Peningkatan Jalan Lingkungan Fakultas Mipa

Basic Information
Type: Public Tender
Tender Code: 16001025
Date: 7 September 2023
Year: 2023
KLPD: Kementerian Pendidikan dan Kebudayaan
Work Unit: Universitas Palangkaraya
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 874,680,000
Estimated Value (Nilai HPS): Rp 874,680,000
Winner (Pemenang): CV Andhika Kencana
NPWP: 722633146711000
RUP Code: 43926345
Work Location: Kampus Tunjung Nyaho Jalan Yos Sudarso - Palangka Raya (Kota)
Participants: 27
Applicants
0722633146711000Rp 861,081,400
0316634195941000-
0969711894803000-
CV Heora Istiqomah
04*1**7****07**0-
0812489953712000-
0833775893732000-
0029780269711000-
CV Dewata Putra Consultant
07*3**7****11**0-
0316195429505000-
PT Epithu Logica Sembada
09*5**4****15**0-
0806806873831000-
0738985308127000-
0023948540822000-
Chanel
00*8**4****21**0-
0965142482711000-
0904280922322000-
0026761536711000-
CV Chezii Jaya Mandiri
06*5**9****11**0-
0013270327002000-
0028096626711000-
0022607345703000-
0662700343705000-
CV Efod Design Consultant
07*5**9****17**0-
0811948520102000-
0749697389711000-
0031802325814000-
0625196514711000-
Attachment
REKAPITULASI                                    
                             HARGA PEKERJAAN                                 
                                                                             
 PROGRAM    : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
 KEGIATAN   : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN                         
 PEKERJAAN  : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA         
 LOKASI     : UNIVERSITAS PALANGKA RAYA                                      
 TAHUN ANGGARAN : 2023                                                       
                                                                             
                                                           Jumlah Harga      
  No. Divisi                  Uraian                        Pekerjaan        
                                                            (Rupiah)         
                                                                             
     1      Umum                                                  0.00       
     2      Drainase                                              0.00       
     3      Pekerjaan Tanah Dan Geosintetik                       0.00       
     5      Pekerasan Berbutir Dan Perkerasan Beton Semen         0.00       
     6      Perkerasan Aspal                                      0.00       
     7      Struktur                                              0.00       
  (A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 0.00     
  (B) Pajak Pertambahan Nilai ( PPN ) = 11% x (A)                 0.00       
  (C) JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)                    0.00       
  (D) DIBULATKAN                                                  0.00       
  Terbilang :                                                                
                         DAFTAR KUANTITAS DAN HARGA                          
                         SPESIFIKASI UMUM 2018 (REVISI 2)                    
PROGRAM  : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
KEGIATAN : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN                            
PEKERJAAN : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA           
LOKASI   : UNIVERSITAS PALANGKA RAYA                                         
TAHUN ANGGARAN : 2023                                                        
                                                                             
                                                                             
                                             Total   Harga     Total         
                     Uraian           Satuan                                 
   No. Mata                                 Perkiraan Satuan   Jumlah        
                                                    (Rupiah)                 
  Pembayaran                                Kuantitas          Harga         
                                                               (Rupiah)      
    a                 b                c      d       e        f = (d x e)   
         DIVISI 1. UMUM                                                      
    1.2  Mobilisasi                    Ls      1 .00      -          -       
                                                                             
   1.8.(1) Manajemen dan Keselamatan Lalu Lintas Ls 1 .00 -          -       
   1.8.(2) Biaya K3                    Ls      1 .00      -          -       
   1.8.(3) Pembuatan Laporan DMF Tanah Timbunan Ls 1 .00  -          -       
   1.8.(4) Pembuatan Laporan DMF Beton Fc' 20 Mpa Ls 1 .00 -         -       
   1.8.(5) Pembuatan Laporan JMF Tanah Timbunan Ls 1 .00  -          -       
   1.8.(6) Pembuatan Laporan JMF Beton Fc' 20 Mpa Ls 1 .00 -         -       
                                                                             
                                                                             
         Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
                                                                             
         DIVISI 2. DRAINASE                                                  
   2.1.(1) Galian untuk Selokan Drainase dan Saluran Air M3 1 20.00 - -      
                                                                             
                                                                             
         Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
                                                                             
         DIVISI 3. PEKERJAAN TANAH DAN GEOSINTETIK                           
   3.1.(1) Galian Biasa                M3      3 9.60     -          -       
                                                                             
   3.2.(1a) Timbunan Biasa dari sumber galian M3 1 98.63  -          -       
                                                                             
                                                                             
         Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
                                                                             
         DIVISI 5. PERKERASAN BERBUTIR                                       
   K- 618-A Levelling Batu Pecah       M2     1 ,564.03   -          -       
   K- 516 Konstruksi Lapis Pondasi Bawah (LPB)/Telford M3 1 56.40 -  -       
                                                                             
                                                                             
         Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                             Total   Harga     Total         
                     Uraian           Satuan                                 
   No. Mata                                 Perkiraan Satuan   Jumlah        
                                                    (Rupiah)                 
  Pembayaran                                Kuantitas          Harga         
                                                               (Rupiah)      
    a                 b                c      d       e        f = (d x e)   
         DIVISI 6. PERKERASAN ASPAL                                          
   K 618 Lapis Penetrasi Makadam 5 Cm (Lapen) M2 1 ,564.03 -         -       
                                             Total   Harga     Total         
                     Uraian           Satuan                                 
   No. Mata                                 Perkiraan Satuan   Jumlah        
                                                    (Rupiah)                 
  Pembayaran                                Kuantitas          Harga         
                                                               (Rupiah)      
    a                 b                c      d       e        f = (d x e)   
         Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
                                                                             
                                                                             
         DIVISI 7. STRUKTUR                                                  
   7.1 (7a)                                                                  
         Beton strukur, fc’20 MPa      M3      1 6.18     -          -       
   7.1 (10)                                                                  
         Beton, fc’10 Mpa              M3      0 .94      -          -       
   7.3 (1)                                                                   
         Baja Tulangan Polos-BjTP 280  Kg     1 ,445.45   -          -       
   7.6 (1)                                                                   
         Fondasi Cerucuk, Penyediaan dan Pemancangan M1 6 0.00 -     -       
         Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan) -
    A    Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) -     
    B    Pajak Pertambahan Nilai ( PPN ) = 11% x (A)                 -       
    C    JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)                    -       
    D    PEMBULATAN                                                  -       
    ITEM PEMBAYARAN NO. : 1.2                                                
    JENIS PEKERJAAN : MOBILISASI                                             
                                                                             
    % TERHADAP TOTAL BIAYA PROYEK = 0.0000 %                                 
                                                            Lembar 1.2-1     
                                                  HARGA    JUMLAH            
     No.           U R A I A N      SATUAN VOL.   SATUAN    HARGA            
                                                   (Rp.)    (Rp.)            
     A.  Sewa Tanah                   M2      -         -         -          
                                                                             
                                                                             
     B.  PERALATAN                                                           
         Periksa lembar 1.2-2                                     -          
                                                                             
     C.  Kantor Lapangan dan Fasilitas                                       
      1  Base Camp                                                           
      2  Kantor                               -         -         -          
      3  Barak                                -         -         -          
      4  Bengkel                                                             
      5  Gudang, dan lain-lain                                               
      6  Pagar dll                    ls      -         -         -          
       7 Bangsal Kerja              Ls       1.00                 -          
     D.  MOBILISASI FASILITAS LABORATORIUM set -        -         -          
      1  Ruang Laboratorium (sesuai Gambar)                                  
      2  Soil & Aggregate Testing                                            
         Compaction Test                                                     
         CBR Test                                                            
         Specific Gravity                                                    
         Atterberg Limits                                                    
         Grain Size Analysis                                                 
         Field Density Test by Sand Cone Methode                             
         Moisture Content                                                    
         Abrasion of Aggregate by Los Angeles Machine                        
      3  Bituminous Testing                                                  
         Marshall Asphalt Test                                               
         Extraction Test, Centrifuge/Refflux Method                          
         Specific Gravity for Coarse Aggregate                               
         Specific Gravity for Fine Aggregate                                 
         Mix Air Viod Content (Accurate Method)                              
         Core Drill                                                          
         Metal Thermometer                                                   
         Accessories and Tolls                                               
         Penetration Test                                                    
         Softening Point                                                     
         Refusal Density Compactor                                           
      4  Concrete Testing                                                    
         Slump Cone                                                          
         Cylinder/Cube Mould for Compressive Strength                        
         Beam Mould for Flexural Strength (RIGID)                            
         Crushing Machine                                                    
      5  Pendukung (Periksa Fasilitas Laboratorium)                          
      6  Operasional (Periksa Fasilitas Laboratorium)                        
     E.  MOBILISASI PERSONIL                                                 
     E.I. Personil Sesuai Struktur Organisasi LS -                -          
      1  GS                                                                  
      2  Tenaga Ahli Jalan                                                   
      3  Tenaga Ahli Jembatan        . . . .                                 
                                                                             
     E.II. Personi Lainnya            Set     -                   -          
      1  Koordinator Manajemen dan Keselamatan Lalu Lintas Set               
      2  Manajer Kendal Mutu          Set                                    
      3  Sewa mobil 4x4              Unit                         -          
      4  Sewa motor                  Unit                         -          
      5  . . . . . . . . . . . . . . . . . . . . . . . . . .                 
      6  . . . . . . . . . . . . . . . . . . . . . . . . . .                 
     F.  Manajemen dan Keselamatan lalu lintas LS                 -          
                                                                             
     G.  DEMOBILISASI                 LS      -                   -          
                                                                             
     E   TOTAL BIAYA MANAJEMEN DAN KESELAMATAN LALU LINTAS       0           
     F   OVERHEAD & PROFIT            15.00 % x D               0.00         
     G   HARGA SATUAN PEKERJAAN ( E + F )                       0.00         
    Catatan : Harga Satuan Personil tersebut sudah termasuk seluruh pajak dan bea (kecuali PPN),
         Asuransi Tenaga Kerja dan pengeluaran lainnya.                      
    ITEM PEMBAYARAN NO. : 1.2                                                
    JENIS PEKERJAAN : M O B IL I S ASI                                       
                                                            Lembar 1.2-2     
                             KODE                 HARGA    JUMLAH            
     No.      JENIS ALAT      ALAT  SATUAN VOL.   SATUAN    HARGA            
                                                   (Rp.)    (Rp.)            
     B.  PERALATAN                                                           
                                                                             
