| 0530543263003000 | Rp 588,359,330 | |
| 0030198873303000 | Rp 588,424,673 | |
| 0725453724303000 | Rp 603,149,132 | |
| 0019895200301000 | - | |
CV Adhi Pramana Konstruksi | 06*3**5****25**0 | - |
| 0436001556416000 | - | |
| 0435610639307000 | Rp 664,476,146 | |
| 0032164188301000 | - | |
| 0027603018307000 | - | |
| 0423432251529000 | - | |
CV Efod Design Consultant | 07*5**9****17**0 | - |
| 0316817790322000 | - | |
| 0759750235306000 | - | |
CV Konsepmu Jaya Interior | 06*3**6****18**0 | - |
CV Alifah Rizkia Jaya | 0852553049307000 | - |
| 0810606681307000 | - | |
| 0947879136216000 | - | |
Tri Pola Internusa | 06*5**8****07**0 | - |
| 0030704886307000 | - | |
| 0015806565201000 | - | |
| 0032697740307000 | - | |
| 0032132789307000 | - | |
| 0750173155311000 | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - |
| 0439178112322000 | - | |
Tiga Putra Muara Ogan | 05*9**9****12**0 | - |
Karya Anindya Sejahtera | 07*7**5****07**0 | - |
| 0922839030325000 | - | |
| 0027647288701000 | - | |
| 0019479583301000 | - | |
| 0923439376306000 | - | |
| 0316534981215000 | - | |
| 0822711123301000 | - | |
Chanel | 00*8**4****21**0 | - |
PT Laksana Satya Wijaya | 04*2**9****04**0 | - |
REKAPITULASI BILL OF QUANTITY
PEKERJAAN : RENOVASI GEDUNG LAMA TEKNIK ARSITEKTUR
LOKASI : PALEMBANG
TAHUN ANGGARAN : 2023
JUMLAH HARGA
NO URAIAN PEKERJAAN
(Rp.)
A PEKERJAAN PERSIAPAN
JUMLAH
B PEKERJAAN BONGKARAN
I PEK. BONGKARAN PAGAR EKSISTING
II PEK. BONGKARAN KUSEN PINTU & JENDELA EKSISTING
III PEK. BONGKARAN DINDING PARTISI EKSISTING
IV PEK. BONGKARAN PLAFOND DAN ATAP EKSISTING
V PEK. BONGKARAN STRUKTUR & DINDING EKSISTING
VI PEK. BONGKARAN ELEKTRIKAL EKSISTING
VII PEK. BONGKARAN PLUMBING EKSISTING
JUMLAH
C PEKERJAAN PENAMBAHAN
I PEKERJAAN GALIAN & URUGAN
II PEKERJAAN BATU & PLESTERAN
III PEKERJAAN BETON BERTULANG
IV PEKERJAAN PARTISI & PINTU
V PEKERJAAN SANITASI & PLUMBING
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
VII PEKERJAAN CAT
VIII PEKERJAAN ELEKTRIKAL
IX PEKERJAAN PLAFOND
X PEKERJAAN ATAP DAN BAJA
JUMLAH
Jumlah Keseluruhan
PPN 11%
Total Setelah Pajak
Dibulatkan
Terbilang :
Palembang, Juli 2023
PEJABAT PEMBUAT KOMITMEN (PPK)
UNIVERSITAS SRIWIJAYA
BILL OF QUANTITY
PEKERJAAN : RENOVASI GEDUNG LAMA TEKNIK ARSITEKTUR
LOKASI : PALEMBANG
TAHUN : 2023
NO JENIS PEKERJAAN VOLUME SATUAN HARGA SATUAN JUMLAH
A PEKERJAAN PERSIAPAN
1 Alat Bantu Project 1 .00 Ls
2 Pek. Photo Dokumentasi, dll 1 .00 Ls
3 Pek. Pembersihan Lahan 1 .00 Ls
4 Pek. Direksikeet 1 .00 Ls
