| Reason | |||
|---|---|---|---|
| 0021803119125000 | Rp 8,512,638,177 | - | |
| 0032282915124000 | - | - | |
| 0941306870121000 | Rp 7,918,403,924 | Peralatan truck mixer yang ditawarkan tidak sesuai karena melebihi kapasitas tonase kenderaan yang diminta, sehingga tidak memungkinkan masuk ke lokasi pekerjaan. | |
| 0314009697121000 | - | - | |
| 0023661408127000 | - | - | |
| 0924586092124000 | - | - | |
| 0715481685122000 | - | - | |
| 0945223022121000 | - | - | |
| 0858906928128000 | - | - | |
| 0705046027412000 | - | - | |
| 0705339406121000 | - | - | |
| 0724180179121000 | - | - | |
| 0763876570121000 | - | - | |
| 0940713555127000 | - | - | |
| 0858783277122000 | - | - | |
| 0853359149124000 | - | - | |
| 0413873050128000 | - | - | |
| 0032526220114000 | - | - | |
| 0920409869121000 | - | - | |
CV Mega Alam Perkasa | 06*4**0****17**0 | - | - |
| 0635354699121000 | - | - | |
CV Sanagari | 00*2**0****01**0 | - | - |
| 0812056133124000 | - | - | |
CV Finika | 00*3**1****22**0 | - | - |
| 0023742406128000 | - | - | |
| 0633492574128000 | - | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - | - |
PT Surya Distribusindo Lestari | 06*9**9****35**0 | - | - |
| 0020480521215000 | - | - | |
| 0029317120128000 | - | - | |
| 0917409021116000 | - | - | |
| 0032944365125000 | - | - | |
| 0027208180915000 | - | - | |
| 0011431103128000 | - | - | |
| 0808378756407000 | - | - | |
| 0920947827111000 | - | - | |
| 0311911754124000 | - | - | |
| 0317559029119000 | - | - | |
| 0210199626623000 | - | - |
REKAPITULASI RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN RUMAH SAKIT UMUM DAERAH KABANJAHE
LOKASI : JL. KIRAS BANGUN DESA RUMAH KABANJAHE KEC. KABANJAHE
KABUPATEN KARO
HARGA SATUAN JUMLAH
No. UNIT PEKERJAAN
(Rp) (Rp)
1 2 3 4
I. PENDAHULUAN Rp. - Rp. -
II. STRUKTUR LANTAI PERTAMA Rp. - Rp. -
III. ARSITEKTUR LANTAI PERTAMA Rp. - Rp. -
IV. MEKANIKAL, ELEKTRIKAL DAN PLUMBING (MEP) LANTAI PERTAMA Rp. - Rp. -
JUMLAH KONSTRUKSI Rp. -
PAJAK PERTAMBAHAN NILAI (PPn) 11% Rp. -
T O T A L Rp. -
Terbilang : ......................................................................................................................................................................................
.........................................., ......................2023
Disusun & Dibuat Oleh :
CV/PT…...........................
….............................
