REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS
UNTUK UPTD SMP N 2 KROYA (DAU 2025)
SUMBER DANA : DANA ALOKASI UMUM (DAU) TAHUN 2025
LOKASI : UPTD SMP N 2 KROYA
JUMLAH TKDN JUMLAH BIAYA TKDN
NO. URAIAN PEKERJAAN
(RP.) (%) (RP.)
A PEKERJAAN PERSIAPAN 10.157.986,00 2,74% 9.875.270,85
JUMLAH A 10.157.986,00 2,74% 9.875.270,85
B PEKERJAAN KONSTRUKSI
REHABILITASI 3 RUANG KELAS
I PEKERJAAN PASANGAN 25.978.009,72 7,16% 25.761.400,16
II PEKERJAAN BETON K. 175 SITE MIX 8.162.664,63 1,85% 6.659.669,85
III PEKERJAAN KUSEN 45.237.582,00 7,77% 27.961.244,22
IV PEKERJAAN PENUTUP ATAP 151.588.656,76 30,50% 1 09.743.471,58
V PEKERJAAN PLAFOND 45.881.194,04 7,58% 27.280.015,61
VI PEKERJAAN PENUTUP LANTAI DAN DINDING 44.028.742,00 10,50% 37.762.773,87
VII PEKERJAAN PENGECATAN 20.521.729,91 3,26% 11.717.239,90
VIII PEKERJAAN LISTRIK DAN MEKANIKAL 7.880.698,00 1,61% 5.780.517,19
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES 350.000,00 0,10% 350.000,00
JUMLAH B 349.629.277,06 70,32% 253.016.332,37
a. JUMLAH TOTAL (A+B) 359.787.263,06 73,07% 2 62.891.603,23
b. PPN 11% (a x 11%) 39.576.598,94 2 8.918.076,35
c. JUMLAH TOTAL (a+b) 399.363.862,00 2 91.809.679,58
b. DIBULATKAN 399.363.000,00 2 91.809.000,00
TERBILANG : Tiga ratus sembilan puluh sembilan juta tiga ratus enam puluh tiga ribu rupiah
Diperiksa, Dibuat,
Pejabat Pelaksana Teknis Kegiatan Penawar
Dinas Pendidikan Dan Kebudayaan CV/PT …....................
Kabupaten Indramayu
AGUS SUMARDJO, S.IP …......................
NIP. 19770830 200901 1 003 Direktur
Disetujui,
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN SEKOLAH MENENGAH PERTAMA
SUB KEGIATAN : REHABILITASI SEDANG/BERAT RUANG KELAS SEKOLAH
PEKERJAAN : REHABILITASI RUANG KELAS
UNTUK UPTD SMP N 2 KROYA (DAU 2025)
SUMBER DANA : DANA ALOKASI UMUM (DAU) TAHUN 2025
LOKASI : UPTD SMP N 2 KROYA
HARGA JUMLAH
NILAI JUMLAH BIAYA
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL % TKDN
TKDN TKDN (RP)
(Rp.) (3 x 6)
1 2 3 4 5 6 7 8 9 10
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1,00 Bh A.5 368.986,00 368.986,00 98,97% 0,10% 365.170,85
2 Biaya Bongkaran 1,00 Ls - 3.500.000,00 3.500.000,00 100,00% 0,97% 3.500.000,00
3 Biaya Administrasi Pelaporan & Dokumentasi 1,00 Ls - 2.900.000,00 2.900.000,00 100,00% 0,81% 2.900.000,00
4 Pengadaan Air + Listrik Selama Pekerjaan 1,00 Ls - 500.000,00 500.000,00 100,00% 0,14% 500.000,00
5 Pembersihan dan Perapihan selesai pekerjaan 1,00 Ls - 500.000,00 500.000,00 100,00% 0,14% 500.000,00
6 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 10,00 Bh - 7 5.000,00 750.000,00 72,11% 0,15% 540.825,00
- Rompi Keselamatan ( Safety Vest) 10,00 Bh - 2 5.000,00 250.000,00 72,11% 0,05% 180.275,00