JUMLAH
B PEKERJAAN BONGKARAN
I PEK. BONGKARAN PAGAR EKSISTING
1 Pek. Bongkaran Pagar BRC Eksisting 8 5.37 M²
JUMLAH
II PEK. BONGKARAN KUSEN PINTU & JENDELA EKSISTING
1 Pek. Bongkaran Jendela & Ventilasi Kayu uk. 480x180 cm 4 .00 Unit
2 Pek. Bongkaran Pintu Kayu Panel Kaca uk. 210x170 cm 1 .00 Unit
3 Pek. Bongkaran Ventilasi Kayu uk. 386x60 cm 2 .00 Unit
4 Pek. Bongkaran Ventilasi Kayu uk. 480x60 cm 3 .00 Unit
5 Pek. Bongkaran Pintu & Ventilasi Kayu uk. 262x96 cm 4 .00 Unit
6 Pek. Bongkaran Pintu Aluminium + Kaca uk. 200x80 cm 1 .00 Unit
7 Pek. Bongkaran Pintu Aluminium + Kaca uk. 193x94 cm 1 .00 Unit
8 Pek. Bongkaran Jendela Aluminium + Kaca uk. 100x145 cm 1 .00 Unit
9 Pek. Bongkaran Jendela Aluminium + Kaca uk. 100x300 cm 1 .00 Unit
10 Pek. Bongkaran Bouven uk. 80x40 cm 1 .00 Unit
JUMLAH
III PEK. BONGKARAN DINDING PARTISI EKSISTING
1 Pek. Bongkaran Partisi Kaca + Pintu t: 290 cm 4 6.32 M²
2 Pek. Bongkaran Partisi Kaca + Pintu t: 210 cm 1 8.03 M²
3 Pek. Bongkaran Partisi Pintu Lipat 1 0.19 M²
JUMLAH
IV PEK. BONGKARAN PLAFOND DAN ATAP EKSISTING
1 Pek. Bongkaran Plafond 2 45.00 M²
2 Pek. Bongkaran Plafond Kanopi 1 1.80 M²
3 Pek. Bongkaran Atap 2 46.78 M²
JUMLAH
V PEK. BONGKARAN STRUKTUR & DINDING EKSISTING
1 Pek. Bongkaran Dinding Bata Atas Pintu Jendela t: 40 cm 0 .38 M³
2 Pek. Bongkaran Dinding Partisi Atas Pintu Lipat 1 .94 M³
3 Pek. Bongkaran Dinding Bata uk. 21x42 cm 0 .01 M³
4 Pek. Bongkaran Balok Late Pintu uk. 15x20 cm 0 .10 M³
5 Pek. Bongkaran Balok Late Jendela uk. 15x20 cm 0 .71 M³
6 Pek. Bongkaran Balok Kanopi 0 .81 M³
7 Pek. Bongkaran Ring Balok 0 .58 M³
8 Pek. Bongkaran Dak Beton Atap Kanopi 1 .91 M³
JUMLAH
VI PEK. BONGKARAN ELEKTRIKAL EKSISTING
1 Pek. Bongkaran Titik Lampu Downlight 2 5.00 Titik
2 Pek. Bongkaran Titik Lampu TL 1 .00 Titik
3 Pek. Bongkaran Titik Saklar Ganda 4 .00 Titik
4 Pek. Bongkaran Titik Saklar Tunggal 2 .00 Titik
5 Pek. Bongkaran Titik Stop Kontak Bawah +0,25 1 4.00 Titik
6 Pek. Bongkaran Titik Stop Kontak Atas 8 .00 Titik
7 Pek. Bongkaran Titik Stop Kontak Triple 3 .00 Titik
8 Pek. Bongkaran Titik Stop Kontak AC 8 .00 Titik
9 Pek. Bongkaran Titik Ceiling Fan 1 .00 Titik
10 Pek. Bongkaran Titik Server 1 .00 Titik
11 Pek. Bongkaran Titik Phone Box 1 .00 Titik
12 Pek. Bongkaran Titik Router Wifi 1 .00 Titik
13 Pek. Bongkaran Titik Panel Box 1 .00 Titik
14 Pek. Bongkaran Titik Unit AC Indoor 8 .00 Titik
JUMLAH
VII PEK. BONGKARAN PLUMBING EKSISTING
1 Pek. Bongkaran Kloset 1 .00 Unit
