| Reason | |||
|---|---|---|---|
| 0314652447121000 | Rp 1,780,844,317 | - | |
Raja Konstruksi Perkasa | 09*3**8****28**0 | - | - |
| 0703647800127000 | Rp 1,669,268,634 | Data personel manajerial yang diusulkan adalah tidak benar | |
| 0748839560124000 | - | - | |
CV Pemain Lama | 01*9**1****26**0 | - | - |
| 0018516435117000 | - | - | |
CV Arqi Mitra Bungsu | 01*9**1****25**0 | - | - |
| 0701883241124000 | - | - | |
CV Busimor Engineering | 0210247656122000 | - | - |
| 0964847255117000 | - | - | |
| 0736588856121000 | - | - | |
| 0718870058124000 | - | - | |
| 0869405357119000 | - | - | |
CV San Vahoda | 05*4**9****28**0 | - | - |
| 0412732729117000 | - | - | |
| 0710279878127000 | - | - | |
CV Delima Makmur | 09*2**2****15**0 | - | - |
| 0858906928128000 | - | - | |
| 0409715430127000 | - | - | |
| 0923355127124000 | - | - | |
CV Muda Paronan | 09*4**4****27**0 | - | - |
| 0925723991121000 | - | - | |
| 0018674101125000 | - | - | |
| 0020197570127000 | - | - | |
| 0017478033127000 | - | - | |
| 0033196759121000 | - | - | |
PT Benua Cipta Sumatera | 02*4**6****11**0 | - | - |
| 0763876570121000 | - | - | |
| 0026262451122000 | - | - | |
| 0024949190128000 | - | - | |
CV Rancang Cipta Jaya | 00*8**6****19**0 | - | - |
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
Nama Kegiatan : Pembangunan Tembok Penahan di Objek Wisata Sipiso-piso
Lokasi : Sipiso-piso
1.1.4.2 Pemasangan 1 m' Bowplank
No. Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 Oh 0 ,0120
Tukang kayu L.02 Oh 0 ,0060
Kepala tukang L.05 Oh 0 ,0006
Mandor L.04 Oh 0 ,0012
B BAHAN
Kayu 5/7 Sembarang keras M3 0 ,0130
Paku 5 -12 cm Kg 0 ,0200
Kayu papan 3/20 Sembarang keras M3 0 ,0070
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
1.2.1.1.1 Penggalian 1 m3 tanah biasa sedalam 1 m
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,7500
Mandor L.04 Oh 0 ,0380
B BAHAN
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
1.2.1.1.4 Penggalian 1 m3 tanah biasa sedalam 2 m secara manual
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,9000
Mandor L.04 Oh 0 ,0450
B BAHAN
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
1.3.1.1 1 m3 Urukan Kembali Galian Tanah
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,5000
Mandor L.04 Oh 0 ,0250
B BAHAN
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
1.3.1.3 1 m3 Urukan dengan pasir gunung untuk volume > 200 m3
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,0650
Mandor L.04 Oh 0 ,0065
B BAHAN
Pasir gunung m3 1 ,2000
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.4.1 1 m3 beton mutu rendah f'c 7.5 MPa , slump (100±25 ) mm, agregat maks 19 mm secara manual
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 1 ,6500
Tukang batu L.02 Oh 0 ,2750
Kepala tukang L.05 Oh 0 ,0280
Mandor L.04 Oh 0 ,0090
B BAHAN
Portland Cement (PC) kg 2 50,00
Pasir Pasang (kg) kg 8 88,00
Batu Pecah Uk. 2 - 3 cm (kg) kg 1 .009,00
Air liter 2 02,00
