| Reason | |||
|---|---|---|---|
| 0436001556416000 | Rp 609,760,000 | Tidak hadir pembuktian kualifikasi | |
| 0923439376306000 | Rp 609,760,000 | - | |
Chanel | 00*8**4****21**0 | - | - |
| 0403182090211000 | - | - | |
| 0316817790322000 | - | - | |
CV Alittifaqiah Press | 09*7**3****12**0 | - | - |
| 0763838919201000 | - | - | |
| 0836977868225000 | - | - | |
| 0012169256422000 | - | - | |
| 0965863269223000 | - | - | |
| 0032164188301000 | - | - | |
| 0423161850323000 | - | - | |
Tri Pola Internusa | 06*5**8****07**0 | - | - |
| 0955369376307000 | - | - | |
CV Putra Abung Sentosa | 0032663288323000 | - | - |
| 0435610639307000 | - | - | |
CV Solusi Inti Pembangunan | 08*2**3****06**0 | - | - |
Berdikari Abadi | 00*0**6****14**0 | - | - |
Tiga Putra Muara Ogan | 05*9**9****12**0 | - | - |
| 0759750235306000 | - | - | |
| 0022031843307000 | - | - | |
| 0030055289307000 | - | - | |
| 0933456097503000 | - | - | |
| 0019479583301000 | - | - | |
| 0633094271224000 | - | - | |
| 0906006002313000 | - | - | |
| 0419403076322000 | - | - | |
CV El Centro | 0312248230542000 | - | - |
| 0903624096023000 | - | - | |
| 0024444648331000 | - | - | |
| 0316534981215000 | - | - |
REKAPITULASI
BILL OF QUANTITY
PEKERJAAN : Renovasi Gedung Lama Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya
LOKASI : Fakultas Teknik Universitas Sriwijaya
TAHUN ANGGARAN : 2023
No Uraian Pekerjaan Jumlah Harga (Rp)
A PEKERJAAN BANGUNAN
I PEKERJAAN BONGKARAN
II PEKERJAAN PONDASI
III PEKERJAAN STRUKTUR
IV PEKERJAAN DINDING DAN LANTAI
V PEKERJAAN KUSEN & DAUN PINTU
VI PEKERJAAN PLAFOND
VII PEKERJAAN ATAP
VIII PEKERJAAN SANITARY/PLUMBING
IX PEKERJAAN LISTRIK
X PEKERJAAN AKHIR
XI PEKERJAAN LANDSCAPE
Jumlah Keseluruhan Rp -
PPN 11% Rp -
Total Setelah Pajak Rp -
Dibulatkan Rp -
Terbilang :
BILL OF QUANTITY
PEKERJAAN Renovasi Gedung Lama Teknik Pertambangan Fakultas Teknik Universitas Sriwijaya
LOKASI Fakultas Teknik Universitas Sriwijaya
TAHUN ANGGARAN 2023
Vol Sat Harga Satuan Jumlah Harga
No Uraian Pekerjaan
Pek Pek ( Rp. ) ( Rp. )
1 2 4 5 6 7
A PEKERJAAN PERSIAPAN
I PEKERJAAN BONGKARAN
1 Pek Bongkaran Plafond 340.00 m2 - -
3 Pek. Bongkaran Pintu 18.00 unit - -
4 Pek. Bongkaran Closed Jongkok 3.00 unit - -
5 Pek. Bongkaran Dinding 6.80 m3 - -
6 Pek. Bongkaran Dak Selasar 2.66 m3 - -
7 Pek. Timbunan 37.40 m3 - -
Jumlah -
II PEKERJAAN PONDASI
1 Pek. Galian Tanah Pondasi 4.40 m3 - -
2 Pek. Urugan Tanah Kembali 1.47 m3 - -
3 Pek. Urugan Pasir Bawah Pondasi 0.24 m3 - -
4 Pek. Lantai Kerja B 0.24 m3 - -
5 Pek. Pondasi Plat Setempat ad. 1:2:3 -
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 1.83 m3 - -
Pembesian Pondasi 671.98 kg - -
Bekisting Pondasi 3.60 m2 - -
Jumlah -
III PEKERJAAN STRUKTUR
1 Pek. Sloof 25/40 K. 225 (S1)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 1.85 m3 - -
Pembesian Sloof 207.63 kg - -
Bekisting Sloof 8.40 m2 - -
2 Pek. Sloof 20/30 K. 225 (S2)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 2.46 m3 - -
Pembesian Sloof 365.84 kg - -
Bekisting Sloof 12.30 m2 - -
3 Pek. Kolom 30/30 K. 225 (K1)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 1.19 m3 - -
Pembesian Kolom 131.88 kg - -
Bekisting Kolom 3.96 m2 - -
4 Pek. Kolom 20/40 K. 225 (K2)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 1.06 m3 - -
Pembesian Kolom 108.46 kg - -
Bekisting Kolom 3.96 m2 - -
5 Pek. Kolom Praktis K. 225 (K3) 52.80 m - -
