| 0316925718706000 | Rp 858,003,030 | |
CV Adhipramana Dimitra Surya | 06*5**2****06**0 | - |
PT Tardilo Borneo Konstruksi | 01*8**0****04**0 | - |
| 0029396595706000 | - | |
| 0621850528706000 | - | |
Dika Karya | 00*9**6****06**0 | - |
CV Tuah Rayo Mandiri | 01*8**8****06**0 | - |
| 0722646908706000 | - | |
| 0840197503704000 | - | |
CV Berkah Jasa Konstruksi | 10*1**1****69**2 | - |
CV Zaimo Group | 10*0**0****94**0 | - |
CV Mayora Bertuah | 00*9**7****06**0 | - |
| 0029402245706000 | - | |
| 0026319608706000 | - | |
| 0817620875701000 | - | |
CV Dhilan Sakti | 07*7**8****06**0 | - |
| 0926269499701000 | - | |
| 0016286619008000 | - | |
| 0942879214705000 | - | |
| 0026885145706000 | - | |
| 0020511556706000 | - | |
CV Umar Ahmad Group | 02*7**5****04**0 | - |
| 0811927565706000 | - | |
CV Mitra Banguntama | 05*6**4****06**0 | - |
| 0610767816706000 | - | |
| 0933884470706000 | - |
URAIAN SINGKAT PEKERJAAN
Pembangunan Puskesmas Pembantu Tekudak
1) Subtansi ruang lingkup pekerjaan ini adalah melakukan Pembangunan Puskesmas Pembantu
Tekudak dan memenuhi ketentuan sebagaimana diatur dalam Menurut Peraturan Menteri
Pekerjaan Umum No. 45/PRT/M/2007 tentang Pedoman Teknis Pembangunan Bangunan
Gedung Negara dan sesuai peraturan yang berlaku. Secara garis besar ruang lingkup
pekerjaan ini meliputi:
Pekerjaan Pembangunan Puskesmas Pembantu Tekudak
I. PEKERJAAN PERSIAPAN
- Pembersihan Lokasi
- Pemasangan Bowplank
II. SISTEM MANAJEMEN KESELAMATAN KONSTRUKSI (SMKK)
- Spanduk (Banner)
- Papan Informasi Keselamatan konstruksi
- APD, antara lain :
- Topi pelindung (Safety Helmet)
- Pelindung Mulut dan Hidung (Masker)
- Sarung tangan (Safety Gloves)
- Sepatu keselamatan (Safety Shoes/ rubber safety shoes)
- Rompi keselamatan (Safety Vest)
- Peralatan P3K (Kotak K3, Tandu, Obat Luka, Obat Umum, Perban)
- Alat pemadam kebakaran
III. PEKERJAAN PONDASI
➢ Tapak Pondasi ( P1 )
- Galian Tanah Pondasi
- Cerucuk dia. 10-12 cm 2 M
- Upah Pemancangan Cerucuk
- Pasir Urug T : 10 cm
- Lantai Kerja T : 5 cm K 100
- Bekisting
- Tulangan Induk tul. D 12
- Beton Mutu K 175
➢ Kolom Pondasi ( P1 )
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
➢ Urugan Bekas galian
IV. PEKERJAAN STRUKTUR
➢ ELEVASI ± 0,00 M
➢ Balok BL 1 20/60
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
➢ Balok BL 1 20/40
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
➢ Plat Lantai
- Bekisting
- Tulangan Wiremesh M6 x 1
- Beton Mutu K 175
- Plastik Cor
➢ Kolom K1 20 x 20
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
➢ Kolom Praktis 10x10
- Bekisting
- Tulangan Induk Ø10
- Tulangan Sengkang (Beugel)
- Beton Mutu K 100
➢ Balok Praktis 10x10
- Bekisting
- Tulangan Induk Ø10
- Tulangan Sengkang (Beugel)
- Beton Mutu K 100
➢ Ring Balok RB 1 20/40
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 100
➢ TANGGA BETON SAMPING
- Cerucuk dia. 10-12 cm 2 M
- Upah Pemancangan Cerucuk
- Balok BL 1 20/60
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
- Tangga
- Bekisting
- Cor Beton K-175
➢ TANGGA BETON DEPAN
- Cerucuk dia. 10-12 cm 2 M
- Upah Pemancangan Cerucuk
- Balok BL 1 20/60
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
- Tangga
- Bekisting
- Cor Beton K-175
➢ RAM BETON DEPAN
- Cerucuk dia. 10-12 cm 2 M
- Upah Pemancangan Cerucuk
- Balok BL 1 20/60
- Bekisting
- Tulangan Induk tul. D 12
- Tulangan Induk tul. D 12
- Tulangan Sengkang (Beugel)
- Beton Mutu K 175
- Tangga
- Bekisting
- Cor Beton K-175
V. PEKERJAAN ATAP
- Kuda-kuda ky. Klas II
- Gording 5/10 ky. Klas II
- Atap Seng Gelombang Warna 0.25
- Perabung / Jurai
- Listplank GRC
