| Reason | |||
|---|---|---|---|
| 0410647168101000 | Rp 747,043,748 | - | |
| 0868959115102000 | Rp 716,366,506 | Tidak menyampaikan NIB sesuai yang dipersyaratkan Dokumen Pemilihan | |
CV Gunama Jaya | 02*4**2****01**0 | Rp 710,009,894 | Bukti Peralatan yang disampaikan tidak valid |
| 0608005823101000 | - | - | |
| 0720084722101000 | - | - | |
| 0734542079101000 | - | - | |
PT Rajawali Asia Emas | 02*8**8****08**0 | - | - |
| 0863714408102000 | - | - | |
| 0868961665102000 | - | - | |
| 0021221528102000 | - | - | |
| 0015400260102000 | - | - | |
Julok Perkasa | 01*7**8****01**0 | - | - |
| 0021247150102000 | - | - | |
| 0902576362101000 | - | - | |
| 0902955442101000 | - | - | |
| 0019025394102000 | - | - | |
| 0838217024101000 | - | - |
PEMERINTAH KOTA LHOKSEUMAWE
DINAS PEKERJAAN UMUM DAN PERUMAHAN RAKYAT
Jalan H. Ramli Ridwan Nomor 1 Lhokseumawe Kode Pos 24319
Telp. (0645) 630037 Fax. (0645) 630099 Email : [email protected]
URAIAN SINGKAT PEKERJAAN
PEMBANGUNAN INSTALASI PENGOLAHAN AIR (IPA)/ BRONCAPTERING/
SUMUR BOR DALAM TERLINDUNGI GP. MON GEUDONG KEC. BANDA SAKTI
1.1 Lokasi Pekerjaan
Lokasi pekerjaan terletak di Kecamatan Banda Sakti Kota Lhokseumawe
1.2 Uraian Pekerjaan
A. PEKERJAAN PERSIAPAN
1. Administrasi dan Dokumentasi
2. Pengukuran dan Patok Kontrol
3. Penyelenggaraan SMK3
4. Papan Nama Proyek dan Batu Prasati
5. Mobilisasi dan Demobilisasi
B. PEKERJAAN PENGEBORAN SUMUR BOR
1. Pipa Cassing PVC Dia. 4" (AW)
2. Pipa PVC Dia. 2" (AW)
3. Biaya Pengeboran
4. Biaya Cuci Sumur
5. Mesin Pompa Submersible
6. Kerikil Bersih
7. Pemasukan Arus Listrik 10 Ampere + Instalasi
8. Logging Test
C. PEKERJAAN BAK PENAMPUNGAN
I. PEKERJAAN TANAH
1. Galian Tanah Pondasi Tapak
2. Urugan Bekas Galian
3. Cerucuk Pangkal Bambu
II. PEKERJAAN BETON BERTULANG
1. Lantai Kerja Bawah Pondasi Tapak Beton K-100
2. Urugan Pasir Bawah Lantai
3. Beton Bertulang Pondasi Tapak
Tulangan
Beton K225
4. Beton Bertulang Kolom Pedestal 30 x 40
Bekisting
Tulangan
Beton K225
5. Beton Bertulang Kolom 30 x 40
Bekisting
Tulangan
Beton K225
6. Beton Bertulang Sloof 30 x 35 cm
Bekisting
Tulangan
Beton K225
7. Beton Bertulang Balok Tipe I 30 x 35 cm
Bekisting
Tulangan
Beton K225
8. Beton Bertulang Balok Tipe II 30 x 20 cm
Bekisting
Tulangan
Beton K225
9. Beton Bertulang Plat Lantai Dasar
Bekisting
Tulangan
Beton K225
10. Beton Bertulang Plat Dinding Bak Penampung
Bekisting
Tulangan
Beton K225
11. Beton Bertulang Plat Atas Bak Penampung
Bekisting
Tulangan
Beton K225
III. PEKERJAAN PASANGAN
1. Plasteran 1 : 2
IV. PEKERJAAN LAIN-LAIN
1. Pengadaan waterstop pvc wsf 200 lebar 20cm
2. Pembuatan Penutup MainHole + Lengkap Terpasang
3. Pembersihan akhir
4. Tabung Filter Air + Aksesoris Lengkap Terpasang
5. Pengujian Kualitas Air
6. Tangga Reservoir Besi Galvanis dia. 2 Inch Lengkap Terpasang
7. Beton Cor K-175 Pinggir Sumur Bor
V. PEKERJAAN PENGECATAN