      1  ASPHALT MIXING PLANT E01    Unit     -                   -          
      2  ASPHALT FINISHER     E02    Unit     -                   -          
      3  POWER BROOM          E03    Unit     -                   -          
      4  COMPRESSOR 4000-6500 L\M E05 Unit    -                   -          
      5  TRUK MIXER (AGITATOR) E49   Unit     -                   -          
      7  CRANE 10-15 TON      E07    Unit                         -          
      6  DUMP TRUCK 4 TON (2-3 M3) E08 Unit   -                   -          
      7  DUMP TRUCK 10 TON (6-8 M3) E09 Unit 3.00                 -          
      8  EXCAVATOR 80-140 HP  E10    Unit    1.00                 -          
      9  FLAT BED TRUCK 3-4 TON E11  Unit     -                   -          
      10 GENERATOR SET        E12    Unit     -                   -          
      11 MOTOR GRADER >100 HP E13    Unit    1.00                 -          
      12 WHEEL LOADER 1.0-1.6 M3 E15 Unit     -                   -          
      13 TANDEM ROLLER 6-8 T. E17    Unit    1.00                 -          
      14 TIRE ROLLER 8-10 T.  E18    Unit     -                   -          
      15 VIBRATORY ROLLER 5-8 T. E19 Unit    1.00                 -          
      16 CONCRETE VIBRATOR    E20    Unit     -                   -          
      17 WATER PUMP 70-100 mm E22    Unit     -                   -          
      18 WATER TANKER 3000-4500 L. E23 Unit  1.00                 -          
      19 TAMPER               E25    Unit     -                   -          
      20 JACK HAMMER          E26    Unit     -                   -          
      21 TRAILER 20 TON       E29    Unit     -                   -          
      22 WELDING SET          E32    Unit     -                   -          
      23 COLD MILLING MACHINE E37    Unit     -                   -          
      24 ASPHALT DISTRIBUTOR  E41    Unit     -                   -          
      25 GRASS CUTTER                Unit     -                   -          
      26 CHAIN SAW                   Unit     -                   -          
         Total untuk Item B pada Lembar 1                         -          
                          PERHITUNGAN BIAYA SMK3 KONSTRUKSI                  
 Paket : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA              
                               SATUAN VOLUME HARGA TOTAL HARGA  KET          
  NO            URAIAN                                                       
                                          SATUAN                             
      Biaya K3                                                               
 1  a                                                                        
      Topi Pelindung (Safety Net); Bh  10            0.0                     
    b Pelindung Mata (Goggles, Spectacles); Psg                              
    c Tameng Muka (Face Shield); Bh                                          
    d Masker Selam (Breathing Apparatus); Bh                                 
    e Pelindung Telinga (Ear Plug, Ear Muff); Psg                            
    f Pelindung Pernafasan Dan Mulut (Masker); Bh                            
    g Sarung Tangan (Safety Gloves); Psg 10          0.0                     
    h Sepatu Keselamatan (Safety Shoes); Psg 10      0.0                     
    i Penunjang Seluruh Tubuh (Full Body Harness); Bh                        
    j Jaket Pelampung (Life Vest); Bh                                        
    k Rompi Keselamatan (Safety Vest); Bh 10         0.0                     
    l Celemek (Apron/Coveralls); Bh                                          
    m Pelindung Jatuh (Fall Arrester); Bh                                    
                               TOTAL =               0.0                     
                               Provit + Overhead 15% 0.0                     
                               Total Harga Satuan    0.0                     
      Manajemen dan Keselamatan Lalu Lintas                                  
 2                                                                           
    a Rambu Petunjuk;           Bh     2             0.0                     
    b Rambu Larangan;           Bh     2             0.0                     
    c Rambu Peringatan;         Bh     2             0.0                     
    d Rambu Kewajiban;          Bh     2             0.0                     
    e Rambu Informasi;          Bh     2             0.0                     
    f Rambu Pekerjaan Sementara; Bh    2             0.0                     
    g Tongkat Pengatur Lalu Lintas Bh  2             0.0                     
      (Warning Lights Stick);                                                
    h Kerucut Lalu Lintas (Traffic Cone); Bh 2       0.0                     
    i Lampu Putar (Rotary Lamp); Bh                                          
    j Lampu Selang Lalu Lintas; Ls                                           
                                                     0.0                     
      Personil K3 Konstruksi                                                 
 6                                                                           
    a Ahli K3       Risiko K3 Tinggi OB              0.0                     
    b Petugas K3    Risiko K3 Sedang/kecil OB        0.0                     
    c Petugas tanggap darurat   OB                        -                  
    d Petugas P3K               OB                        -                  
    e Petugas Paramedis         OB                        -                  
                                                     0.0                     
                               TOTAL =             0.0                       
                               Provit + Overhead 15%  0.0                    
                               Total Harga Satuan     0.0                    
                                                  Analisa EI-211             
                          FORMULIR STANDAR UNTUK                             
                    PEREKAMAN ANALISA MASING-MASING HARGA SATUAN             
                                                                             
       PROGRAM         : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
       KEGIATAN        : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN              
       PEKERJAAN       : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA
       LOKASI          : UNIVERSITAS PALANGKA RAYA                           
       TAHUN ANGGARAN  : 2023                                                
       ITEM PEMBAYARAN NO. : 2.1.(1)                                         
       JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air       
       SATUAN PEMBAYARAN : M3                                                
                                 PERKIRAAN HARGA   JUMLAH                    
        NO.      KOMPONEN   SATUAN KUANTITAS SATUAN HARGA                    
                                          (Rp.)     (Rp.)                    
        A.  TENAGA                                                           
        1.  Pekerja     (L01) jam   0.1606   0.00      0.00                  
        2.  Mandor      (L03) jam   0.0268   0.00      0.00                  
                                   JUMLAH HARGA TENAGA 0.00                  
        B.  BAHAN                                                            
            -                                                                
                                    JUMLAH HARGA BAHAN 0.00                  
        C.  PERALATAN                                                        
        1.  Excavator   (E10a) jam  0.0268   0.00      0.00                  
        2.  Dump Truck  (E08) jam   0.0000   0.00                            
        3.  Alat Bantu       Ls     1.0000   0.00      0.00                  
                                  JUMLAH HARGA PERALATAN 0.00                
        D.  JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00      
        E.  OVERHEAD & PROFIT 15.0 % x D               0.00                  
        F.  HARGA SATUAN PEKERJAAN ( D + E )           0.00                  
       Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
            berat untuk bahan-bahan.                                         
          2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
            dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
            terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
          3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
          4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
            yang dibayar dari kontrak) dan biaya-biaya lainnya.              
       ITEM PEMBAYARAN NO. : 2.1.(1)                   Analisa EI-211        
       JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air       
       SATUAN PEMBAYARAN : M3                      URAIAN ANALISA HARGA SATUAN
                                                                                 PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
        No.            U R A I A N       KODE KOEF. SATUAN KETERANGAN        
        I. ASUMSI                                                            
         1 Menggunakan alat berat (cara mekanik)                             
         2 Lokasi pekerjaan : sepanjang jalan                                
         3 Kondisi Jalan : baik                                              
         4 Jam kerja efektif per-hari    Tk    7.00 jam                      
         5 Faktor pengembangan bahan     Fk    1.20 -                        
        II. URUTAN KERJA                                                     
         1 Penggalian dilakukan dengan menggunakan Mini Excavator            
         2 Selanjutnya Mini Excavator menuangkan material hasil              
           galian kedalam Dump Truck                                         
         3 Dump Truck membuang material hasil galian keluar Disesuaikan dengan
                                                      kondisi dilapangan     
           lokasi jalan sejauh            L    2.00 Km                       
                                                      sesuai ketentuan Pasal 
         4 Sekelompok pekerja akan merapikan hasil galian khususnya untuk lined
                                                      1.5.3                  
           ditch                                                             
        III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                
        1. BAHAN                                                             
           Tidak ada bahan yang diperlukan                                   
        2. ALAT                                                              
        2.a. MINI EXCAVATOR              (E10a)                              
           Kapasitas Bucket               V    0.93 M3                       
           Faktor Bucket                 Fb    1.00 -                        
           Faktor Efisiensi alat         Fa    0.83 -                        
           Faktor konversi , kedalaman 40 %-75 %, Normal Fv 1.00             
           Waktu siklus                  Ts1       menit                     
           - Menggali , memuat (swing 180ᵒ) T1 0.240 menit                   
           - Lain lain                   T2   1.000 menit                    
           Waktu siklus = T1 + T2        Ts1   1.24 menit Permen PUPR        
                                                      No 28/PRT/M/2016       
           Kap. Prod. / jam = V x Fb x Fa x 60 Q1 37.35 M3/Jam               
                            Ts1 x Fv                                         
           Koefisien Alat / M3 = 1 : Q1  (E10a) 0.0268 Jam                   
        2.b. DUMP TRUCK 4 TON (2-3 M3)   (E08)        Disesuaikan dengan     
                                                      jenis pekerjaan        
           Kapasitas bak                  V    2.00 M3                       
           Faktor efisiensi alat         Fa    0.83 -                        
           Kecepatan rata-rata bermuatan v1   25.00 Km/Jam                   
           Kecepatan rata-rata kosong    v2   35.00 Km/Jam                   
           Waktu siklus :                Ts2                                 
           - Muat         = (V /Q1) x 60 T1    3.21 menit                    
           - Waktu tempuh isi = (L : v1) x 60 T2 4.80 menit                  
           - Waktu tempuh kosong = (L : v2) x 60 T3 3.43 menit               
           - Lain-lain                   T4    0.00 menit                    
                                         Ts2  11.44 menit                    
           Kapasitas Produksi / Jam = V x Fa x 60 Q2 7.25 M3                 
                               Fk x Ts2                                      
           Koefisien Alat / M3 = 1 : Q2  (E08) 0.0000 Jam                    
                                                     Berlanjut ke halaman berikut
       ITEM PEMBAYARAN NO. : 2.1.(1)                   Analisa EI-211        
       JENIS PEKERJAAN : Galian untuk Selokan Drainase dan Saluran Air       
       SATUAN PEMBAYARAN : M3                      URAIAN ANALISA HARGA SATUAN
                                                           Lanjutan          
        No.            U R A I A N       KODE KOEF. SATUAN KETERANGAN        
        2.d. ALAT BANTU                                                      
           Diperlukan alat-alat bantu kecil                                  
           - Sekop                                                           
           - Keranjang + Sapu                                                
        3. TENAGA                                                            
           Produksi menentukan : MINI EXCAVATOR Q1 37.35 M3/Jam              
           Produksi Galian / hari = Tk x Q1 Qt 261.45 M3                     
           Kebutuhan tenaga :                                                
                    - Pekerja             P    6.00 orang                    
                    - Mandor             M     1.00 orang                    
           Koefisien tenaga / M3 :                                           
                    - Pekerja = (Tk x P) : Qt (L01) 0.1606 Jam               
                    - Mandor = (Tk x M) : Qt (L03) 0.0268 Jam                
        4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                           
           Lihat lampiran.                                                   
        5. ANALISA HARGA SATUAN PEKERJAAN                                    
           Lihat perhitungan dalam FORMULIR STANDAR UNTUK                    
           PEREKAMAN ANALISA MASING-MASING HARGA                             
           SATUAN.                                                           
           Didapat Harga Satuan Pekerjaan :                                  
                 Rp.    0.00 / M3                                            
        6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                 
           Masa Pelaksanaan : . . . . . . . . . . . . bulan                  
        7. VOLUME PEKERJAAN YANG DIPERLUKAN                                  
           Volume pekerjaan : 0.00 M3                                        
                                           Analisa EI-311                    
                     FORMULIR STANDAR UNTUK                                  
                PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                 
                                                                             