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.6.1a Pengecoran beton menggunakan ready mixed f'c 20 MPa
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,4000
Tukang batu L.02 Oh 0 ,1000
Kepala tukang L.05 Oh 0 ,0100
Mandor L.04 Oh 0 ,0400
B BAHAN
Beton f'c 20 MPa Ready Mix m3 1 ,0200
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.6.1b Pengecoran beton menggunakan ready mixed f'c 15 MPa
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,4000
Tukang batu L.02 Oh 0 ,1000
Kepala tukang L.05 Oh 0 ,0100
Mandor L.04 Oh 0 ,0400
B BAHAN
Beton f'c 15 MPa Ready Mix m3 1 ,0200
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
2.2.1.6.1c Pengecoran beton menggunakan ready mixed f'c 30 MPa
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,4000
Tukang batu L.02 Oh 0 ,1000
Kepala tukang L.05 Oh 0 ,0100
Mandor L.04 Oh 0 ,0400
B BAHAN
Beton f'c 30 MPa Ready Mix m3 1 ,0200
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.6.1d Pengecoran beton menggunakan ready mixed f'c 30 Mpa-SCC
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,4000
Tukang batu L.02 Oh 0 ,1000
Kepala tukang L.05 Oh 0 ,0100
Mandor L.04 Oh 0 ,0400
B BAHAN
Beton f'c 30 Mpa-SCC (Ready Mix) m3 1 ,0200
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.1.3 Pembesian 1 Kg dengan besi polos untuk BjTS diameter < 12 mm, manual
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,0016
Tukang besi L.02 Oh 0 ,0016
Kepala tukang L.05 Oh 0 ,00016
Mandor L.04 Oh 0 ,00016
B BAHAN
Besi Beton Polos kg 1 ,0200
Kawat Beton kg 0 ,0280
C PERALATAN
D JUMLAH (A+B+C)
F OVERHEAD & PROFIT 15% X E
G Harga Satuan Pekerjaan Pembesian / kg
2.2.1.1.4 Pembesian 1 Kg dengan besi ulir untuk BjTP ≥ 12 mm
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,0016
Tukang besi L.02 Oh 0 ,0016
Kepala tukang L.05 Oh 0 ,00016
Mandor L.04 Oh 0 ,00016
B BAHAN
Besi Beton Ulir kg 1 ,0200
Kawat Beton kg 0 ,0280
C PERALATAN
Cutter Baja Beton hari 0 ,0400
Bender Baja Beton hari 0 ,0400
D JUMLAH (A+B+C)
F OVERHEAD & PROFIT 15% X E
G Harga Satuan Pekerjaan Pembesian / kg
Analisa Harga Satuan
2.2.1.3.1 Pemasangan 1 m2 bekisting untuk pondasi telapak (3 kali pakai)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,5200
Tukang kayu L.02 Oh 0 ,2600
Kepala tukang L.05 Oh 0 ,0260
Mandor L.04 Oh 0 ,0090
B BAHAN
Kayu Sembarang Keras m3 0 ,0160
Paku 5 -12 cm kg 0 ,3000
Minyak Bekisting Liter 0 ,1000
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.3.4 Pemasangan 1 m2 bekisting untuk Kolom (3 kali Pakai)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,6600
Tukang Kayu L.02 Oh 0 ,3300
Kepala Tukang L.05 Oh 0 ,0330
Mandor L.04 Oh 0 ,0110
B BAHAN
Paku 5 -12 cm Kg 0 ,4000
Minyak Bekisting Ltr 0 ,2000
Kayu Sembarang Keras m3 0 ,00465
Plywood t = 9 mm Lbr 0 ,12705
Bambu Diameter 8- 10 cm Btg 0 ,6500
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.3.7 Pemasangan 1 m2 bekisting untuk dinding shearwall (3 kali Pakai)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,6600
