| Reason | |||
|---|---|---|---|
| 0809093222822000 | Rp 13,744,806,984 | - | |
| 0019045806942000 | Rp 14,488,210,788 | - | |
| 0316669944942000 | - | - | |
| 0412652216942000 | - | - | |
| 0747675114001000 | Rp 14,154,092,195 | Pengalaman personil manajerial (Ahli K3 Konstruksi) yang disampaikan hanya 2 tahun adalah kurang dari 3 tahun persyaratan dalam dokumen pemilihan | |
PT Jasiandra Sejahtera Abadi | 09*6**6****06**0 | - | - |
| 0942770389942000 | - | - | |
| 0920092798942000 | - | - | |
| 0031381338943000 | - | - | |
| 0016166605942000 | - | - | |
| 0016165615942000 | - | - | |
| 0700098643942000 | - | - | |
| 0024019259942000 | - | - | |
CV Nurul Sakti | 09*7**7****42**0 | - | - |
| 0025986480942000 | - | - | |
| 0025466913942000 | - | - | |
| 0019724665941000 | - | - | |
| 0030342026722000 | - | - | |
| 0933445041942000 | - | - | |
| 0316634195941000 | - | - | |
| 0029392057821000 | - | - | |
CV Alsya Mandiri Konstruksi | 10*0**0****34**7 | - | - |
| 0429373434942000 | - | - |
URAIAN SINGKAT PEKERJAAN
SATUAN KERJA : DINAS KESEHATAN KAB. HALMAHERA SELATAN
PEKERJAAN : PEMBANGUNAN RUMAH SAKIT PRATAMA MAKIAN
TAHUN : 2025
LOKASI : DESA RABUTDAIYO KEC. PULAU MAKIAN KAB. HALMAHERA SELATAN
NO URAIAN SATUAN VOL.
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Mobilisasi/ Demobilisasi Ls 1,00
2 Pembongkaran & Perataan Tanah Ls 1,00
3 Kantor Lapangan dan Fasilitas Ls 1,00
4 Penyediaan air kerja dan penerangan / listrik Ls 1,00
5 Pekerjaan Pembersihan Akhir Ls 1,00
6 Papan Proyek Ls 1,00
Pembuatan Laporan (Backup Data, Progres Harian, Mingguan, Bulanan, Dokumentasi, Shop Drawing dan
7 Ls 1,00
Asbuild Drawing)
II PENYELENGGARAAN KEAMANAN DAN KESEHATAN KERJA SERTA KESELAMATAN KONSTRUKSI
1 Penyiapan RKK
- Pembuatan dokumen RKK (Rencana Keselamatan Konstruksi) Buku 1,00
- Pembuatan prosedur dan instruksi kerja Set 1,00
2 Alat Pelindung Kerja (APK) dan Alat Pelindung Diri (APD)
APK :
- Tali keselamatan (Life line) Pcs 20,00
- Topi / Helm pelindung (Safety helmet) Bh 60,00
- Pelindung mata (Goggles, Spectacles) Psg 60,00
- Pelindung pernapasan dan mulut (Masker) Box 60,00
- Sarung tangan (Safety glowes) Psg 60,00
Sepatu keselamatan (Safety shoes) Caterpilar Psg 60,00
3 Fasilitas sarana, prasarana, dan alat kesehatan
- Peralatan P3K (Kotak P3K, Obat luka, perban dll) Ls 1,00
- Ruang P3K Ls 1,00
4 Rambu-rambu yang diperlukan
- Rambu petunjuk Bh 2,00
- Rambu larangan Bh 2,00
- Rambu peringatan Bh 2,00
- Rambu kewajiban Bh 2,00
- Rambu informasi Bh 2,00
5 Kegiatan dan peralatan terkait dengan pengendalian Risiko Keselamatan Konstruksi
- Alat pemadam api ringan (APAR) Bh 1,00
- Sirene Bh 1,00
- Bendera K3 Bh 2,00
6 Administrasi dan dokumentasi Ls 1,00
7 Manajemen Mutu Ls 1,00
NO URAIAN SATUAN VOL.