2 Pek. Bongkaran Kran Air 4 .00 Unit
3 Pek. Bongkaran Shower 1 .00 Unit
4 Pek. Bongkaran Sink Dapur 1 .00 Unit
JUMLAH
C PEKERJAAN PENAMBAHAN
I PEKERJAAN GALIAN & URUGAN
1 Pek. Galian Tanah Pondasi Setempat 2 .40 M³
2 Pek. Urugan Tanah Kembali 1 .53 M³
3 Pek. Pasir Urug T = 10 cm (Pondasi) 0 .51 M³
4 Pek. Lantai Kerja T = 5 cm (Pondasi) 0 .25 M³
JUMLAH
II PEKERJAAN BATU & PLESTERAN
1 Pek. Pas. Dinding Batu Bata ad. 1:4 (Bag. Bawah Pintu & Jendela) 1 4.06 M²
2 Pek. Pas. Dinding Batu Bata ad. 1:4 (Bag. Atas Ring Balok) 6 7.53 M²
3 Pek. Pas. Dinding Batu Bata ad. 1:4 (Bag. Atas Kanopi) 5 .17 M²
4 Pek. Pas. Dinding Batu Bata ad. 1:4 (Bag. WC Kaprodi) 1 3.60 M²
5 Pek. Plesteran ad. 1:4, Tbl. 20 mm (Luar Dalam) + Acian 1 00.36 M²
JUMLAH
III PEKERJAAN BETON BERTULANG
1 Pek. Pembuatan Pondasi Setempat
- Beton K.250 0.87 M³
- Besi Ø 12 104.13 Kg
- Besi Ø 8 7.02 Kg
- Bekisting 4.80 M²
JUMLAH
2 Pek. Pembuatan Sloof uk. 20x40 cm
- Beton K.225 1.12 M³
- Besi Ø 12 74.49 Kg
- Besi Ø 8 43.52 Kg
- Bekisting 11.16 M²
JUMLAH
3 Pek. Pembuatan Sloof uk. 15x20 cm
- Beton K.225 0.11 M³
- Besi Ø 12 13.53 Kg
- Besi Ø 8 7.10 Kg
- Bekisting 1.52 M²
JUMLAH
4 Pek. Pembuatan Kolom Baru uk. 20x40 cm
- Beton K.225 0.96 M³
- Besi Ø 12 85.44 Kg
- Besi Ø 8 37.91 Kg
- Bekisting 14.40 M²
JUMLAH
5 Pek. Pembuatan Kolom Lama +100 cm uk. 20x40 cm
- Beton K.225 0.88 M³
- Besi Ø 12 78.32 Kg
- Besi Ø 8 36.04 Kg
- Bekisting 13.20 M²
JUMLAH
6 Pek. Penambahan Kolom Praktis Baru uk. 12x12 cm K3
- Beton K.225 0.17 M³
- Besi Ø 12 42.72 Kg
- Besi Ø 8 15.16 Kg
- Bekisting 2.88 M²
JUMLAH
7 Pek. Pembuatan Kolom Praktis Lama +100 cm uk. 15x15 cm KP1
- Beton K.225 0.07 M³
- Besi Ø 12 10.68 Kg
- Besi Ø 8 4.91 Kg
- Bekisting 1.80 M²
JUMLAH
8 Pek. Pembuatan Kolom Praktis Lama +200 cm uk. 15x15 cm KP2
- Beton K.225 0.27 M³
- Besi Ø 10 29.76 Kg
- Besi Ø 8 19.66 Kg
- Bekisting 7.20 M²
JUMLAH
9 Pek. Pas. Profilan Kolom 5.00 M²
10 Pek. Pembuatan Ring Balok Kanopi uk. 15x30 cm RBK1
- Beton K.225 0.33 M³
- Besi Ø 12 32.71 Kg
- Besi Ø 8 17.20 Kg
- Bekisting 5.51 M²
JUMLAH
11 Pek. Pembuatan Ring Balok Kanopi uk. 15x45 cm RBK2
- Beton K.225 0.60 M³
- Besi Ø 12 47.13 Kg
- Besi Ø 8 27.61 Kg
- Bekisting 9.27 M²
JUMLAH
12 Pek. Pembuatan Ring Balok uk. 15x30 cm RB1
- Beton K.225 3.48 M³
- Besi Ø 12 344.21 Kg
- Besi Ø 8 181.12 Kg
- Bekisting 58.01 M²
JUMLAH
13 Pek. Pembuatan Ring Balok uk. 15x20 cm RB2
- Beton K.225 0.66 M³
- Besi Ø 12 78.85 Kg
- Besi Ø 8 40.40 Kg
- Bekisting 12.18 M²
JUMLAH
JUMLAH
IV PEKERJAAN PARTISI & PINTU