Tukang Kayu L.02 Oh 0 ,3300
Kepala Tukang L.05 Oh 0 ,0330
Mandor L.04 Oh 0 ,0110
B BAHAN
Paku 5 -12 cm Kg 0 ,4000
Minyak Bekisting Ltr 0 ,2000
Kayu Sembarang Keras m3 0 ,00600
Plywood t = 9 mm Lbr 0 ,12705
Bambu Diameter 8- 10 cm Btg 0 ,6500
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
2.2.1.3.5 Pemasangan 1 m2 bekisting untuk Balok (3 kali pakai)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,6600
Tukang Kayu L.02 Oh 0 ,3300
Kepala Tukang L.05 Oh 0 ,0330
Mandor L.04 Oh 0 ,0110
B BAHAN
Paku 5 -12 cm Kg 0 ,4000
Minyak Bekisting Ltr 0 ,2000
Kayu Sembarang Keras m3 0 ,00558
Plywood t = 9 mm Lbr 0 ,12705
Bambu Diameter 8- 10 cm Btg 0 ,6500
C PERALATAN
D JUMLAH (A+B+C) 2X PAKAI
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.2.3.17a Pengeboran 1 m' Lubang Bored Pile φ 60 cm (Manual)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,9060
Mandor L.04 Oh 0 ,0905
B BAHAN
C PERALATAN
Stang bor, batang bor diameter 1 1/4" Hari 0 ,2265
Bor: Auger ∅ 60 cm Hari 0 ,2265
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
2.2.1.3.6 Pemasangan 1 m2 bekisting untuk plat lantai (3 x pakai)
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,6600
Tukang Kayu L.02 Oh 0 ,3300
Kepala Tukang L.05 Oh 0 ,0330
Mandor L.04 Oh 0 ,0110
B BAHAN
Paku 5 -12 cm Kg 0 ,4000
Minyak Bekisting Ltr 0 ,2000
Kayu Sembarang Keras m3 0 ,00465
Plywood t = 9 mm Lbr 0 ,12700
Bambu Diameter 8- 10 cm Btg 1 ,9500
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
2.2.2.1.6 1 m3 Pas. Batu Belah 1 PC:4 PP
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 1 ,5000
Tukang L.02 Oh 0 ,5000
Mandor L.04 Oh 0 ,1500
B BAHAN
Pasir Pasang m3 0 ,52000
Batu Kali m3 1 ,2000
Portland Cement (PC) kg 1 63,0000
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
3.7.4 Pemasangan 1 m2 Plesteran 1 SP : 4PP
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,2000
Tukang L.02 Oh 0 ,1000
Kepala Tukang L.03 Oh 0 ,0100
Mandor L.04 Oh 0 ,0033
B BAHAN
Pasir Pasang m3 0 ,02400
Portland Cement (PC) Kg 6 ,2400
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
1.3.2.1a 1 m3 Pemadatan tanah per 20 cm
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,5000
Mandor L.04 Oh 0 ,0250
B BAHAN
C PERALATAN
Stamper/Tapak gajah Hari 0 ,0183
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
3.10.4.3a Pemasangan 1 m2 dinding batu alam andesit
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,7000
Tukang batu L.02 Oh 0 ,3500
Kepala Tukang L.03 Oh 0 ,0350
Mandor L.04 Oh 0 ,0117
B BAHAN
Batu Alam Andesit m' 1 ,10000
Portland Cement (PC) Kg 1 1,75000
Pasir Pasang m3 0 ,03500
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
3.9.7.4a Pemasangan 1m2 Batu Alam Andesit untuk lantai
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,7000
Tukang batu L.02 Oh 0 ,3500
Kepala Tukang L.03 Oh 0 ,0350
Mandor L.04 Oh 0 ,0117
B BAHAN
Batu Alam Andesit m' 1 ,05000
Portland Cement (PC) Kg 1 3,63200