1 2 3 4
IIII PEKERJAAN TANAH
1 Galian Tanah Pondasi Menerus M3 246,51
2 Galian Tanah Pondasi Footplat ( PT1 ) M3 60,84
2 Urugan Pasir Bawah Pondasi Menerus M3 246,51
3 Urugan Kembali Hasil Galian Pondasi Menerus M3 61,63
4 Urugan Pasir Dibawah Lantai T 5cm M3 91,88
5 Urugan Tanah Bawah Lantai M3 275,63
IV PEKERJAAN PASANGAN & PLESTERAN
1 Pas.Batu Kosong M3 103,48
2 Pas.Batu Pondasi 1 PC : 5 Ps M3 221,75
3 Pas. Dinding Bata Pres Uk. 11 cm x 22 cm, 1 PC : 4 Ps M2 4002,41
4 Plesteran Dinding Bata 1 PC : 5 Ps M2 8120,04
5 Acian Dinding M2 5303,66
V PEKERJAAN STRUKTUR
1 Pekerjaan Kolom
a. Pek. Lantai Kerja K 175 M3 2,43
b. Telapak PT1 100x120 (18 Buah )
- Beton K 250 M3 10,89
- Tulangan Ø12 (BJTP-24) Kg 1155,24
- Bekisting 2 Pakai M2 39,60
c. Pek. Pedistal 15 x 30 ( 18 Buah )
- Beton K 250 M3 1,27
- Tulangan Ø12 (BJTP-24) Kg 246,41
- Begel Ø10 (BJTP-24) Kg 92,66
- Bekisting 2 Pakai M2 25,43
d. Pek. Kolom K1 15 x 30 ( 18 Buah )
- Beton K 250 M3 4,05
- Tulangan Ø12 (BJTP-24) Kg 479,39
- Begel Ø8 (BJTP-24) Kg 138,25
- Bekisting 2 Pakai M2 81,00
e. Kolom Praktis KP M1 1222,20
2 Pekerjaan Sloof
a. Pek. Sloof 15 x 20
- Beton K 250 M3 29,09
- Tulangan Ø10 (BJTP-24) Kg 3743,01
- Begel Ø8 (BJTP-24) Kg 1992,77
- Bekisting 2 Pakai M2 387,83
b. Pek. Sloof 15 x 30
- Beton K 250 M3 0,72
- Tulanganl Ø12 (BJTP-24) Kg 87,00
- Begel Ø8 (BJTP-24) Kg 53,10
- Bekisting 2 Pakai M2 9,60
3 Pekerjaan Balok
a. Pek. Balok 15 x 30 ( B1 )
- Beton K 250 M3 4,21
- Tulanganl Ø12 (BJTP-24) Kg 587,58
- Begel Ø8 (BJTP-24) Kg 151,17
- Bekisting 2 Pakai M2 70,25
NO URAIAN SATUAN VOL.
1 2 3 4
I b. Pek. Balok Anak ( BA )
- Beton K 250 M3 0,71
- Tulanganl Ø10 (BJTP-24) Kg 149,78
- Begel Ø8 (BJTP-24) Kg 27,54
- Bekisting 2 Pakai M2 13,07
c. Pek. Balok 12 x 15
- Beton K 250 M3 35,18
- Tulanganl Ø10 (BJTP-24) Kg 12218,52
- Begel Ø8 (BJTP-24) Kg 1529,59
- Bekisting 2x Pakai M2 762,24
4 Pekerjaan Dinding Beton
a. Pek. Dinding Beton T 25cm
- Beton K 250 M3 14,87
- Tulanganl Ø8 (BJTP-24) Kg 671,51
- Bekisting 2x Pakai M2 148,70
b. Pek. Meja Beton M1 2,56
5 Pekerjaan Lantai Dak
Pek. Plat Dak Beton T 13 cm EV + 400
- Beton K 250 M3 46,15
- Tulanganl Ø8 (BJTP-24) Kg 6349,93
- Bekisting 2x Pakai M2 355,00
VI PEKERJAAN LANTAI DAN LAPISAN DINDING
1 Rabat Dibawah Lantai T 8cm K-100 M3 147,00