1. Pengecatan Tower Air
2. Pengecatan Bak Air (Waterproof)
D. PEKERJAAN PIPA DISTRIBUSI DAN AKSESORIS
1. Galian/Bongkaran Rabat Beton
2. Rekondisi Rabat Beton Kembali (Beton K-175)
3. Galian Pipa
4. Urugan Pasir di Bawah Trus Block Pada Perlintasan
5. Urugan Kembali Galian
6. Pengadaan dan Pemasangan 1M' Pipa HDPE Ø 90 mm ( Ø 3" ) SDR - 17
PN - 10
7. Pengetesan Pipa dia. 90 mm
8. Pengadaan dan Pemasangan 1M' Pipa HDPE Ø 63 mm ( Ø 2" ) SDR - 17
PN - 10
9. Pengetesan Pipa dia. 63 mm
10. Pipa Gip 3"
11. Baut + Mur Flange Steel 3" (3/4 X 2,5")
12. Stub End Flange HDPE 3"
13. Gate Valve Ø 90 mm ( 3" ) - Cast Iron ( CI )
14. Air Release Ø 90 mm ( 3" ) - Single - Cast Iron ( CI )
15. Tee Reduce 90x63 mm
16. Tee 90 mm
17. Tee 63 mm
18. Dop 90 mm
19. Dop 63 mm
20. Elbow 90 mm
21. Clam Sadle 90 x 3/4"
22. Clam Sadle 63 x 3/4"
23. Packing Disket Karet 3"
24. Elbow GIP 90° dia 3 "
25. Elbow HDPE 90° dia 3 "
26. Pengelasan Pipa Steel
E. PEKERJAAN PENYEDIAAN DAN PEMASANGAN SAMBUNGAN RUMAH (SR)
Sambungan Rumah (SR) + Acsesories Lengkap Terpasang
1. Meteran Air Ø 1/2"
2. Pipa GIP Ø 1/2"
3. Pipa HDPE Ø 3/4"
4. Elbow GIP Ø 1/2"
5. Stop Kran (Kuningan) Ø 1/2"
6. Hand Kran (CI) Ø 1/2"
7. Plug Kran (Kuningan) Ø 1/2"
8. Katup Searah (Kuningan) Ø 1/2"
9. Tee GIP Ø 1/2"
10. Seal Tape
11. Baut Mur + Ring Pengikat Box Meter
12. Nipple GIP Ø 1/2"
13. Box Meteran (Plastik)
14. Male Tread Adaptor (MTA) 3/4"
15. F Elbow HDPE 3/4x1/2"
16. Dop Gip 1/2"
17. Biaya Pemasangan Sambungan Rumah (SR)
18. Pondasi Beton Cor K-175 Bawah Meteran Air
1.3 Gambar Rencana Kerja
Gambar rencana kerja yang dipergunakan adalah gambar yang terlampir dalam
Dokumen Kontrak.
1.4 Jadwal Pelaksana Pekerjaan
1. Jadwal pelaksanaa pekerjaan yang dipakai sebagai pedoman adalah jadwal
yang telah disesuaiakan dengan tanggal terbitnya Surat Perintah Mulai
Kerja.
2. Pelaksanaan pekerjaan selama 180 (seratus depalan puluh) hari kalender
terhitung dari tanggal mulai kerja sesuai dengan SPMK.
1.5 Personil dan Peralatan
Tenaga Personil dan Peralatan yang dibutuhkan atau terlibat pada pekerjaan
Pembangunan Instalasi Pengolahan Air (IPA)/Broncaptering/Sumur Bor Dalam
Terlindungi Gp. Mon Geudong Kec. Banda Sakti yaitu terdiri dari:
Pengalaman Sertifikat Kompetensi Jumlah
No. Jabatan
Kerja Kerja Personil
1 Pelaksana SKT Pelaksana
Lapangan 2 Tahun Perpipaan Air Bersih 1 Orang
(TT 011)
2 Petugas K3 / Ahli Sertifikat Pelatihan K3/
K3 Konstruksi 1 Tahun SKA Ahli K3 Konstruksi 1 Orang
Peralatan utama yang diperlukan untuk melaksanakan pekerjaan yaitu terdiri dari :
No. Jenis Peralatan Kapasitas Volume Keterangan
1 Pick Up 1 Ton 1 Unit Sewa/ Milik
2 Dump Truck/Truck 3 – 4 M3 1 Unit Sewa/ Milik
3 Alat Ukur 2 Unit Sewa/ Milik
4 Concrete Mixer 3 Unit Sewa/ Milik
5 Peralatan Tukang 1 Set Sewa/ Milik
6 Alat Hidro Test 1 Unit Sewa/ Milik
7 1 Unit Sewa/ Milik
Alat Penyambung Pipa