Package 2: Construction Of The Kejawanan Nusantara Fishing Port (Ppn) – West Java Province

Basic Information
Type: Public Tender
Tender Code: 10032090000
Date: 8 May 2025
Year: 2027
KLPD: Kementerian Kelautan Dan Perikanan
Work Unit: Pelabuhan Perikanan Nusantara Kejawanan
Procurement Type: Pekerjaan Konstruksi
Method: Tender - Prakualifikasi Dua File - Harga Terendah Ambang Batas
Contract Type: Gabungan Lumsum dan Harga Satuan
Financial Information
Value (Nilai Pagu): Rp 448,995,000,000
Estimated Value (Nilai HPS): Rp 446,737,268,052
RUP Code: 61155494
Work Location: Jalan Pelabuhan Perikanan No 1 Cirebon - Cirebon (Kota)
Participants: 125
Applicants
Reason
CV Mutia Karya
07*5**0****22**0-Tidak menyampaikan keseluruhan dokumen Kualifikasi yang dipersyaratkan.
0010016111093000--
0010016103093000--
0010016137093000--
0010016152093000--
0011342144812000--
0010016145093000--
0013076336062000-Specific Construction & Contract Management Experience (4.2 (a)) : Not Similar contract complete (Construction of the Inland Port Project at Taliabu Island, North Maluku, Indonesia. The declared experience value amounts to IDR 262.26 billion.)
0010016129093000--
PT China Railway Engineering Construction
01*6**9****63**0-1. Financial Capabilities (3.1) : The results of the evaluation show that working capital has a negative value (The reported Working Capital is negative, amounting to IDR-11,237,010,000,000.00) 2. General Construction Experience (4.1(a)) : Companies registered in Indonesia in 2024 , but work experience submitted in 2020. (Form ELI 1.1 dan 1.2 : Deed Company Estebilishment and Last Amendement) 3. Specific Construction & Contract Management Experience (4,2 (a)) : The project experience presented in this document refers to your company’s corporate headquarters located in China. As the parent entity, the headquarters holds full ownership and operational control over the listed projects. The local subsidiary, PT China Railway Engineering Construction, is a legally registered entity in Indonesia, established in 2024, and operates under direct supervision and strategic alignment with the headquarters 4. Specific Construction & Contract Management Experience (4,2 (b)) : implementation): '- Land reclamation: minimum 565,562 m3; experience does not meet the requirements '- Breakwater: minimum 840 m1; experience does not meet the requirements - Wharf, Trestle and Jetty: minimum 441 m1. experience does not meet the requirements That the submitted experience does not meet the minimum requirement of four key construction activities as stated in the prequalification criteria. While the listed projects reflect relevant roles as prime contractor or subcontractor, they cover only part of the required scope.
0010016145093000--
0011141454018000--
0910660315542000--
0023980782542000--
0010613115093000--
0020011698105000--
CV Rangga Dejava
00*7**4****16**0--
0011492048007000--
0854283876432000--
0719162018113000--
0734449416101000--
PT Fasla Niscala Mandiri
06*4**3****15**0--
0916557358802000--
0015276090501000--
0025149212631000--
PT Ayesa Pribumi Parigi
05*0**1****42**0--
0011321197441000--
0738315357003000--
CV Firman Jaya Sakti
08*3**0****09**0--
0818512931427000--
0905326088447000--
0012169256422000--
0030486013019000--
0025466913942000--
Razco Empat Saudara
10*0**0****11**5--
0013045208046000--
0811230986833000--
0752962001005000--
PT Wijoksono Jaya Sakti
03*5**6****45**0--
CV Wenny Sakti
00*1**3****21**0--
0021282934432000--
0013008180062000--
0012358982623000--
0908421415101000--
0664836889609000--
0011456167426000--
PT Patra Geoteksindo Jaya
09*6**1****35**0--
0010005817431000--
0011148269941000--
0015552540429000--
0926281692061000--
PT Peppas Karya Bersama
02*5**6****17**0--
0800675795085000--
0946821964432000--
0026804245002000--
CV Nivo Graphic Konsultan Teknik
06*1**8****31**0--
0021556642411000--
0023806086048000--
PT Faira Yumn Atmajaya
06*9**2****23**0--
0905534970811000--
0725694020009000--
0747340610034000--
0019205855008000--
Samudera Atlantis International
07*0**2****48**0--
0822695656101000--
Trisula Muda Berkarya
04*3**1****22**0--
PT Rekagunatek Persada
00*6**5****43**0--
Kelman Infra Perkasa
08*9**4****02**0--
CV Wahana Citra Lestari
00*3**6****03**0--
0010600039093000--
PT Rekayasa Tata Udara
00*6**0****04**0--
CV Lativa Bestari
02*8**9****08**0--
Stfa
00*0**7****38**1--
0746117035521000--
0014409924631000--
0012014189441000--
CV Pilar Pantura
0312643679645000--
0018097881407000--
0730211869626000--
0021807664308000--
CV Gitang Care
00*7**7****42**0--
0828558965526000--
Chanel
00*8**4****21**0--
CV Idea Kreatif Nusantara
05*3**9****04**0--
Alvie Puradiredja
32*1**0****70**6--
PT Altara Pillar Indonesia
08*7**3****12**0--
0013641790008000--
0311660112607000--
0028359180401000--
Rajawali Berkat Agung
09*0**5****27**0--
PT Aditama Indonesia Persada
08*0**8****04**0--
PT Qdc Technologies
00*1**0****58**0--
PT Probikon Karya Gemilang
06*3**0****26**0--
Sumber Teknik Konstruksi
07*0**6****47**0--
0016638223614000--
0023782659623000--
CV Setia Mulia Baru
02*9**0****08**0--
CV Dayma Totalindo
07*0**6****05**0--
CV Gema Sangkakala
07*2**3****54**0--
0020840070424000--
0012173084627000--
0627659956127000--
CV Mandawe
00*8**1****15**0--
0022980841655000--
Permata Emas Berlian
06*7**1****48**0--
PT Varia Usaha Beton
00*4**2****41**0--
0802793323421000--
0857754980543000--
CV M. Alam Semesta
07*7**3****14**0--
0942216706652000--
0935041087626000--
0016147449722000--
0015284987941000--
0019379114005000--
0742816176442000--
0016506834432000--
0025476854725000--
Anugrah Emditi
00*5**0****45**0--
0765258298811000--
0012413076404000--
PT Geo Indogreen Karya
07*0**9****52**0--
0013703509054000--
0013626437054000--
0010016152093000--
PT Sumber Teknik Konstruksi
07*0**6****47**0--
Attachment
B I D D  I N G   D O  C  U M  E  N T  S                    
                                         th                              
                  Issued  on: October  6  , 2025                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
          For     the     Procurement                of                  
                                                                         