2 Lantai Ruangan Granit 60x60 cm M2 1384,95
3 Lantai Granit Anti Slip 60x60 cm M2 321,49
4 Lantai KM/WC keramik Anti Slip 30x30 cm (Unpolish) M2 15,95
5 Dinding KM/WC tinggi 180 cm keramik 40x40 cm M2 206,14
6 Lantai Vinyl M2 115,15
7 Pek. Lapisan Timbal RG. Radiologi M2 44,16
8 Pek. Rangka + Penutup GRC Dinding RG. Radiologi M2 44,16
VII PEKERJAAN PLAFOND DAN ATAP
1 Pas. Rangka Plafond Hollow Modul 60 x 60 M2 1837,55
2 Pas. Penutup Plafond Gypsum M2 1837,55
3 Pas. Rangka Atap Baja Ringan M2 1751,33
4 Pas. Pentup Atap Spandek M2 1751,33
5 Pas.Nok Spandek M1 159,39
VIII PEKERJAAN KUSEN & DAUN + AKSESORIS
1 P1 ( 25 Buah )
- Kusen Aluminium M1 168,36
- Daun Pintu Lapis HPL M2 99,08
- Kaca 5mm M2 16,38
- Engsel Bh 138,00
- Pemasangan kunci tanam kualitas baik Bh 23,00
- Grendel Bh 23,00
2 P2 ( 51 Buah )
- Kusen Aluminium M1 349,80
- Daun Pintu Lapis HPL M2 155,71
- Kaca 5mm M2 23,90
- Engsel Bh 159,00
- Pemasangan kunci tanam kualitas baik Bh 53,00
- Grendel Bh 53,00
NO URAIAN SATUAN VOL.
1 2 3 4
I 3 P3 ( 9 Buah )
- Kusen Aluminium M1 66,00
- Daun Pintu Lapis HPL M2 25,64
- Kaca 5mm M2 3,98
- Engsel Bh 30,00
- Pemasangan kunci tanam kualitas baik Bh 10,00
4 P4 ( 25 Buah )
- Daun Pintu PVC Dan Aksesoris Unit 25,00
5 P5 ( 2 Buah )
- Daun Pintu Aluminium M2 10,00
- Rel Pintu Slide Bh 2,00
- Kaca 5mm M2 1,50
6 P6 ( 2 Buah )
- Daun Pintu Aluminium M2 5,00
- Rel Pintu Slide Bh 1,00
- Kaca 5mm M2 0,75
7 PJ1 ( 4 Buah )
- Kusen Aluminium M1 72,96
- Daun Pintu Aluminium M2 3,92
- Kaca 5mm M2 24,29
- Engsel Bh 24,00
- Pemasangan kunci tanam kualitas baik Bh 4,00
- Grendel Bh 4,00
8 PJ2 ( 2 Buah )
- Kusen Aluminium M1 41,44
- Daun Pintu Aluminium M2 1,96
- Kaca 5mm M2 14,90
- Engsel Bh 12,00
- Pemasangan kunci tanam kualitas baik Bh 2,00
- Grendel Bh 2,00
9 PJ3 ( 6 Buah )
- Kusen Aluminium M1 97,92
- Daun Pintu Aluminium M2 1,96
- Kaca 5mm M2 30,08
- Engsel Bh 36,00
- Pemasangan kunci tanam kualitas baik Bh 6,00
- Grendel Bh 6,00
10 PJ4 ( 1 Buah )
- Kusen Aluminium M1 97,92
- Daun Pintu Aluminium M2 0,66
- Rel Pintu Slide Bh 1,00
- Kaca 5mm M2 9,57
11 J1 ( 46 Buah )
- Kusen Aluminium M1 276,48
- Daun Jendela Aluminium M2 11,71
- Kaca 5mm M2 72,96
- Engsel Bh 64,00
- Kait Angin Bh 64,00
- Grendel Bh 64,00
12 V1 ( 21 Buah )
- Kusen Aluminium M1 23,40
- Kaca 5mm M2 2,50
NO URAIAN SATUAN VOL.
