| Reason | |||
|---|---|---|---|
| 0847783438437000 | Rp 262,527,083 | - | |
| 0931374300437000 | - | - | |
| 0436667661437000 | Rp 255,036,320 | Dokumne RKK yang di lampirkan/upload tidak sesuai dengan yang di syaratkan dalam MDP dan KAK | |
Bersama Aneka Proaktif | 06*5**7****37**0 | - | - |
PT Pradipa Graha Construction | 06*3**5****37**0 | - | - |
| 0963170675437000 | - | - | |
| 0763446309438000 | - | - |
REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
UNTUK UPTD SDN BABAKANJATI (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN BABAKANJATI
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
I PEKERJAAN TANAH DAN PONDASI
II PEKERJAAN PASANGAN
III PEKERJAAN BETON K. 175 SITE MIX
IV PEKERJAAN KUSEN
V PEKERJAAN PENUTUP ATAP
VI PEKERJAAN PLAFOND
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK DAN MEKANIKAL
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Penawar
PT/CV………………….
…………………………………
Direktur
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER
PEKERJAAN : PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
UNTUK UPTD SDN BABAKANJATI (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SDN BABAKANJATI
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1 .00 Bh A.5
2 Pek. Pasang Bowplank 1 6.00 M' A.1
3 Biaya Administrasi Pelaporan & Dokumentasi 1 .00 Ls -
4 Pengadaan Air + Listrik Selama Pekerjaan 1 .00 Ls -
5 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 1 0.00 Bh -
- Rompi Keselamatan ( Safety Vest) 1 0.00 Bh -
b Rambu - rambu
- Rambu Petunjuk 2 .00 Bh -
- Rambu Larangan 2 .00 Bh -
- Rambu Peringatan 2 .00 Bh -
c BPJS Ketenagakerjaan dan Kesehatan Kerja 1 .00 Ls -
JUMLAH PEKERJAAN A
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUANG LABORATORIUM KOMPUTER BESERTA PERABOTNYA
I PEKERJAAN TANAH DAN PONDASI
1 Pek. Galian tanah pondasi 3 0.24 M3 B.1
2 Pek. Urugan tanah bekas galian 1 0.29 M3 B.9
3 Pek. Urugan Tanah merah peninggian lantai t. 20 cm 1 4.40 M3 B.13
4 Pek. Lapisan pasir bawah pondasi t. 5 cm 1 .68 M3 B.12
5 Pek. Lapisan pasir bawah lantai t. 5 cm 3 .60 M3 B.12
6 Pek. Aanstamping batu kali 6 .72 M3 C.7
7 Pek. Pasang Pondasi Batu Kali 1 Pc : 5 Psr 1 1.34 M3 C.4
8 Pek. Curucuk bambu ampel dia. 7 - 10 cm p = 1.50 m 8 4.00 Ttk A.10
Sub. Total Pekerjaan I
II PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata 1 Pc : 5 Psr 9 6.98 M2 D.3
2 Pek. Plesteran 1 Pc : 5 Psr 179.13 M2 E.3
3 Pek. Acian Dinding 179.13 M2 E.6
4 Pek. Profil Kolom 4 .00 Bh -
5 Pek. Rabat Beton alas lantai t. 5 Cm 1Pc : 3Pc : 5Kr 3 .60 M3 G.1
6 Pek. Rabat keliling t. 7 Cm 1Pc : 3Pc : 5Kr 2 .94 M3 G.1
7 Pek. Pas. tangga landai (Ramp) Beton t. 10 cm 1Pc : 3Pc : 5Kr 0 .26 M3 G.1
Sub. Total Pekerjaan II
III PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Sloof 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 1 .26 M3 G.2
- Besi beton terpasang U-24 2 10.00 Kg G.25
- Begisting Papan Terentang 1 6.80 M2 G.23
2 Pek. Pasang Kolom 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .84 M3 G.2
- Besi beton terpasang U-24 1 40.00 Kg G.25
- Begisting Papan Terentang 1 1.20 M2 G.23
3 Pek. Pasang Kolom Teras 15/15 (211.25 Kg/m3)
