REKAPITULASI BILL OF QUANTITY (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN ANAK USIA DINI (PAUD)
SUB KEGIATAN : PEMBANGUNAN RUANG GURU PAUD
PERENCANAAN TEKNIS KEGIATAN PEMBANGUNAN RUANG
PEKERJAAN : GURU PAUD
UNTUK TK NEGERI PEMBINA PATROL (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : TK NEGERI PEMBINA PATROL
JUMLAH
NO. URAIAN PEKERJAAN
(RP.)
A PEKERJAAN PERSIAPAN 3 .550.135,00
JUMLAH A 3 .550.135,00
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUAG GURU PAUD
I PEKERJAAN TANAH DAN PASIR 1 6.120.526,04
II PEKERJAAN PASANGAN 3 7.450.109,60
III PEKERJAAN BETON K. 175 SITE MIX 2 2.071.376,00
IV PEKERJAAN KUSEN 1 8.505.288,10
V PEKERJAAN PENUTUP ATAP 3 7.961.599,56
VI PEKERJAAN PLAFOND 1 3.175.311,52
VII PEKERJAAN PENUTUP LANTAI DAN DINDING 1 9.819.456,00
VIII PEKERJAAN PENGECATAN 8 .064.025,56
IX PEKERJAAN LISTRIK DAN MEKANIKAL 2 .262.195,00
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES 7 50.000,00
JUMLAH B 176.179.887,38
a. JUMLAH TOTAL (A+B) 179.730.022,38
b. PPN 11% (a x 11%) 19.770.302,46
c. JUMLAH TOTAL (a+b) 199.500.324,84
b. DIBULATKAN 199.500.000,00
TERBILANG : Seratus Sembilan Puluh Sembilan Juta Lima Ratus Ribu Rupiah
Diperiksa, Dibuat,
Pejabat Pelaksana Teknis Kegiatan Konsultan Perencana
Dinas Pendidikan Dan Kebudayaan CV. AURA BUANA CAHAYA
Kabupaten Indramayu
SRI PURNAMASARI, M.Pd SUYITNO, ST
NIP. 19740930 200801 2 005 Direktur
Disetujui,
Pejabat Pembuat Komitmen
Dinas Pendidikan Dan Kebudayaan
Kabupaten Indramayu
HJ. EMILIA KUSNANDAR, S.PD., M.M
NIP. 19690315 199202 2 001
Bill Of Quantity (BoQ)
KEGIATAN : PENGELOLAAN PENDIDIKAN ANAK USIA DINI (PAUD)
SUB KEGIATAN : PEMBANGUNAN RUANG GURU PAUD
PERENCANAAN TEKNIS KEGIATAN PEMBANGUNAN RUANG GURU
PEKERJAAN : PAUD
UNTUK TK NEGERI PEMBINA PATROL (DAK 2024)
SUMBER DANA : DANA ALOKASI KHUSUS (DAK) TAHUN 2024
LOKASI : TK NEGERI PEMBINA PATROL
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
A PEKERJAAN PERSIAPAN
1 Pek. Papan Nama Kegiatan Digital Printing 1,00 Bh A.5 3 68.135,00 3 68.135,00
2 Biaya Administrasi Pelaporan & Dokumentasi 1,00 Ls - 1 .500.000,00 1 .500.000,00
3 Pengadaan Air + Listrik Selama Pekerjaan 1,00 Ls - 2 57.000,00 2 57.000,00
4 Pembersihan dan Perapihan selesai pekerjaan 1,00 Ls - 2 50.000,00 2 50.000,00
5 Biaya Penyelenggaraan Sistem Manajemen Keselamatan
dan kesehatan kerja (SMK3)
a Alat Pelindung Kerja dan pelindungan diri
- Topi Pelindung (Safety Helmet) 5,00 Bh - 7 5.000,00 3 75.000,00
- Rompi Keselamatan ( Safety Vest) 5,00 Bh - 2 5.000,00 1 25.000,00
b Rambu - rambu
- Rambu Petunjuk 3,00 Bh - 7 5.000,00 2 25.000,00
- Rambu Larangan 3,00 Bh - 7 5.000,00 2 25.000,00
- Rambu Peringatan 3,00 Bh - 7 5.000,00 2 25.000,00
6 BPJS Ketenagakerjaan 1,00 Ls - 3 39.150,00 3 39.150,00
JUMLAH PEKERJAAN A 3 .550.135,00
B PEKERJAAN KONSTRUKSI
PEMBANGUNAN RUAG GURU PAUD
I PEKERJAAN TANAH DAN PASIR
