |
| 0027487388009000 | Rp 9,883,052,670 | Tidak dievaluasi, karena telah diperoleh 3 (tiga) penawar terendah yang memenuhi syarat. | |
| 0028567949815000 | Rp 8,856,052,904 | 1. Kapasitas alat bar cutter yang ditawarkan tidak sesuai yang disyaratkan 2. Pengalaman Personil Ahli Muda K3 yang ditawarkan kurang dari yang disyaratkan, berdasarkan Dokumen Pemilihan BAB III. IKP Klausul 28.12. huruf c angka (9) Penilaian pengalaman Petugas Keselamatan Konstruksi/Ahli K3 Konstruksi dilakukan terhadap pengalaman keterampilan/keahlian K3 dalam melaksanakan pekerjaan konstruksi. 3. Pengalaman Personil Pelaksana Lapangan yang ditawarkan kurang dari yang disyaratkan, berdasarkan Dokumen Pemilihan BAB III. IKP Klausul 28.12. huruf c angka (8) Penilaian Pengalaman Manajer Pelaksana/Proyek dan Manajer Teknis serta pelaksana dilakukan terhadap pengalaman dalam melaksanakan pekerjaan konstruksi. | |
| 0025347683822000 | Rp 8,502,661,600 | Sertifikat Badan Usaha yang ditawarkan telah berstatus dibekukan dan pencabutan mulai tanggal 29 Februari 2024 (Sebelum Batas akhir pemasukan penawaran). | |
| 0825712508912000 | Rp 8,502,661,000 | 1. Daftar peralatan untuk Molen/Beton Mixer yang ditawarkan adalah status sewa, namun tidak melampirkan surat perjanjian sewa dan bukti kepemilikan dari pemberi sewa; 2. Pengalaman Personil Ahli Muda K3 yang ditawarkan kurang dari yang disyaratkan, berdasarkan Dokumen Pemilihan BAB III. IKP Klausul 28.12. huruf c angka (9) Penilaian pengalaman Petugas Keselamatan Konstruksi/Ahli K3 Konstruksi dilakukan terhadap pengalaman keterampilan/keahlian K3 dalam melaksanakan pekerjaan konstruksi. | |
| 0737868422822000 | - | - | |
| 0032415960822000 | Rp 10,078,696,173 | Tidak dievaluasi, karena telah diperoleh 3 (tiga) penawar terendah yang memenuhi syarat. | |
| 0752270785822000 | - | - | |
| 0926281692061000 | - | - | |
| 0858417272822000 | - | - | |
| 0031708241822000 | - | - | |
CV 55 Konstruksi | 0757219654822000 | - | - |
Sexy Road Indo | 06*9**5****22**0 | - | - |
Mahapatih Gadjah Mada | 06*9**8****14**0 | - | - |
| 0022281877822000 | - | - | |
Metch Construction | 05*5**7****22**0 | - | - |
| 0660850496822000 | - | - | |
| 0031549041941000 | - | - | |
| 0751422700822000 | - | - | |
| 0016293037803000 | - | - | |
CV Cahaya Mutiara Mandiri | 00*3**7****22**0 | - | - |
PT Labolytic Periferal Indonesia | 08*3**3****03**0 | - | - |
| 0022275705822000 | - | - | |
| 0749317079822000 | - | - | |
| 0024154528017000 | - | - | |
| 0033283425412000 | - | - | |
| 0030918957822000 | - | - | |
| 0015791635907000 | - | - | |
| 0033125766822000 | - | - | |
Setia Berkarya | 05*3**5****22**0 | - | - |
| 0823730346822000 | - | - | |
| 0026804518822000 | - | - | |
CV Mutia Karya | 07*5**0****22**0 | - | - |
| 0626295372822000 | - | - | |
| 0738694561822000 | - | - | |
| 0033169533824000 | - | - | |
| 0022275648822000 | - | - | |
| 0830313193822000 | - | - | |
CV Dua Lima Persada | 05*9**7****22**0 | - | - |
| 0819888306814000 | - | - | |
| 0026531780912000 | - | - | |
| 0024552820833000 | - | - | |
| 0030915474822000 | - | - | |
| 0655038768822000 | - | - | |
CV Surya Sukses Bersama | 09*8**6****31**0 | - | - |
| 0031691819814000 | - | - | |
All Mustafa Sejahtera | 03*5**7****22**0 | - | - |
| 0901003301822000 | - | - | |
| 0751324807008000 | - | - | |
| 0014762611831000 | - | - | |
| 0805642014952000 | - | - | |
CV Bintang Sahabat | 09*1**9****22**0 | - | - |
| 0748222775811000 | - | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - | - |
| 0752659664811000 | - | - | |
Gamma Raya | 00*6**9****22**0 | - | - |
| 0023949274822000 | - | - | |
CV Airi Jaya Konstruksi | 08*8**3****22**0 | - | - |
CV Ekaputra | 08*7**4****22**0 | - | - |
PT Savar Bikuro Sejahtera | 07*5**9****15**0 | - | - |
| 0030368484806000 | - | - | |
| 0809498900822000 | - | - | |
| 0025347824822000 | - | - | |