b Rambu - rambu
- Rambu Petunjuk 3,00 Bh - 7 5.000,00 225.000,00 100,00% 0,06% 225.000,00
- Rambu Larangan 3,00 Bh - 7 5.000,00 225.000,00 100,00% 0,06% 225.000,00
- Rambu Peringatan 3,00 Bh - 7 5.000,00 225.000,00 100,00% 0,06% 225.000,00
c BPJS Ketenagakerjaan dan Kesehatan Kerja 1,00 Ls - 714.000,00 714.000,00 100,00% 0,20% 714.000,00
JUMLAH PEKERJAAN A 10.157.986,00 2,74% 9.875.270,85
B PEKERJAAN KONSTRUKSI
REHABILITASI 3 RUANG KELAS
I PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata 1 Pc : 5 Psr 57,43 M2 D.3 161.804,00 9.292.403,72 99,25% 2,56% 9.222.495,27
2 Pek. Plesteran 1 Pc : 5 Psr 114,80 M2 E.3 100.832,00 11.575.513,60 99,14% 3,19% 11.475.730,09
3 Pek. Acian Dinding 114,80 M2 E.6 44.513,00 5.110.092,40 99,08% 1,41% 5.063.174,80
Sub. Total Pekerjaan I 25.978.009,72 7,16% 25.761.400,16
II PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 ,74 M3 G.2 1.281.781,00 9 48.517,94 98,05% 0,26% 930.032,52
- Besi beton terpasang U-24 1 60,99 Kg G.25 1 9.319,00 3 .110.165,81 57,44% 0,50% 1.786.502,92
- Begisting Papan Terentang 2 1,08 M2 G.23 194.686,00 4 .103.980,88 96,08% 1,10% 3.943.134,41
Sub. Total Pekerjaan II 8.162.664,63 1,85% 6.659.669,85
HARGA JUMLAH
NILAI JUMLAH BIAYA
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL % TKDN
TKDN TKDN (RP)
(Rp.) (3 x 6)
1 2 3 4 5 6 7 8 9 10
III PEKERJAAN KUSEN
1 Pek. Pasang Kusen + Pintu Alumunium type P1 (3 Unit)
- Frame Kusen Alumunium 4" Warna Putih 24,78 M' F.4 139.992,00 3 .469.001,76 62,57% 0,60% 2.170.699,87
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 6,00 Unit F.27.rob 989.283,00 5 .935.698,00 60,60% 1,00% 3.597.023,81
- Pasang Kaca 5 mm 1,80 M2 L.8 198.740,00 3 57.732,00 60,99% 0,06% 218.196,27
2 Pek. Pasang Kusen + Pintu Alumunium type P2 (2 Unit)
- Frame Kusen Alumunium 4" Warna Putih 13,92 M' F.4 139.992,00 1 .948.688,64 62,57% 0,34% 1.219.376,20
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 2,00 Unit F.27.rob 989.283,00 1 .978.566,00 60,60% 0,33% 1.199.007,94
- Pasang Kaca 5 mm 1,20 M2 L.8 198.740,00 2 38.488,00 60,99% 0,04% 145.464,18
3 Pek. Pasang Kusen + Jendela Alumunium type J1 (7 Unit)
- Frame Kusen Alumunium 4" Warna Putih 77,91 M' F.4 139.992,00 1 0.906.776,72 62,57% 1,90% 6.824.827,56
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 14,00 Unit F.28.rob 414.283,00 5 .799.962,00 60,60% 0,98% 3.514.768,00
- Pasang Kaca 5 mm 7,70 M2 L.8 198.740,00 1 .530.298,00 60,99% 0,26% 933.395,15
4 Pek. Pasang Kusen Alumunium type BV1 (12 Unit)
- Frame Kusen Alumunium 4" Warna Putih 74,64 M' F.4 139.992,00 1 0.449.002,88 62,57% 1,82% 6.538.379,27
- Pasang Kaca 5 mm 13,20 M2 L.8 198.740,00 2 .623.368,00 60,99% 0,44% 1.600.105,97
Sub. Total Pekerjaan III 45.237.582,00 7,77% 27.961.244,22