1 Pek. Galian tanah pondasi 26,32 M3 B.1 7 5.440,00 1 .985.580,80
2 Pek. Urugan tanah bekas galian 9,07 M3 B.9 5 5.430,00 5 02.750,10
4 Pek. Lapisan pasir bawah pondasi t. 5 cm 1,40 M3 B.12 3 06.866,00 4 29.612,40
5 Pek. Lapisan pasir bawah lantai t. 5 cm 3,20 M3 B.12 3 06.866,00 9 81.971,20
6 Pek. Pasang Pondasi Batu Kali 1 Pc : 5 Psr 11,03 M3 C.4 1 .037.118,00 1 1.439.411,54
7 Pek. Curucuk bambu ampel dia. 7 - 10 cm p = 1.50 m 105,00 Ttk A.10 7 .440,00 7 81.200,00
Sub. Total Pekerjaan I 1 6.120.526,04
II PEKERJAAN PASANGAN
1 Pek. Pas. 1/2 bata 1 Pc : 5 Psr 78,49 M2 D.3 153.640,00 1 2.059.203,60
2 Pek. Plesteran 1 Pc : 5 Psr 174,08 M2 E.3 90.290,00 1 5.717.683,20
3 Pek. Acian Dinding 174,08 M2 E.6 39.255,00 6 .833.510,40
4 Pek. Rabat Keliling Bangunan T. 7 Cm 1Pc : 3 Psr : 5 Kr 2,80 M3 G.1 1 .014.183,00 2 .839.712,40
Sub. Total Pekerjaan II 3 7.450.109,60
III PEKERJAAN BETON K. 175 SITE MIX
1 Pek. Sloof 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 1 ,05 M3 G.2 1 .224.270,00 1 .285.483,50
- Besi beton terpasang U-24 1 75,00 Kg G.25 1 8.658,00 3 .265.150,00
- Begisting Papan Terentang 1 4,00 M2 G.23 1 89.890,00 2 .658.460,00
2 Pek. Pasang Kolom 20/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 ,54 M3 G.2 1 .224.270,00 6 61.105,80
- Besi beton terpasang U-24 9 0,00 Kg G.25 1 8.658,00 1 .679.220,00
- Begisting Papan Terentang 4 ,32 M2 G.23 1 89.890,00 8 20.324,80
3 Pek. Kolom Teras 15/15 (131.28 Kg/m3)
- Beton Site Mix K. 175 0 ,09 M3 G.2 1 .224.270,00 1 10.184,30
- Besi beton terpasang U-24 1 1,81 Kg G.25 1 8.658,00 2 20.350,98
- Begisting Papan Terentang 3 ,20 M2 G.23 1 89.890,00 6 07.648,00
4 Pek. Pasang Ring Balok 15/20 (166.67 Kg/m3)
- Beton Site Mix K. 175 0 ,29 M3 G.2 1 .224.270,00 3 55.038,30
- Besi beton terpasang U-24 4 8,00 Kg G.25 1 8.658,00 8 95.584,00
- Begisting Papan Terentang 4 ,48 M2 G.23 1 89.890,00 8 50.707,20
5 Pek. Pasang Balok Liufel 12/15 Cm (216,38 Kg/m3)
- Beton Site Mix K. 175 0 ,19 M3 G.2 1 .224.270,00 2 32.611,30
- Besi beton terpasang U-24 4 1,54 Kg G.25 1 8.658,00 7 75.053,32
- Begisting Papan Terentang 5 ,44 M2 G.23 1 89.890,00 1 .033.001,60
6 Pek. Pasang Balok Konsol 15/20 (161.93 Kg/m3)
- Beton Site Mix K. 175 0 ,13 M3 G.2 1 .224.270,00 1 59.155,10
- Besi beton terpasang U-24 2 1,38 Kg G.25 1 8.658,00 3 98.908,04
- Begisting Papan Terentang 2 ,42 M2 G.23 1 89.890,00 4 59.533,80
HARGA JUMLAH
NO. URAIAN PEKERJAAN VOLUME SATUAN ANALISA SATUAN TOTAL
(Rp.) (3 x 6)
1 2 3 4 5 6 7
7 Pek. Pasang Balok Selasar 15/20 (166.74 Kg/m3)
- Beton Site Mix K. 175 0 ,24 M3 G.2 1 .224.270,00 2 93.824,80
- Besi beton terpasang U-24 3 8,86 Kg G.25 1 8.658,00 7 25.049,88
- Begisting Papan Terentang 6 ,00 M2 G.23 1 89.890,00 1 .139.340,00
8 Pek. Pasang Balok ampig 12/12 Cm (308.25 Kg/m3)
- Beton Site Mix K. 175 0 ,34 M3 G.2 1 .224.270,00 4 16.251,80
- Besi beton terpasang U-24 1 04,76 Kg G.25 1 8.658,00 1 .954.612,08
