| Reason | |||
|---|---|---|---|
CV Mutia Karya | 07*5**0****22**0 | - | Tidak menyampaikan keseluruhan dokumen Kualifikasi yang dipersyaratkan. |
| 0010016111093000 | - | - | |
| 0010016103093000 | - | - | |
| 0010016137093000 | - | - | |
| 0010016152093000 | - | - | |
| 0011342144812000 | - | - | |
| 0010016145093000 | - | - | |
| 0013076336062000 | - | Specific Construction & Contract Management Experience (4.2 (a)) : Not Similar contract complete (Construction of the Inland Port Project at Taliabu Island, North Maluku, Indonesia. The declared experience value amounts to IDR 262.26 billion.) | |
| 0010016129093000 | - | - | |
PT China Railway Engineering Construction | 01*6**9****63**0 | - | 1. Financial Capabilities (3.1) : The results of the evaluation show that working capital has a negative value (The reported Working Capital is negative, amounting to IDR-11,237,010,000,000.00) 2. General Construction Experience (4.1(a)) : Companies registered in Indonesia in 2024 , but work experience submitted in 2020. (Form ELI 1.1 dan 1.2 : Deed Company Estebilishment and Last Amendement) 3. Specific Construction & Contract Management Experience (4,2 (a)) : The project experience presented in this document refers to your company’s corporate headquarters located in China. As the parent entity, the headquarters holds full ownership and operational control over the listed projects. The local subsidiary, PT China Railway Engineering Construction, is a legally registered entity in Indonesia, established in 2024, and operates under direct supervision and strategic alignment with the headquarters 4. Specific Construction & Contract Management Experience (4,2 (b)) : implementation): '- Land reclamation: minimum 565,562 m3; experience does not meet the requirements '- Breakwater: minimum 840 m1; experience does not meet the requirements - Wharf, Trestle and Jetty: minimum 441 m1. experience does not meet the requirements That the submitted experience does not meet the minimum requirement of four key construction activities as stated in the prequalification criteria. While the listed projects reflect relevant roles as prime contractor or subcontractor, they cover only part of the required scope. |
| 0010016145093000 | - | - | |
| 0011141454018000 | - | - | |
| 0910660315542000 | - | - | |
| 0023980782542000 | - | - | |
| 0010613115093000 | - | - | |
| 0020011698105000 | - | - | |
CV Rangga Dejava | 00*7**4****16**0 | - | - |
| 0011492048007000 | - | - | |
| 0854283876432000 | - | - | |
| 0719162018113000 | - | - | |
| 0734449416101000 | - | - | |
PT Fasla Niscala Mandiri | 06*4**3****15**0 | - | - |
| 0916557358802000 | - | - | |
| 0015276090501000 | - | - | |
| 0025149212631000 | - | - | |
PT Ayesa Pribumi Parigi | 05*0**1****42**0 | - | - |
| 0011321197441000 | - | - | |
| 0738315357003000 | - | - | |
CV Firman Jaya Sakti | 08*3**0****09**0 | - | - |
| 0818512931427000 | - | - | |
| 0905326088447000 | - | - | |
| 0012169256422000 | - | - | |
| 0030486013019000 | - | - | |
| 0025466913942000 | - | - | |
Razco Empat Saudara | 10*0**0****11**5 | - | - |
| 0013045208046000 | - | - | |
| 0811230986833000 | - | - | |
| 0752962001005000 | - | - | |
PT Wijoksono Jaya Sakti | 03*5**6****45**0 | - | - |
CV Wenny Sakti | 00*1**3****21**0 | - | - |
| 0021282934432000 | - | - | |
| 0013008180062000 | - | - | |
| 0012358982623000 | - | - | |
| 0908421415101000 | - | - | |
| 0664836889609000 | - | - | |
| 0011456167426000 | - | - | |
PT Patra Geoteksindo Jaya | 09*6**1****35**0 | - | - |
| 0010005817431000 | - | - | |
| 0011148269941000 | - | - | |
| 0015552540429000 | - | - | |
| 0926281692061000 | - | - | |
PT Peppas Karya Bersama | 02*5**6****17**0 | - | - |
| 0800675795085000 | - | - | |
| 0946821964432000 | - | - | |
| 0026804245002000 | - | - | |
CV Nivo Graphic Konsultan Teknik | 06*1**8****31**0 | - | - |
| 0021556642411000 | - | - | |
| 0023806086048000 | - | - | |
PT Faira Yumn Atmajaya | 06*9**2****23**0 | - | - |
| 0905534970811000 | - | - | |
| 0725694020009000 | - | - | |
| 0747340610034000 | - | - | |
| 0019205855008000 | - | - | |
Samudera Atlantis International | 07*0**2****48**0 | - | - |
| 0822695656101000 | - | - | |
Trisula Muda Berkarya | 04*3**1****22**0 | - | - |
PT Rekagunatek Persada | 00*6**5****43**0 | - | - |
Kelman Infra Perkasa | 08*9**4****02**0 | - | - |
CV Wahana Citra Lestari | 00*3**6****03**0 | - | - |
| 0010600039093000 | - | - | |
PT Rekayasa Tata Udara | 00*6**0****04**0 | - | - |
