| 0402251045437000 | Rp 784,606,862 | |
| 0313901340419000 | - | |
CV Khayza Gemilang | 09*3**5****37**0 | - |
| 0925265597648000 | - | |
Bersama Aneka Proaktif | 06*5**7****37**0 | - |
| 0024717043426000 | - | |
PT Pradipa Graha Construction | 06*3**5****37**0 | - |
| 0607294840429000 | - | |
CV Murtitama Nusa Karya | 00*6**9****03**0 | - |
| 0316798941426000 | - | |
CV Kapuan Jaya Abadi | 09*4**9****37**0 | - |
CV Repiktra Apari | 00*7**2****21**0 | - |
| 0963170675437000 | - | |
| 0763446309438000 | - |
REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SD NEGERI 1 LOMBANG (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SD NEGERI 1 LOMBANG
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
PEKERJAAN KONSTRUKSI
B REHABILITASI 5 RUANG KELAS
I PEKERJAAN TANAH DAN PASIR
II PEKERJAAN PASANGAN
III PEKERJAAN BETON K. 225 SITE MIX
III PEKERJAAN BETON K. 175 SITE MIX
IV PEKERJAAN KUSEN
V PEKERJAAN PENUTUP ATAP
VI PEKERJAAN PLAFOND
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK DAN MEKANIKAL
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Penawar
PT/CV………………….
…………………………………
Direktur
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SD NEGERI 1 LOMBANG (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SD NEGERI 1 LOMBANG
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 Bh A.5
2 Biaya Bongkaran 1.00 Ls -
3 Biaya Administrasi Pelaporan & Dokumentasi 1.00 Ls -
4 Pengadaan Air + Listrik Selama Pekerjaan 1.00 Ls -
5 Pembersihan dan Perapihan selesai pekerjaan 1.00 Ls -
6 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 10.00 Bh -
- Rompi Keselamatan ( Safety Vest) 10.00 Bh -
b Rambu - rambu
- Rambu Petunjuk 3.00 Bh -
- Rambu Larangan 3.00 Bh -
- Rambu Peringatan 3.00 Bh -
JUMLAH PEKERJAAN A
PEKERJAAN KONSTRUKSI
B REHABILITASI 5 RUANG KELAS
PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah pondasi Telapak 25.78 M3 B.1
2 Pek. Urugan tanah bekas galian 17.18 M3 B.11
Sub. Total Pekerjaan
II PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata peninggian dan perbaikan kusen 1 Pc : 5 Psr 51.39 M2 D.3
2 Pek. Plesteran 1 Pc : 5 Psr 161.92 M2 E.3
3 Pek. Acian Dinding 161.92 M2 E.6
Sub. Total Pekerjaan II
III PEKERJAAN BETON K. 225 SITE MIX
1 Pek. Pondasi Plat Uk. 1 x 1 m (P1) Site Mix K.225
- Beton Site Mix K. 225 3 .40 M3 G.3
- Pembesian 4 71.21 Kg G.25
- Begisting Untuk Pondasi Plat 1 3.60 M2 G.23
2 Pek. Pondasi Plat Uk. 0,8 x 0,8 m (P2) Site Mix K.225
- Beton Site Mix K. 225 0 .90 M3 G.3
- Pembesian 1 24.18 Kg G.25
- Begisting Untuk Pondasi Plat 4 .48 M2 G.23
3 Pek. Balok 25/50
- Beton Site Mix K. 225 4 .38 M3 G.3
- Besi beton terpasang U-24 8 15.28 Kg G.25
- Begisting Papan Terentang 4 9.00 M2 G.23
4 Pek. Balok 20/30
- Beton Site Mix K. 225 5 .62 M3 G.3
- Besi beton terpasang U-24 1 ,391.55 Kg G.25
- Begisting Papan Terentang 3 6.00 M2 G.23
4 Pek. Dak Beton t.12 cm Site Mix K.225
- Beton Site Mix K. 225 1 6.20 M3 G.3
- Besi beton terpasang U-24 2 ,382.05 Kg G.25
- Begisting Papan Terentang 1 35.00 M2 G.23
- Stootwerk 1 35.00 M2 G.34
Sub. Total Pekerjaan
III PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Lantai Kerja Pondasi Plat t.5 cm Site Mix 175 1 .07 M3 G.2
2 Pek. Kolom Teras 20/30 (131.28 Kg/m3)
- Beton Site Mix K. 175 1 .34 M3 G.2
- Besi beton terpasang U-24 1 76.43 Kg G.25