Direktur/Wakil Direktur
Rekapitulasi RAB Instalasi Bedah dan Instalasi Gawat Darurat
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH SAKIT UMUM DAERAH KABANJAHE
TAHUN ANGGARAN
LOKASI PEKERJAAN : JLN. KIRAS BANGUN KEC. KABANJAHE
Harga Satuan Jumlah Harga
No Uraian Analisa Volume Satuan
(Rp) (Rp)
1 2 3 4 5 6 7
PENDAHULUAN
1 Pengukuran dan Pemasangan Bowplank 6.1.1.1.4 218.00 M3 - -
2 PDA (Pile Driving Analyzer) Test Taksir 1.00 Nos - -
3 Air Kerja Taksir 1.00 Ls - -
4 Listrik Kerja Taksir 1.00 Ls - -
5 Papan nama proyek 6.1.1.1.3 1.00 Unit - -
6 Mobilisasi dan Demobilisasi Ditaksir 1.00 Unit - -
7 Direksi Keet 6.1.1.1.5 36.00 M2 - -
8 Barak Kerja 6.1.1.1.7 36.00 M2 - -
9 Gudang Alat 6.1.1.1.7 36.00 M2 - -
10 Test Beton Ditaksir 1.00 Set - -
11 Pagar seng 6.1.1.1.2 212.00 M3 - -
12 K3 Taksir 1.00 Ls - -
Jumlah -
II STRUKTUR
II.1 STRUKTUR LANTAI PERTAMA
A PEKERJAAN TIMBUNAN
1 Pemasangan Batu Bata Trasram tbl. 1/2 bata camp. 1:2 6.1.1.7.4 375.72 M2 - -
2 Timbunan Tanah, T. 60 cm 6.1.1.2.14a 852.77 M3 - -
3 Pemadatan tanah 6.1.1.2.10 852.77 M3 - -
Sub Total -
B PONDASI
B.1 Tiang Pancang (25x25) cm
1 Tiang Pancang (25x25) cm T 12 m 6.1.1.4.11 2,208.00 M1 - -
2 Pemotongan kepala tiang Taksir 92.00 Nos - -
Sub Total -
B.2 Pondasi P.1
1 Galian Tanah 6.1.1.2.1 149.31 M3 - -
2 Timbunan Kembali 6.1.1.2.9 84.53 M3 - -
3 Lantai Kerja (K 100) 6.1.1.4.2 14.22 M3 - -
4 Beton K 275 6.1.1.4.10 50.56 M3 - -
5 Bekisting Pondasi 6.1.1.4.14a 189.60 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 6,266.96 Kg - -
Sub Total -
B.3 Pondasi P.2
1 Galian Tanah 6.1.1.2.1 6.30 M3 - -
2 Timbunan Kembali 6.1.1.2.9 3.78 M3 - -
3 Lantai Kerja (K 100) 6.1.1.4.2 0.60 M3 - -
4 Beton K 275 6.1.1.4.10 1.92 M3 - -
5 Bekisting Pondasi 6.1.1.4.14a 14.40 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 271.81 Kg - -
Sub Total -
B.4 Pondasi PL
1 Galian Tanah 6.1.1.2.1 17.91 M3 - -
2 Timbunan Kembali 6.1.1.2.9 8.56 M3 - -
3 Lantai Kerja (K 100) 6.1.1.4.2 1.71 M3 - -
4 Beton K 275 6.1.1.4.10 7.65 M3 - -
5 Bekisting Pondasi 6.1.1.4.14a 6.75 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 531.55 Kg - -
Sub Total -
C KOLOM
C.1 Kolom K.1 (40x40) cm
1 Beton K 275 6.1.1.4.10 73.62 M3 - -
2 Bekisting Kolom 6.1.1.4.16a 736.16 M2 - -
3 Pembesian Ulir 6.1.1.4.12b 8,545.48 Kg - -
4 Pembesian Polos 6.1.1.4.12a 3,753.75 Kg - -
Sub Total -
C.2 Kolom KP (15x15) cm
1 Beton K 275 6.1.1.4.10 2.80 M3 - -
2 Bekisting Kolom 6.1.1.4.16a 37.35 M2 - -
3 Pembesian Polos 6.1.1.4.12a 472.42 Kg - -
Sub Total -
D SLOOF
D.1 Sloof S.1
1 Galian Tanah 6.1.1.2.1 19.50 M3 - -
2 Timbunan kembali 6.1.1.2.9 7.02 M3 - -
3 Pasir Urug 6.1.1.2.11 1.95 M3 - -