CV Lativa Bestari | 02*8**9****08**0 | - | - |
Stfa | 00*0**7****38**1 | - | - |
| 0746117035521000 | - | - | |
| 0014409924631000 | - | - | |
| 0012014189441000 | - | - | |
CV Pilar Pantura | 0312643679645000 | - | - |
| 0018097881407000 | - | - | |
| 0730211869626000 | - | - | |
| 0021807664308000 | - | - | |
CV Gitang Care | 00*7**7****42**0 | - | - |
| 0828558965526000 | - | - | |
Chanel | 00*8**4****21**0 | - | - |
CV Idea Kreatif Nusantara | 05*3**9****04**0 | - | - |
Alvie Puradiredja | 32*1**0****70**6 | - | - |
PT Altara Pillar Indonesia | 08*7**3****12**0 | - | - |
| 0013641790008000 | - | - | |
| 0311660112607000 | - | - | |
| 0028359180401000 | - | - | |
Rajawali Berkat Agung | 09*0**5****27**0 | - | - |
PT Aditama Indonesia Persada | 08*0**8****04**0 | - | - |
PT Qdc Technologies | 00*1**0****58**0 | - | - |
PT Probikon Karya Gemilang | 06*3**0****26**0 | - | - |
Sumber Teknik Konstruksi | 07*0**6****47**0 | - | - |
| 0016638223614000 | - | - | |
| 0023782659623000 | - | - | |
CV Setia Mulia Baru | 02*9**0****08**0 | - | - |
CV Dayma Totalindo | 07*0**6****05**0 | - | - |
CV Gema Sangkakala | 07*2**3****54**0 | - | - |
| 0020840070424000 | - | - | |
| 0012173084627000 | - | - | |
| 0627659956127000 | - | - | |
CV Mandawe | 00*8**1****15**0 | - | - |
| 0022980841655000 | - | - | |
Permata Emas Berlian | 06*7**1****48**0 | - | - |
PT Varia Usaha Beton | 00*4**2****41**0 | - | - |
| 0802793323421000 | - | - | |
| 0857754980543000 | - | - | |
CV M. Alam Semesta | 07*7**3****14**0 | - | - |
| 0942216706652000 | - | - | |
| 0935041087626000 | - | - | |
| 0016147449722000 | - | - | |
| 0015284987941000 | - | - | |
| 0019379114005000 | - | - | |
| 0742816176442000 | - | - | |
| 0016506834432000 | - | - | |
| 0025476854725000 | - | - | |
Anugrah Emditi | 00*5**0****45**0 | - | - |
| 0765258298811000 | - | - | |
| 0012413076404000 | - | - | |
PT Geo Indogreen Karya | 07*0**9****52**0 | - | - |
| 0013703509054000 | - | - | |
| 0013626437054000 | - | - | |
| 0010016152093000 | - | - | |
PT Sumber Teknik Konstruksi | 07*0**6****47**0 | - | - |
B I D D I N G D O C U M E N T S
th
Issued on: October 6 , 2025
For the Procurement of
Package 2:
Construction of Kejawanan Nusantara Fishing Port
(PPN) – West Java Province Project
PART 2 – WORKS REQUIREMENTS
Section VII. Works Requirements
Annex 3: VII-3. Scope Of Works
Project:
Kejawanan Nusantara Fishing Port (PPN) – West Java Province Project
Loan Agreement No.: IDN-1055 Package 2
Employer:
Ministry of Marine Affairs and Fisheries
Directorate General of Capture Fisheries
VII-3. Scope Of Works
1. Description of the Works
The Integrated Fishing Port and International Fish Market Project Phase I funded by the
Islamic Development Bank (ISDB) is currently being implemented and is in the design review
stage by the construction management consultant. The Integrated Fishing Port and International
Fish Market Project Phase I intends to expand the port command area with construction and
revitalization areas. This project, package 2 of the Integrated Fishing Port and International
Fish Market Project Phase I is located in the Nusantara Kejawanan fishing port, West Java
Province.
1.1 Location of the Project
This project is located at the Nusantara Fisheries Port (PPN) Kejawanan, Cirebon City,
West Java Province, Indonesia. This location is a strategic port area on the north coast
of the island of Java.
1.2 Objective of the Project
The purpose of this project is to build an Integrated Fishing Port and International Fish
Market in PPN Kejawanan as part of the Integrated Fishing Ports and International
Fish Markets Phase I Project. This project aims to improve port infrastructure, support
capture fishery activities, strengthen the competitiveness of national fishery products,
and create a modern and export-viable fish market
1.3 Scope of Project
The scope of this project includes the following construction works:
a. Construction of breakwaters and embankments
b. Dredging of harbour ponds and canals
c. Land reclamation
d. Development of port buildings and infrastructure
e. Construction of piers and jetties
f. Road construction and drainage
2. Description of Package
2.1 General Information
Package 2 is included in the Phase I project funded by the Islamic Development Bank
(IsDB) and implemented through the International Competitive Bidding mechanism
limited to IsDB member countries. The employer is the Directorate General of Capture
Fisheries, Ministry of Maritime Affairs and Fisheries.