                           Package    2:                                 
                                                                         
  Construction     of Kejawanan      Nusantara    Fishing  Port          
                                                                         
            (PPN)   – West   Java  Province    Project                   
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
        PART     2 – WORKS        REQUIREMENTS                           
                                                                         
                                                                         
                                                                         
          Section    VII.  Works     Requirements                        
                                                                         
              Annex    3: VII-3. Scope   Of  Works                       
                                                                         
                                                                         
                                                                         
                                                                         
                              Project:                                   
                                                                         
      Kejawanan Nusantara Fishing Port (PPN) – West Java Province Project
                                                                         
                                                                         
            Loan Agreement   No.: IDN-1055   Package  2                  
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                             Employer:                                   
                  Ministry of Marine Affairs and Fisheries               
                  Directorate General of Capture Fisheries               
                     VII-3. Scope  Of  Works                             
                                                                         
                                                                         
                                                                         
1. Description of the Works                                              
                                                                         
      The Integrated Fishing Port and International Fish Market Project Phase I funded by the
    Islamic Development Bank (ISDB) is currently being implemented and is in the design review
                                                                         
    stage by the construction management consultant. The Integrated Fishing Port and International
    Fish Market Project Phase I intends to expand the port command area with construction and
    revitalization areas. This project, package 2 of the Integrated Fishing Port and International
    Fish Market Project Phase I is located in the Nusantara Kejawanan fishing port, West Java
    Province.                                                            
                                                                         