- Beton Site Mix K. 175 0 .25 M3 G.2
- Besi beton terpasang U-24 3 3.08 Kg G.25
- Begisting Papan Terentang 6 .72 M2 G.23
4 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .90 M3 G.2
- Besi beton terpasang U-24 1 50.00 Kg G.25
- Begisting Papan Terentang 8 .40 M2 G.23
5 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .24 M3 G.2
- Besi beton terpasang U-24 3 8.86 Kg G.25
- Begisting Papan Terentang 4 .20 M2 G.23
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
6 Pek. Pasang Balok Konsol 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 .18 M3 G.2
- Besi beton terpasang U-24 2 9.93 Kg G.25
- Begisting Papan Terentang 3 .39 M2 G.23
7 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 .29 M3 G.2
- Besi beton terpasang U-24 6 2.32 Kg G.25
- Begisting Papan Terentang 4 .70 M2 G.23
8 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .31 M3 G.2
- Besi beton terpasang U-24 9 4.10 Kg G.25
- Begisting Papan Terentang 5 .09 M2 G.23
Sub. Total Pekerjaan III
IV PEKERJAAN KUSEN
1 Pek. Pasang Kusen Alumunium Type. P. 1 (1 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 9 .10 M' F.8
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 2 .00 Unit F.27
- Pasang Kaca 5 mm 0 .78 M2 L.8
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (5 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Kilap 6 6.70 M' F.8
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 1 0.00 Unit F.28
- Pasang Kaca 5 mm 5 .50 M2 L.8
3 Pek. Jalusi Ampig ky Set. Kls Kuat II 2 .00 Unit Ls
Sub. Total Pekerjaan IV
V PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 120.96 M2 -
2 Pek. Pasang Atap Metal Berpasir 120.96 M2 H.30
3 Pek. Pasang Nok Atap Metal Berpasir 9 .60 M' H.54
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 4 4.40 M' H.64
Sub. Total Pekerjaan V
VI PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 100.96 M2 I.23
2 Pek. Pasang Plafond Gypsum (bagian dalam) 5 6.00 M2 I.14
3 Pek. Pasang Plafond GRC (Bagian teras dan tritisan) 4 4.96 M2 I.11
Sub. Total Pekerjaan VI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Keramik Putih 40x40 Cm 7 2.00 M2 #REF!
2 Pas. Keramik Kolom Teras Motif Batu Alam 20x40 Cm T. 1,6 M 7 .68 M2 #REF!
Sub. Total Pekerjaan VII
VIII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 179.13 M2 P.12
2 Pek. Cat Plafond 100.96 M2 P.16
3 Pek. Cat Listplank 8 .88 M2 P.4
Sub. Total Pekerjaan VIII
IX PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 1 1.00 Titik -
2 Pek. Pasang Saklar Tunggal 1 .00 Bh -
3 Pek. Pasang Saklar Double 1 .00 Bh -
4 Pek. Pasang Stop Kontak 6 .00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 4 .00 Bh -
6 Pas. Lampu LED 9 Watt 1 .00 Bh -
Sub. Total Pekerjaan IX
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1 .00 Bh -
Sub. Total Pekerjaan X
JUMLAH B
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
C PERABOT
1 Png. Lemari Simpan 1 .00 Bh Ls
2 Png. Kursi komputer Guru 1 .00 Bh Ls
3 Png. Kursi komputer Siswa 2 8.00 Bh Ls
4 Png. Meja Guru 1 .00 Bh Ls
5 Png. Meja Komputer Siswa 2 8.00 Bh Ls
6 Png. Meja Proyektor 1 .00 Bh Ls
JUMLAH C
JUMLAH TOTAL PEKERJAAN (A+B+C)
Penawar
PT/CV………………….
…………………………………
Direktur