    PROGRAM      : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN     : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN                    
    PEKERJAAN    : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA    
    LOKASI       : UNIVERSITAS PALANGKA RAYA                                 
    TAHUN ANGGARAN : 2023                                                    
    ITEM PEMBAYARAN NO. : 3.1.(1)                                            
    JENIS PEKERJAAN : Galian Biasa                                           
    SATUAN PEMBAYARAN : M3                                                   
                           PERKIRAAN HARGA  JUMLAH                           
     NO.    KOMPONEN  SATUAN KUANTITAS SATUAN HARGA                          
                                   (Rp.)    (Rp.)                            
     A. TENAGA                                                               
     1. Pekerja   (L01) Jam  0.0374   0.00     0.00                          
     2. Mandor    (L03) Jam  0.0187   0.00     0.00                          
                              JUMLAH HARGA TENAGA 0.00                       
     B. BAHAN                                                                
        -                                                                    
                              JUMLAH HARGA BAHAN 0.00                        
     C. PERALATAN                                                            
     1. Excavator (E10) Jam  0.0187   0.00     0.00                          
     2. Dump Truck (E09) Jam 0.0451   0.00                                   
     3. Alat Bantu     Ls    1.0000   0.00     0.00                          
                                                                             
                    JUMLAH HARGA PERALATAN     0.00                          
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT 15.0 % x D           0.00                          
     F. HARGA SATUAN PEKERJAAN ( D + E )       0.00                          
    Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
        berat untuk bahan-bahan.                                             
       2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
        dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
        terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
       3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
       4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
        yang dibayar dari kontrak) dan biaya-biaya lainnya.                  
    ITEM PEMBAYARAN NO. : 3.1.(1)                         Analisa EI-311     
    JENIS PEKERJAAN : Galian Biasa                                           
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                                               PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
     No.             U R A I A N         KODE KOEF. SATUAN KETERANGAN        
     I. ASUMSI                                                               
      1 Menggunakan alat berat (cara mekanik)                                
      2 Lokasi pekerjaan : sepanjang jalan                                   
      3 Kondisi Jalan : baik                                                 
      4 Jam kerja efektif per-hari       Tk      7.00 Jam                    
      5 Faktor pengembangan bahan        Fk      1.20 -                      
      6                                                                      
     II. URUTAN KERJA                                                        
      1 Tanah yang dipotong umumnya berada disisi jalan                      
      2 Penggalian dilakukan dengan menggunakan Excavator                    
      3 Selanjutnya Excavator menuangkan material hasil                      
        galian kedalam Dump Truck                                            
      4 Dump Truck membuang material hasil galian keluar Disesuaikan dengan kondisi
        lokasi jalan sejauh              L       2.00 Km dilapangan sesuai ketentuan
                                                        Pasal 1.5.3          
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
        Tidak ada bahan yang diperlukan                                      
     2. ALAT                                                                 
     2.a. EXCAVATOR                      (E10)                               
        Kapasitas Bucket                 V       0.93 M3                     
        Faktor Bucket                    Fb      1.20 -                      
        Faktor Efisiensi alat            Fa      0.83                        
        Faktor konversi , (asumsi : kedalaman 40%-75%, Normal, sehingga Fv diambil 1) Fv 0.80
        Waktu siklus                     Ts1         menit                   
        - Menggali , memuat (swing 180ᵒ) T1      0.30 menit                  
        - Lain lain                      T2      1.00 menit                  
        Waktu siklus = T1 + T2           Ts1     1.30 menit Permen PUPR      
                                                        No 28/PRT/M/2016     
        Kap. Prod. / jam = V x Fb x Fa x 60 Q1   53.44 M3/Jam                
                           Ts1 x Fv                                          
        Koefisien Alat / M3 = 1 : Q1     (E10)  0.0187 Jam                   
     2.b. DUMP TRUCK 10 TON (6-8 M3)     (E09)                               
        Kapasitas bak                    V       8.00 M3                     
        Faktor efisiensi alat            Fa      0.83 -                      
        Kecepatan rata-rata bermuatan    v1      40.00 KM/Jam                
        Kecepatan rata-rata kosong       v2      60.00 KM/Jam                
        Waktu siklus                     Ts2         menit                   
        - Muat           = (V/Q1) x 60   T1      8.98 menit                  
        - Waktu tempuh isi = (L : v1) x 60 T2    3.00 menit                  
        - Waktu tempuh kosong = (L : v2) x 60 T3 2.00 menit                  
        - Lain-lain                      T4      1.00 menit                  
                                         Ts2     14.98 menit                 
        Kapasitas Produksi / Jam = V x Fa x 60 Q2 22.16 M3/Jam               
                              Fk x Ts2                                       
        Koefisien Alat / M3 = 1 : Q2     (E09)  0.0451 Jam                   
     2.c. ALAT BANTU                                                         
        Diperlukan alat-alat bantu kecil                Lump Sump            
        - Sekop                                                              
        - Keranjang                                                          
                                                        Berlanjut ke halaman berikut
    ITEM PEMBAYARAN NO. : 3.1.(1)                         Analisa EI-311     
    JENIS PEKERJAAN : Galian Biasa                                           
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
     No.             U R A I A N         KODE KOEF. SATUAN KETERANGAN        
     3. TENAGA                                                               
        Produksi menentukan : EXCAVATOR  Q1      53.44 M3/Jam                
        Produksi Galian / hari = Tk x Q1 Qt     374.07 M3                    
        Kebutuhan tenaga :                                                   
                  - Pekerja              P       2.00 orang                  
                  - Mandor               M       1.00 orang                  
        Koefisien tenaga / M3 :                                              
                  - Pekerja = (Tk x P) : Qt (L01) 0.0374 Jam                 
                  - Mandor = (Tk x M) : Qt (L03) 0.0187 Jam                  
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
        Lihat lampiran.                                                      
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
        Lihat perhitungan dalam FORMULIR STANDAR UNTUK                       
        PEREKAMAN ANALISA MASING-MASING HARGA                                
        SATUAN.                                                              
        Didapat Harga Satuan Pekerjaan :                                     
                Rp.    0.00 / M3                                             
     6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                    
        Masa Pelaksanaan : . . . . . . . . . . . . bulan                     
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
        Volume pekerjaan : 0.00 M3                                           
    ITEM PEMBAYARAN NO. : 3.2.(1a)                        Analisa EI-321a    
    JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian                      
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                                               PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
     No.             U R A I A N         KODE KOEF. SATUAN KETERANGAN        
     I. ASUMSI                                                               
      1 Pekerjaan dilakukan secara mekanis                                   
      2 Lokasi pekerjaan : sepanjang jalan                                   
      3 Kondisi Jalan : baik                                                 
      4 Jam kerja efektif per-hari       Tk      7.00 Jam                    
      5 Faktor pengembangan bahan (padat ke asli) Fk 1.20 -                  
      6 Tebal hamparan padat              t      0.15 M                      
     II. URUTAN KERJA                                                        
      1 Excavator menggali dan memuat ke dalam dump truck                    
      2 Dump Truck mengangkut ke lapangan dengan jarak                       
        dari sumber galian ke lapangan   L       15.00 Km Disesuaikan dengan kondisi
                                                        dilapangan sesuai ketentuan
      3 Material diratakan dengan menggunakan Motor Grader                   
                                                        Pasal 1.5.3          
      4 Material dipadatkan menggunakan Sheep Foot Roller dan Tandem Roller  
      5 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan 
        level permukaan dengan menggunakan alat bantu                        
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
     1.a. Bahan timbunan = 1 x Fv        (M08)   1.20 M3                     
     2. ALAT                                                                 
     2.a. EXCAVATOR                      (E10)                               
        Kapasitas Bucket                 V       0.93 M3                     
        Faktor Bucket                    Fb      1.10 -                      
        Faktor Efisiensi alat            Fa      0.83                        
        Faktor konversi , (asumsi : kedalaman 40%-75%, Normal, sehingga Fv diambil 1) Fv 1.00
        Waktu siklus                     Ts1         menit                   
        - Menggali , memuat              T1      0.320 menit                 
        - Lain lain                      T2      0.100 menit                 
        Waktu siklus = T1 x Fv           Ts1     0.42 menit Permen PUPR      
                                                          No 28/PRT/M/2016   
        Kap. Prod. / jam = V x Fb x Fa x 60 Q1  121.30 M3/Jam                
                           Ts1 x Fv                                          
        Koefisien alat / M3 = 1 : Q1     (E10)  0.0082 Jam                   
     2.b. DUMP TRUCK 10 TON (6-8 M3)     (E09)                               
        Kapasitas bak                    V       7.00 M3                     
        Faktor efisiensi alat            Fa      0.83 -                      
        Kecepatan rata-rata bermuatan    v1      40.00 KM/Jam                
        Kecepatan rata-rata kosong       v2      50.00 KM/Jam                
        Waktu siklus                     Ts2         menit                   
        - Muat           = (V/Q1) x 60   T1      3.46 menit                  
        - Waktu tempuh isi = (L : v1) x 60 T2    22.50 menit                 
        - Waktu tempuh kosong = (L : v2) x 60 T3 2.00 menit                  
        - Lain-lain                      T4      5.00 menit                  
                                         Ts2     32.96 menit                 
        Kapasitas Produksi / Jam = V x Fa x 60 Q2 8.81 M3/Jam                
                              Fk x Ts2                                       
        Koefisien Alat / M3 = 1 : Q2     (E09)  0.1135 Jam                   
                                                        Berlanjut ke halaman berikut
    ITEM PEMBAYARAN NO. : 3.2.(1a)                        Analisa EI-321a    
    JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian                      
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
     No.             U R A I A N         KODE KOEF. SATUAN KETERANGAN        
     2.c. MOTOR GRADER                   (E13)                               
        Panjang hamparan                 Lh      50.00 M                     
        Lebar Area Pemadatan             w       3.50 M                      
        Lebar Overlap                    bo      0.30 M                      
        Faktor Efisiensi kerja           Fa      0.83 -                      
        Kecepatan rata-rata alat         v       4.00 Km / Jam               
        Jumlah lintasan                  n        2 lintasan                 
        Jumlah lajur lintasan = w / (b - bo) N   2.00                        
        Lebar pisau effektif             b        2.6 M                      
        Waktu siklus                     Ts3                                 
        - Perataan 1 kali lintasan Lh x 60 T1    0.75 menit                  
        - Lain-lain           v x 1000   T2      1.00 menit                  
                                         Ts3     1.75 menit                  
        Kapasitas Prod / Jam = Lh x (N(b-bo)+bo) x t x Fa x 60 Q3 261.45 M3  
                         Ts3 x n x N                                         
        Koefisien Alat / M3 = 1 : Q3     (E13)  0.0038 Jam                   
     2.d. VIBRATORY ROLLER                                                   
        Kecepatan rata-rata alat         v       4.00 KM/jam                 
        Lebar lajur lalu lintas          W       3.50 M                      
        Lebar roda alat pemadat          b       1.68 M                      
        Lebar overlap                    bo      0.20 M                      
        Lebar efektif pemadatan (be = b - bo) be 1.48 M                      
        Jumlah lintasan                  n       10.00 lintasan              
        Lajur lintasan (N = W/(b-bo))    N       3.00                        
        Faktor Efisiensi alat           Fa       0.83 -                      
        Kap. Prod. / jam = (v x 1000) x (N(b-bo)+bo) x t x Fa Q4 77.02 M3    
                  n x N                                                      
        Koefisien Alat / M3 = 1 : Q4     (E19)  0.0130 jam                   
     2.f. WATER TANK TRUCK               (E32)                               
        Volume tangki air                V       5.00 M3                     
        Kebutuhan air/M3 material padat  Wc      0.07 M3                     
        Kapasitas pompa air              pa     200.00 liter/menit           
        Faktor efisiensi alat            Fa      0.83                        
        Kapasitas Prod./Jam = pa x Fa x 60 Q6   142.29 M3                    
                  1000 x Wc                                                  
        Koefisien Alat / M3 = 1 : Q6            0.0070 jam                   
     2.g. ALAT BANTU                                                         
        Diperlukan alat-alat bantu kecil                  Lump Sump          
        - Sekop                                                              
     3. TENAGA                                                               
        Produksi menentukan : EXCAVATOR  Q1     121.30 M3/Jam                
        Produksi Timbunan / hari = Tk x Q1 Qt   849.09 M3                    
        Kebutuhan tenaga :                                                   
                  - Pekerja              P       5.00 orang                  
                  - Mandor               M       1.00 orang                  
        Koefisien tenaga / M3 :                                              
                  - Pekerja = (Tk x P) : Qt (L01) 0.0412 Jam                 
                  - Mandor = (Tk x M) : Qt (L02) 0.0082 Jam                  
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
        Lihat lampiran.                                                      
                                                        Berlanjut ke halaman berikut
    ITEM PEMBAYARAN NO. : 3.2.(1a)                        Analisa EI-321a    
    JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian                      
    SATUAN PEMBAYARAN : M3                            URAIAN ANALISA HARGA SATUAN
                                                              Lanjutan       
     No.             U R A I A N         KODE KOEF. SATUAN KETERANGAN        
                                                                             