- Begisting Papan Terentang 5 ,66 M2 G.23 1 89.890,00 1 .074.777,40
Sub. Total Pekerjaan III 2 2.071.376,00
IV PEKERJAAN KUSEN
1 Pek. Pasang Kusen + Pintu Alumunium type P1 (1 Unit)
- Frame Kusen Alumunium 4" Warna Coklat 7,16 M' F.8 1 86.389,00 1 .334.545,24
- Pintu Swing + Daun Pintu Kaca 5 mm lengkap 1,00 Unit F.27 1 .390.347,00 1 .390.347,00
- Pasang Kaca 5 mm 0,45 M2 L.8 1 98.360,00 8 9.262,00
2 Pek. Pasang Kusen + Jendela Alumunium type J1 (4 Unit)
- Frame Kusen Alumunium 4" Warna Coklat 44,52 M' F.8 1 86.389,00 8 .298.038,28
- Daun Jendela + Engsel Casment + Kaca polos 5 mm 8,00 Unit F.28 6 42.847,00 5 .142.776,00
- Pasang Kaca 5 mm 4,40 M2 L.8 1 98.360,00 8 72.784,00
3 Pek. Pasang Kusen Alumunium type BV1 (1 Unit)
- Frame Kusen Alumunium 4" Warna Coklat 6,22 M' F.8 1 86.389,00 1 .159.339,58
- Pasang Kaca 5 mm 1,10 M2 L.8 1 98.360,00 2 18.196,00
Sub. Total Pekerjaan IV 1 8.505.288,10
V PEKERJAAN PENUTUP ATAP
1 Pek. Kuda-kuda + rangka atap baja ringan (Zincallume) 101,52 M2 H.18 1 86.533,00 1 8.936.830,16
2 Pek. Pasang Atap Metal Berpasir 101,52 M2 H.30 1 47.080,00 1 4.931.561,60
3 Pek. Pasang Nok Atap Metal Berpasir 9,40 M' H.54 1 18.101,00 1 .110.149,40
4 Pek. Pasang Lisplank GRC Tumpangsari (1/20 + 1/10) Cm 29,60 M' H.64 1 00.779,00 2 .983.058,40
Sub. Total Pekerjaan V 3 7.961.599,56
VI PEKERJAAN PLAFOND
1 Pek. Pasang Rangka Plafond galvalume modul 60x60 Cm 90,08 M2 I.23 7 8.839,00 7 .101.817,12
2 Pek. Pasang Plafond Gypsum (Bagian Dalam) 48,00 M2 I.14 7 0.968,00 3 .406.464,00
3 Pek. Pasang Plafond GRC (Bagian Luar dan Tritisan) 42,08 M2 I.11 6 3.380,00 2 .667.030,40
Sub. Total Pekerjaan VI 1 3.175.311,52
VII PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pasang Lantai Granit 60x60 Cm 64,00 M2 M.14 3 09.679,00 1 9.819.456,00
Sub. Total Pekerjaan VII 1 9.819.456,00
VIII PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok baru 174,09 M2 P.12 3 6.092,00 6 .283.256,28
2 Pek. Cat Plafond 42,08 M2 P.16 3 3.574,00 1 .412.793,92
3 Pek. Cat Listplank 5,92 M2 P.4 6 2.158,00 3 67.975,36
Sub. Total Pekerjaan VIII 8 .064.025,56
IX PEKERJAAN LISTRIK DAN MEKANIKAL
1 Pek. Pasang Instalasi Titik Penerangan dan Stop Kontak 6,00 Titik Q.1 2 15.538,00 1 .293.228,00
2 Pek. Pasang Saklar Tunggal 1,00 Bh Q.3 3 5.719,00 3 5.719,00
3 Pek. Pasang Saklar Double 1,00 Bh Q.4 3 8.709,00 3 8.709,00
4 Pek. Pasang Stop Kontak 1,00 Bh Q.2 3 6.639,00 3 6.639,00
5 Pas. Lampu TL 1x18 Watt berikut Kap 4,00 Bh Q.5 1 88.669,00 7 54.676,00
6 Pas. Lampu LED 9 Watt + Fitting 1,00 Bh Q.6 1 03.224,00 1 03.224,00
Sub. Total Pekerjaan IX 2 .262.195,00
X PEKERJAAN PERLENGKAPAN DAN ACSESORIES
1 Pek. Pasang Prasasti Granit Uk. P. 30 Cm L. 20 Cm 1,00 Bh - 7 50.000,00 7 50.000,00
Sub. Total Pekerjaan X 7 50.000,00
JUMLAH B 1 76.179.887,38
JUMLAH TOTAL PEKERJAAN (A+B) 179.730.022,38
Dibuat,
Konsultan Perencana
CV. AURA BUANA CAHAYA
SUYITNO, ST
Direktur