| 0023850365807000 | - | - | |
| 0967062803822000 | - | - | |
| 0955673884822000 | - | - | |
| 0841515505822000 | - | - | |
Tulus Mulia | 0028369767822000 | - | - |
| 0862657111822000 | - | - | |
| 0836972703822000 | - | - | |
| 0029364742824000 | - | - | |
| 0022277495822000 | - | - | |
| 0636864506822000 | - | - | |
| 0659150197822000 | - | - | |
CV Batu Beling | 08*6**6****19**0 | - | - |
| 0946622792821000 | - | - | |
| 0024470460822000 | - | - | |
| 0602251597822000 | - | - | |
| 0011379757801000 | - | - | |
| 0026414466953000 | - | - | |
PT Wildhan Bangun Sejahtera | 06*1**7****22**0 | - | - |
| 0705946937822000 | - | - | |
| 0025350224822000 | - | - | |
CV Erka Arkatama | 00*4**1****22**0 | - | - |
| 0855522975824000 | - | - | |
| 0925463895804000 | - | - | |
| 0808711691822000 | - | - | |
| 0821262722418000 | - | - | |
| 0714470291822000 | - | - | |
| 0032269250822000 | - | - | |
| 0901130609212000 | - | - | |
| 0412164733822000 | - | - | |
| 0660549650822000 | - | - | |
| 0031709728822000 | - | - | |
| 0866384555807000 | - | - | |
| 0844400135101000 | - | - | |
| 0014933485822000 | - | - | |
| 0011139045822000 | - | - | |
| 0019724665941000 | - | - | |
CV Arcadia Grida Pradana | 0025348012822000 | - | - |
CV Kagungan Abadi Pratama | 03*4**1****23**0 | - | - |
URAIAN SINGKAT
PEKERJAAN PEMBANGUNAN GEDUNG
UPTD LABORATORIUM KESEHATAN DAERAH
TAHUN ANGGARAN 2024
Kode RUP 51799992
Program : Program Pemenuhan Upaya Kesehatan Perorangan Dan
Upaya Kesehatan Masyarakat.
Kegiatan : Penyediaan Fasilitas Pelayanan, Sarana, Prasarana dan
Alat Kesehatan untuk UKP Rujukan, UKM dan UKM Rujukan
Tingkat Daerah Provinsi.
Nama Paket : Pengadaan Jasa Konstruksi Pembangunan Gedung
UPTD Laboratorium Kesehatan Daerah.
Mata Anggaran : 1.02.02.1.01.0002
Pagu Anggaran : Rp. 10.628.327.500,-
HPS : Rp. 10.628.327.000,-
1. Maksud dan Tujuan
a. Maksud dari pekerjaan ini adalah untuk melaksanakan pekerjaan
pembangunan Gedung UPTD Laboratorium Kesehatan Daerah sesuai dengan
lingkup pekerjaan dengan tepat waktu, mutu dan biaya, serta tertib administrasi
b. Tujuan pekerjaan ini adalah terbangunnya Gedung UPTD Laboratorium
Kesehatan Daerah Provinsi Gorontalo.
2. Sasaran
Sasaran yang ingin dicapai terkait pekerjaan pembangunan Gedung UPTD
Laboratorium Kesehatan Daerah adalah diharapkan Penyedia dapat melaksanakan
tanggung jawabnya dengan baik dalam Pekerjaan Pembangunan Gedung UPTD
Laboratorium Kesehatan Daerah Provinsi Gorontalo sesuai ruang lingkup, tanggung
jawab dan wewenangnya.
3. Lokasi Pekerjaan
Lokasi pekerjaan Pembangunan Gedung UPTD Laboratorium Kesehatan Daerah
Provinsi Gorontalo adalah di Jl. Sultan Amay Kelurahan Tamalate Kecamatan Kota
Timur, Kota Gorontalo Provinsi Gorontalo
4. Lingkup Pekerjaan
Lingkup pekerjaan Pembangunan Gedung UPTD Laboratorium Kesehatan Daerah
Provinsi Gorontalo adalah melaksanakan pekerjaan pembangunan konstruksi sejak
masa persiapan, pelaksanaan sampai serah terima kedua secara penuh waktu
sesuai masa waktu yang ditetapkan diuraikan sebagai berikut:
a) Pekerjaan Persiapan;
b) Pekerjaan SMKK;
c) Pekerjaan Lantai 1;
1) Pekerjaan Tanah
2) Pekerjaan Pondasi Jalur/Menerus
3) Pekerjaan Beton
4) Pekerjaan Pasangan Dinding
5) Pekerjaan Kusen Pintu dan Jendela
6) Pekerjaan Rangka dan Plafond
7) Pekerjaan Penutup Lantai dan Dinding
8) Pekerjan Pengecetan
9) Pekerjaan BSL (rg.ektraksi)
10) Pekerjaan Mekanikal dan Elektrikal
11) Pekerjaan Sanitasi Dan Perpipaan
d) Pekerjaan Lantai 2;
e) Pekerjaan Luar Bangunan (Saluran, GWT & Bak Equalisasi)
f) Pekerjaan Akhir.
5. Spesifikasi Teknis
Spesifikasi dan Rencana Keselamatan Kerja berpedoman pada Detailed
Enggineering Design (DED) dan Hasil Revieu Konsultan Perencanaan Pembangunan
UPTD Laboratorium Kesehatan Daerah.
Gorontalo, 29 Mei 2024
Pejabat Pembuat Komitmen
(PPK)
Mohamad Rizal Podungge, ST, MT
NIP. 198309122010011005