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
        Lihat perhitungan dalam FORMULIR STANDAR UNTUK                       
        PEREKAMAN ANALISA MASING-MASING HARGA                                
        SATUAN.                                                              
        Didapat Harga Satuan Pekerjaan :                                     
                Rp.    0.00 / M3                                             
     6. WAKTU PELAKSANAAN YANG DIPERLUKAN                                    
        Masa Pelaksanaan : . . . . . . . . . . . . bulan                     
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
        Volume pekerjaan : 0.00 M3                                           
                                           Analisa EI-321a                   
                     FORMULIR STANDAR UNTUK                                  
                PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                 
                                                                             
    PROGRAM      : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN     : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN                    
    PEKERJAAN    : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA    
    LOKASI       : UNIVERSITAS PALANGKA RAYA                                 
    TAHUN ANGGARAN : 2023                                                    
    ITEM PEMBAYARAN NO. : 3.2.(1a)                                           
    JENIS PEKERJAAN : Timbunan Biasa Dari Sumber Galian                      
    SATUAN PEMBAYARAN : M3                                                   
                           PERKIRAAN HARGA  JUMLAH                           
     NO.    KOMPONEN  SATUAN KUANTITAS SATUAN HARGA                          
                                   (Rp.)    (Rp.)                            
     A. TENAGA                                                               
     1. Pekerja   (L01) Jam  0.0412   0.00     0.00                          
     2. Mandor    (L02) Jam  0.0082   0.00     0.00                          
                              JUMLAH HARGA TENAGA 0.00                       
     B. BAHAN                                                                
     1. Bahan Timbunan Biasa (M08) M3 1.2000 0.00 0.00                       
        (Tanah Urug)                                                         
                              JUMLAH HARGA BAHAN 0.00                        
     C. PERALATAN                                                            
     1. Excavator (E10) Jam  0.0082   0.00     0.00                          
     2. Dump Truck (E09) Jam 0.1135   0.00     0.00                          
     3. Motor Grader (E13) Jam 0.0038 0.00     0.00                          
     4. Vibrator Roller (E19) Jam 0.0130 0.00  0.00                          
     5. Tandem Roller (E17) Jam 0.0078 0.00                                  
     6. Water tank truck (E23) Jam 0.0070 0.00 0.00                          
     7. Alat Bantu     Ls    1.0000   0.00                                   
                              JUMLAH HARGA BAHAN 0.00                        
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT 15.0 % x D           0.00                          
     F. HARGA SATUAN PEKERJAAN ( D + E )       0.00                          
    Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
        berat untuk bahan-bahan.                                             
       2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
        dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
        terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
       3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
       4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
        yang dibayar dari kontrak) dan biaya-biaya lainnya.                  
                                      A N A L I S A B I A Y A P E K E R J A A N K O D E
              UNIVERSITAS PALANGKA RAYA Lapis Penetrasi Makadam 5 Cm (Lapen) 
                                         (MENGGUNAKAN BURUH)     K 618       
         PROPINSI :    KODE   KABUPATEN /KOTA : KODE                         
         KALIMANTAN TENGAH 62 PALANGKA RAYA 71                               
         URAIAN :            ANGGAPAN / ASUMSI :                             
         1. Semprotkan aspal tack coat 0,8 l 1.Menggunakan Tenaga Buruh      
         2. Hamparkan agregat pokok 3-5,25 m2/m3 2.Harga Material ( Agregat pokok,agregat pengunci, agregat penutup aspal) adalah
          dan dipadatkan      harga dilokasi proyek                          
         3. Menghampar split 2-3,45 m2/m3 dan dipadatkan 3.Volume aspal cair untuk Tack Coat / primt coat 0.8 Lt/m2
         4. Semprotkan aspal (2,5 Kg/m2) 4.Tebal Lapisan Penetrasi 5 cm      
         5. Hamparkan agregat pengunci split 1-2: 90 5.Agregat dikirim sampai tempat pekerjaan oleh leveransir
          m2/m3 dan padatkan                                                 
         6. Semprotkan Aspal 1.5 Kg/m2 dan gilas                             
         7. Taburkan pasir rata2 400 m2/m3                                   
                  P E K E R J A JUMLAH HARI KODE JUMLAH UPAH B I A Y A SUB TOTAL
                              ORANG     HARI-ORANG (Rp./org/hari) (Rp.) (Rp.)
          Mandor               2.0 3      6          -      -                
         P Pekerja             66.0 3     198        -      -                
         E Tukang              2.0 3      6          -      -                
         K Operator Terampil   2.0 3      6          -      -                
         E Pembantu Operator   2.0 3      6          -      -                
         R                                                                   
         J                                                                   
         A                                                                   
                                                                    -        
                  M A T E R I A L JUMLAH VOLUME KODE HARGA SATUAN B I A Y A SUB TOTAL
                                  SATUAN         (Rp.)   (Rp.)   (Rp.)       
          Batu pecah 3-5 cm     5 6.00 m3            -      -                
         M Batu pecah 2-3 cm    3 1.00 m3            -      -                
         A Batu pecah 1-2 cm    1 5.50 m3            -      -                
         T Pasir                3 .50 m3             -      -                
         E Aspal               5 ,600.00 Kg          -      -                
         R Minyak Tanah        3 50.00 Ltr           -      -                
         I Alat Bantu           8 .10 Set            -      -                
         A Kayu Bakar           10.00 M3             -      -                
         L                                                                   
                                                                    -        
                 P E R A L A T A N JUMLAH HARI KODE JAM HARGA B I A Y A SUB TOTAL
                               ALAT KERJA KERJA (Rp./Jam) (Rp.)  (Rp.)       
          Tandem Roller        1.0 1  E.17 7         -      -                
         P Dump Truck          2.0 2  E.08 7         -      -                
         E                                                                   
         R                                                                   
         A                                                                   
         L                                                                   
         A                                                                   
         T                                                                   
         A                                                                   
         N                                                                   
                                                                    -        
                                                       TOTAL (Rp.)  -        
          VOLUME/ : 1400     SATUAN : m2 HARGA SATUAN Rp. -   per m2         
          QUANTITY                      Harga + Keuntungan 15 % - per m2     
            UNIVERSITAS PALANGKA RAYA A N A L I S A H A R G A S A T U A N K O D E
                                   Konstruksi Lapis Pondasi Bawah (LPB)/Telford K- 516
                                        ( Menggunakan Buruh ).               
                                                                             
        PROPINSI      KODE     KOTA          KODE                            
        KALIMANTAN TENGAH 62   PALANGKA RAYA  71                             
      URAIAN :                 ANGGAPAN /ASUMSI :                            
      1.Material dikirim kelokasi pekerjaan 1.Menggunakan tenaga manusia (400m2/hari)
      2.Pasir dihampar setebal 5 cm 2.Material dikirim kelokasi pekerjaan oleh pemasok
      3.Batu pecah ukuran besar disusun berdiri pada 3.Batu sdh dipecah (50% berat ukuran 10-15cm,20% berat ukuran 5-7cm dan
       hamparan pasir 5 cm      30% berat pasir urug )                       
      4.Batu pecah ukuran lebih kecil dihampar diatasnya 4.Tanah dasar jalan sudah disiapkan
       sehingga rata kemudian dipadatkan dgn msn gilas 5.Dipadatkan sampai tebal 20cm
                               6.Koefisien pemadatan = 1,2                   
                               7.Umur alat bantu rata-rata 1 bulan/orang/set @ 3 alat.
                                      TOTAL                                  
             P E K E R J A VOLUME HARI KODE VOLUME U P A H BIAYA SUB TOTAL   
                                     (org.hari) Rp/org/hari (Rp.) (Rp.)      
         Mandor         1.00 1.00 L.061 1.0000  0.00     0.00                
       P Operator terampil 1.00 1.00 L.081 1.0000 0.00   0.00                
       E Pembantu Operator 1.00 1.00 L.089 1.0000 0.00   0.00                
       K Pekerja        30.00 1.00 L.101 80.0000 0.00    0.00                
       E                                                                     
       R                                                                     
       J                                                                     
       A                                                                     
                                                                  0.00       
            M A T E R I A L SATUAN KODE TOTAL HARGA  B I A Y A SUB TOTAL     
                                     VOLUME (Rp./Unit) (Rp.)  (Rp.)          
       M                                                                     
       A Batu Belah 10/10   M3  K.013-A 50.000  0.00     0.00                
       T Batu Pecah tak Tersaring M3 M.020 20.000 0.00   0.00                
       E Tanah Urug         M3  M.040  30.000   0.00     0.00                
       R Alat Bantu         SET M.170   3.200   0.00     0.00                
       I                                                                     
       A                                                                     
       L                                                                     
                                                                  0.00       
            P E R A L A T A N JUMLAH HARI KODE JAM KERJA HARGA B I A Y A SUB TOTAL
                           KERJA            (Rp./JAM) (Rp.)   (Rp.)          
       P                                                                     
       E Tandem Roller  1.00 3.00 E-17  21.00   0.00     0.00                
       R                                                                     
       A                                                                     
       L                                                                     
       A                                                                     
       T                                                                     
       A                                                                     
       N                                                          0.00       
         VOLUME                                   JUMLAH (Rp.)    0.00       
         QUANTITY      80.00 SATUAN M3                                       
                               HARGA SATUAN Rp.         0.00 PER M3          
                               Harga + Keuntungan 15 %  0.00 PER M3          
            UNIVERSITAS PALANGKA RAYA A N A L I S A H A R G A S A T U A N K O D E
                                         Levelling Batu Pecah K- 618-A       
                                        (Menggunakan Buruh)                  
                                                                             