1 2 3 4
I 13 V2 ( 8 Buah )
- Kusen Aluminium M1 40,50
- Kaca 5mm M2 6,48
14 V3 ( 14 Buah )
- Kusen Aluminium M1 25,60
- Kaca 5mm M2 4,32
15 V4 ( 4 Buah )
- Kusen Aluminium M1 74,70
- Kaca 5mm M2 12,96
16 V5 ( 1 Buah )
- Kusen Aluminium M1 27,00
- Kaca 5mm M2 4,05
IX PEKERJAAN PENGECATAN
1 Pek.Cat Dinding M2 5303,66
2 Pek.Cat Palfond M2 1837,55
X PEKERJAAN SANITASI
1 Pas. closet duduk Bh 18,00
2 Pas. Wastafel + Aksesoris Bh 11,00
3 Pas. Keran Air Stenlis Bh 18,00
4 Pekerjaan Instalasi Air Bersih ( Pipa PVC Rucika Dia. 1/2" ) m 223,91
5 Pekerjaan Instalasi Air Kotor ( Pipa PVC Dia. 4" ) m 191,50
6 Pekerjaan Instalasi Air Hujan ( Ø 150 mm ) m 50,00
7 Floor drain dia 2" bh 18,00
XI TAMBAHAN BANGUNAN DEPAN LANTAI I & LANTAI II
1 Pengadaan dan pemasangan Air Cooled Wall Mounted & Ceilling Cassete Lengkap dengan thermostat dan peralatan bantu
a Single IU/OU
- FTKQ50UVM4 2 PK Flash Inverter Thailand R32 unit 3,00
- FCNQ21MV14 2,5 Cassette Standard R410a unit 4,00
b Multi Split 3 Koneksi Inverter R32
- Unit Outdoor MKC70SVM4 (3 PK) unit 6,00
- Unit Outdoor MKC50RVM4 (2 PK) unit 3,00
- Unit Indoor CTKC20RVM5 (3/4 PK) unit 8,00
- Unit Indoor CTKC25RVM6 (1 PK) unit 10,00
- Unit Indoor CTKC35RVM7 (1,5 PK) unit 3,00
- Unit Indoor CTKC50SVM4 (2 PK) unit 1,00
2 Pekerjaan Instalasi Penerangan Bangunan 1 Lantai 1
a Lampu TKI TL 2x36 W bh 70,00
b Lampu LED 18 W bh 111,00
c Lampu LED 7 W bh 16,00
d Lampu Exit 8 W bh 5,00
e Exhausfan 30 W bh 16,00
f Stop Kontak bh 77,00
g Stop Kontak floor mounted bh 7,00
h Veteng Downlight 5 Inchi bh 111,00
i Veteng Downlight 4 Inchi bh 16,00
j Saklar tunggal bh 43,00
k Saklar ganda bh 44,00
NO URAIAN SATUAN VOL.
1 2 3 4
I 3 Pekerjaan Instalasi Penerangan Bangunan 1 Lantai 2
a Lampu TKI TL 2x36 W bh 55,00
b Lampu LED 18 W bh 80,00
c Lampu LED 7 W bh 27,00
d Lampu Exit 8 W bh 4,00
e Exhausfan 30 W bh 20,00
f Stop Kontak bh 140,00
g Stop Kontak floor mounted bh 4,00
XII PEKERJAAN SYSTEM TATA UDARA
1 Pengadaan dan pemasangan Air Cooled Wall Mounted & Ceilling Cassete Lengkap dengan thermostat dan peralatan bantu
a Single IU/OU
- FTKQ60SVM4 2,5 PK Split Flash Inverter Thailand R32 unit 5,00
- FTKQ25UVM4 1 PK Split Flash Inverter Thailand R32 unit 3,00
- FCNQ21MV14 2,5 Cassette Standard R410a unit 6,00
b Multi Split 3 Koneksi Inverter R32
- Unit Outdoor MKC70SVM4 (3 PK) unit 6,00
- Unit Outdoor MKC50RVM4 (2 PK) unit 2,00
- Unit Indoor CTKC20RVM5 (3/4 PK) unit 13,00
- Unit Indoor CTKC25RVM6 (1 PK) unit 13,00
- Unit Indoor CTKC35RVM7 (1,5 PK) unit 2,00
- Unit Indoor CTKC50SVM4 (2 PK) unit 1,00
2 Pekerjaan Instalasi Perpipaan
a Perpipaan Refrigerant ASTM B280
- Dia 1/4 " (6.4mm ) m 500,00
- Dia 3/8 " ( 9.5mm ) m 350,00
- Dia 1/2 " (12.7mm) m 40,00
- Dia 5/8" (15.9 mm) m 80,00
a Perpipaan drain, PVC clas AW lengkap dengan isolasi class 1 APDM tebal 13 mm
- Dia 1/4 " (6.4mm ) m 400,00
- Dia 3/8 " ( 9.5mm ) m 380,00
XIII PEKERJAAN ELEKTRIKAL