Pasir Pasang m3 0 ,02700
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
3.8.15 Pengecatan 1 m2 Permukaan Baja Galvanis secara Manual Sistem 3 Lapis
No. Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 Oh 0 ,4000
Tukang batu L.02 Oh 0 ,8000
Kepala Tukang L.03 Oh 0 ,0800
Mandor L.04 Oh 0 ,0267
B BAHAN
Cat menie besi kg 0 ,11000
Cat kilat mutu baik kg 0 ,17000
Cat kilat mutu baik kg 0 ,08000
Kuas 2" bh 0 ,01000
Pengencer/Thiner liter 0 ,01000
C PERALATAN
D JUMLAH (A+B+C)
E OVERHEAD & PROFIT 15% X D
F Harga Satuan Pekerjaan
Analisa Harga Satuan
DAFTAR HARGA SATUAN MATERIAL DAN UPAH
PEKERJAAN : Pembangunan Tembok Penahan di Objek Wisata Sipiso-piso
LOKASI : Sipiso-piso
No Jenis Tenaga Kerja Satuan Harga Satuan
PEKERJAAN BANGUNAN
1 Pekerja Orang/Hari
2 Tukang kayu Orang/Hari
3 Tukang batu Orang/Hari
4 Tukang besi Orang/Hari
5 Tukang cat Orang/Hari
6 Tukang Orang/Hari
7 Mandor Orang/Hari
8 Kepala Tukang Orang/Hari
No Bahan Satuan
B MATERIAL
1 Portland Cement (PC) Kg
2 Portland Cement (PC) @40 kg Zak
3 Beton f'c 15 MPa Ready Mix m3
4 Beton f'c 20 MPa Ready Mix m3
5 Beton f'c 30 MPa Ready Mix m3
6 Beton f'c 30 Mpa-SCC (Ready Mix) m3
7 Pasir gunung M3
8 Pasir Pasang M3
9 Pasir Pasang (kg) kg
10 Batu Kali M3
11 Batu Pecah Uk. 2 - 3 cm (kg) Kg
12 Batu Pecah Uk. 2 - 3 cm M3
13 Besi Beton Polos Kg
14 Besi Beton Ulir Kg
15 Kawat Beton Kg
16 Besi Hollow 40.40.1.8 Btg
17 Besi Hollow 40.40.1.8 (m') m'
18 Besi Hollow 20.40.1.8 Btg
19 Besi Hollow 20.40.1.8 (m') m'
20 Kawat las kg
21 Paku 5 -12 cm Kg
22 Minyak Bekisting Liter
23 Kayu Sembarang Keras M3
24 Plastik cor M1
25 Plastik cor M2
26 Bambu Diameter 8- 10 cm M1
27 Batu Alam Andesit M2
28 Stamper/Tapak gajah Hari
29 Kayu 5/7 Sembarang keras M3
30 Kayu papan 3/20 Sembarang keras M3
31 Plywood t = 9 mm Lembar
32 Cat menie besi Kg
33 Cat kilat mutu baik Kg
34 Pengencer/Thiner Liter
35 Kuas 2" Bh
36 Air Liter
37 Stang bor, batang bor diameter 1 1/4" Hari
38 Bor: Auger ∅ 60 cm Hari
39 Cutter Baja Beton Hari
40 Bender Baja Beton Hari
Daftar Harga Satuan Material dan Upah
REKAPITULASI
Kegiatan : Pembangunan Tembok Penahan di Objek Wisata Sipiso-piso
Spesifikasi : Sipiso-piso
Kebupaten : Karo
Jumlah
No. Unit Pekerjaan
(Rp.)
1 2 3
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
III. PEKERJAAN STRUKTUR
IV. PEKERJAAN PENATAAN
V. PEKERJAAN AKHIR
JUMLAH
PPN 11%
TOTAL
Dibulatkan
Terbilang : Satu Milyard Delapan Ratus Juta Rupiah
Kabanjahe, Juli 2025
Dibuat Oleh
Kontraktor Pelaksana
PT / CV …
Nama
Direktur / Wakil Direktur
RENCANA ANGGARAN BIAYA
PEKERJAAN : Pembangunan Tembok Penahan di Objek Wisata Sipiso-piso
LOKASI : Sipiso-piso
Harga Satuan Jumlah Harga
No. Uraian Pekerjaan Analisa Volume Satuan
(Rp) (Rp)
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
1 Papan Nama Proyek LS 1,00 Paket
2 Pematokan dan Pengukuran LS 1,00 Paket
3 Mobilisasi dan Demobilisasi LS 2,00 Paket
4 Penyelenggaraan SMK3 SMK3 1,00 Paket