        PROPINSI      KODE     KOTA          KODE                            
        KALIMANTAN TENGAH 62   PALANGKA RAYA  71          #REF!              
       URAIAN :                ANGGAPAN/ASUMSI                               
       1. Menggali persegi sampai LPA, lubang yang 1. Rata-rata kedalam 10 cm
        akan ditambal              2. Termasuk pengadaan material            
       2. Gantikan LPA tersebut dan padatkan sambil disiram 3. Rata-rata hasil kerja kelompok 35 m2/hari
        secara manual              4. Penggunaan alat bantu 1 bulan- orang   
                                      TOTAL                                  
             P E K E R J A VOLUME HARI KODE VOLUME U P A H BIAYA SUB TOTAL   
                                     (org.hari) Rp/org/hari (Rp.) (Rp.)      
         Mandor         1.00 3.00 L.061 3.00    0.00     0.00                
       P Pekerja        25.00 3.00 L.101 75.00  0.00     0.00                
       E Tukang         4.00 3.00 L.106 6.00    0.00     0.00                
       K Operator terampil 1.00 3.00 L.091 3.00 0.00     0.00                
       E Pembantu Operator 1.00 3.00 L.099 3.00 0.00     0.00                
       R                                                                     
       J                                                                     
       A                                                                     
                                                                  0.00       
            M A T E R I A L SATUAN KODE TOTAL HARGA  B I A Y A SUB TOTAL     
                                     VOLUME (Rp./Unit) (Rp.)  (Rp.)          
       M                                                                     
       A Alat bantu         SET M.170   8.10    0.00     0.00                
       T Batu Pecah 3/5     KG  M.022   56.00   0.00     0.00                
       E Batu Pecah 2/3     M2  M.023   31.00   0.00     0.00                
       R                                                                     
       I                                                                     
       A                                                                     
       L                                                          0.00       
            P E R A L A T A N JUMLAH HARI KODE JAM KERJA HARGA B I A Y A SUB TOTAL
                           KERJA            (Rp./JAM) (Rp.)   (Rp.)          
       P                                                                     
       E Tandem Roller  1.00 3.00 E-17  21.00   0.00     0.00                
       R                                                                     
       A                                                                     
       L                                                                     
       A                                                                     
       T                                                                     
       A                                                                     
       N                                                          0.00       
         VOLUME                                   JUMLAH (Rp.)    0.00       
         QUANTITY     1,400.00 SATUAN M'M2                                   
                               HARGA SATUAN Rp.         0.00 PER M2          
                               Harga + Keuntungan 15 %  0.00 PER M2          
    ITEM PEMBAYARAN NO. :7.1 (7a)                         Analisa El-717a    
    JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa                               
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                                                      PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
     I. ASUMSI                                                               
     1 Menggunakan alat (cara mekanik)                                       
     2 Lokasi pekerjaan : Struktur Jembatan                                  
     3 Bahan dasar (Agregat Kasar, Agregat Halus, Semen dan Super Plasticizer) diterima
       diterima seluruhnya di lokasi pekerjaan                               
     4 Jarak rata-rata Batching Plan ke lokasi pekerjaan L 17.68 KM          
     5 Jam kerja efektif per-hari         Tk      7.00 jam                   
     6 Perbandingan Camp.     : Semen     Sm     330.00 Kg/M3                
                              : Agregat Halus Ps 818.00 Kg/M3                
                              : Agregat Kasar Kr 922.00 Kg/M3                
                              : Air       W      194.70 Kg/M3 FAS 0,590      
                              : Super Plasticizer Plt 4.95 Kg/M3 1,5% terhadap semen
     7 Berat Isi :                                                           
       - Beton                            D1      2.20 T/M3                  
       - Semen                            D2      1.13 T/M3                  
       - Agregat Halus                    D3      1.31 T/M3                  
       - Agregat Kasar                    D4      1.25 T/M3                  
       - Air                              D5      1.00 T/M3                  
     8 Faktor kehilangan bahan : Semen    Fh1     1.02                       
                              : Agregat/Agregat Halus Fh2 1.05               
     II. URUTAN KERJA                                                        
     1 Semen, Agregat Halus, Agregat Kasar dan Super Plasticizer ditakar dan dimuat
       kedalam Concrete Batching Plant menggunakan Wheel Loader              
     2 Dituang kedalam Truck Mixer dan dicampur dengan air dan diaduk, kemudian dibawa
       ke lokasi pekerjaan                                                   
     3 Beton di-cor ke dalam bekisting yang telah disiapkan dan dipadatkan dengan Concrete Vibrator
     4 Penyelesaian dan perapihan setelah pengecoran oleh pekerja secara manual
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
    1.a. Semen (PC)           = Sm x 1.03 (M12) 336.6000 Kg    859           
    1.b. Agregat Halus Beton  = (Ps/1000 : D3) x 1.05 (M01a) 0.6561 M3 968   
    1.c. Agregat Kasar        = (Kr/1000 : D4) x 1.05 (M03) 0.7745 M3        
    1.d. Kayu Perancah dan/atau Bekisting (M19)  0.2500 M3 Sesuai dengan     
    1.e. Paku                 = M19 x 12  (M18)  3.0000 Kg Gambar/Peruntukannya
     1.f. Air                 = Air x Fh1 (M170) 198.5940 Ltr                
    1.g. Super Plastizier     = Plt x Fh1 (M182) 5.0490 Kg                   
     2. ALAT                                                                 
    2.a. WHEEL LOADER                     (E15)                              
       Kapasitas bucket                    V      0.80 M3   (lepas)          
       Faktor bucket                      Fb      0.85 -                     
       Faktor efisiensi alat              Fa      0.83 -                     
       Waktu Siklus                                                          
       - Memuat Agregat ke Batching Plant T1      1.10 menit                 
       - Hauling material dan Lain lain   T2      0.60 menit                 
                                          Ts1     1.70 menit                 
       Kap. Prod. / jam = V x Fb x Fa x 60 Q1    19.920 M3                   
                       Ts1                                                   
       Koefisien Alat/M2 = 1 : Q1                0.0502 Jam                  
    2.b. CONCRETE BATCHING PLANT;HZS25; 25 M3/JAM; 15 HP (E80)               
       Kapasitas Alat                     V1     500.00 M3/jam               
       Faktor Efisiensi Alat              Fa      0.83 -                     
       Waktu siklus : (T1 + T2 + T3 + T4) Ts                                 
       - Memuat                           T1      1.10 menit                 
       - Mengaduk                         T2      0.00 menit                 
       - Menuang                          T3      0.15 menit                 
       - Tunggu, dll.                     T4      0.00 menit                 
                                          Ts2     1.25 menit                 
       Kap. Prod. / jam = V1 x Fa x 60    Q2     19.920 M3/jam               
                      1000 x Ts1                                             
       Koefisien Alat / M3 = 1 : Q2       (E80)  0.0502 jam                  
                                                        Berlanjut ke hal. berikut.
    ITEM PEMBAYARAN NO. :7.1 (7a)                         Analisa El-717a    
    JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa                               
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                             Lanjutan        
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
    2.c. TRUCK MIXER AGITATOR; UD Q CVE28064; 5 M3; 280 HP (E49)             
       Kapasitas drum                     V2      5.00 M3                    
       Faktor Efisiensi alat              Fa      0.83 -                     
       Kecepatan rata-rata isi            v1     20.00 KM / Jam              
       Kecepatan rata-rata kosong         v2     40.00 KM / Jam              
       Waktu Siklus                                                          
       - mengisi   = (V : Q2) x 60        T1     15.06 menit                 
       - mengangkut = (L : v1) x 60 menit T2     53.03 menit                 
       - Kembali   = (L : v2) x 60 menit  T3     26.51                       
       - menumpahkan dll                  T4      5.00 menit                 
                                          Ts3    99.60 menit                 
       Kap.Prod. / jam = V2 x Fa x 60     Q3     2.5001 M3                   
                       Ts3                                                   
       Koefisien Alat / M3 = 1 : Q3       (E49)  0.4000 Jam                  
    2.d. WATER TANK TRUCK                                                    
       Volume Tanki Air                    V      4.00 M3                    
       Kebutuhan air / M3 beton           Wc      0.19 M3 Tergantung slump   
       Faktor Efiesiensi Alat             Fa      0.83 -                     
       Kapasitas pompa air                Pa     100.00 liter/menit          
       Kap. Prod. / jam = pa x Fa x 60    Q4     26.21 M3                    
                      1000 x Wc                                              
       Koefisien Alat / M3 = 1 : Q4       (E23)  0.0382 jam                  
    2.e. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)                             
       Kebutuhan alat penggetar beton disesuaikan dengan                     
       kapasitas produksi alat pencampur (concrete mixing plant) dibutuhkan n vib 6 buah lihat Spesifikasi
                                                          butuh 6 bh utk 20m3
       Kap. Prod. / jam = Q2 / n vib      Q5     3.320 M3                    
       Koefisien Alat / M3 = 1 : Q5       (E20)  0.3012 jam                  
     2.f. ALAT BANTU                                                         
       Alat bantu                                           lumpsum          
       Palu                                                                  
       Alat pemotong, dlsb                                                   
                                                                             
                                                                             
                                                        Berlanjut ke hal. berikut.
    ITEM PEMBAYARAN NO. :7.1 (7a)                         Analisa El-717a    
    JENIS PEKERJAAN :Beton struktur fc’ 20 Mpa                               
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                             Lanjutan        
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
     3. TENAGA                                                               
       Produksi Beton dalam 1 hari = Tk x Q1 Qt  139.44 M3                   
       Kebutuhan tenaga : - Mandor         M      2.00 orang                 
                   - Tukang :             Tb     30.00 orang                 
                         Tk batu/cor = 6                                     
                      Tk Kayu/bekisting = 24                                 
                   - Pekerja               P     12.00 orang                 
       Koefisien Tenaga / M3 :                                               
                   - Mandor   = (Tk x M) : Qt (L03) 0.1004 jam               
                   - Tukang   = (Tk x Tb) : Qt (L02) 1.5060 jam              
                   - Pekerja  = (Tk x P) : Qt (L01) 0.6024 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKAMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                 Rp.        - / M3                                           
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : ………………… bulan                                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :  0.00 M3                                           
    ITEM PEMBAYARAN NO. : 7.3 (1)                         Analisa El-731     
    JENIS PEKERJAAN : Baja Tulangan Polos BjTP 280                                         FORMULIR STANDAR UNTUK
    SATUAN PEMBAYARAN : Kg                          URAIAN ANALISA HARGA SATUAN
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
                                                                             
