Konstruksi Fisik Gedung Pelayanan Dan Area Parkir Bbtklpp Yogyakarta

Basic Information
Type: Public Tender
Tender Code: 26528047
Date: 13 May 2019
Year: 2019
KLPD: Kementerian Kesehatan
Work Unit: Balai Besar Tehnik Kesehatan Lingkungan Dan Pengendalian Penyakit Yogyakarta
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Pascakualifikasi Satu File - Harga Terendah Sistem Gugur
Contract Type: Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 19,701,995,000
Estimated Value (Nilai HPS): Rp 19,701,995,000
Winner (Pemenang): PT Tri Mustika Abadi
NPWP: 025895004034000
RUP Code: 18747775
Work Location: BBTKLPP YOGYAKARTA - Bantul (Kab.)
Participants: 110
Applicants
Reason
0025895004034000Rp 17,295,476,635-
0020677464615000Rp 17,362,939,290-
0011249042711000Rp 17,940,310,836-
0210069407541000Rp 17,999,906,256-
0668740251609000Rp 18,125,202,7591. Tidak hadir pembuktian kualifikasi 2. Beberapa persyaratan kualifikasi tidak terverifikasi melalui SiKAP, yaitu: a. Surat Keterangan Dukungan Keuangan dari Bank Pemerintah atau Swasta untuk Mengikuti Pengadaan Barang/Jasa b. Sebagian peralatan, yaitu: mobil crane, pompa air, stamper, lift barang, water pass, skid steer leader, hydrolic jacking, pick up, scaffolding, baby roller, alat las listrik, generator c. Dokumen Sisa Kemampuan Nyata (SKN d. surat pernyataan kesanggupan memberikan surat dukungan untuk pekerjaan lift jika ditunjuk sebagai pemenang e. Dokumen Kemampuan Dasar (KD)
0022989123517000Rp 18,363,456,4461. Tidak hadir pembuktian kualifikasi 2. Beberapa persyaratan kualifikasi tidak terverifikasi melalui SiKAP PT Satriamas Karyatama, yaitu: a. SBU MK 005 (SBU dimiliki oleh KSO-nya, yaitu PT Utama Sumber Mas) b. Surat Keterangan Dukungan Keuangan dari Bank Pemerintah atau Swasta untuk Mengikuti Pengadaan Barang/Jasa c. Sebagian peralatan, yaitu: mobil crane (spesifikasi tidak memenuhi); dump truck (spesifikasi dan jumlah tidak memenuhi); pick up (jumlah tidak memenuhi); scaffolding (jumlah tidak memenuhi); electric vibrator (spesifikasi tidak tercantum); bar bender (spesifikasi tidak tercantum); bar cutter (spesifikasi tidak tercantum); stamper (tidak tercantum); skid steer leader (tidak tercantum); lift barang (tidak tercantum); hydrolic jacking (tidak tercantum); baby roller (tidak tercantum); excavator (tidak tercantum) d. Dokumen Sisa Kemampuan Nyata (SKN) e. Surat pernyataan kesanggupan memberikan surat dukungan untuk pekerjaan lift jika ditunjuk sebagai pemenang f. Dokumen Kemampuan Dasar (KD)
0315119206002000Rp 18,516,135,393-
0018368449428000Rp 18,621,620,741-
0316968429528000Rp 19,012,937,092-
PT Carresih Abadi
0023108368024000Rp 19,110,300,000-
0021099684009000Rp 19,209,366,8871. Tidak hadir pada pembuktian kualifikasi 2. Data kualifikasi tidak tercantum dalam SIKAP sehingga tidak dapat di verifikasi
0012014189441000Rp 17,230,582,711Surat Pernyataan Kesanggupan memberikan surat dukungan pekerjaan lift ada, tapi tidak memberikan surat pernyataan kesanggupan memberikan surat dukungan kusen aluminium, fire hydrant dan sprinkler, dan penangkal petir
0313108771432000Rp 19,105,994,174Sisa Kemampuan Nyata (SKN) tidak memenuhi syarat paling kurang 10% dari total HPS (SKN PT Tigamas Mitra Selaras = 0)
0312116445543000--
0311539027614000Rp 17,140,736,9071. Tidak melampirkan Dokumen Rencana Keselamatan Konstruksi secara lengkap (hanya melampirkan Pakta Keselamatan Konstruksi) 2. Tidak melampirkan surat pernyataan: a. kesanggupan bersedia melengkapi dokumen perizinan yang terkait dengan pekerjaan yang membutuhkan proses perizinan (fire hydrant dan penangkal petir) b. kesanggupan bersedia melakukan test comissioning terhadap semua peralatan yang terpasang