- Begisting Papan Terentang 1 7.92 M2 G.23
2 Pek. Pasang Kolom Badan 30/30 (166.74 Kg/m3)
- Beton Site Mix K. 175 4 .90 M3 G.2
- Besi beton terpasang U-24 6 42.72 Kg G.25
- Begisting Papan Terentang 4 3.52 M2 G.23
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
3 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 1 .56 M3 G.2
- Besi beton terpasang U-24 2 60.00 Kg G.25
- Begisting Papan Terentang 1 4.56 M2 G.23
4 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 1 .35 M3 G.2
- Besi beton terpasang U-24 2 92.11 Kg G.25
- Begisting Papan Terentang 2 2.05 M2 G.23
5 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .56 M3 G.2
- Besi beton terpasang U-24 9 1.09 Kg G.25
- Begisting Papan Terentang 9 .84 M2 G.23
6 Pek. Pasang Balok Konsol 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .14 M3 G.2
- Besi beton terpasang U-24 2 2.44 Kg G.25
- Begisting Papan Terentang 2 .54 M2 G.23
7 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .17 M3 G.2
- Besi beton terpasang U-24 5 2.38 Kg G.25
- Begisting Papan Terentang 2 .83 M2 G.23
Sub. Total Pekerjaan III
IV PEKERJAAN KUSEN
1 Pek. Pasang Kusen Alumunium Type. P. 1 (5 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Doff 41.30 M' F.8
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 10.00 Unit F.27
- Pasang Kaca 5 mm 3.25 M2 L.8
- Karet Silent 65.60 M' -
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (20 Unit)
- Frame Kusen Alumunium 4" Warna Putih 222.60 M' F.6
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 40.00 Unit F.28.rob
- Pasang Kaca 5 mm 22.00 M2 L.8
- Karet Silent 281.60 M' -
3 Pek. Pasang Kusen Alumunium type BV1 (5 Unit)
- Frame Kusen Alumunium 4" Warna Putih 31.10 M' F.6
- Pasang Kaca 5 mm 5.50 M2 L.8
- Karet Silent 56.00 M' -
5 Pek. Pasang Partisi Foldinggate 27.50 M2 Ls
Sub. Total Pekerjaan IV
V PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 288.92 M2 -
2 Pek. Pasang Atap Metal Pasir 288.92 M2 H.30
3 Pek. Pasang Nok Atap Metal Paris 23.30 M' H.54
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 59.00 M' H.64
Sub. Total Pekerjaan V
VI PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 260.42 M2 I.23
2 Pek. Pasang Plafond Gypsum (Bagian Dalam) 157.50 M2 I.14
3 Pek. Pasang Plafond GRC (Bagian Luar dan Tritisan) 102.92 M2 I.11
Sub. Total Pekerjaan VI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Keramik Putih 40x40 Cm 337.50 M2 M.7
Sub. Total Pekerjaan VII
VIII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 164.18 M2 P.12
2 Pek. Cat dinding tembok Lama 434.98 M2 P.14
3 Pek. Cat Plafond 260.42 M2 P.16
4 Pek. Cat Listplank 11.80 M2 P.4
Sub. Total Pekerjaan VIII
IX PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 30.00 Titik -
2 Pek. Pasang Saklar Tunggal 2.00 Bh -
3 Pek. Pasang Saklar Double 5.00 Bh -
4 Pek. Pasang Stop Kontak 5.00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 20.00 Bh -
6 Pas. Lampu LED 9 Watt + Fitting 5.00 Bh -
Sub. Total Pekerjaan IX
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1.00 Bh -
Sub. Total Pekerjaan X
JUMLAH B
C PERABOT
1 Lemari Simpan 5.00 Bh -
2 Kursi Guru 5.00 Bh -
3 Kursi Siswa 100.00 Bh -
4 Meja Guru 5.00 Bh -
5 Meja Ganda Siswa 50.00 Bh -
6 Papan Tulis 5.00 Bh -
SUB TOTAL PEKERJAAN
JUMLAH TOTAL PEKERJAAN (A+B+C)