     I. ASUMSI                                                               
     1 Pekerjaan dilakukan secara manual                                     
     2 Lokasi pekerjaan : sepanjang jalan                                    
     3 Bahan dasar (besi dan kawat) diterima seluruhnya                      
       di lokasi pekerjaan                                                   
     4 Jarak rata-rata Base camp ke lokasi pekerjaan L 17.68 KM              
     5 Jam kerja efektif per-hari         Tk      7.00 jam                   
     6 Faktor Kehilangan Besi Tulangan    Fh      1.02 -                     
     II. URUTAN KERJA                                                        
     1 Besi tulangan dipotong dan dibengkokkan sesuai                        
       dengan yang diperlukan                                                
     2 Batang tulangan dipasang / disusun sesuai dengan                      
       Gambar Pelaksanaan dan persilangannya diikat kawat                    
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
    1.a. Baja Tulangan Polos BjTP 280 = 1 x Fh (M39a) 1.0200 Kg              
    1.b. Kawat beton                      (M14)  0.0200 Kg                   
     2. ALAT                                                                 
    2.a. ALAT BANTU                                   Ls                     
       Diperlukan :                                                          
       - Gunting Potong Baja                                                 
       - Kunci Pembengkok Tulangan                                           
       - Alat lainnya                                                        
     3. TENAGA                                                               
       Produksi kerja satu hari           Qt     200.00 Kg                   
       dibutuhkan tenaga : - Mandor        M      1.00 orang                 
                   - Tukang               Tb      1.00 orang                 
                   - Pekerja               P      3.00 orang                 
       Koefisien Tenaga / Kg :                                               
                   - Mandor   = ( M x Tk ) : Qt (L03) 0.0350 jam             
                   - Tukang   = ( Tb x Tk ) : Qt (L02) 0.0350 jam            
                   - Pekerja  = ( P x Tk ) : Qt (L01) 0.1050 jam             
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKAMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                 Rp.       0.00 / Kg                                         
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : . . . . . . . . . . . . bulan                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :  0.00 Kg.                                          
                                                     Analisa El-731          
                          FORMULIR STANDAR UNTUK                             
                     PEREKAMAN ANALISA MASING-MASING HARGA SATUAN            
                                                                             
    PROGRAM               : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN              : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN           
    PEKERJAAN             : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA
    LOKASI                : UNIVERSITAS PALANGKA RAYA                        
    TAHUN ANGGARAN        : 2023                                             
    ITEM PEMBAYARAN NO.   : 7.3 (1)                                          
    JENIS PEKERJAAN       : Baja Tulangan Polos BjTP 280                     
    SATUAN PEMBAYARAN     : Kg                                               
                                     PERKIRAAN HARGA JUMLAH                  
     NO.         KOMPONEN       SATUAN KUANTITAS SATUAN HARGA                
                                             (Rp.)    (Rp.)                  
     A. TENAGA                                                               
     1. Pekerja Biasa      (L01) jam   0.1050   0.00     0.00                
     2. Tukang             (L02) jam   0.0350   0.00     0.00                
     3. Mandor             (L03) jam   0.0350   0.00     0.00                
                                JUMLAH HARGA TENAGA      0.00                
     B. BAHAN                                                                
     1. Baja Tulangan Polos BjTP 280 (M39a) Kg 1.0200 0.00 0.00              
     2. Kawat Beton        (M14) Kg    0.0200   0.00     0.00                
                                JUMLAH HARGA BAHAN       0.00                
     C. PERALATAN                                                            
     1. Alat Bantu               Ls    1.0000   0.00     0.00                
                              JUMLAH HARGA PERALATAN     0.00                
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT         15.0 % x D             0.00                
     F. HARGA SATUAN PEKERJAAN ( D + E )                 0.00                
    Note: 1 Satuan dapat atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
       berat untuk bahan-bahan.                                              
      2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
       dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
       terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
      3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
      4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
       yang dibayar dari kontrak) dan biaya-biaya lainnya.                   
    ITEM PEMBAYARAN NO. :7.1 (10)                         Analisa El-7110    
    JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa                             
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                                                      PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
     I. ASUMSI                                                               
     1 Menggunakan alat (cara mekanik)                                       
     2 Lokasi pekerjaan : Struktur Jembatan                                  
     3 Bahan dasar (Agregat Kasar, Agregat Halus, Semen dan Super Plasticizer) diterima
       diterima seluruhnya di lokasi pekerjaan                               
     4 Jarak rata-rata Batching Plan ke lokasi pekerjaan L 17.68 KM          
     5 Jam kerja efektif per-hari         Tk      7.00 jam                   
     6 Perbandingan Camp.     : Semen     Sm     279.00 Kg/M3                
                              : Agregat Halus Ps 873.00 Kg/M3                
                              : Agregat Kasar Kr 909.00 Kg/M3                
                              : Air       W      195.30 Kg/M3 FAS 0,700      
                              : Super Plasticizer Plt 4.19 Kg/M3 1,5% terhadap semen
     7 Berat Isi :                                                           
       - Beton                            D1      2.20 T/M3                  
       - Semen                            D2      1.13 T/M3                  
       - Agregat Halus                    D3      1.31 T/M3                  
       - Agregat Kasar                    D4      1.25 T/M3                  
       - Air                              D5      1.00 T/M3                  
     8 Faktor kehilangan bahan : Semen    Fh1     1.02                       
                              : Agregat/Agregat Halus Fh2 1.05               
     II. URUTAN KERJA                                                        
     1 Semen, Agregat Halus, Agregat Kasar dan Super Plasticizer ditakar dan dimuat
       kedalam Concrete Batching Plant menggunakan Wheel Loader              
     2 Dituang kedalam Truck Mixer dan dicampur dengan air dan diaduk, kemudian dibawa
       ke lokasi pekerjaan                                                   
     3 Beton di-cor ke dalam bekisting yang telah disiapkan dan dipadatkan dengan Concrete Vibrator
     4 Penyelesaian dan perapihan setelah pengecoran oleh pekerja secara manual
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
    1.a. Semen (PC)           = Sm x 1.03 (M12) 284.580 Kg     917           
    1.b. Agregat Halus Beton  = (Ps/1000 : D3) x 1.05 (M01a) 0.7003 M3 954   
    1.c. Agregat Kasar        = (Kr/1000 : D4) x 1.05 (M03) 0.7636 M3        
                                                           Sesuai dengan     
    1.d. Kayu Perancah dan/atau Bekisting (M19)  0.0000 M3 Gambar/Peruntukannya
    1.e. Paku                 = M19 x 12  (M18)  0.0000 Kg                   
     1.f. Air                 = Air x Fh1 (M170) 199.206 Ltr                 
    1.g. Super Plastizier     = Plt x Fh1 (M182) 4.269 Kg                    
     2. ALAT                                                                 
    2.a. WHEEL LOADER                     (E15)                              
       Kapasitas bucket                    V      0.80 M3   (lepas)          
       Faktor bucket                      Fb      0.85 -                     
       Faktor efisiensi alat              Fa      0.83 -                     
       Waktu Siklus                                                          
       - Memuat Agregat ke Batching Plant T1      1.10 menit                 
       - Hauling material dan Lain lain   T2      0.60 menit                 
                                          Ts1     1.70 menit                 
       Kap. Prod. / jam = V x Fb x Fa x 60 Q1    19.920 M3                   
                       Ts1                                                   
       Koefisien Alat/M2 = 1 : Q1                0.0502 Jam                  
    2.b. CONCRETE BATCHING PLANT;HZS25; 25 M3/JAM; 15 HP (E80)               
       Kapasitas Alat                     V1     500.00 M3/jam               
       Faktor Efisiensi Alat              Fa      0.83 -                     
       Waktu siklus : (T1 + T2 + T3 + T4) Ts                                 
       - Memuat                           T1      1.10 menit                 
       - Mengaduk                         T2      0.00 menit                 
       - Menuang                          T3      0.15 menit                 
       - Tunggu, dll.                     T4      0.00 menit                 
                                          Ts2     1.25 menit                 
       Kap. Prod. / jam = V1 x Fa x 60    Q2     19.920 M3/jam               
                      1000 x Ts2                                             
       Koefisien Alat / M3 = 1 : Q2       (E80)  0.0502 jam                  
                                                        Berlanjut ke hal. berikut.
    ITEM PEMBAYARAN NO. :7.1 (10)                         Analisa El-7110    
    JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa                             
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                             Lanjutan        
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
    2.c. TRUCK MIXER AGITATOR; UD Q CVE28064; 5 M3; 280 HP (E49)             
       Kapasitas drum                     V2      5.00 M3                    
       Faktor Efisiensi alat              Fa      0.83 -                     
       Kecepatan rata-rata isi            v1     20.00 KM / Jam              
       Kecepatan rata-rata kosong         v2     40.00 KM / Jam              
       Waktu Siklus                                                          
       - mengisi   = (V : Q2) x 60        T1     15.06 menit                 
       - mengangkut = (L : v1) x 60 menit T2     53.03 menit                 
       - Kembali   = (L : v2) x 60 menit  T3     26.51                       
       - menumpahkan dll                  T4      5.00 menit                 
                                          Ts3    99.60 menit                 
       Kap.Prod. / jam = V2 x Fa x 60     Q3     2.5001 M3                   
                       Ts3                                                   
       Koefisien Alat / M3 = 1 : Q3       (E49)  0.4000 Jam                  
    2.d. WATER TANK TRUCK                 (E23)                              
       Volume Tanki Air                    V      4.00 M3                    
       Kebutuhan air / M3 beton           Wc      0.19 M3 Tergantung slump   
       Faktor Efiesiensi Alat             Fa      0.83 -                     
       Kapasitas pompa air                Pa     100.00 liter/menit          
       Kap. Prod. / jam = pa x Fa x 60    Q4     26.21 M3                    
                      1000 x Wc                                              
       Koefisien Alat / M3 = 1 : Q4       (E23)  0.0382 jam                  
    2.b. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)                             
       Kebutuhan alat penggetar beton disesuaikan dengan                     
       kapasitas produksi alat pencampur (concrete mixing plant) dibutuhkan n vib 6 buah lihat Spesifikasi
                                                         butuh 6 bh utk 20m3 
       Kap. Prod. / jam = Q2 / n vib      Q5     3.320 M3                    
       Koefisien Alat / M3 = 1 : Q5       (E20)  0.3012 jam                  
    2.e. ALAT BANTU                                                          
       Alat bantu                                        lumpsum             
       Palu                                                                  
       Alat pemotong, dlsb                                                   
                                                                             