0033224320002000Rp 18,386,336,079IUJK memenuhi syarat, tetapi tidak melampirkan SBU MK 005
0021913256029000--
0012026753533000--
0027780295544000--
0027166727113000--
CV Sarana Karya
00*1**6****41**0--
0866324478518000--
0317945673002000--
0013404249009000--
PT Cahaya Artha Mas
08*9**3****45**0--
CV Matano Graha Mandiri
0739520021805000--
Alpha Orion
07*3**3****43**0--
0022041792429000--
0753199231524000--
0019324045524000--
0027551381541000--
0014293047604000--
0763564424543000--
0016789083009000--
0019433028311000--
0018583203034000--
PT Panca Sakti Indonesia Jaya
08*5**1****06**0--
PT Royal Inti Mahiro
07*6**9****09**0--
0027987155508000--
0015678816614000--
0015895568009000--
0024946261005000--
PT Aura Jagat Mandiri
03*6**8****09**0--
0023463755003000--
0315642496609000--
0024458879424000--
0024767220615000--
0016357774321000--
0021953930728000--
PT Wisma Karya Andalas
0011017654411000--
0839111887101000--
Tirta Agung
00*5**2****17**0--
PT Wikanandaru Multi Laksana
0023047756526000--
0023388762412000--
0012135323321000--
0311674527411000--
0011363165526000--
0018443853005000--
0030479596211000--
PT Trico Wana
03*5**3****15**0--
CV Cahyo Suminar
03*1**6****02**0--
0013400098028000--
PT Anugerah Adhi Persada
00*1**9****11**0--
CV Genting Maju
0021229349104000--
0016094666018000--
0016094989018000--
0015965866034000--
PT Pajajaran Multicon
03*4**4****02**0--
PT Asarkon
03*4**0****02**0--
PT Anugrah Putra Bungsu
00*2**3****33**0--
PT Multi Info Infrastruktur
08*6**0****09**0--
0027152164331000--
PT Bidik Nasional Pers
07*0**8****17**0--
Ciptama Mitra Tatagraha
08*0**1****32**0--
0013205190009000--
0014815666615000--
0013312376021000--
0019210913542000--
0021815626307000--
0017893058301000--
0011403490541000--
Tatakarsa Kreasindo
03*6**2****45**0--
0013486097411000--
0026563205511000--
CV Berkibar Bangun Bersama
09*7**8****03**0--
CV Tehnik Pompa
00*8**2****09**0--
0033068859503000--
0022335988324000--
0029614245543000--
0312736093543000--
0730931557503000--
0744018805518000--
0756600391001000--
0736622531542000--
0014647481541000--
PT Mangisi Makmur Sentosa
0013944564011000--
0013616867003000--
CV Arimel Mulia Sakti
03*5**0****05**0--
0019799725005000--
PT Damar Intan Lestari
07*2**9****17**0--
PT Moses Edgar Partogi Utama
07*0**5****35**0--
0861103638009000--
0811176346541000--
0837629625543000--
0026760405003000--
0011131430911000--
0014911218523000--
0021454178009000--
0666050232528000--
0016494429511000--
Tenders also won by PT Tri Mustika Abadi
Authority
22 March 2016Pembangunan Gedung Kantor Psekp Tahap IIKementerian PertanianRp 9,836,276,000
3 April 2017Pengembangan Gedung Laboratorium Bbia IKementerian PerindustrianRp 8,200,000,000
30 March 2015Pembangunan Gedung Dan Pagar Kantor Pengadilan Negeri Wates Sesuia PrototypeMahkamah AgungRp 8,090,270,000
17 May 2016Pembangunan Gedung KantorLpse Kabupaten BogorRp 7,609,875,000
23 May 2018Belanja Modal Pengadaan Kontruksi/Pembelian Gedung Kantor Tahap 3Kab. BogorRp 6,774,800,000
30 May 2014Rehab Gedung Flat Taruna Akpol Paket 2Akpol Lemdiklat PolriRp 6,558,000,000
25 April 2018Pembangunan Rumah Dinas 40 Unit T.36/60 Polres KarawangKepolisian Negara Republik IndonesiaRp 6,019,200,000
17 June 2013Renovasi Kelas Besar SoemartoSespim Lemdiklat PolriRp 4,940,228,000
11 May 2016Renovasi Laboratorium SeKementerian PertanianRp 4,680,000,000
16 April 2012Pembangunan Mako Polres Cianjur Tahap IIPolda JabarRp 4,296,395,000