| 0436667661437000 | Rp 462,206,765 | |
| 0931374300437000 | Rp 471,800,980 | |
| 0963170675437000 | - | |
| 0926324559439000 | - | |
| 0847783438437000 | - | |
PT Pradipa Graha Construction | 06*3**5****37**0 | - |
| 0633935333437000 | - | |
| 0763446309438000 | - | |
CV Naratama Karya Abadi | 00*6**4****37**0 | - |
REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SD NEGERI 3 WANGUK (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SD NEGERI 3 WANGUK
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN
JUMLAH A
PEKERJAAN KONSTRUKSI
B REHABILITASI 3 RUANG KELAS
I PEKERJAAN TANAH DAN PASIR
II PEKERJAAN PASANGAN
III PEKERJAAN BETON K. 175 SITE MIX
IV PEKERJAAN KUSEN
V PEKERJAAN PENUTUP ATAP
VI PEKERJAAN PLAFOND
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
VIII PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK DAN MEKANIKAL
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
JUMLAH B
C PERABOT
JUMLAH A
a. JUMLAH TOTAL (A+B)
b. PPN 11% (a x 11%)
c. JUMLAH TOTAL (a+b)
b. DIBULATKAN
TERBILANG :
Penawar
PT/CV………………….
…………………………………
Direktur
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN SARANA PRASARANA BIDANG PEMBINAAN SD
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS BESERTA PERABOTNYA
UNTUK UPTD SD NEGERI 3 WANGUK (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : UPTD SD NEGERI 3 WANGUK
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1.00 Bh A.5
2 Biaya Bongkaran 1.00 Ls -
3 Biaya Administrasi Pelaporan & Dokumentasi 1.00 Ls -
4 Pengadaan Air + Listrik Selama Pekerjaan 1.00 Ls -
5 Pembersihan dan Perapihan selesai pekerjaan 1.00 Ls -
6 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 10.00 Bh -
- Rompi Keselamatan ( Safety Vest) 10.00 Bh -
b Rambu - rambu
- Rambu Petunjuk 3.00 Bh -
- Rambu Larangan 3.00 Bh -
- Rambu Peringatan 3.00 Bh -
JUMLAH PEKERJAAN A
PEKERJAAN KONSTRUKSI
B REHABILITASI 3 RUANG KELAS
PEKERJAAN TANAH DAN PASIR
1 Pek. Urugan tanah lokal t. 30 cm 56.70 M3 B.11
Sub. Total Pekerjaan
II PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata peninggian dan perbaikan kusen 1 Pc : 5 Psr 54.50 M2 D.3
2 Pek. Plesteran 1 Pc : 5 Psr 154.48 M2 E.3
3 Pek. Acian Dinding 154.48 M2 E.6
4 Pek. Profil Kolom 10.00 Bh -
6 Pek. Pas. Rabat Beton keliling bangunan t. 7 cm 1Pc : 3Pc : 5Kr 3.71 M3 G.1
7 Pek. Pas. tangga landai (Ramp) Beton t. 10 cm 1Pc : 3Pc : 5Kr 0.78 M3 G.1
Sub. Total Pekerjaan II
III PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 2 .19 M3 G.2
- Besi beton terpasang U-24 3 65.00 Kg G.25
- Begisting Papan Terentang 2 0.44 M2 G.23
2 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 .81 M3 G.2
- Besi beton terpasang U-24 1 75.27 Kg G.25
- Begisting Papan Terentang 1 3.23 M2 G.23
3 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .09 M3 G.2
- Besi beton terpasang U-24 1 4.57 Kg G.25
- Begisting Papan Terentang 1 .58 M2 G.23
4 Pek. Pasang Balok Konsol 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 .46 M3 G.2
- Besi beton terpasang U-24 7 4.81 Kg G.25
- Begisting Papan Terentang 8 .47 M2 G.23
5 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 .17 M3 G.2
- Besi beton terpasang U-24 5 2.38 Kg G.25
- Begisting Papan Terentang 2 .83 M2 G.23
Sub. Total Pekerjaan III
IV PEKERJAAN KUSEN
1 Pek. Pasang Kusen Alumunium Type. P. 1 (3 Unit)
- Frame Kusen Alumunium 4" Warna Coklat Doff 24.78 M' F.8
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 6.00 Unit F.27
- Pasang Kaca 5 mm 1.95 M2 L.8
- Karet Silent 39.36 M' -
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (12 Unit)
- Frame Kusen Alumunium 4" Warna Putih 133.56 M' F.6
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 24.00 Unit F.28.rob
- Pasang Kaca 5 mm 13.20 M2 L.8
- Karet Silent 168.96 M' -
3 Pek. Pasang Kusen Alumunium type BV1 (3 Unit)
- Frame Kusen Alumunium 4" Warna Putih 18.66 M' F.6
- Pasang Kaca 5 mm 3.30 M2 L.8
- Karet Silent 33.60 M' -
Sub. Total Pekerjaan IV
V PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 288.92 M2 -
2 Pek. Pasang Atap Bitumen Selulosa Monolayer Corak t. 3 mm 288.92 M2 H.42
3 Pek. Pasang Nok Atap Bitumen Monolayer t. 3 mm 23.30 M' H.56
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 59.00 M' H.64
Sub. Total Pekerjaan V
VI PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 247.09 M2 I.23
2 Pek. Pasang Plafond Gypsum (Bagian Dalam) 157.50 M2 I.14
3 Pek. Pasang Plafond PVC Motif (Bagian Luar dan Tritisan) 89.59 M2 I.16
Sub. Total Pekerjaan VI
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Granite Tile 60x60 Cm (ex.cina) 202.50 M2 M.14
2 Pek. Pasang Keramik Kolom motif batu alam 20x40 cm 14.40 M2 N.3
Sub. Total Pekerjaan VII
VIII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 154.48 M2 P.12
2 Pek. Cat dinding tembok Lama 283.68 M2 P.14
3 Pek. Cat Plafond 247.09 M2 P.16
4 Pek. Cat Listplank 11.80 M2 P.4
Sub. Total Pekerjaan VIII
IX PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 18.00 Titik -
2 Pek. Pasang Saklar Tunggal 1.00 Bh -
3 Pek. Pasang Saklar Double 3.00 Bh -
4 Pek. Pasang Stop Kontak 3.00 Bh -
5 Pas. Lampu TL 1x18 Watt berikut Kap 12.00 Bh -
6 Pas. Lampu LED 9 Watt + Fitting 3.00 Bh -
Sub. Total Pekerjaan IX
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1.00 Bh -
Sub. Total Pekerjaan X
JUMLAH B
C PERABOT
1 Lemari Simpan 3.00 Bh -
2 Kursi Guru 3.00 Bh -
3 Kursi Siswa 60.00 Bh -
4 Meja Guru 3.00 Bh -
5 Meja Ganda Siswa 30.00 Bh -
6 Papan Tulis 3.00 Bh -
SUB TOTAL PEKERJAAN
JUMLAH TOTAL PEKERJAAN (A+B+C)
Penawar
PT/CV………………….
…………………………………
Direktur