1 Pek. Pas. Partisi Kaca uk. 378,8x290 cm P1 10.99 M²
2 Pek. Pas. Partisi Kaca uk. 488,7x290 cm P2 14.17 M²
3 Pek. Pas. Partisi Kaca uk. 288,7x290 cm P3 8.37 M²
4 Pek. Pas. Partisi Kaca uk. 461,2x290 cm P4 13.37 M²
5 Pek. Pas. Partisi Kaca uk. 288,7x290 cm P5 8.37 M²
6 Pek. Pas. Pintu Lipat uk. 581,2x210 cm P6 16.85 M²
7 Pek. Pasangan Kembali Pintu P1 (Ganti Daun Pintu) 1.00 Unit
8 Pek. Pasangan Kembali Pintu P2 1.00 Unit
9 Pek. Pas. Pintu WC Baru 1.00 Unit
10 Pek. Pas. Jendela J1 uk. 480x125 cm (Ganti Daun Jendela) 18.00 M²
11 Pek. Pas. Jendela J2 uk. 480x60 cm (Ganti Daun Jendela) 21.00 M²
12 Pek. Pas. Jendela J3 uk. 386x60 cm (Ganti Daun Jendela) 3.00 M²
13 Pek. Pas. Jendela J4 uk. 291x125 cm (Ganti Daun Jendela) 4.00 M²
14 Pek. Pas. Jendela J5 uk. 291x60 cm (Ganti Daun Jendela) 2.00 M²
15 Pek. Pasangan Kembali Bouven BV1 uk. 80x40 cm 1.00 Unit
16 Pek. Pas. Bouven BV2 uk. 80x40 cm 1.00 Unit
JUMLAH
V PEKERJAAN SANITASI & PLUMBING
1 Pek. Pas Closet Duduk 2.00 Unit
2 Pek. Pas Floordrain 2.00 Unit
3 Pek. Pas Keran Air 2.00 Unit
4 Pek. Pas. Shower Set 2.00 Unit
5 Pek. Instalasi Air Bersih 1.00 Ls
6 Pek. Instalasi Air Bekas 1.00 Ls
7 Pek. Instalasi Air Kotor 1.00 Ls
8 Pek. Pas. Septictank uk. 100x200 cm 1.00 Ls
JUMLAH
VI PEKERJAAN PENUTUP LANTAI DAN DINDING
1 Pek. Pas. Granite Homogeneus Tile 60x60 Antique White UnPolished 16.56 M²
2 Pek. Pas. Dinding Lapis Keramik e.g. Roman dCanyon Charcoal uk. 30x 6 0 72.94 M²
JUMLAH
VII PEKERJAAN CAT
1 Pek. Cat Dinding Tembok 513.25 M²
JUMLAH
VIII PEKERJAAN ELEKTRIKAL
1 Panel Listrik
Box MCB 1.00 Bh
2 Pek. Pas. Titik Stop Kontak + Instalasi 22.00 Bh
3 Pek. Pas. Titik Stop Kontak Triple + Instalasi 3.00 Bh
4 Pek. Pas. Titik Saklar Tunggal + Instalasi 4.00 Bh
5 Pek. Pas. Titik Saklar Ganda + Instalasi 5.00 Bh
6 Pek. Pas Stop Kontak Kontak AC + Instalasi 8.00 Bh
7 Pek. Pas Titik Lampu Downlight 12 Watt 26.00 Bh
8 Pek. Pas. Lampu TL 1x120 cm 3.00 Bh
9 Pek. Pas. Ceiling Fan 2.00 Unit
10 Pek. Pasangan Kembali Unit AC 8.00 Unit
JUMLAH
IX PEKERJAAN PLAFOND
1 Pek. Pas. Plafond PVC Putih 180.30 M²
2 Pek. Pas. Plafond PVC Motif Kayu 64.70 M²
3 Pek. Perubahan Plafond PVC area Kanopi 13.24 M²
4 Pek. List Profil PVC 258.60 M'
JUMLAH
X PEKERJAAN ATAP DAN BAJA
1 Pek. Rangka Atap Baja Berat 341.55 M²
2 Pek. Penutup Atap Keramik e.g. M. Class 341.55 M²
3 Pek. Nok Atap Keramik e.g. M Class 35.07 M'
4 Pek. Penutup Atap Spandek Zincalume area Kanopi 9.18 M²
5 Pek. Rangka Atap Baja Ringan area Kanopi 9.18 M²
JUMLAH