4 Beton K 275 6.1.1.4.10 10.53 M3 - -
5 Bekisting Sloof 6.1.1.4.15a 46.80 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 1,375.28 Kg - -
7 Pembesian Polos 6.1.1.4.12a 569.65 Kg - -
Sub Total -
D.2 Sloof S.2
1 Galian Tanah 6.1.1.2.1 141.26 M3 - -
2 Timbunan kembali 6.1.1.2.9 56.50 M3 - -
3 Pasir Urug 6.1.1.2.11 14.13 M3 - -
4 Beton K 275 6.1.1.4.10 70.63 M3 - -
5 Bekisting Sloof 6.1.1.4.15a 313.90 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 9,035.31 Kg - -
7 Pembesian Polos 6.1.1.4.12a 4,283.44 Kg - -
Sub Total -
E TANGGA
1 Galian Tanah 6.1.1.2.1 3.02 M3 - -
2 Timbunan kembali 6.1.1.2.9 1.43 M3 - -
3 Lantai Kerja Beton Tumbuk 1Pc : 3Ps : 5Kr 6.1.1.4.2 0.25 M3 - -
4 Beton K 275 6.1.1.4.10 4.98 M3 - -
5 Bekisting Tangga 6.1.1.4.20a 37.12 M2 - -
6 Pembesian Ulir 6.1.1.4.12b 1,619.40 Kg - -
Sub Total -
F STRUKTUR LIFT
1 Beton K 275 6.1.1.4.10 12.26 M3 - -
2 Bekisting Struktur Lift 6.1.1.4.19a 124.32 M2 - -
3 Pembesian Ulir 6.1.1.4.12b 1,460.81 Kg - -
Sub Total -
C PLAT LANTAI
C.1 Plat Lantai
1 Beton K 275 6.1.1.4.10 162.53 M3 - -
2 Bekisting Lantai 6.1.1.4.18a 1,381.08 M2 - -
3 Pembesian Polos 6.1.1.4.12a 21,869.94 Kg - -
Sub Total -
Jumlah Struktur -
III ARSITEKTUR
III.1 ARSITEKTUR LANTAI PERTAMA
A PEKERJAAN LANTAI
1 Pasir Urug 6.1.1.2.11 66.86 M3 - -
2 Beton Tumbuk 1Pc : 3Ps : 5Kr 6.1.1.4.2 66.86 M3 - -
3 Granit 60 x 60 cm u/ Lantai 6.1.1.9.7 1,237.13 M2 - -
4 Keramik KM 40 x 40 6.1.1.9.6 45.87 M2 - -
Sub Total -
B PEKERJAAN DINDING
1 Pasangan Bata, 1:4 6.1.1.7.6 1,269.37 M2 - -
2 Pasangan Bata, 1:2 6.1.1.7.4 288.54 M2 - -
3 Plesteran, 1:4 6.1.1.8.3 2,538.74 M2 - -
4 Plesteran, 1:2 6.1.1.8.1 200.47 M2 - -
5 Keramik Dinding 6.1.1.9.18 376.61 M2 - -
6 Acian Kolom 6.1.1.8.10 577.92 M2 - -
7 Pengecatan Eksterior - weather shield 6.1.1.14.11a 630.39 M2 - -
8 Pengecatan Interior 6.1.1.14.11 2,686.73 M2 - -
9 Relief Kolom Taksir 8.00 Bh - -
10 Railling Tangga Taksir 6.58 M1 - -
Sub Total -
C PEKERJAAN PINTU DAN JENDELA
1 PJ.1 6.1.1.13.13a 3.00 Unit - -
2 PJ.2 6.1.1.13.13b 2.00 Unit - -
3 P.1 6.1.1.13.13c 2.00 Unit - -
4 P.2 6.1.1.13.13d 10.00 Unit - -
5 P.3 6.1.1.13.13e 1.00 Unit - -
6 P.4 6.1.1.13.13f 12.00 Unit - -
7 P.6 6.1.1.13.13h 4.00 Unit - -
8 P.7 6.1.1.13.13h 15.00 Unit - -
9 J.1 6.1.1.13.13k 6.00 Unit - -
10 J.2 6.1.1.13.13l 8.00 Unit - -
11 J.3 6.1.1.13.13m 9.00 Unit - -
Sub Total -
D PEKERJAAN LANGIT-LANGIT
1 Rangka Plafond 6.1.1.10.8 1,478.64 M2 - -
2 Plafond PVC 9 mm 6.1.1.10.6 1,432.77 M2 - -
3 Plafond GRC 4 mm 6.1.1.10.6c 45.87 M2 - -
4 Water Proofing 6.1.1.11.12 188.20 M2 - -
Sub Total -
Jumlah -
IV MEP
IV.1 MEP LANTAI PERTAMA