                                                                         
    1.1  Location of the Project                                         
                                                                         
         This project is located at the Nusantara Fisheries Port (PPN) Kejawanan, Cirebon City,
                                                                         
         West Java Province, Indonesia. This location is a strategic port area on the north coast
         of the island of Java.                                          
                                                                         
                                                                         
    1.2  Objective of the Project                                        
                                                                         
         The purpose of this project is to build an Integrated Fishing Port and International Fish
         Market in PPN Kejawanan as part of the Integrated Fishing Ports and International
         Fish Markets Phase I Project. This project aims to improve port infrastructure, support
                                                                         
         capture fishery activities, strengthen the competitiveness of national fishery products,
         and create a modern and export-viable fish market               
                                                                         
                                                                         
    1.3  Scope of Project                                                
                                                                         
         The scope of this project includes the following construction works:
                                                                         
         a. Construction of breakwaters and embankments                  
         b. Dredging of harbour ponds and canals                         
         c. Land reclamation                                             
         d. Development of port buildings and infrastructure             
                                                                         
         e. Construction of piers and jetties                            
         f. Road construction and drainage                               
                                                                         
                                                                         
2. Description of Package                                                
                                                                         
   2.1 General Information                                               
                                                                         
      Package 2 is included in the Phase I project funded by the Islamic Development Bank
      (IsDB) and implemented through the International Competitive Bidding mechanism
      limited to IsDB member countries. The employer is the Directorate General of Capture
                                                                         
      Fisheries, Ministry of Maritime Affairs and Fisheries.             
                                                                         
                                                                         
   2.2 Project Scale                                                     
                                                                         
      The scope of development includes:                                 
                                                                         
         a. Breakwater and revetments: ±1,195 meters total length        
         b. Dredging: ±486,136 m³                                        
                                                                         
         c. Land reclamation: ±576,265 Ha                                
         d. Buildings and infrastructure: more than 37 types of buildings and facilities
         e. Wharf, Trestle and Jetty Construction: total length ±495 m   
         f. Roads and drainage: roads ±48,442 m² and drainage ±14,746 meters
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                   Figure 2.2.1 Overview of the development              
                          Figure 2.2.2 Perspektif                        
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
                                                                         
   2.4 Equipment                                                         
      The main equipment required includes:                              
                                                                         
         a. Amphibious Excavator                                         
                                                                         
         b. Dredger (CSD or BHD)                                         
         c. Dump Truck and Dozer                                         
         d. Crane and Pile Driver                                        
         e. Concrete Batching Plant and precast tools                    
         f. Material quality testing equipment                           
                                                                         
                                                                         
                                                                         
3. Time Of Completion                                                    
                                                                         
 The duration of the construction work is for 24 calendar months from the date of determination of
 the Notice to Proceed (NTP). Time breakdowns for each of the major jobs are shown in the
                                                                         
 following Gantt Chart:                                                  
4. Safety And Hazard Identification                                      
                                                                         
 The implementation of the project will refer to the policies and standards of K3 (Occupational
 Safety and Health) in accordance with the guidelines of the IsDB and national regulations. The
 commitments are summarized in the table below:                          
                                                                         
                                                                         
                                                                         
                    Table: Safety and Hazard Identification              
                                                                         
  No Job Description Hazard Identification Risk  Mitigation to Eliminate 
                                    Level        or Reduce Hazard and    
                                                 Risks                   
                                                                         
  1  Marine Construction Falling into water, Hight Install guardrails, provide life
     (Dock, Jetty)  vessel collision        vests, conduct emergency rescue
                                            drills                       
                                                                         
  2  Dredging Operations Exposure to sediment, Hight Use certified equipment, monitor
                    pollution, equipment    water quality, provide dredging
                    failure                 safety training              
                                                                         
  3  Reclamation Work Unstable filled land, Medium Conduct geotechnical  
                    heavy machinery         assessments, limit access, ensure
                    movement                proper ground compaction     
                                                                         
  4  Structural Works at Falls from height Hight Use fall protection (harness,
     Height                                 lifeline), inspect scaffolding
                                            regularly                    
                                                                         