2.2 Project Scale
The scope of development includes:
a. Breakwater and revetments: ±1,195 meters total length
b. Dredging: ±486,136 m³
c. Land reclamation: ±576,265 Ha
d. Buildings and infrastructure: more than 37 types of buildings and facilities
e. Wharf, Trestle and Jetty Construction: total length ±495 m
f. Roads and drainage: roads ±48,442 m² and drainage ±14,746 meters
Figure 2.2.1 Overview of the development
Figure 2.2.2 Perspektif
2.4 Equipment
The main equipment required includes:
a. Amphibious Excavator
b. Dredger (CSD or BHD)
c. Dump Truck and Dozer
d. Crane and Pile Driver
e. Concrete Batching Plant and precast tools
f. Material quality testing equipment
3. Time Of Completion
The duration of the construction work is for 24 calendar months from the date of determination of
the Notice to Proceed (NTP). Time breakdowns for each of the major jobs are shown in the
following Gantt Chart:
4. Safety And Hazard Identification
The implementation of the project will refer to the policies and standards of K3 (Occupational
Safety and Health) in accordance with the guidelines of the IsDB and national regulations. The
commitments are summarized in the table below:
Table: Safety and Hazard Identification
No Job Description Hazard Identification Risk Mitigation to Eliminate
Level or Reduce Hazard and
Risks
1 Marine Construction Falling into water, Hight Install guardrails, provide life
(Dock, Jetty) vessel collision vests, conduct emergency rescue
drills
2 Dredging Operations Exposure to sediment, Hight Use certified equipment, monitor
pollution, equipment water quality, provide dredging
failure safety training
3 Reclamation Work Unstable filled land, Medium Conduct geotechnical
heavy machinery assessments, limit access, ensure
movement proper ground compaction
4 Structural Works at Falls from height Hight Use fall protection (harness,
Height lifeline), inspect scaffolding
regularly
5 Material Handling Crush injury, dropped Medium Use certified lifting gear, follow
N O .
A .
BI
II
III
IV
V
V I
V II
C
R IN C IA N P E K E R J A A N
P e k e r ja a n P e r s ia p a n
P e k e r ja a n B a n g u n a n P e r a ir a n (L a u t)
P E K E R J A A N D re d g in g
P e k e rja a n D re d g in g P a d a K o la m E k s is tin g
P e k e rja a n D re d g in g P a d a K o la m B a ru
P e k e rja a n D re d g in g P a d a A lu r P e la y a ra n
P e k e rja a n D re d g in g P a d a K o la m D o c k in g
P E K E R J A A N T IM B U N A N R E K L A M A S I
P e k e rja a n R e k la m a s i P a d a Z o n a A
P e k e rja a n T im b u n a n D e n g a n M a te ria l D a ri H a s il P
P e k e rja a n R e k la m a s i P a d a Z o n a B
P e k e rja a n R e k la m a s i P a d a Z o n a L e v e llin g
P e k e rja a n P e m b u a n g a n H a s il D re d g in g k e Z o n a D
P e k e rja a n P e m b u a n g a n H a s il D re d g in g k e Z o n a D
P e m b u a ta n d a n P e m a s a n g a n G e o tu b e G e o te k s til
P E K E R J A A N B R E A K W A T E R
G ro in B a ra t (K o la m D o c k in g )
B re a k w a te r B a ra t
B re a k w a te r T im u r
B re a k w a te r T im u r (R e h a b E k s is tin g )
P E K E R J A A N R E V E T M E N T
- R e v e tm e n t B a ra t
P E K E R J A A N S T R U K T U R D E R M A G A
- D e rm a g a 2 0 0 G T
- D e rm a g a E x te n s io n
- D e rm a g a S ta irla n d in g
P E K E R J A A N J A L A N
P e k e rja a n P e rb a ik a n T a n a h J a la n
P e k e rja a n P e rk e ra s a n K a k u
P E K E R J A A N D R A IN A S E
P e k e r ja a n B a n g u n a n D a r a t
re lo
u m
u m
a
pp
d
inin
in
gg
g
d
d
i L
i S
oa k am sp i
in g
2 0 2
1
5
2 1 2 3 4 5
2 0
6
2 6
7 8 9 1 0 1 1 1 2 1 2 3 4 5
2 0 2 7
6 7 8 9 1 0 1 1
and Lifting loads lifting plans, proper operator
training
6 General Site Works Slips, trips, and falls Medium Keep areas clean, use anti-slip
flooring, place warning signage
7 Noise and Vibration Hearing damage, Medium Provide ear protection, maintain
mechanical failure equipment regularly
8 Worker Fatigue Lack of focus, Low Implement work-rest cycles,
increased accident risk ensure hydration and proper
lighting
9 Exposure to Respiratory irritation, Medium Use PPE (masks, gloves), ensure
Hazardous chemical burns ventilation, provide material
Substances safety training
10 GBV/SEA and Labor Harassment, High Enforce code of conduct, conduct
Rights Violations discrimination, child GBV/SEA training, establish