REKAPITULASI BILL OF QUANTITY (BoQ)
REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SMP NEGERI 4 GABUSWETAN (DAK 2024)
SUMBER DANA : DANA ALOKASI UMUM (DAK) TAHUN 2024
LOKASI : UPTD SMP NEGERI 4 GABUSWETAN
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
B PEKERJAAN KONSTRUKSI
REHABILITASI 2 RUANG KELAS
I PEKERJAAN TANAH DAN PASIR
II PEKERJAAN PASANGAN
III PEKERJAAN BETON K. 175 SITE MIX
IV PEKERJAAN KUSEN
V PEKERJAAN PENUTUP ATAP
VI PEKERJAAN PLAFOND
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK DAN MEKANIKAL
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Dibuat,
Penawar
CV. / PT. …...............
…..................
Direktur
KOP PERUSAHAAN
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SMP NEGERI 4 GABUSWETAN (DAK 2024)
SUMBER DANA : DANA ALOKASI UMUM (DAK) TAHUN 2024
LOKASI : UPTD SMP NEGERI 4 GABUSWETAN
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1,00 Bh A.5
2 Biaya Bongkaran 1,00 Ls -
3 Biaya Administrasi Pelaporan & Dokumentasi 1,00 Ls -
4 Pengadaan Air + Listrik Selama Pekerjaan 1,00 Ls -
5 Pembersihan dan Perapihan selesai pekerjaan 1,00 Ls -
6 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 1 0,00 Bh -
- Rompi Keselamatan ( Safety Vest) 1 0,00 Bh -
b Rambu - rambu
- Rambu Petunjuk 3,00 Bh -
- Rambu Larangan 3,00 Bh -
- Rambu Peringatan 3,00 Bh -
c BPJS Ketenagakerjaan dan Kesehatan Kerja 1,00 Ls -
JUMLAH PEKERJAAN A
B PEKERJAAN KONSTRUKSI
REHABILITASI 2 RUANG KELAS
I PEKERJAAN TANAH DAN PASIR
1 Pek. Urugan sirtu peninggian lantai t. 20 cm 3 2,40 M2 B.14
Sub. Total Pekerjaan I
II PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata peninggian dan perbaikan kusen 1 Pc : 5 Psr 4 8,19 M2 D.3
2 Pek. Plesteran 1 Pc : 5 Psr 121,85 M2 E.3
3 Pek. Acian Dinding 121,85 M2 E.6
4 Pek. Pas. Rabat Beton keliling bangunan t. 7 cm 1Pc : 3Pc : 5Kr 2,94 M3 G.1
5 Pek. Pas. tangga landai (Ramp) Beton t. 10 cm 1Pc : 3Pc : 5Kr 0,52 M3 G.1
Sub. Total Pekerjaan II
III PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Praktis partisi 12/12 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 ,10 M3 G.2
- Besi beton terpasang U-24 1 5,84 Kg G.25
- Begisting Papan Terentang 1 ,58 M2 G.23
2 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 1 ,71 M3 G.2
- Besi beton terpasang U-24 2 85,00 Kg G.25
- Begisting Papan Terentang 1 5,96 M2 G.23
3 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 ,65 M3 G.2
- Besi beton terpasang U-24 1 40,21 Kg G.25
- Begisting Papan Terentang 1 5,12 M2 G.23
4 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 ,54 M3 G.2
- Besi beton terpasang U-24 8 7,44 Kg G.25
- Begisting Papan Terentang 9 ,45 M2 G.23
5 Balok Gantung Partisi 15/40 (161,93 Kg)
- Beton Site Mix K. 175 0 ,22 M3 G.2
- Besi beton terpasang U-24 3 5,71 Kg G.25
- Begisting Papan Terentang 3 ,68 M2 G.23
6 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 ,34 M3 G.2
- Besi beton terpasang U-24 1 04,76 Kg G.25
- Begisting Papan Terentang 5 ,66 M2 G.23
Sub. Total Pekerjaan III
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
IV PEKERJAAN KUSEN
1 Pek. Kusen + Pintu Steel Door Mother and son + Acsesoris Type P1
- Pintu Steel Door + Acsesories (Pabrikasi) 2,00 Unit F.27.Rob.1
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (8 Unit)
- Frame Kusen Alumunium 4" Warna Putih 106,72 M' F.6
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 1 6,00 Unit F.28
- Pasang Kaca 5 mm 8,80 M2 L.8
3 Pek. Pasang Kusen Alumunium type BV1 (2 Unit)
- Frame Kusen Alumunium 4" Warna Putih 1 4,96 M' F.6
- Pasang Kaca 5 mm 2,20 M2 L.8
Sub. Total Pekerjaan IV
V PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 243,04 M2 -
2 Pek. Pasang Atap Metal Berpasir 243,04 M2 H.30
3 Pek. Pasang Nok Atap Metal Berpasir 1 9,60 M' H.54
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 5 1,60 M' H.64
Sub. Total Pekerjaan V
VI PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 201,64 M2 I.23
2 Pek. Pasang Plafond Gypsum (Bagian Dalam) 126,00 M2 I.14
3 Pek. Pasang Plafond GRC (Bagian Luar dan Tritisan) 7 5,64 M2 I.11
Sub. Total Pekerjaan VI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Keramik Putih 40x40 Cm 162,00 M2 M.7
2 Pek. Pasang Keramik Kolom motif batu alam 20x40 cm t. 1,6 m 1 0,08 M2 N.3
Sub. Total Pekerjaan VII
VIII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 121,85 M2 P.12
2 Pek. Cat dinding tembok Lama 141,81 M2 P.14
3 Pek. Cat Plafond 201,64 M2 P.16
4 Pek. Cat Listplank 1 0,32 M2 P.4
Sub. Total Pekerjaan VIII
IX PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 1 2,00 Titik -
2 Pek. Pasang Saklar Tunggal 2,00 Bh -
3 Pek. Pasang Saklar Double 2,00 Bh -
4 Pek. Pasang Stop Kontak 2,00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 8,00 Bh -
6 Pas. Lampu LED 9 Watt + Fitting 2,00 Bh -
Sub. Total Pekerjaan IX
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Partisi Foldinggate 1 3,50 M2 -
2 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1,00 Bh -
Sub. Total Pekerjaan X
JUMLAH B
C PERABOT
1 Kursi Siswa 3 2,00 Bh -
2 Meja Siswa Ganda 1 6,00 Bh -
3 Kursi Guru 2,00 Bh -
4 Meja Guru 2,00 Bh -
5 Papan Tulis 2,00 Bh -
SUB TOTAL PEKERJAAN
JUMLAH TOTAL PEKERJAAN (A+B+C)
Dibuat,
Penawar
CV. / PT. …...............
…..................
Direktur