Pembangunan Gedung Kantor Kppd DIY Di Kabupaten Sleman (Konstruksi Tahap I)

Basic Information
Type: Public Tender
Tender Code: 3496013
Date: 10 March 2015
Year: 2015
Work Unit: Null
Procurement Type: Pekerjaan Konstruksi
Method: Lelang Umum - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 17,945,027,000
Estimated Value (Nilai HPS): Rp 17,899,978,000
Winner (Pemenang): PT Dutaraya Dinametro
NPWP: 015448632009000
Work Location: Kab. Sleman - Sleman (Kab.)
Participants: 67
Applicants
Reason
0015448632009000Rp 14,624,173,000-
0011403490541000Rp 15,878,563,000-
0014647481541000--
PT Abid Putra Utama
0024770182615000--
0023787260009000Rp 16,096,490,000Jadwal Waktu Pelaksanaan, Network Planning, tidak ada
0013258330407000Rp 17,538,744,000Metode Pelaksanaan, Jadwal Waktu Pelaksanaan, Jenis, Kapasitas, komposisi dan jumlah peralatan, spesifikasi teknis, daftar personil inti, bagian pekerjaan yang akan disubkontrakkan tidak ada
PT Arrester Guna Abadi
00*5**5****07**0Rp 17,388,003,000Jenis,jumlah,kapasitas dan komposisi peralatan yang ditawarkan kurang dari persyaratan. Theodolite/TS hanya 1 set sedangkan persyaratan 2 set, scafolding hanya 800 set sedangkan persyaratan 5000 set
0017395286609000Rp 16,828,506,000Masa berlaku penawaran 60 hari kalender kurang dari persyaratan yaitu 90 hari kalender
0021866983044000Rp 0Tidak Memasukkan Dokumen Penawaran
PT Sartonia Agung
0013210240028000Rp 14,306,820,0001. Daftar Upah Tenaga Rp. 39.000/hr dibawah (UMP Rp. 1.200.000) 1 bulan = 25 hari (=48.000/hr) 2. Analisa Teknis untuk Proyek KPP Kulon Progo 3. Metoda Pelaksanaan yang ditawarkan tidak menggambarkan penguasaan dalam penyelesaian pekerjaan
0014646970542000Rp 15,529,223,000Personil inti yang akan ditempatkan kurang dari persyaratan, Site Engineer Struktur hanya 1 orang sedangkan dalam persyaratan 2 orang
0011324514542000Rp 15,673,163,000Metode Pelaksanaan, Jadwal Waktu Pelaksanaan, Jenis, Kapasitas, komposisi dan jumlah peralatan, spesifikasi teknis, daftar personil inti, bagian pekerjaan yang akan disubkontrakkan tidak ada
PT Mangkubuana Hutama Jaya
0018173161007000--
0708717624542000Rp 16,632,731,000Daftar Upah Tenaga Rp. 47.000/hr dibawah (UMP Rp. 1.200.000) 1 bulan = 25 hari (=48.000/hr)
0022993315511000--
0019206580008000--
0026829697542000--
0022057269542000--
0316968429528000--
PT Kathir Mas Samodra
0317091759541000--
0022059851544000--
CV Restu Mulyo
00*7**7****42**0--
CV Cipta Prima
03*1**9****42**0--
0024778656542000--
0022648794543000--
PT Idee Murni Pratama
0013029657073000--
PT Artha Putra Arjuna
00*1**6****19**0--
0015458870526000--
0012194635631000--
CV Zara Diva
03*4**8****24**0--
0029614914541000--
0017316563013000--
CV Ijo Daun Media
0032314981331000--
CV Albana
03*5**0****16**0--
0016951592541000--
0019924141542000--
PT Tirta Dhea Addonnics Pratama
0020221495009000--
PT Ivan Santosa Mandiri
0012109898424000--
0020707360009000--
PT Yastifias Sukses
03*6**5****36**0--
0317159986541000--
PT Mahesa Sejahtera
02*0**0****44**0--
0013010517003000--
0027551035543000--
0012664629118000--
0013400098028000--
0019923499541000--
0022824080952000--
0026449389541000--
0012348793645000--
0315166363544000--
CV Agita Karya
00*4**9****44**0--
0027551381541000--
0012690798218000--
0012026753533000--
0019210913542000--
0315801688545000--
0027781327544000--
Hayyu Jaya Lestari
0311575278602000--
0021702188609000--
0024946261005000--
CV Genting Maju
0021229349104000--
0022652713541000--
CV Sugih Artha Kalamukti
00*6**5****25**0--
PT Asarkon
03*4**0****02**0--
0025895004034000--
0023980923542000--
Tenders also won by PT Dutaraya Dinametro
Authority
31 March 2023Pembangunan Waduk/Situ/Embung Dan Bangunan KelengkapannyaProvinsi DKI JakartaRp 93,626,969,787
3 April 2023Rehabilitasi Dan Renovasi Prasarana Sekolah Provinsi Kalimantan Barat 8Kementerian Pekerjaan Umum dan Perumahan RakyatRp 69,195,827,000
28 April 2022Pembangunan Waduk Marunda Tahap IProvinsi DKI JakartaRp 59,000,000,000
2 May 2016Pengendalian Banjir Sungai Randangan Kab. Pohuwato (Lanjutan)Kementerian Pekerjaan Umum dan Perumahan RakyatRp 53,700,000,000
18 April 2016Pembangunan Gedung Rawat Inap, Intensive Care Unit (Icu) Rsud Kab. Sumedang Tahap IIAgency Kabupaten SumedangRp 44,650,000,000
18 July 2014Pembangunan Trotoar Dan Saluran Jl.Re.Martadinata Segmen 1 (Dari Jl.Wastukancana S/D.Jl.Banda)Agency BLP Kota BandungRp 25,839,394,000
18 April 2016Pembangunan Gedung Kantor Tahap 1Provinsi Jawa BaratRp 25,733,367,000
10 June 2015Lanjutan Pembangunan Gedung Laboratorium Seni Isi YogyakartaInstitut Seni Indonesia YogyakartaRp 23,867,000,000
21 March 2016Pembangunan Tanggul Sisi Timur, Barat Dan Utara Muara Angke (Jasa Konstruksi)Provinsi DKI JakartaRp 23,859,605,007
22 June 2017Pembangunan Gedung Rawat Inap Dan Ruang Operasi Rsud Dr SoekardjoRp 19,162,600,000