                                                                             
                                                        Berlanjut ke hal. berikut.
    ITEM PEMBAYARAN NO. :7.1 (10)                         Analisa El-7110    
    JENIS PEKERJAAN :Beton struktur fc’ = 10 Mpa                             
    SATUAN PEMBAYARAN :M3                           URAIAN ANALISA HARGA SATUAN
                                                             Lanjutan        
    No.               U R A I A N         KODE KOEF. SATUAN KETERANGAN       
     3. TENAGA                                                               
       Produksi Beton dalam 1 hari = Tk x Q1 Qt  139.44 M3                   
       Kebutuhan tenaga : - Mandor         M      2.00 orang                 
                   - Tukang :             Tb     30.00 orang                 
                         Tk batu/cor = 6                                     
                      Tk Kayu/bekisting = 24                                 
                   - Pekerja               P     12.00 orang                 
       Koefisien Tenaga / M3 :                                               
                   - Mandor   = (Tk x M) : Qt (L03) 0.1004 jam               
                   - Tukang   = (Tk x Tb) : Qt (L02) 1.5060 jam              
                   - Pekerja  = (Tk x P) : Qt (L01) 0.6024 jam               
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKAMAN ANALISA MASING-MASING HARGA                                 
       SATUAN.                                                               
       Didapat Harga Satuan Pekerjaan :                                      
                 Rp.        - / M3                                           
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : ………………… bulan                                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :  0.00 M3                                           
                                                     Analisa El-717a         
                          FORMULIR STANDAR UNTUK                             
                     PEREKAMAN ANALISA MASING-MASING HARGA SATUAN            
                                                                             
    PROGRAM               : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN              : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN           
    PEKERJAAN             : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA
    LOKASI                : UNIVERSITAS PALANGKA RAYA                        
    TAHUN ANGGARAN        : 2023                                             
    ITEM PEMBAYARAN NO.   :7.1 (10)                                          
    JENIS PEKERJAAN       :Beton struktur fc’ = 10 Mpa                       
    SATUAN PEMBAYARAN     :M3                                                
                                     PERKIRAAN HARGA JUMLAH                  
     NO.         KOMPONEN       SATUAN KUANTITAS SATUAN HARGA                
                                             (Rp.)    (Rp.)                  
     A. TENAGA                                                               
     1. Pekerja            (L01) jam   0.6024   0.00     0.00                
     2. Tukang             (L02) jam   1.5060   0.00     0.00                
     3. Mandor             (L03) jam   0.1004   0.00     0.00                
                                JUMLAH HARGA TENAGA      0.00                
     B. BAHAN                                                                
     1. Semen              (M12) Kg    284.5800 0.00     0.00                
     2. Agregat Halus Beton (M01a) M3  0.7003   0.00     0.00                
     3. Agregat Kasar      (M03) M3    0.7636   0.00     0.00                
     4. Kayu Perancah      (M19) M3    0.0000   0.00     0.00                
     5. Paku               (M18) Kg    0.0000   0.00     0.00                
     6. Air                (M170) Ltr  199.2060 0.00     0.00                
     7. Super Plastizier   (M182) Kg   0.0000   0.00     0.00                
                                JUMLAH HARGA BAHAN       0.00                
     C. PERALATAN                                                            
     1. Wheel Loader       (E15) jam   0.0502    -       0.00                
     2 Concrete Batching Plant (E80) jam 0.0502 0.00     0.00                
     3 Truck Mixer         (E49) jam   0.4000   0.00     0.00                
     4 Water TankTruck     (E23) jam   0.0382   0.00     0.00                
     5 Concrete Vibrator   (E20) jam   0.3012   0.00     0.00                
     6 Alat Bantu                Ls    1.0000   0.00     0.00                
                              JUMLAH HARGA PERALATAN     0.00                
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT         15.0 % x D             0.00                
     F. HARGA SATUAN PEKERJAAN ( D + E )                 0.00                
    Note: 1 Satuan dapat atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
       berat untuk bahan-bahan.                                              
      2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
       dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
       terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
      3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
      4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
       yang dibayar dari kontrak) dan biaya-biaya lainnya.                   
                                                     Analisa El-717a         
                          FORMULIR STANDAR UNTUK                             
                     PEREKAMAN ANALISA MASING-MASING HARGA SATUAN            
                                                                             
    PROGRAM               : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN              : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN           
    PEKERJAAN             : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA
    LOKASI                : UNIVERSITAS PALANGKA RAYA                        
    TAHUN ANGGARAN        : 2023                                             
    ITEM PEMBAYARAN NO.   :7.1 (7a)       PERKIRAAN VOL. PEK. : 0.00         
    JENIS PEKERJAAN       :Beton struktur fc’ 20 Mpa TOTAL HARGA (Rp.) : 0.00
    SATUAN PEMBAYARAN     :M3             % THD. BIAYA PROYEK : 0.00         
                                     PERKIRAAN HARGA JUMLAH                  
     NO.         KOMPONEN       SATUAN KUANTITAS SATUAN HARGA                
                                             (Rp.)    (Rp.)                  
     A. TENAGA                                                               
     1. Pekerja            (L01) jam   0.6024   0.00     0.00                
     2. Tukang             (L02) jam   1.5060   0.00     0.00                
     3. Mandor             (L03) jam   0.1004   0.00     0.00                
                                JUMLAH HARGA TENAGA      0.00                
     B. BAHAN                                                                
     1. Semen              (M12) Kg    336.6000 0.00     0.00                
     2. Agregat Halus Beton (M01a) M3  0.6561   0.00     0.00                
     3. Agregat Kasar      (M03) M3    0.7745   0.00     0.00                
     4. Kayu Perancah      (M19) M3    0.2500   0.00     0.00                
     5. Paku               (M18) Kg    3.0000   0.00     0.00                
     6. Air                (M170) Ltr  198.5940 0.00     0.00                
     7. Super Plastizier   (M182) Kg   5.0490   0.00     0.00                
                                JUMLAH HARGA BAHAN       0.00                
     C. PERALATAN                                                            
     1. Wheel Loader       (E15) jam   0.0502    -       0.00                
     2 Concrete Batching Plant (E80) jam 0.0502 0.00     0.00                
     3 Truck Mixer         (E49) jam   0.4000   0.00     0.00                
     4 Concrete Vibrator   (E20) jam   0.3012   0.00     0.00                
     5 Water Tank Truck    (E23) jam   0.0382   0.00     0.00                
     6 Alat Bantu                Ls    1.0000   0.00     0.00                
                              JUMLAH HARGA PERALATAN     0.00                
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT         15.0 % x D             0.00                
     F. HARGA SATUAN PEKERJAAN ( D + E )                 0.00                
    Note: 1 Satuan dapat atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
       berat untuk bahan-bahan.                                              
      2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
       dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
       terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
      3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
      4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
       yang dibayar dari kontrak) dan biaya-biaya lainnya.                   
                                                 Analisa EI-761              
                        FORMULIR STANDAR UNTUK                               
                   PEREKAMAN ANALISA MASING-MASING HARGA SATUAN              
                                                                             
    PROGRAM           : PROGRAM DUKUNGAN MANAJEMEN DAN TUGAS TEKNIS LAINNYA DITJEN PENDIDIKAN TINGGI
    KEGIATAN          : SARANA/PRAARANA PENDUKUNG PEMBELAJARAN               
    PEKERJAAN         : PERENCANAAN PENINGKATAN JALAN LINGKUNGAN FAKULTAS MIPA
    LOKASI            : UNIVERSITAS PALANGKA RAYA                            
    TAHUN ANGGARAN    : 2023                                                 
    ITEM PEMBAYARAN NO. : 7.6 (1)                                            
    JENIS PEKERJAAN   : Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk    
    SATUAN PEMBAYARAN : M                                                    
                                 PERKIRAAN HARGA  JUMLAH                     
     NO.       KOMPONEN     SATUAN KUANTITAS SATUAN HARGA                    
                                          (Rp.)   (Rp.)                      
     A. TENAGA                                                               
     1. Pekerja         (L01) jam   0.0500  0.00     0.00                    
     2. Tukang          (L02) jam   0.0500  0.00     0.00                    
     3. Mandor          (L03) jam   0.0200  0.00     0.00                    
                                    JUMLAH HARGA TENAGA 0.00                 
     B. BAHAN                                                                
     1. Cerucuk dolken diameter 8 - 10 cm (M61) M1 1.0500 0.00 0.00          
                                     JUMLAH HARGA BAHAN 0.00                 
     C. PERALATAN                                                            
     1 Alat Bantu             Ls    1.0000   0.00    0.00                    
       Excavator                                                             
                                                                             
                           JUMLAH HARGA PERALATAN    0.00                    
     D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 0.00          
     E. OVERHEAD & PROFIT      15.0 % x D            0.00                    
     F. HARGA SATUAN PEKERJAAN ( D + E )             0.00                    
    Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
       berat untuk bahan-bahan.                                              
      2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
       dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
       terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
      3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
      4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
       yang dibayar dari kontrak) dan biaya-biaya lainnya.                   
    ITEM PEMBAYARAN NO. : 7.6 (1)                          Analisa EI-761    
    JENIS PEKERJAAN    : Fondasi Cerucuk Penyedian dan Pemancangan Cerucuk   
    SATUAN PEMBAYARAN  : M                           URAIAN ANALISA HARGA SATUAN
                                                                                    PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
     No.              U R A I A N          KODE KOEF. SATUAN KETERANGAN      
     I. ASUMSI                                                               
     1 Dilakukan secara manual                                               
     2 Bahan diterima di lokasi Jembatan                                     
     3 Jam kerja efektif per-hari           Tk     7.00 jam                  
     4 Faktor kehilangan                    Fh     1.05                      
     II. URUTAN KERJA                                                        
     1 Melakukan persiapan bahan cerucuk                                     
     2 Dilakukan pemancangan secara manual                                   
     III. PEMAKAIAN BAHAN, ALAT DAN TENAGA                                   
     1. BAHAN                                                                
     1.a. Bahan pondasi cerucuk dolken dia.8 -10 cm = 1 x Fh (M61) 1.0500 M1 
     2. ALAT                                                                 
     2.e. ALAT BANTU                                                         
       Diperlukan alat bantu untuk pek pondasi cerucuk      Lumpsum          
       - 1 set palu tripot                                                   
       - Alat pertukangan                                                    
     3. TENAGA                                                               
       Produksi Tiang dalam 1 hari          Qt    700.00 M1                  
       Kebutuhan tenaga tambahan di lokasi ::                                
                       - Mandor             M      2.00 orang                
                       - Tukang             Tb     5.00 orang                
                       - Pekerja            P      5.00 orang                
       Koefisien Tenaga kerja                                                
                       - Mandor = (Tk x M) : Qt (L03) 0.0200 jam             
                       - Tukang = (Tk x Tb) : Qt (L02) 0.0500 jam            
                       - Pekerja = (Tk x P) : Qt (L01) 0.0500 jam            
     4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT                              
       Lihat lampiran.                                                       
     5. ANALISA HARGA SATUAN PEKERJAAN                                       
       Lihat perhitungan dalam FORMULIR STANDAR UNTUK                        
       PEREKAMAN ANALISA MASING-MASING HARGA SATUAN                          
       Didapat Harga Satuan Pekerjaan :                                      
                     Rp.     0.00 / M                                        
     6. MASA PELAKSANAAN YANG DIPERLUKAN                                     
       Masa Pelaksanaan : . . . . . . . . . . . . bulan                      
     7. VOLUME PEKERJAAN YANG DIPERLUKAN                                     
       Volume pekerjaan :    0.00 M                                          
                      HARGA  DASAR SATUAN UPAH                               
                                                                             