  5  Material Handling Crush injury, dropped Medium Use certified lifting gear, follow
 N O .                                                                   
  A .                                                                    
  BI                                                                     
  II                                                                     
  III                                                                    
  IV                                                                     
  V                                                                      
  V I                                                                    
  V II                                                                   
  C                                                                      
           R IN C IA N P E K E R J A A N                                 
   P e k e r ja a n P e r s ia p a n                                     
   P e k e r ja a n B a n g u n a n P e r a ir a n (L a u t)             
   P E K E R J A A N D re d g in g                                       
   P e k e rja a n D re d g in g P a d a K o la m E k s is tin g         
   P e k e rja a n D re d g in g P a d a K o la m B a ru                 
   P e k e rja a n D re d g in g P a d a A lu r P e la y a ra n          
   P e k e rja a n D re d g in g P a d a K o la m D o c k in g           
   P E K E R J A A N T IM B U N A N R E K L A M A S I                    
   P e k e rja a n R e k la m a s i P a d a Z o n a A                    
   P e k e rja a n T im b u n a n D e n g a n M a te ria l D a ri H a s il P
   P e k e rja a n R e k la m a s i P a d a Z o n a B                    
   P e k e rja a n R e k la m a s i P a d a Z o n a L e v e llin g       
   P e k e rja a n P e m b u a n g a n H a s il D re d g in g k e Z o n a D
   P e k e rja a n P e m b u a n g a n H a s il D re d g in g k e Z o n a D
   P e m b u a ta n d a n P e m a s a n g a n G e o tu b e G e o te k s til
   P E K E R J A A N B R E A K W A T E R                                 
   G ro in B a ra t (K o la m D o c k in g )                             
   B re a k w a te r B a ra t                                            
   B re a k w a te r T im u r                                            
   B re a k w a te r T im u r (R e h a b E k s is tin g )                
   P E K E R J A A N R E V E T M E N T                                   
    - R e v e tm e n t B a ra t                                          
   P E K E R J A A N S T R U K T U R D E R M A G A                       
   - D e rm a g a 2 0 0 G T                                              
   - D e rm a g a E x te n s io n                                        
   - D e rm a g a S ta irla n d in g                                     
   P E K E R J A A N J A L A N                                           
   P e k e rja a n P e rb a ik a n T a n a h J a la n                    
   P e k e rja a n P e rk e ra s a n K a k u                             
   P E K E R J A A N D R A IN A S E                                      
   P e k e r ja a n B a n g u n a n D a r a t                            
                   re lo                                                 
                   u m                                                   
                   u m                                                   
                    a                                                    
                    pp                                                   
                    d                                                    
                    inin                                                 
                     in                                                  
                     gg                                                  
                     g                                                   
                     d                                                   
                     d                                                   
                      i L                                                
                      i S                                                
                       oa k am sp i                                      
                        in g                                             
                          2 0 2                                          
                           1                                             
                           5                                             
                           2 1 2 3 4 5                                   
                                     2 0                                 
                                     6                                   
                                     2 6                                 
                                       7 8 9 1 0 1 1 1 2 1 2 3 4 5       
                                                        2 0 2 7          
                                                         6 7 8 9 1 0 1 1 
     and Lifting    loads                   lifting plans, proper operator
                                            training                     
  6  General Site Works Slips, trips, and falls Medium Keep areas clean, use anti-slip
                                            flooring, place warning signage
                                                                         
  7  Noise and Vibration Hearing damage, Medium Provide ear protection, maintain
                    mechanical failure      equipment regularly          
                                                                         
  8  Worker Fatigue Lack of focus,  Low     Implement work-rest cycles,  
                    increased accident risk ensure hydration and proper  
                                            lighting                     
                                                                         
  9  Exposure to    Respiratory irritation, Medium Use PPE (masks, gloves), ensure
     Hazardous      chemical burns          ventilation, provide material
     Substances                             safety training              
                                                                         
  10 GBV/SEA and Labor Harassment,  High    Enforce code of conduct, conduct
     Rights Violations discrimination, child GBV/SEA training, establish 
                    labor, exploitation     grievance mechanisms