IV PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 414,16 M2 H.18 205.382,00 8 5.061.009,12 77,48% 18,32% 65.905.477,60
2 Pek. Pasang Atap Metal Tidak Berpasir 414,16 M2 H.30.rob 131.474,00 5 4.451.271,84 64,58% 9,77% 35.165.305,31
3 Pek. Pasang Nok Atap Metal Tidak Berpasir 33,40 M' H.54.rob 115.977,00 3 .873.631,80 72,69% 0,78% 2.815.915,48
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 79,20 M' H.64 103.570,00 8 .202.744,00 71,40% 1,63% 5.856.773,18
Sub. Total Pekerjaan IV 151.588.656,76 30,50% 109.743.471,58
V PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 287,36 M2 I.23 8 6.435,00 2 4.837.961,60 69,43% 4,79% 17.244.089,68
2 Pek. Pasang Plafond Gypsum (Bagian Dalam) 189,00 M2 I.14 7 3.503,00 1 3.892.067,00 42,48% 1,64% 5.901.037,39
3 Pek. Pasang Plafond GRC (Bagian Luar dan Tritisan) 98,36 M2 I.11 7 2.704,00 7 .151.165,44 57,82% 1,15% 4.134.888,54
Sub. Total Pekerjaan V 45.881.194,04 7,58% 27.280.015,61
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Keramik Putih 40x40 Cm 263,50 M2 M.7 167.092,00 4 4.028.742,00 85,77% 10,50% 37.762.773,87
Sub. Total Pekerjaan VI 44.028.742,00 10,50% 37.762.773,87
VII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 127,53 M2 P.12 4 2.085,00 5 .367.100,05 62,74% 0,94% 3.367.251,53
2 Pek. Cat dinding tembok Lama 304,22 M2 P.14 3 3.697,00 1 0.251.301,34 54,63% 1,56% 5.599.893,00
3 Pek. Cat Plafond 98,36 M2 P.16 3 9.555,00 3 .890.629,80 58,54% 0,63% 2.277.437,26
4 Pek. Cat Listplank 15,84 M2 P.4 6 3.933,00 1 .012.698,72 46,67% 0,13% 472.658,10
Sub. Total Pekerjaan VII 20.521.729,91 3,26% 11.717.239,90
HARGA JUMLAH
NILAI JUMLAH BIAYA
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL % TKDN
TKDN TKDN (RP)
(Rp.) (3 x 6)
1 2 3 4 5 6 7 8 9 10
VIII PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 21,00 Titik Q.1 216.809,00 4 .552.989,00 92,70% 1,17% 4.220.717,10
2 Pek. Pasang Saklar Tunggal 3,00 Bh Q.3 3 5.972,00 1 07.916,00 56,03% 0,02% 60.468,29
3 Pek. Pasang Saklar Double 3,00 Bh Q.4 3 8.962,00 1 16.886,00 58,42% 0,02% 68.286,64
4 Pek. Pasang Stop Kontak 4,00 Bh Q.2 3 6.892,00 1 47.568,00 55,35% 0,02% 81.682,03
5 Pas. Lampu TL 1x18 Watt berikut Kap 14,00 Bh Q.5 188.922,00 2 .644.908,00 45,10% 0,33% 1.192.820,25
6 Pas. Lampu LED 9 Watt + Fitting 3,00 Bh Q.6 103.477,00 3 10.431,00 50,43% 0,04% 156.542,88
Sub. Total Pekerjaan VIII 7.880.698,00 1,61% 5.780.517,19
IX PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 40 Cm L. 30 Cm 1,00 Bh - 3 50.000,00 3 50.000,00 100,00% 0,10% 350.000,00
Sub. Total Pekerjaan IX 3 50.000,00 0,10% 3 50.000,00
JUMLAH B 349.629.277,06 70,32% 253.016.332,37
JUMLAH TOTAL PEKERJAAN (A+B) 359.787.263,06 73,07% 262.891.603,23