1 Pekerjaan Daya Bangunan
Panel Daya Tegangan Rendah
Pengadaan dan pemasangan panel termasuk pentanahan panel sesuai dengan gambar rencana &
komponen panel sesuai gambar rencana dan spesifikasi teknis. Tebal pelat 2,0 mm, cat bakar
- Panel LP - BANGUNAN 2 LT.1 lot 1,00
- Panel VAC- BANGUNAN 2 LT.1.1 lot 1,00
- Panel VAC- BANGUNAN 2 LT.1.2 lot 1,00
- Panel VAC- BANGUNAN 2 LT.1.3 lot 1,00
2 Pekerjaan Instalasi Penerangan
- Lampu TKI TL 2x36 W bh 70,00
- Lampu LED 18 W bh 224,00
- Lampu LED 7 W bh 23,00
- Lampu Exit 8 W bh 4,00
- Exhausfan 30 W bh 17,00
- Stop Kontak bh 143,00
- Stop Kontak floor mounted bh 10,00
- Stop Kontak AC bh 52,00
- Instalasi titik cahaya dalam gedung lengkap ttk 338,00
- Instalasi stop kontak ttk 143,00
- Instalasi stop kontak floor mounted ttk 10,00
- Instalasi Exhausfan ttk 17,00
NO URAIAN SATUAN VOL.
1 2 3 4
I - Instalasi AC ttk 52,00
- Veteng Downlight 5 Inchi bh 224,00
- Veteng Downlight 4 Inchi bh 23,00
- Saklar tunggal bh 56,00
- Saklar ganda bh 61,00
- Testing commisioning ls 1,00
3 Instalasi Cable Tray
Perforated type- hot rolled steel sheet, SPHC 2.0 mm thickness, 100 mm height & hot dipped galvanized.
- Cabel tray 40 cm m 30,00
- Equal Tee 40 cm bh 6,00
- Elbow Tray 40 x 10 cm bh 6,00
- Alat bantu (mur-baut, hanger rod, hinge fish plate dll.) lot 1,00
- Testing commisioning ls 1,00
4 Pekerjaan Penangkal Petir
Pengadaan & Pemasangan Penangkal Petir Meliputi: lot 1,00
5 Intalasi Outlet Telepon
Pengadaan dan Pemasangan Peralatan Telepon Instalasi lengkap dgn. tel. receptacle outlet, pengkabelan
dgn. ITC 2 x 2 x 0,6 sqmm di dalam konduit PVC high-impact heavy duty
- Outlet telepon & Faximili bh 2,00
- Instalasi dgn ITC 2 x 2 x 0.6 mm2 dlm PVC dia. 3/4" lengkap dengan peralatan bantu titik 2,00
- Cable Tray 30 cm m 30,00
- Equal Tee Tray 30 cm bh 6,00
- Elbow Tray 30 cm bh 3,00
6 Sambungan Telkom
- Sambungan Telepon (PT. Telkom) + Indihome set 6,00
- Testing & Commissioning lot 1,00
7 Pekerjaan Instalasi Oulet Data
Instalasi lengkap outlet data (RJ-45) pengkabelan dengan. UTP CAT- 6 di dalam konduit pipa PVC high-
impact heavy duty atau di dalam underfloor ducting system
- Unit Terminal
Outlet RG 45 + Face Plate bh 17,00
- Instalasi Kabel Data
Instalasi data dengan mengunakan kabel UTP Cat 6 cable 4 pair dalam pipa konduit PVC 20 mm Titik 17,00
8 Sistem Administrasi
- Rack 19" tipe 12 U bh 1,00
- Patch Panel 24 porth bh 1,00
- Peralatan bantu termasuk patch cord, connector, coupling jumper dll lot 1,00
- Testing & Commissioning lot 1,00
XIV PEKERJAAN RAMP
1 Galian Tanah Pondasi M3 15,01
2 Pas.Batu Pondasi 1 PC : 5 Ps M3 6,93
3 Pek. Plesteran Dinding 1 PC : 5 Ps M2 157,00
4 Galian Tanah Pondasi Telapak M3 67,20
5 Urugan Kembali M3 59,14
6 Urugan Pasir Bawah Pondasi Telapak M3 2,10
7 Pek. Lantai Kerja K 175 M3 3,56
8 Sloof Beton 20 x 25
- Beton K 250 M3 13,98
- Tulangan D13 (BJTD-30) Kg 1748,91
NO URAIAN SATUAN VOL.