                                      HARGA    HARGA                         
     No.       U R A I A N KODE SATUAN YG DIGUNAKAN SATUAN KETERANGAN        
                                       ( Rp.)   ( Rp.)                       
     1.  Pekerja            (L01) Jam     0.00         Sesuai dengan peraturan
     2.  Tukang             (L02) Jam     0.00          dan ketentuan yang   
     3.  M a n d o r        (L03) Jam     0.00            berlaku            
     4.  Operator           (L04) Jam     0.00         (HSD Kota Palangka Raya)
     5.  Pembantu Operator  (L05) Jam     0.00                               
     6.  Sopir / Driver     (L06) Jam     0.00                               
     7.  Pembantu Sopir / Driver (L07) Jam 0.00                              
     8.  Mekanik            (L08) Jam     0.00                               
     9.  Pembantu Mekanik   (L09) Jam     0.00                               
     10. Kepala Tukang      (L10) Jam     0.00                               
     11. Tenaga Ahli Muda S1 (1 Tahun) (L11) Jam 155,071.43 1,085,500.00 2 7,137,500.00
     12. Tenaga Ahli Muda S1 (5 Tahun) (L12) Jam 193,142.86 1,352,000.00 3 3,800,000.00
     13. cad / cam operator (L16) Jam   65,628.33 459,398.33 1 1,484,958.25  
     14. software programmer / implementer (L17) Jam 65,628.33 459,398.33 1 1,484,958.25
     15. hardware technician (L18) Jam  78,585.00 550,095.00 1 3,752,375.00  
     16. facilitator        (L19) Jam   65,628.33 459,398.33 1 1,484,958.25  
     17. senior assistant professional staff (L20) Jam 65,628.33 459,398.33 1 1,484,958.25
     18. assistant professional staff (L21) Jam 65,628.33 459,398.33 1 1,484,958.25
     19. special technician / inspector (L22) Jam 65,628.33 459,398.33 1 1,484,958.25
     20. technician         (L23) Jam   65,628.33 459,398.33 1 1,484,958.25  
     21. inspector          (L24) Jam   65,628.33 459,398.33 1 1,484,958.25  
     22. surveyor           (L25) Jam   61,966.67 433,766.67 1 0,844,166.75  
                                DAFTAR                                       
                         HARGA DASAR SATUAN BAHAN                            
                                                                             
                                      HARGA                                  
     No.       U R A I A N KODE SATUAN SATUAN      KETERANGAN                
                                       ( Rp.)                                
      1  Pasir Kasar (Beton, Lapis Drainase) M3                              
      2  Pasir Halus (HRS)       M3                                          
      3  Pasir Urug              M3                                          
      4  Agregat Pecah Kasar     M3                                          
      5  Boulder (Berangkal)     M3                                          
      6  Bahan Timbunan Biasa (Tanah Urug) M3                                
      7  Aspal 60/70             Kg                                          
      8  Kerosen / Minyak Tanah  Ltr                                         
      9  Semen / PC (40kg)       Zak                                         
     10  Semen / PC (kg)         Kg                                          
     11  Kawat Beton             Kg                                          
     12  P a k u                 Kg                                          
     13  Kayu Perancah           M3                                          
     14  Pertamax                Ltr                                         
     15  pertamina dex           Ltr                                         
     16  Minyak Pelumas / Oli    Ltr                                         
     17  BjTP 280                Kg                                          
     18  Cerucuk diameter 8-10 cm M                                          
     19  Agregat Pecah Mesin 0-5 mm M3                                       
     20  Batu pecah Mesin 1-2 cm (Split) M3                                  
     21  Batu pecah Mesin 1-2 cm M3                                          
     22  Batu pecah Mesin 2-3 cm M3                                          
     23  Batu pecah Mesin 3-5 cm M3                                          
     24  Batu Pecah Tak tersaring M3                                         
     25  Batu Belah 10/15        M3                                          
     26  Alat Bantu              Ls                                          
     27  Kayu Bakar                                                          
     28  Plastizier              Kg                                          
                   DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA                 
                                                                             
                                                       BIAYA                 
 No.        URAIAN         KO  HP     KAP.     HARGA    SEWA    KET.         
                           DE                  ALAT    ALAT/JAM              
                                                      (di luar PPN)          
 1  ASPHALT MIXING PLANT   E01 294.0 60.0 T/Jam                              
 2  ASPHALT FINISHER       E02 72.4  10.0 Ton                                
 3  POWER BROOM            E03 12.0 4,000.0 M2/Jam                           
 4  BULLDOZER 100-150 HP   E04 155.0  -  -                                   
 5  COMPRESSOR 4000-6500 L\M E05 75.0 5,000.0 CPM/(L/m)                      
 6  CONCRETE MIXER 0.3-0.6 M3 E06 20.0 500.0 Liter                           
 7  CRANE 10-15 TON        E07 138.0 15.0 Ton                                
 8  DUMP TRUCK 4 TON (2-3 M3) E08 133.3 2.0 M3                               
 9  DUMP TRUCK 10 TON (6-8 M3) E09 254.8 7.0 M3                              
 10 EXCAVATOR 80-140 HP    E10 133.0 0.9 M3                                  
 11 FLAT BED TRUCK 3-4 TON E11 100.0 4.0 ton                                 
 12 GENERATOR SET          E12 180.0 135.0 KVA                               
 13 MOTOR GRADER >100 HP   E13 135.0 10,000.0 -                              
 14 TRACK LOADER 75-100 HP E14 70.0  0.8 M3                                  
 15 WHEEL LOADER 1.0-1.6 M3 E15 96.0 1.5 M3                                  
 16 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton                                
 17 TANDEM ROLLER 6-8 T.   E17 74.3  6.9 Ton                                 
 18 TIRE ROLLER 8-10 T.    E18 135.0 10.9 Ton                                
 19 VIBRATORY ROLLER 5-8 T. E19 82.0 7.1 Ton                                 
 20 CONCRETE VIBRATOR      E20  5.5  25.0 -                                  
 21 STONE CRUSHER          E21 220.0 60.0 T/Jam                              
 22 WATER PUMP 70-100 mm   E22  6.0   - -                                    
 23 WATER TANKER 3000-4500 L. E23 135.0 4,000.0 Liter                        
 24 PEDESTRIAN ROLLER      E24  8.8 835.00 Ton                               
 25 TAMPER                 E25  1.5 121.00 Ton                               
 26 JACK HAMMER            E26  0.0   - -                                    
 27 PULVI MIXER            E27 345.0  - -                                    
 28 CONCRETE PUMP          E28 150.0 100.00 M3/jam                           
 29 TRAILER 20 TON         E29 245.0 20.00 Ton                               
 30 PILE DRIVER + HAMMER   E30 25.0  2.50 Ton                                
 31 CRANE ON TRACK 35 TON  E31 125.0 35.0 Ton                                
 32 WELDING SET            E32 11.0 250.0 Amp                                
 33 BORE PILE MACHINE      E33 150.0 2,000.0 Meter                           
 34 ASPHALT LIQUID MIXER   E34  5.0 1,000.0 Liter                            
 36 COLD MILLING           E36 240.0 1,000.0 m                               
 37 ROCK DRILL BREAKER     E37 138.0 0.7 M3                                  
 38 COLD RECYCLER          E38 900.0 2.2 M                                   
 39 HOT RECYCLER           E39 400.0 3.0 M                                   
 40 AGGREGAT (CHIP) SPREADER E40 115.0 3.5 M                                 
 41 ASPHALT DISTRIBUTOR    E41 115.0 5,000.0 Liter                           
 42 SLIP FORM PAVER        E42 174.0 7.0 M                                   
 43 CONCRETE PAN MIXER     E43 15.4 500.0 Liter                              
 44 CONCRETE BREAKER       E44 290.0 20.0 m3/jam                             
 45 ASPHALT TANKER         E45 190.0 4,000.0 liter                           
 46 CEMENT TANKER          E46 190.0 4,000.0 liter                           
 47 CONCRETE MIXER (350)   E47 20.0 350.0 liter                              
 48 VIBRATING RAMMER       E48  4.2  80.0 KG                                 
 49 TRUK MIXER (AGITATOR)  E49 254.8 5.0 M3                                  
 50 BORE PILE MACHINE      E50 125.0 60.0 CM                                 
 51 CRANE ON TRACK 75-100 TON E51 200.0 75.0 Ton                             
 52 BLENDING EQUIPMENT     E52 50.0  30.0 Ton                                
 53 ASPHALT LIQUID MIXER   E34a 40.0 20,000.0 Liter                          
 54 BAR BENDER             E53  3.0  0.0 -                                   
 55 BAR CUTTER             E54  3.0  0.0 -                                   
 56 BREAKER                E55 170.0 15.0 m3/jam                             
 57 GROUTING PUMP          E56 100.0 15.0 Ton                                
 58 JACK HIDROLIC          E57 10.0   - -                                    
 59 MESIN LAS              E58 33.0  2.0 Kw                                  
 60 PILE DRIVER LEADER, 75 kw E59 70.0 75.0 kw                               
 61 PILE HAMMER            E60 75.0  2.0 Ton                                 
 62 PILE HAMMER, 2,5 Ton   E61 75.0  2.5 Ton                                 
 63 STRESSING JACK         E62 89.0  15.0 Ton                                
 64 WELDING MACHINE, 300 A E63  5.0  0.0 -
Tenders also won by CV Andhika Kencana
Authority
18 October 2021Pembangunan Mushola Dan Rumah Dinas Kejaksaan Negeri KatinganKab. KatinganRp 1,820,000,000
24 March 2021Pembangunan Jalan Menuju Desa TalingkeKab. KatinganRp 999,944,000
9 April 2019Peningkatan Jalan Desa Tumbang Penyahuan, Kecamatan Bukit Santuei, Kabupaten Kotawaringin Timur, Provinsi Kalimantan TengahPemerintah Daerah Provinsi Kalimantan TengahRp 600,000,000
12 February 2018Rehabilitasi Gedung Gereja Kaharap Jl. Beliang Ujung Palangka RayaProvinsi Kalimantan TengahRp 467,500,000
9 July 2023Rekonstruksi Jalan Sei. Telang-MajundreKab. Barito SelatanRp 450,000,000
17 June 2016Pengadaan Mesin Pembangkit Listrik/Generator Siap PakaiLPSE Kabupaten Gunung MasRp 450,000,000
9 September 2025Belanja Modal Bangunan Terbuka - Pengamanan Kawasan Tahura Provinsi - Menara Pantau Paket 1Provinsi Kalimantan TengahRp 444,937,500
4 September 2025Belanja Modal Bangunan Terbuka - Pengamanan Kawasan Tahura Provinsi - Menara Pantau Paket 2Provinsi Kalimantan TengahRp 444,937,500
29 July 2022Pembangunan Kandang Ayam Petelur Beserta PerlengkapannyaKab. Gunung MasRp 400,000,000
7 November 2017Biaya Fisik Penataan Halaman Kantor Camat Tahun 2017Kab. KapuasRp 384,000,000