- Rangka Kanopi Teras Samping Besi Galvanis + Atap Seng Gelombang
- Atap Teras Depan ACP + Rangka Besi Siku uk 4/4/3mm
VI. PEKERJAAN PENUTUP LANTAI, PLAFOND, DAN DINDING
- Keramik Lantai (40X40) POLISHED
- Keramik Lantai (40X40) UNPOLISHED
- Keramik Lantai (20X20) UNPOLISHED
- Dinding Batako Uk. 7 x 15 x 30 cm
- Plesteran Dinding T : 1.5 cm
- Rangka Plafond Kayu Klas II
- Plafond GRC Board
VII. PEKERJAAN KUSEN,PINTU, JENDELA, DAN VENTILASI
- Pintu tipe P1 ( 2 UNIT )
- Kusen Kayu Klas 1
- Pintu Panel Kayu Klas I
- Kunci 2 Slaag
- Engsel Pintu
- Slot Pintu
- Handle Pintu (khusus pintu didalam bangunan)
- Handle Pintu 40cm (khusus pintu masuk bangunan)
- Ventilasi Kisi – Kisi
- Pintu tipe P2 ( 7 UNIT )
- Kusen Kayu Klas 1
- Pintu Panel Kayu Klas I
- Kunci 2 Slaag
- Engsel Pintu
- Slot Pintu
- Ventilasi Kisi – Kisi
- Pintu tipe P3 ( 2 UNIT )
- Kusen Kayu Klas 1
- Pintu Panel Kayu Klas I
- Kunci 2 Slaag
- Engsel Pintu
- Slot Pintu
- Ventilasi Kisi – Kisi
- J1
- Kusen Kayu Klas 1
- Bingkai Kayu Klas 1
- Jendela Kaca T 5 mm
- Engsel Jendela
- Handle Jendela
- Kait Angin
- Slot Jendela
- Ventilasi Kisi – Kisi
- J2
- Kusen Kayu Klas 1
- Bingkai Kayu Klas 1
- Jendela Kaca T 5 mm
- Engsel Jendela
- Handle Jendela
- Kait Angin
- Slot Jendela
- Ventilasi Kisi – Kisi
- V1
- Kusen Kayu Klas 1
- Ventilasi Kisi – Kisi
- V2
- Kusen Kayu Klas 1
- Ventilasi Kisi – Kisi
- LO
- Kaca T 5 mm
VIII. PEKERJAAN PENGECATAN
- Pengecatan Dinding, Kolom dan Balok
- Cat Plafond
- Cat Kilat
IX. PEKERJAAN SANITASI
- Kloset Duduk
- Kloset Jongkok
- Baik Air Plastik 120 Lt
- Wastafel
- Kran Air Stainless Diameter 1/2"
- Floor Drain Stainless
- Instalasi Air Besih dan Air Kotor + Talang Air
- Tong Fibber Air 1 m3
- Septi Tank
- Gorong - Gorong Dia 80 Cm (2 sambung) + Penutup
- Pompa Air Otomatis
- Stelling Rangka Kayu Belian
X. PEKERJAAN ELEKTRIKAL
- Lampu Downlight LED Inbow 10 Watt
- Saklar Ganda
- Saklar Tunggal
- Stop Kontak Dinding
- Instalasi Titik Lampu + MCB
- Listrik 900 Watt
a) Tahap Persiapan
• Mempersiapkan sumber daya berupa : tenaga kerja, peralatan dan perlengkapan,
bahan bangunan, informasi, dana, program Quality Assurance/Quality Control,
dan program kesehatan dan keselamatan kerja (K3);
• Penyusunan jadwal pekerjaa yang akan dilaksanakan, agar tidak terjadi pekerjaan
yang terlambat.
b) Tahap Pelaksanaan
(1) Melakukan peleksanaan pekerjaan yang terdiri atas:
▪ Melaksanakan pekerjaan sesuai dengan gambar dan RAB (rencana Anggaran
Biaya).
▪ Memeriksa material atau bahan yang sesuai dengan keperluan dilapangan.
▪ Menyiapkan material dan tenaga kerja sesuai dengan jadwal pelaksanaan pekerjaan
dilapangan.
▪ Melaksanakan pekerjaan sesuai dengan item-item pekerjaan yang terdapat didalam
gambar kerja dan di RAB (Rencana Anggaran Biaya).
▪ Berkoordinasi dengan pengawas dan Pejabat Pembuat Komitmen apabila ada yang
harus diselesaikan bersama dan mendapatkan keputusan yang disepakai bersama.
(2) Menyusun laporan Konstruksi
▪ Penyusunan format laporan dikonsultasikan kepada konsultan pengawas dan pejabat
pembuat komitmen. Agar hasil laporan dapat dipergunakan sebagai laporan
pekerjaan dan melampirkan sebagai berikut :
▪ Laporan harian
▪ Laporan mingguan
▪ Laporan bulanan
▪ Laporan schedulle
▪ Dokumentasi pekerjaan (0%-100%)
▪ Laporan pencairan
2) Data dan fasilitas yang dapat disediakan oleh PA/KPA/PPK adalah:
a) Data Perencanaan (Detail Engineering Design);
b) Surat menyurat kepada instansi terkait
Putussibau, 19 Mei 2025
Dinas Kesehatan, Pengendalian Penduduk Dan Keluarga
Berencana Kabupaten Kapuas Hulu
Pejabat Pembuat Komitmen
NANANG PADLI, SKM., SE, M.Si.
NIP. 19790807 200604 1 012