1 2 3 4
I - Tulangan Ø8 (BJTP-24) Kg 514,91
- Bekisting 2 Kali Pakai M2 69,88
9 Telapak Beton 80 x 80
- Beton K 250 M3 8,06
- Tulangan Ø12 (BJTP-24) Kg 1921,90
- Bekisting 2 Kali Pakai M2 20,16
10 Pedistal Beton 30 x 30
- Beton K 250 M3 4,57
- Tulangan D13 (BJTD-30) Kg 411,16
- Tulangan Ø8 (BJTP-24) Kg 132,22
- Bekisting 2 Kali Pakai M2 60,98
11 Kolom Beton 30x30
- Beton K 250 M3 28,35
- Tulangan D13 (BJTD-30) Kg 1969,16
- Tulangan Ø8 (BJTP-24) Kg 743,73
- Bekisting 2 Kali Pakai M2 189,00
12 Balok Beton 20 x 35
- Beton K 250 M3 12,64
- Tulangan D13 (BJTD-30) Kg 1508,23
- Tulangan Ø8 (BJTP-24) Kg 427,66
- Bekisting 2 Kali Pakai M2 81,23
13 Balok Beton 20 x 30
- Beton K 250 M3 12,95
- Tulangan D13 (BJTD-30) Kg 1351,74
- Tulangan Ø8 (BJTP-24) Kg 454,64
- Bekisting 2 Kali Pakai M2 172,72
14 Plat Lantai Ramp T 12 cm
- Beton K 250 M3 46,70
- Tulangan Ø10 dan Ø8 (BJTP-24) Kg 5675,18
- Bekisting 2 Kali Pakai M2 389,15
15 Plat Beton Top Roof T 10 cm
- Beton K 250 M3 25,07
- Tulangan Ø8 dan Ø8 (BJTP-24) Kg 2476,74
- Bekisting 2 Kali Pakai M2 208,92
16 Reling Ramp Stainlees 2" M1 229,38
17 Pek. Atap
Pasang Rangka Atap Baja Ringan M2 332,63
Pentup Atap Spandek M2 332,63
18 Pek. Dinding
Pas, Dinding Batu Bata M2 193,76
Pek. Pek. Plesteran Dinding 1 PC : 5 Ps M2 193,76
Pek. Acian M2 193,76
19 Pas. Kawat Mesh Expanded Metal M2 113,88
20 Almunium Strip M' 451,98| Authority | |||
|---|---|---|---|
| 25 January 2024 | Pembangunan Gedung Pelayanan Bptd Kalimantan Selatan | Kementerian Perhubungan | Rp 13,203,510,741 |
| 29 March 2023 | Pembangunan Gedung Layanan Perpustakaan | Kab. Banggai Laut | Rp 10,000,000,000 |
| 1 January 2024 | Renovasi Gedung Kantor Tahap I | Kementerian Perhubungan | Rp 10,000,000,000 |
| 19 June 2020 | Rehabilitasi Jaringan Irigasi D.I Paguyaman Kab. Gorontalo | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 7,957,000,000 |
| 31 July 2023 | Pembangunan Kluster Tambak Udang Di Muna Sulawesi Tenggara | Kementerian Kelautan Dan Perikanan | Rp 5,787,800,000 |
| 6 May 2019 | Pembangunan Gedung Asrama Diklat Provinsi Kab. Bone Bolango | Provinsi Gorontalo | Rp 5,600,000,000 |
| 27 December 2017 | Pembangunan Drainase Lingkungan Kota Gorontalo | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 5,250,000,000 |
| 17 April 2017 | Bangunan Kantor Dan Rumah Dinas | Kementerian Pekerjaan Umum dan Perumahan Rakyat | Rp 5,247,450,000 |
| 22 January 2021 | Pekerjaan Arsitektur Site (Did) | Kab. Gorontalo | Rp 4,761,257,396 |
| 25 August 2020 | Pembangunan Persemaian Modern Likupang Batuputih Tahap I Provinsi Sulawesi Utara Tahun 2020 | Kementerian Lingkungan Hidup dan Kehutanan | Rp 4,537,100,000 |