5 Sewa Gudang dan Bengkel Lapangan LS 1,00 Paket
6 Sewa Barak Pekerja LS 1,00 Paket
7 Bongkar dan Buang Batang Pohon LS 1,00 Paket
8 Pemasanganan Bowplank 1.1.4.2 26,00 M'
II PEKERJAAN TANAH
1 Galian Tanah Pondasi 1.2.1.1.4 254,85 M3
2 Timbunan Tanah Kembali Bekas Galian 1.3.1.1 303,36 M3
3 Timbunan Tanah 1.3.1.3 387,53 M3
4 Pemadatan Timbunan Tanah 1.3.2.1a 690,89 M3
5 Plastik/tenda (penanganan longsor sementara) LS 1,00 Paket
6 Pengeboran Lubang Bor Pile Ø60 Cm 2.2.2.3.17a 180,00 M'
III PEKERJAAN STRUKTUR
1 Pengecoran Bor Pile Ø60 Cm
a. Pembesian ulir untuk bore pile 2.2.1.1.4 3 .845,77 Kg
b. Pembesian Polos 2.2.1.1.3 1 .282,28 Kg
c. Beton Cor f'c=30 Mpa SCC (ready mix) 2.2.1.6.1d 5 0,86 M3
2 Pekerjaan Tembok Penahan Tanah
a. Beton lantai kerja f'c =7.5 Mpa 2.2.1.4.1 8,18 M3
b. Bekisting Tapak 2.2.1.3.1 41,88 M2
c. Bekisting Dinding 2.2.1.3.7 266,54 M2
d. Pembesian Ulir 2.2.1.1.4 19.373,89 Kg
e. Pembesian polos 2.2.1.1.3 14,66 Kg
f. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 164,84 M3
g. Pipa PVC 2" suling-suling LS 1,00 Paket
h. Pervorated pipe, Pipa PVC 6" Dihiting 15,00 M'
IV PEKERJAAN PENATAAN
1 Pasangan batu kali di tepi jalan
a. Galian 1.2.1.1.1 4,40 M3
b. Pasangan batu kali 2.2.2.1.6 11,40 M3
c. Plesteran 1 : 4 3.7.4 40,00 M2
2 Bahu Jalan
a. Galian 1.2.1.1.1 7,20 M3
b. Pekerjaan Plastik cor Upah & Bahan 48,00 M2
c. Cor bahu jalan f'c=20 Mpa (ready mix) 2.2.1.6.1a 9,60 M3
3 Balok B1
a. Bekisting 2.2.1.3.5 12,42 M2
b. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 1,32 M3
c. Pembesian ulir 2.2.1.1.4 140,48 Kg
d. Pembesian polos 2.2.1.1.3 73,33 Kg
4 Balok B2
a. Bekisting 2.2.1.3.5 12,47 M2
b. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 0,67 M3
c. Pembesian ulir 2.2.1.1.4 81,60 Kg
d. Pembesian polos 2.2.1.1.3 47,01 Kg
5 Plat Lantai
a. Bekisting 2.2.1.3.6 21,75 M2
b. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 3,38 M3
c. Pembesian polos 2.2.1.1.3 472,15 Kg
6 Beton Pengaman
a. Bekisting 2.2.1.3.6 18,04 M2
b. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 1,86 M3
c. Pembesian polos 2.2.1.1.3 401,42 Kg
7 Sayap beton bertulang
a. Bekisting 2.2.1.3.5 1,56 M2
b. Beton Cor f'c=30 Mpa (ready mix) 2.2.1.6.1c 0,11 M3
c. Pembesian Ulir 2.2.1.1.4 26,36 Kg
8 Kolom 15x15 cm
a. Bekisting 2.2.1.3.4 5,58 M2
b. Beton Cor f'c=20 Mpa (ready mix) 2.2.1.6.1a 0,20 M3
c. Pembesian Ulir 2.2.1.1.4 56,73 Kg
d. Pembesian polos 2.2.1.1.3 10,71 Kg
e. Pasangan batu alam 3.10.4.3a 5,46 M2
9 Pengecoran area timbunan
a. Bekisting 2.2.1.3.1 2,13 M2
b. Beton Cor f'c=15 Mpa (ready mix) 2.2.1.6.1b 3,78 M3
c. Pembesian polos 2.2.1.1.3 598,10 Kg
d. Pekerjaan Plastik cor Upah & Bahan 31,20 M2
10 Penutup lantai pasangan batu alam andesit 3.9.7.4a 65,89 M2
11 Pagar pengaman tipe 1 besi hollow galvanis Dihitung 18,65 M'
12 Pagar pengaman tipe 2 besi hollow galvanis Dihitung 1,60 M'
13 Pengecatan pagar pengaman 3.8.15 18,52 M2
V PEKERJAAN AKHIR
1 Pembersihan Akhir Lokasi Proyek LS 1 ,00 Paket