IV.1.1 PEKERJAAN PLUMBING DAN SANITASI
1 Pemasangan instalasi air bersih
a. Pipa GIP Dia. 1.5" + Acc Dihitung 150.00 M' - -
b. Pipa GIP Dia. 3/4" + Acc Dihitung 50.00 M' - -
2 Pemasangan Instalasi Air Kotor
a. Pipa PVC Dia. 4"+ Acc Dihitung 40.00 M' - -
b. Pipa PVC Dia. 3"+ Acc Dihitung 40.00 M' - -
c. Pipa PVC Dia 1.5" + Acc Dihitung 25.00 M' - -
3 Closet duduk + acc Dihitung 13.00 Unit - -
4 Urinoir U 57 M Dihitung 3.00 Unit - -
5 Wastafel Dihitung 11.00 Unit - -
6 Floor Drain stainless Dihitung 11.00 Unit - -
7 Paper Holder Dihitung 13.00 Unit - -
8 Shower Kran Dihitung 11.00 Unit - -
9 Kran Dinding Dihitung 15.00 Unit - -
10 Bak kontrol Air Kotor Dihitung 6.00 Bh - -
11 Bak kontrol Air Hujan Dihitung 28.00 Bh - -
12 Septic Tank dan Resapan Dihitung 1.00 Unit - -
13 Tangki Fibre Glass 2000 Liter Dihitung 1.00 Unit - -
14 Menara Air T. 7.20 MM Dihitung 1.00 Unit - -
15 Pompa Isap Tekan Dihitung 1.00 1.00 - -
16 Sumur Dalam Dihitung 1.00 Unit - -
17 Jaringan Ke Bangunan Dihitung 1.00 Ls - -
Sub Total -
IV.1.2 PEKERJAAN LISTRIK DAN PENERANGAN
1 Titik nyala lampu dengan kabel NYM 3 x 2,5 Dihitung 301.00 titik
mm² di dalam conduit PVC HI 20 mm - -
2 Titik nyala Stop kontak NYM 3 x 2,5 mm² Dihitung 32.00 titik
didalam conduit PVC HI 20 mm - -
3 Titik nyala AC dengan kabel NYM 3 x 2,5 mm² Dihitung 20.00 titik
di dalam conduit PVC HI 20 mm - -
4 Titik nyala Fan dengan kabel NYM 3 x 2,5 mm² Dihitung 13.00 titik
di dalam conduit PVC HI 20 mm - -
5 Pipa PVC dia. 3/4" Dihitung 250.00 M' - -
6 Stop Kontak kap. 400 watt Dihitung 22.00 Unit - -
7 Saklar tunggal + Metal Box Dihitung 5.00 Unit - -
8 Saklar ganda + Metal Box Dihitung 19.00 Unit - -
9 Saklar tripleb + Metal Box Dihitung 1.00 Unit - -
10 Lampu TL LED 2 x 16 Watt Type BLK Dihitung 18.00 Unit - -
11 Lampu TL LED 1 x 36 Watt Type BALK Dihitung 17.00 Unit - -
12 Lampu TL LED 2 x 36 Watt Type RM Dihitung 119.00 Unit - -
13 Lampu TL LED 3 x 16 Watt Type RM Dihitung 34.00 Unit - -
14 Lampu Down Light Inbow LED 18 + Acc Dihitung 63.00 Unit - -
15 Lampu Baret LED 18 Watt Dihitung 50.00 Unit - -
15 Lampu EXIT LED 18 Watt Dihitung 2.00 Unit - -
16 Pasang Kabel Instalasi NYY 4 x 10 mm Dihitung 250.00 M' - -
17 Pasang Kabel Instalasi NYY 3 x 5 mm Dihitung 200.00 M' - -
18 Panel Box Dihitung 1.00 Unit - -
19 Testing Dihitung 1.00 ls - -
20 Pasang Kabel NYFGbY 4 x 50 mm2 Dihitung 100.00 M' - -
21 Pemasangan Tiang Lampu Jalan Dihitung 1.00 Unit - -
22 Memasukkan daya Dihitung 1.00 Ls - -
Sub Total -
IV.1.2 PEKERJAAN AIR CONDITIONING
1 AC Split 2 PK + Acc Dihitung 20.00 Unit - -
2 NYY 4 x 95 mm2 ke P AC-3 Dihitung 150.00 M' - -
Sub Total -
Jumlah MEP Lantai I -