6 Pek. Support Kolom 20/15 K. 225 (K4)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 1.08 m3 - -
Pembesian Kolom 171.95 kg - -
Bekisting Kolom 6.30 m2 - -
7 Pek. Support Kolom 25/15 K. 225 (KP1)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 0.34 m3 - -
Pembesian Kolom 44.77 kg - -
Bekisting Kolom 1.80 m2 - -
8 Pek. Support Kolom 20/20 K. 225 (KP2)
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 0.16 m3 - -
Pembesian Kolom 19.90 kg - -
Bekisting Kolom 0.80 m2 - -
9 Pek. Kolom Praktis K. 225 (KP3) 18.00 m - -
11 Pek. Ring Balok 15/20 K. 225 (RB)
Vol Sat Harga Satuan Jumlah Harga
No Uraian Pekerjaan
Pek Pek ( Rp. ) ( Rp. )
1 2 4 5 6 7
beton mutu F'c=19,3 Mpa (K225), slump (12±2) cm, w/c=0,58 0.72 m3 - -
Pembesian Sloof 158.15 kg - -
Bekisting Balok 3.30 m2 - -
Jumlah -
IV PEKERJAAN DINDING DAN LANTAI
1 Pas. Pas. Batu Bata ad. 1:4 133.88 m2 - -
2 Pas. Dinding Batu Alam 49.74 m2 - -
2 Pek. Plesteran ad. 1:4 267.76 m2 - -
5 Pek. Pengectan Eksterior 254.20 m2 - -
6 Pek. Pengectan Interior 524.20 m2 - -
7 Pek. Pemasangan Lantai Granite Homogenous Tile 60x60 303.38 m2 - -
8 Pek. Pemasangan Dinding Homogenous Tile 60x60 51.98 m2 - -
Jumlah -
V PEKERJAAN KUSEN & DAUN PINTU
1 Pek. Pemasangan Pintu P1 2.00 unit - -
2 Pek. Pemasangan Pintu P2 13.00 unit - -
3 Pek. Pemasangan Pintu P3 3.00 unit - -
3 Pek. Pemasangan Pintu Lipat PL 1.00 unit - -
5 Pek. Pemasangan Jendela Alumunium (J1) 5.00 unit - -
Jumlah -
VI PEKERJAAN PLAFOND
1 Pek. Pemasagan Plafond PVC 447.63 m2 - -
2 Pek. Pemasangan List PVC 751.60 m1 - -
Jumlah -
VII PEKERJAAN ATAP
1 Pek. Bongkaran Atap 415.12 m2 - -
2 Pek. Pas. Rangka Atap Baja Ringan 60.00 m2 - -
3 Pek. Pas. Rangka Atap Baja Ringan ( Perkuatan Rangka Lama ) 142.53 m2 - -
4 Pek. Pas. Atap Metal Berpasir 475.12 m2 - -
5 Pek. Pas. Nok Genteng Metal Berpasir 58.02 m' - -
6 Pek. Pas. Klasiplank 85.00 m2 - -
Jumlah -
VIII PEKERJAAN SANITARY/PLUMBING
1 Pek. Pemasangan Instalasi Air Kotor 1.00 ls - -
2 Pek. Pemasangan Instalasi Air Bekas 1.00 ls - -
3 Pek. Pemasangan Instalasi Air Bersih 1.00 ls - -
4 Pek. Pemasangan Closed Duduk Ex. Tidy 3.00 unit - -
5 Pek. Pemasangan Jet Shower + T Stainless 3.00 unit - -
6 Pek. Pemasangan Showe + Kran Air Ex. Paloma 4.00 unit - -
7 Pek. Pemasangan Floor Drain Stainless Stell 4.00 unit - -
8 Pek. Pemasangan Cermin 4.00 unit - -
9 Pek. Pemasangan Pipa Bungan Air Hujan 21.00 m - -
Jumlah -
IX PEKERJAAN LISTRIK
1 Pek. Instlalasi Titik Lampu 50.00 titik - -
2 Pek. Instlalasi Stop Kontak 50.00 titik - -
3 Pek. Pemasangan Downlight 4" + Led 8 watt 22.00 bh - -
4 Pek. Pemasangan Lampu TL 1 x 120 cm 28.00 bh - -
5 Pek. Pemasangan Stop Kontak 33.00 bh - -
6 Pek. Pemasangan Saklar Seri 8.00 bh - -
7 Pek. Pemasangan Saklar Tunggal 9.00 bh - -
8 Pek. Bongkar dan Instalasi Ac 14.00 Unit - -
Jumlah -
X PEKERJAAN AKHIR
1 Administrasi dan Dokumentasi 1.00 ls - -
2 Pembersihan Akhir 1.00 ls - -
Vol Sat Harga Satuan Jumlah Harga
No Uraian Pekerjaan
Pek Pek ( Rp. ) ( Rp. )
1 2 4 5 6 7
Jumlah -
XI PEKERJAAN LANDSCAPEING
1 Pek. Pas. Kanstin 34.40 m1 - -
2 Pek. Pengecatan Kanstin 17.20 m2 - -
3 Pek. Urugan Pasir 1.13 m2 - -
4 Pek. Konblock 11.25 m2 - -
5 Pek. Bangku Beton 2.00 Unit - -
6 Pek. Signage 1.00 Unit - -
7 Pek. Penanaman Pohon Ketapang 5.00 Btng - -
8 Pek. Penanaman Calathea Lutea 26.00 Btng - -
9 Pek. Penanaman Rumput Gajah Mini 25.50 m2' - -
Jumlah -
-